Industrial Summer Training at NTPC Badarpur <ul><li>Anuj Kumar </li></ul><ul><li>Electronics & Communication </li></ul>
Introduction 10/31/11
Overview of NTPC <ul><li>NTPC was set up in the central sector in the 1975. </li></ul><ul><li>NTPC has installed capacity ...
Overview of NTPC
NTPC Badarpur
Overview of BTPS <ul><ul><li>BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY  </li></ul></ul><ul><li>CONSUMPTION </li></ul...
NTPC Badarpur <ul><li>BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region. </li></ul><ul>...
Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbi...
Electricity from Coal
C&I LABS Control and Instrumentation Department has following labs:   1.  Manometry Lab 2.  Protection and Interlocks Lab ...
OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitter...
CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant   1. Metallurgical   2. M...
C&I Lab In C&I Lab parameters to be monitored are:     1. Speed   2. Temperature   3. Current   4. Voltage   5. Pressure  ...
IT Role & Responsibility <ul><ul><li>Maintenance Management  </li></ul></ul><ul><ul><li>Materials & Contracts Management  ...
<ul><li>Why IT  ? </li></ul><ul><li>Materials : 30,000 + items </li></ul><ul><ul><li>Transaction data. </li></ul></ul><ul>...
 
 
 
 
Awards <ul><ul><li>MOP’s  Meritorious Productivity Award :   </li></ul></ul><ul><ul><ul><li>For calendar years 1987, 1988,...
Awards
Awards
Awards <ul><ul><li>British safety award  for 1988, 1994 and 1999. </li></ul></ul><ul><ul><li>One employee bagged the  Vish...
BTPS awarded  Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management  by Greentech foundat...
BTPS received golden peacock award for IT innovations for 2003-04
Conclusion <ul><li>The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT ...
Reference <ul><li>TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY </li></ul><ul><li>INTERNET </li></ul><ul><li>DOCUMENTS...
 
Nächste SlideShare
Wird geladen in …5
×
Nächste SlideShare
Thermal power plant
Weiter
Herunterladen, um offline zu lesen und im Vollbildmodus anzuzeigen.

47

Teilen

Herunterladen, um offline zu lesen

Ntpc badarpur training ppt

Herunterladen, um offline zu lesen

this is a training report PPt for presentation to help the students.

Ähnliche Bücher

Kostenlos mit einer 30-tägigen Testversion von Scribd

Alle anzeigen

Ähnliche Hörbücher

Kostenlos mit einer 30-tägigen Testversion von Scribd

Alle anzeigen

Ntpc badarpur training ppt

  1. 1. Industrial Summer Training at NTPC Badarpur <ul><li>Anuj Kumar </li></ul><ul><li>Electronics & Communication </li></ul>
  2. 2. Introduction 10/31/11
  3. 3. Overview of NTPC <ul><li>NTPC was set up in the central sector in the 1975. </li></ul><ul><li>NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017. </li></ul><ul><li>NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification. </li></ul><ul><li>Today NTPC contributes more than 3 / 5th of the total power generation in India </li></ul>
  4. 4. Overview of NTPC
  5. 5. NTPC Badarpur
  6. 6. Overview of BTPS <ul><ul><li>BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY </li></ul></ul><ul><li>CONSUMPTION </li></ul><ul><ul><li>INSTALLED CAPACITY 720 MW </li></ul></ul><ul><ul><li>DERATED CAPACITY 705 MW </li></ul></ul><ul><li> (3x95 + 2x210MW) </li></ul><ul><li>OWNED BY GOVT. OF INDIA, MINISTRY OF POWER </li></ul><ul><li>BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978 </li></ul><ul><li>NTPC adjudged as the 3rd best employer in India </li></ul>
  7. 7. NTPC Badarpur <ul><li>BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region. </li></ul><ul><li>The site construction activities started in 1968. </li></ul><ul><li>The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81. </li></ul>
  8. 8. Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
  9. 9. Electricity from Coal
  10. 10. C&I LABS Control and Instrumentation Department has following labs:   1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab
  11. 11. OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
  12. 12. CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant   1. Metallurgical   2. Mechanical
  13. 13. C&I Lab In C&I Lab parameters to be monitored are:   1. Speed   2. Temperature   3. Current   4. Voltage   5. Pressure   6. Flow of Gases   7. Vibration
  14. 14. IT Role & Responsibility <ul><ul><li>Maintenance Management </li></ul></ul><ul><ul><li>Materials & Contracts Management </li></ul></ul><ul><ul><li>Financial Accounting </li></ul></ul><ul><ul><li>Coal Monitoring & Accounting. </li></ul></ul><ul><ul><li>Operations & Generation Monitoring </li></ul></ul><ul><ul><li>Hospital Management </li></ul></ul><ul><ul><li>H R & TMS, T/S Management </li></ul></ul><ul><ul><li>Office Automation & communication. </li></ul></ul><ul><ul><li>E-Samadhan complaints Monitoring </li></ul></ul>
  15. 15. <ul><li>Why IT ? </li></ul><ul><li>Materials : 30,000 + items </li></ul><ul><ul><li>Transaction data. </li></ul></ul><ul><ul><li>Master data Material and Service </li></ul></ul><ul><li>Plant : 15,000 equipments </li></ul><ul><ul><li>Equipment master. Task list. </li></ul></ul><ul><li>Employees : 1100 + Personal and payroll data. </li></ul><ul><li>Finance : Accounting data. </li></ul><ul><li>Operation : Plant parameters history data </li></ul><ul><li>Vendors: 5000 + vendors. </li></ul>
  16. 20. Awards <ul><ul><li>MOP’s Meritorious Productivity Award : </li></ul></ul><ul><ul><ul><li>For calendar years 1987, 1988, 1990. </li></ul></ul></ul><ul><ul><ul><li>For financial years 92-93, 94-95 and 97-98 </li></ul></ul></ul><ul><ul><ul><li>Received Bronze medal in 1998-99 and </li></ul></ul></ul><ul><ul><ul><li>Received Silver shield and certificate of Meritorious performance for 2000-01. </li></ul></ul></ul><ul><ul><ul><li>Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004. </li></ul></ul></ul>
  17. 21. Awards
  18. 22. Awards
  19. 23. Awards <ul><ul><li>British safety award for 1988, 1994 and 1999. </li></ul></ul><ul><ul><li>One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998. </li></ul></ul><ul><ul><li>6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 . </li></ul></ul><ul><ul><li>Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02 by Chief Minister of Delhi. </li></ul></ul>
  20. 24. BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04 <ul><ul><li>BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03 </li></ul></ul><ul><ul><li>BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04 </li></ul></ul><ul><ul><li>BTPS received golden peacock award for IT Innovations for 2003-04 </li></ul></ul>
  21. 25. BTPS received golden peacock award for IT innovations for 2003-04
  22. 26. Conclusion <ul><li>The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant. </li></ul>10/31/11
  23. 27. Reference <ul><li>TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY </li></ul><ul><li>INTERNET </li></ul><ul><li>DOCUMENTS OF IT DEPARTMENT </li></ul>
  • Shaikbatch13

    Oct. 14, 2019
  • SWAPNILTRIVEDI6

    Jun. 5, 2019
  • AyushJaiswal72

    Jan. 30, 2019
  • NAWALKISHOR14

    Oct. 15, 2018
  • AnushkaSingh105

    Jul. 14, 2018
  • TarunChaudhary43

    Jun. 29, 2018
  • AranabDas

    Apr. 7, 2018
  • RakeshSingh753

    Mar. 29, 2018
  • dharampal1970

    Jan. 9, 2018
  • ErMdNadeemAlam

    Dec. 30, 2017
  • NISHANTSINGH400

    Dec. 3, 2017
  • omprakash649

    Nov. 9, 2017
  • Shubham19970704

    Sep. 24, 2017
  • A74999

    Aug. 21, 2017
  • PulkitKansal5

    Aug. 19, 2017
  • AnkitKumar1115

    Jul. 10, 2017
  • PriyanshuPandey5

    May. 10, 2017
  • umeshkumarsahu2

    May. 6, 2017
  • RoushanKumar63

    Nov. 17, 2016
  • AdityaPal28

    Nov. 4, 2016

this is a training report PPt for presentation to help the students.

Aufrufe

Aufrufe insgesamt

43.342

Auf Slideshare

0

Aus Einbettungen

0

Anzahl der Einbettungen

52

Befehle

Downloads

4.353

Geteilt

0

Kommentare

0

Likes

47

×