Bord and Pillar
development/depillaring with
LHD/SDL
LOAD HAUL DUMPER
Applicability Condition
• Seam Thickness : more than 1.8m
• Average seam Gradient : up to 1 in 7
• Suitable for weak floor as compared to SDL
• Maximum speed 8-12 KMPH
• Suitable for long distance
• Headings of 4.8 m width is driven
• In a gallery auger holes are drilled in the middle
of the face upto 2m depth and shot holes are
drilled upto 1.8m depth.
• P1 type permitted explosive with instantaneous
type electric copper detonator is used.
• Coal is loaded by LHD on to chain conveyor which
in turn transfer coal to the belt conveyor.
Load Haul Dumper
Model : EIMCO ELECON 811 LHD
Bucket capacity : 1.37 tons
Electric Motor : 37.5 KW 550 V
Height : 1.95-2 m
Length : 6.30 m
Width : 1.5 m
Speed : 1st gear 3.8 KMPH
2ND gear 7.2 KMPH
3rd gear 12.2 KMPH
Model EIMCO ELECON 912E
• Bucket Capacity : 2.7 tons
• Electric Motor : 440 V 64.15 KW
• Height : 2.11 – 2.78 m
• Length : 7.55m
• Payload : 4000 kg
• Cable reel : 120 m
Caterpillar 243-5577 186-9278 243-6143 243-6224 157-3622
Bucket
capacity(m3)
2.4 2.8 3.1 3.4 2.4
Bucket width
over cutting
edge (m)
1.950 2.010 2.200 2.400 2.200
Overall height-
bucket raised(m)
4.23 4.30 4.30 4.30 4.30
Max dump
height(m)
3.548 3.529 3.531 3.529 3.577
Dump clearance
at max lift (m)
1.662 1.558 1.560 1.561 1.561
Digging depth
(mm)
26 36 34 36 36
Dump angle at
max lift(degree)
43 43 43 43 43
Reach (m ) 1.476 1.588 1.583 1.584 1.584
Overall width(m) 2.155 2.185 2.318 2.518 2.318
SIDE DISCHARGE LOADER
SDL SPECIFICATION
MODEL BUCKET
CAPACITY
OPERATING
WEIGHT
ELECTRIC
MOTOR
GROUNG
PRESSURE
TRAVELLING
SPEED
EIMCO
ELECON 625
2.032 tons 8.9 tons 48.5 KW 0.94 Kg/cm2 3.0 kmph
M412 1.35 tons 8.5-9 tons 55 KW 0.9 kg/cm2 2.6 kmph
EIMCO
ELECON 611
0.9 tons 9 tons 48 KW 0.96 kg/cm2 3.0 kmph
HAZEMAG TL 600 TL 800 TL 1200 TL 1500
Gross Loading
capacity (m3/h)
40-55 50-80 60-100 80-130
Weight of
machine
8.6 10.5 15.0 14.5
Bucket capacity 0.6 0.8-1.0 1.2 1.5
Travelling
speed(m/s)
1.2 1.2 1.4 1.4
Discharge
height(m)
1.7 2.6 2.45 2.4
Digging
depth(mm)
350 600 500 650
Drive capacity 55-63 55-63 63-90 63-90
Length of
machine
5.8 6.18 6.9 6.6
Width 1.2 1.32 1.4 1.7
Height (without
canopy)
1.3 1.5 1.8 1.7
Ground
pressure(N/cm2)
10.4 7.8 10.0 10.0
Radiant hydraulic face drilling machine
• Model : RMTL-HFD-1800 Jumbo drill
• Operating pressure : 70 to 100 bar
• Rotational speed : 400 to 600 rpm
• Drilling diameter : 27 to 43 mm
• Medium : DGMS recommended hydraulic oil
• Noise level : below 70 dB
• Approx weight : 12 to 14 kg
Atlas Copco face drill
Sandvick
Chain Conveyor
MODEL Motor Power
(KW)
Capacity (tph)
Peak Avg
Width (mm) Speed( m/s)
LDCC Skat-60 2 X 15 90 60 420 0.87
LDCC PF-00 2 X 30 90 60 426 0.87
MDCC PF-I-500 1 X 45
2 X 30
250 200 632-640 0.65
MDCC PF-Iv-
500
1 X 45
2 X 30
300 220 632-640 0.65
MDCC MIV -
500
1 X 45
2 X 30
350 250 632-640 0.65
Belt Conveyor
Depillaring with LHD
• Average seam thickness : 4.5 m
• Gradient : 1 in 7 to 1 in 8
• Higher productivity
• Minimum labour requirement
• Limited roadway dimension
Support system
Production of different jumbo drills
• Width of heading(w) = 4.8 m
• Height of gallery(h) = 3 m
• No of faces (N) = 9
• No of blast per face per shift = 1
• Specific gravity of coal(Sg) = 1.4
Production per blast = w*h*Hd*Sg *N
Where Hd= Hole depth in m
Model No Hole depth (m) Production per blast (t)
BMH2831 2.795 507.12
BMH2837 3.405 617.8
BMH 2843 4.015 728.5
BMH 2849 4.625 834.6
LHD
• Average lead dis of LHD (d) = 60 m
• Average speed of LHD (v) = 6 KMPH
• Bucket capacity = b
• Bucket fill factor(F) = 0.8
• Loose coal density(D) = 0.9
• Amount of coal loaded per trip = b*F*D = 0.72b
• Cycle Time of LHD = 1+1+1.5 = 3.5 min
• Hourly no of trips = 17
• Hourly production of LHD = Hourly no of trips * 0.72b =
12.24 b
For no. of LHD,
No. of LHD = (Total production/no. of hrs per
shift * no of shift * hourly production of LHD)
= 728 / 3 *3*12.24b
= 6.67/b
Model No Bucket capacity (m3) No of LHD required
CT243-5577 2.4 3
CT186-9278 2.8 3
CT243-6143 3.1 2
CT243-6224 3.4 2
CT157-3662 2.4 3
Eimco Elecon 811 1.52 5
Eimco Elecon 911 3 3
Production of different chain
conveyors
Model No Capacity (tph)
Peak Average
Capacity in tpd
Peak average
MDCC PF-I-500 250 200 2250 1800
MDCC PF-Iv-500 300 220 2700 1980
MDCC MIV -500 350 250 3150 2250
Production of belt conveyor
Sandvik Belt
speed(m/
s)
Power
required(
KW)
Belt
width(mm
)
Idler
angle(deg
ree)
Capacity(t
ph)
Productio
n (tpd)
HC 500 1.25 3-7.5 800 25 100 900
HC 650 1.37 3-15 950 30 250 2250
HC 800 1.42 5.5-30 1150 30 400 3600
HC 1000 1.65 5.5-60 1350 30 700 6300
HC 1200 1.80 7.5-90 1600 30 1000 9000
HC 1400 1.25 15-90 1800 30 1300 11700
HC 1600 1.25 22-110 1900 30 1500 22500
ENDLESS ROPE HAULAGE
• Avg Speed of Endless haulage = 5KMPH
• Amount of coal to be handled = a
• Length of the roadway on which ERH operates
= 800 m
• Capacity of coal tub = 1 ton
• No of tubs = 800 * Amount of coal to be
handled per hour(a)/(Distance travelled by
ERH per hour * capacity of coal tub)
Amount of coal to be handled per hour No of tubs
Loaded Empties
200 32 32
220 36 36
250 40 40
DRH
• Avg Speed of Direct rope haulage = 10KMPH
• Amount of coal to be handled = a
• Length of the roadway on which ERH operates
= 500 m
• Capacity of coal tub = 1 ton
• No of tubs = 500 * Amount of coal to be
handled per hour(a)/(Distance travelled by
DRH per hour * Capacity of coal tub )
Amount of coal to be handled per hour No of tubs
200 10
220 11
250 13
Power Supply Distribution
Equipment Load in KW
MAIN VENTILATION FAN 75
Belt conveyor 180
Direct Haulage 90
Endless haulage 111
Load Haul Dumper 37
Roof bolting machine 75
Auxiliary fan 15
Face pump 7.5
Chain conveyor 2 x 45
Bord Pillar LHD SDL

More Related Content

What's hot

Mining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and DiplomaMining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and DiplomaBhaskar Naidu
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELAIndrajeetKumar110
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyorAnkit Narain
 
Shaft sinking
Shaft sinking Shaft sinking
Shaft sinking OmKaitade
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Surface mining entry system
Surface mining entry systemSurface mining entry system
Surface mining entry systemVIJAY KUMAR
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mininggopal karmakar
 

What's hot (20)

Mining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and DiplomaMining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and Diploma
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Armoured face conveyor
Armoured face conveyorArmoured face conveyor
Armoured face conveyor
 
Shaft sinking
Shaft sinking Shaft sinking
Shaft sinking
 
Surface miner
Surface minerSurface miner
Surface miner
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Surface mining entry system
Surface mining entry systemSurface mining entry system
Surface mining entry system
 
Methane
MethaneMethane
Methane
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 

Similar to Bord Pillar LHD SDL

Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineSafdar Ali
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIYSagnik Datta
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt fileZuhair Bin Jawaid
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)Zorareh Nouri
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbeclAlibaba Construction Ltd.
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysOMPRAKASHCHAUBE
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdfDINESHRANJANPAL
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal HandlingNani Thirupathi
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder pptAMIT SAHU
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014Nikhil Jaipurkar
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxGholamRabbaniGhause
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSErik-André Albrecht
 

Similar to Bord Pillar LHD SDL (20)

Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
 
Design of fischer tropsh reactor zbj -ppt file
Design of fischer tropsh reactor  zbj -ppt fileDesign of fischer tropsh reactor  zbj -ppt file
Design of fischer tropsh reactor zbj -ppt file
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)
 
PROJECT DEMO final
PROJECT DEMO finalPROJECT DEMO final
PROJECT DEMO final
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian Railways
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
 
1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling1.Steam Thermal Power Plant and Coal Handling
1.Steam Thermal Power Plant and Coal Handling
 
Jonathan Mulosa ET'Al
Jonathan Mulosa ET'AlJonathan Mulosa ET'Al
Jonathan Mulosa ET'Al
 
CHP
CHP CHP
CHP
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
تصمم.pptx
تصمم.pptxتصمم.pptx
تصمم.pptx
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Underground mine
Underground mineUnderground mine
Underground mine
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptx
 
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
 

Recently uploaded

Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsAlirezaBagherian3
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 

Recently uploaded (20)

Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal Compressors
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 

Bord Pillar LHD SDL

  • 2.
  • 4. Applicability Condition • Seam Thickness : more than 1.8m • Average seam Gradient : up to 1 in 7 • Suitable for weak floor as compared to SDL • Maximum speed 8-12 KMPH • Suitable for long distance
  • 5. • Headings of 4.8 m width is driven • In a gallery auger holes are drilled in the middle of the face upto 2m depth and shot holes are drilled upto 1.8m depth. • P1 type permitted explosive with instantaneous type electric copper detonator is used. • Coal is loaded by LHD on to chain conveyor which in turn transfer coal to the belt conveyor.
  • 6.
  • 7.
  • 8.
  • 9. Load Haul Dumper Model : EIMCO ELECON 811 LHD Bucket capacity : 1.37 tons Electric Motor : 37.5 KW 550 V Height : 1.95-2 m Length : 6.30 m Width : 1.5 m Speed : 1st gear 3.8 KMPH 2ND gear 7.2 KMPH 3rd gear 12.2 KMPH
  • 10. Model EIMCO ELECON 912E • Bucket Capacity : 2.7 tons • Electric Motor : 440 V 64.15 KW • Height : 2.11 – 2.78 m • Length : 7.55m • Payload : 4000 kg • Cable reel : 120 m
  • 11. Caterpillar 243-5577 186-9278 243-6143 243-6224 157-3622 Bucket capacity(m3) 2.4 2.8 3.1 3.4 2.4 Bucket width over cutting edge (m) 1.950 2.010 2.200 2.400 2.200 Overall height- bucket raised(m) 4.23 4.30 4.30 4.30 4.30 Max dump height(m) 3.548 3.529 3.531 3.529 3.577 Dump clearance at max lift (m) 1.662 1.558 1.560 1.561 1.561 Digging depth (mm) 26 36 34 36 36 Dump angle at max lift(degree) 43 43 43 43 43 Reach (m ) 1.476 1.588 1.583 1.584 1.584 Overall width(m) 2.155 2.185 2.318 2.518 2.318
  • 13.
  • 14. SDL SPECIFICATION MODEL BUCKET CAPACITY OPERATING WEIGHT ELECTRIC MOTOR GROUNG PRESSURE TRAVELLING SPEED EIMCO ELECON 625 2.032 tons 8.9 tons 48.5 KW 0.94 Kg/cm2 3.0 kmph M412 1.35 tons 8.5-9 tons 55 KW 0.9 kg/cm2 2.6 kmph EIMCO ELECON 611 0.9 tons 9 tons 48 KW 0.96 kg/cm2 3.0 kmph
  • 15. HAZEMAG TL 600 TL 800 TL 1200 TL 1500 Gross Loading capacity (m3/h) 40-55 50-80 60-100 80-130 Weight of machine 8.6 10.5 15.0 14.5 Bucket capacity 0.6 0.8-1.0 1.2 1.5 Travelling speed(m/s) 1.2 1.2 1.4 1.4 Discharge height(m) 1.7 2.6 2.45 2.4 Digging depth(mm) 350 600 500 650 Drive capacity 55-63 55-63 63-90 63-90 Length of machine 5.8 6.18 6.9 6.6 Width 1.2 1.32 1.4 1.7 Height (without canopy) 1.3 1.5 1.8 1.7 Ground pressure(N/cm2) 10.4 7.8 10.0 10.0
  • 16.
  • 17. Radiant hydraulic face drilling machine • Model : RMTL-HFD-1800 Jumbo drill • Operating pressure : 70 to 100 bar • Rotational speed : 400 to 600 rpm • Drilling diameter : 27 to 43 mm • Medium : DGMS recommended hydraulic oil • Noise level : below 70 dB • Approx weight : 12 to 14 kg
  • 20. Chain Conveyor MODEL Motor Power (KW) Capacity (tph) Peak Avg Width (mm) Speed( m/s) LDCC Skat-60 2 X 15 90 60 420 0.87 LDCC PF-00 2 X 30 90 60 426 0.87 MDCC PF-I-500 1 X 45 2 X 30 250 200 632-640 0.65 MDCC PF-Iv- 500 1 X 45 2 X 30 300 220 632-640 0.65 MDCC MIV - 500 1 X 45 2 X 30 350 250 632-640 0.65
  • 22. Depillaring with LHD • Average seam thickness : 4.5 m • Gradient : 1 in 7 to 1 in 8 • Higher productivity • Minimum labour requirement • Limited roadway dimension
  • 23.
  • 25. Production of different jumbo drills • Width of heading(w) = 4.8 m • Height of gallery(h) = 3 m • No of faces (N) = 9 • No of blast per face per shift = 1 • Specific gravity of coal(Sg) = 1.4 Production per blast = w*h*Hd*Sg *N Where Hd= Hole depth in m
  • 26. Model No Hole depth (m) Production per blast (t) BMH2831 2.795 507.12 BMH2837 3.405 617.8 BMH 2843 4.015 728.5 BMH 2849 4.625 834.6
  • 27. LHD • Average lead dis of LHD (d) = 60 m • Average speed of LHD (v) = 6 KMPH • Bucket capacity = b • Bucket fill factor(F) = 0.8 • Loose coal density(D) = 0.9 • Amount of coal loaded per trip = b*F*D = 0.72b • Cycle Time of LHD = 1+1+1.5 = 3.5 min • Hourly no of trips = 17 • Hourly production of LHD = Hourly no of trips * 0.72b = 12.24 b
  • 28. For no. of LHD, No. of LHD = (Total production/no. of hrs per shift * no of shift * hourly production of LHD) = 728 / 3 *3*12.24b = 6.67/b
  • 29. Model No Bucket capacity (m3) No of LHD required CT243-5577 2.4 3 CT186-9278 2.8 3 CT243-6143 3.1 2 CT243-6224 3.4 2 CT157-3662 2.4 3 Eimco Elecon 811 1.52 5 Eimco Elecon 911 3 3
  • 30. Production of different chain conveyors Model No Capacity (tph) Peak Average Capacity in tpd Peak average MDCC PF-I-500 250 200 2250 1800 MDCC PF-Iv-500 300 220 2700 1980 MDCC MIV -500 350 250 3150 2250
  • 31. Production of belt conveyor Sandvik Belt speed(m/ s) Power required( KW) Belt width(mm ) Idler angle(deg ree) Capacity(t ph) Productio n (tpd) HC 500 1.25 3-7.5 800 25 100 900 HC 650 1.37 3-15 950 30 250 2250 HC 800 1.42 5.5-30 1150 30 400 3600 HC 1000 1.65 5.5-60 1350 30 700 6300 HC 1200 1.80 7.5-90 1600 30 1000 9000 HC 1400 1.25 15-90 1800 30 1300 11700 HC 1600 1.25 22-110 1900 30 1500 22500
  • 32. ENDLESS ROPE HAULAGE • Avg Speed of Endless haulage = 5KMPH • Amount of coal to be handled = a • Length of the roadway on which ERH operates = 800 m • Capacity of coal tub = 1 ton • No of tubs = 800 * Amount of coal to be handled per hour(a)/(Distance travelled by ERH per hour * capacity of coal tub)
  • 33. Amount of coal to be handled per hour No of tubs Loaded Empties 200 32 32 220 36 36 250 40 40
  • 34. DRH • Avg Speed of Direct rope haulage = 10KMPH • Amount of coal to be handled = a • Length of the roadway on which ERH operates = 500 m • Capacity of coal tub = 1 ton • No of tubs = 500 * Amount of coal to be handled per hour(a)/(Distance travelled by DRH per hour * Capacity of coal tub )
  • 35. Amount of coal to be handled per hour No of tubs 200 10 220 11 250 13
  • 36. Power Supply Distribution Equipment Load in KW MAIN VENTILATION FAN 75 Belt conveyor 180 Direct Haulage 90 Endless haulage 111 Load Haul Dumper 37 Roof bolting machine 75 Auxiliary fan 15 Face pump 7.5 Chain conveyor 2 x 45