8. • Description and general meaning of test
feature is known
• Design of applicable state machine is
completed
• Requirements are shaped and mostly
completed
9.
10. • Latest SRS version is synchronized with
Quality Center (QC)
• Correct requirements are linked to the
Test feature in QC
• Linking requirements to Test feature in QC
is reviewed and approved
11.
12. • Test scope and test sub-features are
defined
• Test situations and applicable controls are
defined for each sub-feature
• Total TDS Test points =
∑ points of test sub features
(situations x controls )
13.
14. • Test Design Specification for a test feature
or its subset is completed and reviewed
• Required Business Components (BC) and
their draft designs are defined
• Latest changes in SRS are re-
synchronized with Quality Center
15.
16. • High priority test cases are implemented,
reviewed and running
• Linking of test cases to requirements and
test features is set and reviewed
• Design and implementation of required
business components are finalized