What is Facility Layout?
The layout facility is the physical location of the various
departments/units of the facility within the premises of the facility.
The departments may be located based on the considerations such
as:
Less walking distance
Logical sequence of the processing requirements of the product
Emergency services, etc
11/5/2012 Anju Rana
Factors affecting Layout
oMaterial
oProduct
oMachinery
oLabour
oLocation
oManagerial Policies
oType of Industry
11/5/2012 Anju Rana
Scope of Facility Layout
Related to material
 Less material handling and minimum transportation cost
 Less waiting time for in-process inventory .
Related to work place
 Safe working conditions from the point of ventilation, lighting, etc.
 Minimum movement of workers
 Least chances of accidents, fire, etc.
 Proper space for machines, worker, tools, etc.
11/5/2012 Anju Rana
Performance related objectives
 Simpler plant maintenance
 Increased productivity, better product quality, and reduced cost
 Least set-up cost and minimal change-over
 Objective related to flexibility
 Scope for future expansion
11/5/2012 Anju Rana
Types of Layouts
1) Process Layout
• suitable when product having standard features is to be
produced in large volumes.
• the specialized machines and equipments are arranged one after
another in the order of sequence required in the production
process.
CAR
1
CAR
2
CAR
3Conveyer
11/5/2012 Anju Rana
Advantages of Process Layout:
•Greater Flexibility
•Better and more efficient supervision possible through
specialization
•Capacity of different product line can be expanded easily.
•Better utilization of men and machine.
Disadvantages:
•More floor space
•More work in progress
•More distance travelled by the product.
11/5/2012 Anju Rana
2) Product Layout
•It is appropriate for producing one standardized product, usually
in large volume. It is also called as flow-shop layout or straight line
layouts. The machines are arranged according to the progressive
steps by which the product is made.
•Example: chemical, paper, rubber, refineries, cement industry.
11/5/2012 Anju Rana
Advantages:
•Mechanization of materials is possible and material
handling cost can be reduced.
•It requires less floor area.
•It facilitates better production control.
•Production bottlenecks are avoided.
Disadvantages:
•Expansion of product line is difficult.
•There is difficulty is supervising.
•Breakdown of equipment disrupts the production.
11/5/2012 Anju Rana
11/5/2012 Anju Rana
Grouping technology layout of cellular manufacturing layout is made for a
single part family i.e parts with common characteristics. In this layout
dissimilar machines are grouped into cells and each cell functions like
product layout.
Advantage and Disadvantages:
3) Grouping Technology Layout
It reduces material handling cost
and simplifies machine
changeovers. It reduces in-process
inventory and automate the
production but reduces the
flexibility.
11/5/2012 Anju Rana
When due to size, shape and other characteristics
constraints, the products cannot be moved, the machine and
operators move around the product.
Example: construction of a building, assemble of an aircraft or
ship.
Advantage:
Less investment is required in this
layout and less transport cost as
bulky machines are not moved.
4) Fixed Position Layout
11/5/2012 Anju Rana
11/5/2012 Anju Rana
Henry Ford- The Inventor of the Assembly Line
In 1973, Henry Ford employed up to 1,000 people simply to move material in his
automobile factory, an occupation that was to be virtually eliminated In a new
building with an improved layout and with mechanized and gravity-based material-
handling systems.
Ford discovered that great economies could be made by moving stocks to the
assembly staff rather than having them leave their workplace to get materials.
He also noted that costs could be greatly reduced by providing that workers
with all the necessary tooling and thereby eliminating tool rooms. The great
emphasis placed on efficiency in transporting materials in ford factories seems
to have been the motivating factor that led to the development of an assemble
line.
11/5/2012 Anju Rana
Ford engineers conserved space by using very detailed floor plans and
positioned equipment such that when a machine comes into the factory, it is
placed so that the material coming from an operation will be as exactly as
possible in position for succeeding one.
Ford himself said, “they (machines) are scientifically arranged, not only in
the sequence of operations, but to give every man and every machine every
square inch of space that he/it requires and… not… more”. Ford was
extremely conscious that space in his factory was valuable and sought to
exploit it as completely as possible without giving any more to work in
progress than was necessary. Ford emphasizes ‘dividing and subdividing
operations, keeping the work in motion- those are the keynotes of
production’, in a perspective that leaves no room for excessive or idle
inventories (Wilson 1995).
11/5/2012 Anju Rana
Maruti Udyog- challenge 50
Shinichi Takeuchi, former head of Suzuki’s Kosai facility in Japan, was sent to one of
Suzuki’s most profitable subsidiaries, Maruti Udyog, as director(Production) in October
2001.
Thus trying to fill in the wide performance gap between Maruti and Suzuki’s Kosai
facility, which produces 600,000 cars in a year.
The low production cost will give Maruti not just more profits, but an advantage over
competition.At Maruti’s Gurgaon plant, Takeuchi has pulled from under the carpet all
kinds of Muda(Japanese for wastage) starting with the assemble line. At some of the
workstations of the assemble line, the number of steps a worker has to walk to fetch
parts and tools from their racks has been brought down to 5 from the earlier 10-
15.With almost 200 workers manning one assemble line, the saving have led not just to
increase in productivity, but also safety.
In may 2002, Takeuchi launched the challenge 50 programme at Maruti.
Challenge 50 aims at increasing the productivity at Maruti’s Gurgaon facility by
50% and reducing the costs by 30%.
11/5/2012 Anju Rana
Another problem successfully handled by Takeuchi at the assemble line
is the proper installation of rubber beadings for doors by the line
operators. Earlier staggering 14% of the cars would fail the shower
test(to check the leakage) as a result of the improper installation of
these beadings. Today, the figure stands at less than 1%. Takeuchi is still
not happy because that means nine cars fail the test in every shift. There
is a specific sequence to be followed for making the fitment. If that is not
done, it may result in warranty claims at the customer’s end. Even if it is
detected in the shower test, costly rework is required. The car needs to
be taken off the assembly line to a rework station, where extra man-
hours have to be spent fixing the problem. Takeuchi ensured that the
workers follow the installation sequence exactly, so that there is no
scope for rework.
11/5/2012 Anju Rana
Maruti udyog ltd. is raising quality and efficiency levels across
the board in order to achieve its benchmark of Suzuki’s facility
at Kosai, Japan, through the challenge 50 programme.
Compared to the 100% benchmark of Kosai, Maruti presently has
comparative assemble hours per vehicle of 78.12% and a direct pass
rate of 80.64%.
Takeuchi has introduced a quicker set-up technique called the single-
minute exchange of dies. Simultaneously to tackle the non-availability
of components, about 160 vendors who do not meet strict parameters
of quality, cost, productivity, and delivery will be dropped.
To increase the speed and quality, Maruti has 120 robots now
compared to only half a dozen of robots five years ago. It is striving to
reach its benchmark on every parameter by the year 2004-2005.
11/5/2012 Anju Rana
http://en.wikipedia.org/wiki/Plant_layout_study
http://pino.univalle.edu.co/~juanp77/ARTICULOS%20PLANTA
S/ARTICULOS/GRUPO%2009%20-
MONTA%D1O%20NEXT%20GENERATION%20FACTORY%20L
AYOUTS.pdf
http://www.cbpa.ewu.edu/~pnemetzmills/OMch5/OMFac.html

More Related Content

What's hot

Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
Vignesh Jayakumar
 
Operations management
Operations managementOperations management
Operations management
Prithvi Ghag
 
Design of the production system
Design of the production systemDesign of the production system
Design of the production system
darious demus
 

What's hot (20)

CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Process selection
Process selectionProcess selection
Process selection
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation management
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Operations management
Operations managementOperations management
Operations management
 
Design of the production system
Design of the production systemDesign of the production system
Design of the production system
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layouts
 
layout planning
layout planninglayout planning
layout planning
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process Layouts
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Process design
Process designProcess design
Process design
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 

Viewers also liked

CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING
889222
 
Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
Jaisa Gapuz
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
gerlyn bonus
 
Facilities layout design and facilities location
Facilities layout design and facilities locationFacilities layout design and facilities location
Facilities layout design and facilities location
Kinjal Lakhani
 
project-report-on-big-bazaar
 project-report-on-big-bazaar project-report-on-big-bazaar
project-report-on-big-bazaar
Tajinder Singh
 
Operation management presentation
Operation management presentationOperation management presentation
Operation management presentation
Anuj STha
 
Ppt on big bazar (gaurav patel)
Ppt on big bazar (gaurav patel)Ppt on big bazar (gaurav patel)
Ppt on big bazar (gaurav patel)
Gaurav Patel
 
Inventory management
Inventory managementInventory management
Inventory management
MOHD ARISH
 

Viewers also liked (20)

Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 
CAPACITY PLANNING
CAPACITY PLANNING CAPACITY PLANNING
CAPACITY PLANNING
 
Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Facilities layout design and facilities location
Facilities layout design and facilities locationFacilities layout design and facilities location
Facilities layout design and facilities location
 
Inventory Management system at big bazaar
Inventory Management system at big bazaarInventory Management system at big bazaar
Inventory Management system at big bazaar
 
Big bazaar
Big bazaarBig bazaar
Big bazaar
 
big bazaar
big bazaarbig bazaar
big bazaar
 
Operations at Big Bazaar
Operations at Big BazaarOperations at Big Bazaar
Operations at Big Bazaar
 
Big bazzar ppt
Big bazzar pptBig bazzar ppt
Big bazzar ppt
 
KFC
KFCKFC
KFC
 
project-report-on-big-bazaar
 project-report-on-big-bazaar project-report-on-big-bazaar
project-report-on-big-bazaar
 
Final big bazaar ppt
Final big bazaar pptFinal big bazaar ppt
Final big bazaar ppt
 
Big bazaar
Big bazaarBig bazaar
Big bazaar
 
MARKETING STRATEGY & CUSTOMER SATISFACTION OF BIG BAZAAR
MARKETING STRATEGY & CUSTOMER SATISFACTION OF BIG BAZAARMARKETING STRATEGY & CUSTOMER SATISFACTION OF BIG BAZAAR
MARKETING STRATEGY & CUSTOMER SATISFACTION OF BIG BAZAAR
 
Operation management presentation
Operation management presentationOperation management presentation
Operation management presentation
 
Ppt on big bazar (gaurav patel)
Ppt on big bazar (gaurav patel)Ppt on big bazar (gaurav patel)
Ppt on big bazar (gaurav patel)
 
Inventory management
Inventory managementInventory management
Inventory management
 

Similar to Facility layout ppt

thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)
Asim Aslam
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
ssusera34210
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategy
nikpet83
 

Similar to Facility layout ppt (20)

Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
IRJET- Manufacturing of Automatic Pneumatic Bumper to Prevent Car Damage
IRJET- Manufacturing of Automatic Pneumatic Bumper to Prevent Car DamageIRJET- Manufacturing of Automatic Pneumatic Bumper to Prevent Car Damage
IRJET- Manufacturing of Automatic Pneumatic Bumper to Prevent Car Damage
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
Dfma
DfmaDfma
Dfma
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
Lay out
Lay outLay out
Lay out
 
Sps ap05
Sps ap05Sps ap05
Sps ap05
 
Pm408
Pm408Pm408
Pm408
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
 
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
A038301010
A038301010A038301010
A038301010
 
Group technolog1 assegment
Group technolog1 assegmentGroup technolog1 assegment
Group technolog1 assegment
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategy
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
synopsis
synopsissynopsis
synopsis
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 

Recently uploaded

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 

Recently uploaded (20)

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 

Facility layout ppt

  • 2. 11/5/2012 Anju Rana CONTENTS  Concepts 1) Introduction 2)Factors affecting Layout 3)Scope of Facility Layout 4)Types of Facility Layout  Scope of the Topic Cases References
  • 3. 11/5/2012 Anju Rana What is Facility Layout? The layout facility is the physical location of the various departments/units of the facility within the premises of the facility. The departments may be located based on the considerations such as: Less walking distance Logical sequence of the processing requirements of the product Emergency services, etc
  • 4. 11/5/2012 Anju Rana Factors affecting Layout oMaterial oProduct oMachinery oLabour oLocation oManagerial Policies oType of Industry
  • 5. 11/5/2012 Anju Rana Scope of Facility Layout Related to material  Less material handling and minimum transportation cost  Less waiting time for in-process inventory . Related to work place  Safe working conditions from the point of ventilation, lighting, etc.  Minimum movement of workers  Least chances of accidents, fire, etc.  Proper space for machines, worker, tools, etc.
  • 6. 11/5/2012 Anju Rana Performance related objectives  Simpler plant maintenance  Increased productivity, better product quality, and reduced cost  Least set-up cost and minimal change-over  Objective related to flexibility  Scope for future expansion
  • 7. 11/5/2012 Anju Rana Types of Layouts 1) Process Layout • suitable when product having standard features is to be produced in large volumes. • the specialized machines and equipments are arranged one after another in the order of sequence required in the production process. CAR 1 CAR 2 CAR 3Conveyer
  • 8. 11/5/2012 Anju Rana Advantages of Process Layout: •Greater Flexibility •Better and more efficient supervision possible through specialization •Capacity of different product line can be expanded easily. •Better utilization of men and machine. Disadvantages: •More floor space •More work in progress •More distance travelled by the product.
  • 9. 11/5/2012 Anju Rana 2) Product Layout •It is appropriate for producing one standardized product, usually in large volume. It is also called as flow-shop layout or straight line layouts. The machines are arranged according to the progressive steps by which the product is made. •Example: chemical, paper, rubber, refineries, cement industry.
  • 10. 11/5/2012 Anju Rana Advantages: •Mechanization of materials is possible and material handling cost can be reduced. •It requires less floor area. •It facilitates better production control. •Production bottlenecks are avoided. Disadvantages: •Expansion of product line is difficult. •There is difficulty is supervising. •Breakdown of equipment disrupts the production.
  • 12. 11/5/2012 Anju Rana Grouping technology layout of cellular manufacturing layout is made for a single part family i.e parts with common characteristics. In this layout dissimilar machines are grouped into cells and each cell functions like product layout. Advantage and Disadvantages: 3) Grouping Technology Layout It reduces material handling cost and simplifies machine changeovers. It reduces in-process inventory and automate the production but reduces the flexibility.
  • 13. 11/5/2012 Anju Rana When due to size, shape and other characteristics constraints, the products cannot be moved, the machine and operators move around the product. Example: construction of a building, assemble of an aircraft or ship. Advantage: Less investment is required in this layout and less transport cost as bulky machines are not moved. 4) Fixed Position Layout
  • 15. 11/5/2012 Anju Rana Henry Ford- The Inventor of the Assembly Line In 1973, Henry Ford employed up to 1,000 people simply to move material in his automobile factory, an occupation that was to be virtually eliminated In a new building with an improved layout and with mechanized and gravity-based material- handling systems. Ford discovered that great economies could be made by moving stocks to the assembly staff rather than having them leave their workplace to get materials. He also noted that costs could be greatly reduced by providing that workers with all the necessary tooling and thereby eliminating tool rooms. The great emphasis placed on efficiency in transporting materials in ford factories seems to have been the motivating factor that led to the development of an assemble line.
  • 16. 11/5/2012 Anju Rana Ford engineers conserved space by using very detailed floor plans and positioned equipment such that when a machine comes into the factory, it is placed so that the material coming from an operation will be as exactly as possible in position for succeeding one. Ford himself said, “they (machines) are scientifically arranged, not only in the sequence of operations, but to give every man and every machine every square inch of space that he/it requires and… not… more”. Ford was extremely conscious that space in his factory was valuable and sought to exploit it as completely as possible without giving any more to work in progress than was necessary. Ford emphasizes ‘dividing and subdividing operations, keeping the work in motion- those are the keynotes of production’, in a perspective that leaves no room for excessive or idle inventories (Wilson 1995).
  • 17. 11/5/2012 Anju Rana Maruti Udyog- challenge 50 Shinichi Takeuchi, former head of Suzuki’s Kosai facility in Japan, was sent to one of Suzuki’s most profitable subsidiaries, Maruti Udyog, as director(Production) in October 2001. Thus trying to fill in the wide performance gap between Maruti and Suzuki’s Kosai facility, which produces 600,000 cars in a year. The low production cost will give Maruti not just more profits, but an advantage over competition.At Maruti’s Gurgaon plant, Takeuchi has pulled from under the carpet all kinds of Muda(Japanese for wastage) starting with the assemble line. At some of the workstations of the assemble line, the number of steps a worker has to walk to fetch parts and tools from their racks has been brought down to 5 from the earlier 10- 15.With almost 200 workers manning one assemble line, the saving have led not just to increase in productivity, but also safety. In may 2002, Takeuchi launched the challenge 50 programme at Maruti. Challenge 50 aims at increasing the productivity at Maruti’s Gurgaon facility by 50% and reducing the costs by 30%.
  • 18. 11/5/2012 Anju Rana Another problem successfully handled by Takeuchi at the assemble line is the proper installation of rubber beadings for doors by the line operators. Earlier staggering 14% of the cars would fail the shower test(to check the leakage) as a result of the improper installation of these beadings. Today, the figure stands at less than 1%. Takeuchi is still not happy because that means nine cars fail the test in every shift. There is a specific sequence to be followed for making the fitment. If that is not done, it may result in warranty claims at the customer’s end. Even if it is detected in the shower test, costly rework is required. The car needs to be taken off the assembly line to a rework station, where extra man- hours have to be spent fixing the problem. Takeuchi ensured that the workers follow the installation sequence exactly, so that there is no scope for rework.
  • 19. 11/5/2012 Anju Rana Maruti udyog ltd. is raising quality and efficiency levels across the board in order to achieve its benchmark of Suzuki’s facility at Kosai, Japan, through the challenge 50 programme. Compared to the 100% benchmark of Kosai, Maruti presently has comparative assemble hours per vehicle of 78.12% and a direct pass rate of 80.64%. Takeuchi has introduced a quicker set-up technique called the single- minute exchange of dies. Simultaneously to tackle the non-availability of components, about 160 vendors who do not meet strict parameters of quality, cost, productivity, and delivery will be dropped. To increase the speed and quality, Maruti has 120 robots now compared to only half a dozen of robots five years ago. It is striving to reach its benchmark on every parameter by the year 2004-2005.