SlideShare ist ein Scribd-Unternehmen logo
1 von 50
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Chapter 12 –
Project Procurement Management
PMP
Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved.
Plan Procurement
Management
SIXTH EDITION
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
12.1 Plan Procurement Management
Overview
Plan Procurement Management Definition?
Plan Procurement Management -> ITTO
Build vs Buy
Source selection criteria's
Procurement documents
Contract types
Review
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Determine if procurement is required
Full or partial procurement requirement
Make or Buy Analysis & decision
Identify & evaluate potential sellers
Decide on requirements (How, What, how much, When)
Can influence schedule, estimating & make or buy decision.
Includes reviewing risks involved & type of contract.
Overview
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
The process of documenting project procurement decisions,
specifying the approach, and identifying potential sellers.
Whether to acquire goods & services from outside, what to
acquire, how to acquire , how much and when to acquire it.
Plan Procurement Management -> Definition
Procurement
decisions
Specifying
approach
Identifying
potential sellers.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Typical Procurement steps
Planning Choosing a source
Acquiring - product
or services
Administering the
contract
Closing contract
Generic Procurement process:
Procurement
applied to
Internal work
orders
Formal
agreements
Contracts
between
organization units
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Prepare SOW or TOR
Prepare high level cost estimate to determine budget
Advertise the opportunity
Shortlist qualified sellers
Prepare & issue bid documents
Seller submits the proposals
Conduct technical evaluation
Conduct financial evaluation
Prepare final evaluation report (quality & cost)
Finalize negotiation & sign contract
Typical Procurement steps
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management-> ITTO
Expert Judgment
Data Gathering
Data analysis
Source selection analysis
Meetings
Project Charter
Business Documents
Project Management
Plan
Project documents
Enterprise
environmental factors
Organizational process
assets
Procurement Management
Plan
Procurement strategy
Bid Documents
Procurement Statement of
Work
Source Selection Criteria
Make-or-buy Decisions
Independent cost estimates
Change Requests
Project document updates
OPA updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management->Input
Project Charter Business Documents
Project Management
Plan
Project documents
Enterprise
environmental factors
Organizational
process assets
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Charter
Contains Objectives, project description, summary milestones & preapproved
financial resources.
Plan Procurement Management->Input-> Project Charter
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Business Documents
Following Business Documents may provide key inputs.
Business Case:
• Procurement strategy & BC need to be
aligned.
Benefit Management plan:
• Expected benefit delivery will drive
procurement date, contract language.
Plan Procurement Management->Input-> Business Documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Following subsidiary plans & scope baseline will provide key inputs.
Scope Management plan:
• How contractor will manage scope of work during
execution.
Quality Management plan:
• Applicable industry standards & codes
• Information will be used in bidding documents (RFP)
Resource Management plan:
• Which resource will be purchased of leased.
• Assumptions & constraints that may influence
procurement.
Scope baseline:
• Known scope elements are used to develop SOW & TOR
(Terms of Reference)
Plan Procurement Management->Input-> Project Management Plan
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Following project documents will provide key inputs.
Requirements
documentation
Requirements
Traceability Matrix
Milestone list
Resource
requirements
Project team
assignments
Risk Register
Stakeholder Register
Plan Procurement Management->Input-> Project documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Plan Procurement Management->Input-> Project documents -> RD
• Product, service or
result requirements
• User requirements
• Acceptance criteria
Business Requirements
• Security
• Safety
• IPR
• Licenses
Project procurement
requirements.
• Performance
• Insurance
• Intellectual
property rights
• Licenses, and
Permits
Contractual and legal
implications
Requirements documentation:
• Contains all Business, technical requirements, non-technical
requirements that seller is required to satisfy.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Milestone list:
•Contains information on when sellers are required to deliver their results.
Include timelines, milestones & delivery dates.
Provides Schedule constraints & dependencies.
Schedule constraints can be major factor in
procurement.
Consider time saving techniques: Preferred seller /
Templates.
Plan Procurement Management->Input-> Project documents -> ML
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Resource requirements:
•Contain information on specific needs such as team & physical resources that may need to be
acquired.
Type
Business Analyst
System Analyst
Programmer
Laptops
Quantity
2
3
10
20
Plan Procurement Management->Input-> Project documents -> RR
People
EquipmentLocation
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Project team assignments:
•Skills & capabilities of team & their availability to support procurement.
Plan Procurement Management->Input-> Project documents -> Team
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Risk Register:
• List of Risks, results of Risk analysis & response planning.
• Transfer risks to seller through procurement agreements.
Ex: Change in Oil
Prices
Ex: Change exchange
rates
Plan Procurement Management->Input-> Project documents -> RR
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Stakeholder Register:
•Provides details on project participants & their interests.
•Can help you to setup vendor selection board/team.
Plan Procurement Management->Input-> Project documents -> SR
Regulatory agencies
Legal experts
Procurement Experts
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
EEF
Marketplace conditions.
Availability of Products, services, & results in marketplace.
Suppliers along with their past performance or reputation
Terms & conditions for products, services (specific to industry)
Unique local requirements.
Legal advice
Contract management system; Contract change control
Multi tier supplier system of prequalified sellers
Financial accounting & contract payment system
Plan Procurement Management->Input-> EEF
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Most organizations have formal
procurement policies.
Project team should supply both
resources & expertise to perform
procurement activities, if there is no
procurement dept.
Procurement Management systems -
An established multi‐tier supplier
system of prequalified sellers based
on prior experience
Plan Procurement Management->Input-> OPA
Formal procurement policies, procedures, and guidelines.
Organizational
process assets
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management->T&T
Expert Judgment Data Gathering Data analysis
Source selection
analysis
Meetings
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Contracting Expert Technical Experts Financial Experts
Legal experts
Project Management
experts
Procurement & Purchasing
Experts
Plan Procurement Management -> T&T-> Expert Judgement
Experts with specialized knowledge or training in:
Procurement &
purchasing
Contract types & contract
documents
Regulations & compliance
topics.
Expert Judgment
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data Gathering
Market Research:
• The process of gathering information at conferences, online
reviews, & variety of sources to identify market capabilities.
Plan Proc. Manag. ->T&T->Data Gathering -> Market Research
Examination of industry & specific vendor capabilities
Leverage information gained to identify market capabilities.
Team may refine procurement objectives to leverage maturing technologies.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Make-or-buy analysis:
•Gathering data about product requirements & analyse them against available
alternatives including purchase or internal manufacture.
•Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA techniques.
•Capacity and Capability
•Exploit Opportunity
•Shift risk (cost, time, or
scope)
Reasons to Buy
•Idle resources
•Want to control
•Confidential information
Reasons to Make
Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis
Buy Make
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Make-or-buy analysis:
•Gathering data about product requirements & analyse them against available
alternatives including purchase or internal manufacture.
•Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA techniques.
Major factor to consider in the decision:
Schedule Budget Cost Skills
Proprietary
information
Contract
type
It is important to consider scope of Make vs Buy Analysis
Renting or leasing is good, if it is one time need
Purchasing is good, when it is long term requirement
Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis
Buy
RentLease
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Make-or-buy analysis:
•Gathering data about product requirements & analyse them against
available alternatives including purchase or internal manufacture.
•Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA
techniques.
How to calculate breakeven point
Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis
Cost Categories Make
(in-house)
Buy
(From Market)
Difference
Product development 100,000 60,000 40,000
Operational cost / month 6,000 10,000 4,000
Breakeven point: 40,000/4,000 = 10 Month
If software is used for < 10 months then “ Buy”
If software is used for > 10 months then “ Make (in-house)”
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Source selection
analysis
Review prioritization of competing demands before deciding on selection method.
Its good practice to include evaluation method in the procurements documents.
Commonly used selection methods includes:
Least cost:
•Routine or standard procurement
Qualifications only:
•Value of procurement is relatively small
•Time & cost of full selection process will not make
sense.
Plan Procurement Management->T&T -> Source selection analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Source selection
analysis
Quality-based/ highest tech. proposal score:
•Technical proposal with cost is submitted.
•Seller is invited to negotiate, if technical proposal is acceptable.
•Highest ranked technical proposal is selected, if financial proposal is
acceptable.
Quality and cost-based:
•Similar to above
•Cost to be included as a factor in sellers selection process.
Plan Procurement Management->T&T -> Source selection analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Source selection
analysis
Sole source:
• Buyer asks specific seller to prepare financial & technical proposal.
• This is expectation process hence proper authorization is required.
Fixed budget:
• Buyer to disclose available budget to sellers.
• Buyer to ensure budget is compatible with SOW.
• This can be used only if SOW is precisely defines & no changes are
anticipated.
Plan Procurement Management->T&T -> Source selection analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Meetings
Meeting with team to formulate a procurement strategy.
Meetings with potential bidders.
Discuss approach, potential issues & seller evaluation
Plan Procurement Management->T&T-> Meetings
Contracting
Experts
Technical Experts Financial Experts Legal experts
Project
Management
experts
Procurement
Experts
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management -> Output
Procurement
Management Plan
Procurement
strategy
Bid Documents
Procurement
Statement of Work
Source Selection
Criteria
Make-or-buy
Decisions
Independent cost
estimates
Change Requests
Project document
updates
OPA updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
Management Plan
Plans describes activities to be undertaken during procurement process.
Document type of bidding like International, national competitive bidding or local bidding.
Alignment of sources & availability of funding, in case of external funding.
How procurement will be
coordinated with other
project aspects
Time table of key
procurement activities
Procurement metrics to be
used
Stakeholder roles and
responsibilities
Constraints and
assumption
Legal jurisdiction and
currency
Determine need of
independent estimates
Risk management -
identifying requirements
for performance bonds or
insurance
Prequalified sellers
Plan Procurement Management-> Output-> Procurement MP
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
strategy
Procurement strategy is developed once “Make or Buy” decision is done.
It helps to determine project delivery method, type of agreement & how to proceed with procurement phases.
Delivery methods
Contract payment
types
Procurement phases
Plan Procurement Management -> Output -> Procurement strategy
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
strategy
Delivery methods:
•Different for professional services versus construction projects
For professional services:
Service provider
with no
subcontracting
Service provider
with
subcontracting
Joint venture
between buyer &
services provider
Service provider
acts as a
representative
Plan Procurement Management -> Output -> Procurement strategy
For industrial or commercial construction projects:
Turnkey
Design build
(DB)
Design bid
build (DBB)
Design build
operate (DBP)
Build own
operate
transfer
(BOOT)
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
strategy
Contract payment types:
• Coordinated with buying organizations internal financial system.
• They include but not limited to contract type plus variations.
• Lump sum, FFP, CPAF, CPIF, T&M, target cost etc.
Fixed fee contracts are suitable when the type of work
is predictable and the requirements are well defined.
Cost plus contracts are suitable when the work is
evolving, likely to change
Incentives and awards may be used to align the
objectives of buyer and seller
Plan Procurement Management -> Output -> Procurement strategy
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
strategy
Procurement phases:
•Sequencing or phasing of the procurement, description of each phase.
Procurement performance indicators and
milestones to be used in monitoring
Criteria for moving from phase to phase
Monitor and evaluation plan for tracking
progress
Process for knowledge transfer
Plan Procurement Management -> Output -> Procurement strategy
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Make-or-buy
Decisions
Decisions made regarding external purchase or internal manufacture of a product (Formally documented)
Make
•Document Internal process
•E.g., Develop Software in-house
Buy
•Document external process
•E.g., Buy Seller services to develop software
Plan Procurement Management-> Output-> Make-or-buy Decisions
Whether particular
work/Service/Product
can best be developed
internally
Needs to be purchased
from outside sources.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
Statement of Work
Developed from the project scope baseline and defines related contract scope.
It describes all the procurement item in detail.
Specifications
Performance
desired
Work location
Delivery
Schedule
Collateral
services (e.g.,
Warranty)
• Clear, complete, and concise.
Written
description
• there are specific content and format need to be used
In some
application areas
Plan Procurement Management-> Output->Procurement SOW
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
Statement of Work
Plan Procurement Management-> Output->Procurement SOW
Terms of reference (TOR):
Tasks the contractor is required to perform
Coordination requirements
Standards the contractor to fulfil
Data that needs to be submitted for approval
List of data and services provided by buyer to contractor
Schedule for initial submission and review / approval time required
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Independent cost
estimates
For large procurements, buyer
Prepare its own estimates Get is done though outside estimators
Plan Procurement Management -> Output ->Independent cost estimates
Significant difference in estimates means
SOW was deficient or ambiguous Seller misunderstood or failed to fully respond
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management-> Output->Source Selection Criteria
Proposal1
Proposal2
Proposal3
0
50
100
150
Seller1 Seller2 Seller3
Source Selection
Criteria
Used to compare sellers proposals based on documented selection
criteria to rate or score proposals.
Capability and
capacity
Product cost and
life cycle cost
Delivery dates
Technical
expertise and
approach
Specific relevant
experience
Proposed
approach and &
plan in
responding
Key staff’s
qualifications,
availability &
competence
Financial stability
of the firm
Management
experience
Suitability of
knowledge
transfer (training)
Criteria1
Criteria2
Criteria3
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Bid Documents
The documents utilized in bid and proposal activities.
Price based decision:
Bid, tender, quotation.
Proposals:
Technical capability or approach are the most
important.
Plan Procurement Management ->Output -> Procurement document
RFI
RFP/RFQ
Request for information(RFI):
•provide various pieces of information related to a
product or service or seller capability.
Request for Proposal (RFP)
•request a detailed proposal on how work will be
accomplished with price.
Request for Quote (RFQ):
•request price quotations from prospective sellers
of common or standard products or services.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
Documents
•Used when buyers
doesn’t have clear
information.
•Used for consolidation
of proposals
•Ex., Constructing a
Hotel
•ERP System
implementation
RFI
•Used when you have
detailed requirements
•Finds cost & detailed
proposal on how work
will be accomplished.
•Ex., Constructing
hotel based on a plan
•IT Automation of
business process
RFP
•Used when your main
focus is on cost.
•Time and Material
contracts.
•Ex., Construction Crain
for 1 year
•6 months consulting
to setup PMO with 2
resources
RFQ
Plan Procurement Management-> Output->Procurement documents
Terminology
may vary by
Industry or
geography.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Change Requests
A decision that involves procuring goods, services, or resources typically requires a
change request.
May cause Frustration, possibility due to
change in original decision.
It will go though Integrated Change
control process.
Change Request due to:
More clarity on the work -> New scope addition.
Project duration may change as Vendor selection process takes time.
Cost may change based on Vendor & development approach (onsite/ offshore)
Plan Procurement Management-> Output-> Change Request
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Updates
Following Project Documents may get updated.
Lessons learned
register
Milestone list
Requirements
documentation
Requirements
Traceability Matrix
Risk Register Stakeholder Register
Plan Procurement Management->Output-> Document updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Updates
Requirements documentation
• New/Changed Requirements
• Requirement with contractual/ legal implications -
health, safety, security, performance, insurance, IPR,
Equal employment opportunity, Licenses, permits etc.
Requirements Traceability Matrix:
• New/Changed Requirements
• Link to sellers deliverables.
Lessons learned register
• Updated with lessons regarding regulation,
compliance or source selection analysis.
Plan Procurement Management->Output-> Document updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Updates
Milestone list
• Major milestone's when seller is expected to deliver
their results.
Risk Register
• Each approved seller comes with its own set of risks.
• e.g., Sellers organization, Contract duration, project
delivery method, contract type, final agreed price etc.
Stakeholder Register
• May updated with regulatory agencies, contracting &
legal personals.
Plan Procurement Management->Output-> Document updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
OPA updates
Updated information on qualified sellers.
Below table shows comparison of procurement documents.
Plan Procurement Management -> Output -> OPA updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Plan Procurement Management -> Review
Procurement Management plan
Plan Procurement Management -> ITTO
Procurement SOW
Build vs Buy
Source selection criteria's
Bid documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2Anand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practiceDr Gordon Murray
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewAnand Bobade
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement ManagementDavidMcLachlan1
 
12.3 Control Procurements
12.3 Control Procurements12.3 Control Procurements
12.3 Control ProcurementsDavidMcLachlan1
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management Serdar Temiz
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
12.2 Conduct Procurements
12.2 Conduct Procurements12.2 Conduct Procurements
12.2 Conduct ProcurementsDavidMcLachlan1
 

Was ist angesagt? (20)

PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
11- PMP Training - Procurement Management
11- PMP Training - Procurement Management 11- PMP Training - Procurement Management
11- PMP Training - Procurement Management
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practice
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management Overview
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement Management
 
12.3 Control Procurements
12.3 Control Procurements12.3 Control Procurements
12.3 Control Procurements
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Procurement process snippet
Procurement process snippetProcurement process snippet
Procurement process snippet
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
12.2 Conduct Procurements
12.2 Conduct Procurements12.2 Conduct Procurements
12.2 Conduct Procurements
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
Procurement management
Procurement managementProcurement management
Procurement management
 

Ähnlich wie Chap 12.1 Plan Procurement Management

Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterAnand Bobade
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewAnand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality managementAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scopeAnand Bobade
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersAnand Bobade
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 

Ähnlich wie Chap 12.1 Plan Procurement Management (20)

Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project Charter
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management Overview
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholders
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 

Mehr von Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewAnand Bobade
 

Mehr von Anand Bobade (15)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 

Kürzlich hochgeladen

Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...PROF. PAUL ALLIEU KAMARA
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teamsshakkardaddy
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt2020102713
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxMadan Karki
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Research Methods ONE.ppt of course public administiretion
Research Methods ONE.ppt of course public administiretionResearch Methods ONE.ppt of course public administiretion
Research Methods ONE.ppt of course public administiretionjamaalfaami
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Managementshakkardaddy
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 

Kürzlich hochgeladen (20)

Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teams
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptx
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Research Methods ONE.ppt of course public administiretion
Research Methods ONE.ppt of course public administiretionResearch Methods ONE.ppt of course public administiretion
Research Methods ONE.ppt of course public administiretion
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Management
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 

Chap 12.1 Plan Procurement Management

  • 1. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Chapter 12 – Project Procurement Management PMP Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Plan Procurement Management SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 12.1 Plan Procurement Management Overview Plan Procurement Management Definition? Plan Procurement Management -> ITTO Build vs Buy Source selection criteria's Procurement documents Contract types Review
  • 3. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Determine if procurement is required Full or partial procurement requirement Make or Buy Analysis & decision Identify & evaluate potential sellers Decide on requirements (How, What, how much, When) Can influence schedule, estimating & make or buy decision. Includes reviewing risks involved & type of contract. Overview
  • 4. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) The process of documenting project procurement decisions, specifying the approach, and identifying potential sellers. Whether to acquire goods & services from outside, what to acquire, how to acquire , how much and when to acquire it. Plan Procurement Management -> Definition Procurement decisions Specifying approach Identifying potential sellers.
  • 5. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Typical Procurement steps Planning Choosing a source Acquiring - product or services Administering the contract Closing contract Generic Procurement process: Procurement applied to Internal work orders Formal agreements Contracts between organization units
  • 6. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Prepare SOW or TOR Prepare high level cost estimate to determine budget Advertise the opportunity Shortlist qualified sellers Prepare & issue bid documents Seller submits the proposals Conduct technical evaluation Conduct financial evaluation Prepare final evaluation report (quality & cost) Finalize negotiation & sign contract Typical Procurement steps
  • 7. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management-> ITTO Expert Judgment Data Gathering Data analysis Source selection analysis Meetings Project Charter Business Documents Project Management Plan Project documents Enterprise environmental factors Organizational process assets Procurement Management Plan Procurement strategy Bid Documents Procurement Statement of Work Source Selection Criteria Make-or-buy Decisions Independent cost estimates Change Requests Project document updates OPA updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management->Input Project Charter Business Documents Project Management Plan Project documents Enterprise environmental factors Organizational process assets
  • 9. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Charter Contains Objectives, project description, summary milestones & preapproved financial resources. Plan Procurement Management->Input-> Project Charter
  • 10. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Business Documents Following Business Documents may provide key inputs. Business Case: • Procurement strategy & BC need to be aligned. Benefit Management plan: • Expected benefit delivery will drive procurement date, contract language. Plan Procurement Management->Input-> Business Documents
  • 11. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Following subsidiary plans & scope baseline will provide key inputs. Scope Management plan: • How contractor will manage scope of work during execution. Quality Management plan: • Applicable industry standards & codes • Information will be used in bidding documents (RFP) Resource Management plan: • Which resource will be purchased of leased. • Assumptions & constraints that may influence procurement. Scope baseline: • Known scope elements are used to develop SOW & TOR (Terms of Reference) Plan Procurement Management->Input-> Project Management Plan
  • 12. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Following project documents will provide key inputs. Requirements documentation Requirements Traceability Matrix Milestone list Resource requirements Project team assignments Risk Register Stakeholder Register Plan Procurement Management->Input-> Project documents
  • 13. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Plan Procurement Management->Input-> Project documents -> RD • Product, service or result requirements • User requirements • Acceptance criteria Business Requirements • Security • Safety • IPR • Licenses Project procurement requirements. • Performance • Insurance • Intellectual property rights • Licenses, and Permits Contractual and legal implications Requirements documentation: • Contains all Business, technical requirements, non-technical requirements that seller is required to satisfy.
  • 14. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Milestone list: •Contains information on when sellers are required to deliver their results. Include timelines, milestones & delivery dates. Provides Schedule constraints & dependencies. Schedule constraints can be major factor in procurement. Consider time saving techniques: Preferred seller / Templates. Plan Procurement Management->Input-> Project documents -> ML
  • 15. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Resource requirements: •Contain information on specific needs such as team & physical resources that may need to be acquired. Type Business Analyst System Analyst Programmer Laptops Quantity 2 3 10 20 Plan Procurement Management->Input-> Project documents -> RR People EquipmentLocation
  • 16. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Project team assignments: •Skills & capabilities of team & their availability to support procurement. Plan Procurement Management->Input-> Project documents -> Team
  • 17. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Risk Register: • List of Risks, results of Risk analysis & response planning. • Transfer risks to seller through procurement agreements. Ex: Change in Oil Prices Ex: Change exchange rates Plan Procurement Management->Input-> Project documents -> RR
  • 18. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Stakeholder Register: •Provides details on project participants & their interests. •Can help you to setup vendor selection board/team. Plan Procurement Management->Input-> Project documents -> SR Regulatory agencies Legal experts Procurement Experts
  • 19. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) EEF Marketplace conditions. Availability of Products, services, & results in marketplace. Suppliers along with their past performance or reputation Terms & conditions for products, services (specific to industry) Unique local requirements. Legal advice Contract management system; Contract change control Multi tier supplier system of prequalified sellers Financial accounting & contract payment system Plan Procurement Management->Input-> EEF
  • 20. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Most organizations have formal procurement policies. Project team should supply both resources & expertise to perform procurement activities, if there is no procurement dept. Procurement Management systems - An established multi‐tier supplier system of prequalified sellers based on prior experience Plan Procurement Management->Input-> OPA Formal procurement policies, procedures, and guidelines. Organizational process assets
  • 21. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management->T&T Expert Judgment Data Gathering Data analysis Source selection analysis Meetings
  • 22. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Contracting Expert Technical Experts Financial Experts Legal experts Project Management experts Procurement & Purchasing Experts Plan Procurement Management -> T&T-> Expert Judgement Experts with specialized knowledge or training in: Procurement & purchasing Contract types & contract documents Regulations & compliance topics. Expert Judgment
  • 23. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data Gathering Market Research: • The process of gathering information at conferences, online reviews, & variety of sources to identify market capabilities. Plan Proc. Manag. ->T&T->Data Gathering -> Market Research Examination of industry & specific vendor capabilities Leverage information gained to identify market capabilities. Team may refine procurement objectives to leverage maturing technologies.
  • 24. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Make-or-buy analysis: •Gathering data about product requirements & analyse them against available alternatives including purchase or internal manufacture. •Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA techniques. •Capacity and Capability •Exploit Opportunity •Shift risk (cost, time, or scope) Reasons to Buy •Idle resources •Want to control •Confidential information Reasons to Make Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis Buy Make
  • 25. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Make-or-buy analysis: •Gathering data about product requirements & analyse them against available alternatives including purchase or internal manufacture. •Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA techniques. Major factor to consider in the decision: Schedule Budget Cost Skills Proprietary information Contract type It is important to consider scope of Make vs Buy Analysis Renting or leasing is good, if it is one time need Purchasing is good, when it is long term requirement Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis Buy RentLease
  • 26. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Make-or-buy analysis: •Gathering data about product requirements & analyse them against available alternatives including purchase or internal manufacture. •Use Payback period, ROI, IRR, Discounted cash flow, NVP & BCA techniques. How to calculate breakeven point Plan Proc. Manag. ->T&T-> Data analysis -> Make-or-buy analysis Cost Categories Make (in-house) Buy (From Market) Difference Product development 100,000 60,000 40,000 Operational cost / month 6,000 10,000 4,000 Breakeven point: 40,000/4,000 = 10 Month If software is used for < 10 months then “ Buy” If software is used for > 10 months then “ Make (in-house)”
  • 27. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Source selection analysis Review prioritization of competing demands before deciding on selection method. Its good practice to include evaluation method in the procurements documents. Commonly used selection methods includes: Least cost: •Routine or standard procurement Qualifications only: •Value of procurement is relatively small •Time & cost of full selection process will not make sense. Plan Procurement Management->T&T -> Source selection analysis
  • 28. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Source selection analysis Quality-based/ highest tech. proposal score: •Technical proposal with cost is submitted. •Seller is invited to negotiate, if technical proposal is acceptable. •Highest ranked technical proposal is selected, if financial proposal is acceptable. Quality and cost-based: •Similar to above •Cost to be included as a factor in sellers selection process. Plan Procurement Management->T&T -> Source selection analysis
  • 29. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Source selection analysis Sole source: • Buyer asks specific seller to prepare financial & technical proposal. • This is expectation process hence proper authorization is required. Fixed budget: • Buyer to disclose available budget to sellers. • Buyer to ensure budget is compatible with SOW. • This can be used only if SOW is precisely defines & no changes are anticipated. Plan Procurement Management->T&T -> Source selection analysis
  • 30. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Meetings Meeting with team to formulate a procurement strategy. Meetings with potential bidders. Discuss approach, potential issues & seller evaluation Plan Procurement Management->T&T-> Meetings Contracting Experts Technical Experts Financial Experts Legal experts Project Management experts Procurement Experts
  • 31. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management -> Output Procurement Management Plan Procurement strategy Bid Documents Procurement Statement of Work Source Selection Criteria Make-or-buy Decisions Independent cost estimates Change Requests Project document updates OPA updates
  • 32. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Management Plan Plans describes activities to be undertaken during procurement process. Document type of bidding like International, national competitive bidding or local bidding. Alignment of sources & availability of funding, in case of external funding. How procurement will be coordinated with other project aspects Time table of key procurement activities Procurement metrics to be used Stakeholder roles and responsibilities Constraints and assumption Legal jurisdiction and currency Determine need of independent estimates Risk management - identifying requirements for performance bonds or insurance Prequalified sellers Plan Procurement Management-> Output-> Procurement MP
  • 33. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement strategy Procurement strategy is developed once “Make or Buy” decision is done. It helps to determine project delivery method, type of agreement & how to proceed with procurement phases. Delivery methods Contract payment types Procurement phases Plan Procurement Management -> Output -> Procurement strategy
  • 34. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement strategy Delivery methods: •Different for professional services versus construction projects For professional services: Service provider with no subcontracting Service provider with subcontracting Joint venture between buyer & services provider Service provider acts as a representative Plan Procurement Management -> Output -> Procurement strategy For industrial or commercial construction projects: Turnkey Design build (DB) Design bid build (DBB) Design build operate (DBP) Build own operate transfer (BOOT)
  • 35. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement strategy Contract payment types: • Coordinated with buying organizations internal financial system. • They include but not limited to contract type plus variations. • Lump sum, FFP, CPAF, CPIF, T&M, target cost etc. Fixed fee contracts are suitable when the type of work is predictable and the requirements are well defined. Cost plus contracts are suitable when the work is evolving, likely to change Incentives and awards may be used to align the objectives of buyer and seller Plan Procurement Management -> Output -> Procurement strategy
  • 36. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement strategy Procurement phases: •Sequencing or phasing of the procurement, description of each phase. Procurement performance indicators and milestones to be used in monitoring Criteria for moving from phase to phase Monitor and evaluation plan for tracking progress Process for knowledge transfer Plan Procurement Management -> Output -> Procurement strategy
  • 37. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Make-or-buy Decisions Decisions made regarding external purchase or internal manufacture of a product (Formally documented) Make •Document Internal process •E.g., Develop Software in-house Buy •Document external process •E.g., Buy Seller services to develop software Plan Procurement Management-> Output-> Make-or-buy Decisions Whether particular work/Service/Product can best be developed internally Needs to be purchased from outside sources.
  • 38. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Statement of Work Developed from the project scope baseline and defines related contract scope. It describes all the procurement item in detail. Specifications Performance desired Work location Delivery Schedule Collateral services (e.g., Warranty) • Clear, complete, and concise. Written description • there are specific content and format need to be used In some application areas Plan Procurement Management-> Output->Procurement SOW
  • 39. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Statement of Work Plan Procurement Management-> Output->Procurement SOW Terms of reference (TOR): Tasks the contractor is required to perform Coordination requirements Standards the contractor to fulfil Data that needs to be submitted for approval List of data and services provided by buyer to contractor Schedule for initial submission and review / approval time required
  • 40. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Independent cost estimates For large procurements, buyer Prepare its own estimates Get is done though outside estimators Plan Procurement Management -> Output ->Independent cost estimates Significant difference in estimates means SOW was deficient or ambiguous Seller misunderstood or failed to fully respond
  • 41. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management-> Output->Source Selection Criteria Proposal1 Proposal2 Proposal3 0 50 100 150 Seller1 Seller2 Seller3 Source Selection Criteria Used to compare sellers proposals based on documented selection criteria to rate or score proposals. Capability and capacity Product cost and life cycle cost Delivery dates Technical expertise and approach Specific relevant experience Proposed approach and & plan in responding Key staff’s qualifications, availability & competence Financial stability of the firm Management experience Suitability of knowledge transfer (training) Criteria1 Criteria2 Criteria3
  • 42. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Bid Documents The documents utilized in bid and proposal activities. Price based decision: Bid, tender, quotation. Proposals: Technical capability or approach are the most important. Plan Procurement Management ->Output -> Procurement document RFI RFP/RFQ Request for information(RFI): •provide various pieces of information related to a product or service or seller capability. Request for Proposal (RFP) •request a detailed proposal on how work will be accomplished with price. Request for Quote (RFQ): •request price quotations from prospective sellers of common or standard products or services.
  • 43. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Documents •Used when buyers doesn’t have clear information. •Used for consolidation of proposals •Ex., Constructing a Hotel •ERP System implementation RFI •Used when you have detailed requirements •Finds cost & detailed proposal on how work will be accomplished. •Ex., Constructing hotel based on a plan •IT Automation of business process RFP •Used when your main focus is on cost. •Time and Material contracts. •Ex., Construction Crain for 1 year •6 months consulting to setup PMO with 2 resources RFQ Plan Procurement Management-> Output->Procurement documents Terminology may vary by Industry or geography.
  • 44. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Change Requests A decision that involves procuring goods, services, or resources typically requires a change request. May cause Frustration, possibility due to change in original decision. It will go though Integrated Change control process. Change Request due to: More clarity on the work -> New scope addition. Project duration may change as Vendor selection process takes time. Cost may change based on Vendor & development approach (onsite/ offshore) Plan Procurement Management-> Output-> Change Request
  • 45. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Updates Following Project Documents may get updated. Lessons learned register Milestone list Requirements documentation Requirements Traceability Matrix Risk Register Stakeholder Register Plan Procurement Management->Output-> Document updates
  • 46. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Updates Requirements documentation • New/Changed Requirements • Requirement with contractual/ legal implications - health, safety, security, performance, insurance, IPR, Equal employment opportunity, Licenses, permits etc. Requirements Traceability Matrix: • New/Changed Requirements • Link to sellers deliverables. Lessons learned register • Updated with lessons regarding regulation, compliance or source selection analysis. Plan Procurement Management->Output-> Document updates
  • 47. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Updates Milestone list • Major milestone's when seller is expected to deliver their results. Risk Register • Each approved seller comes with its own set of risks. • e.g., Sellers organization, Contract duration, project delivery method, contract type, final agreed price etc. Stakeholder Register • May updated with regulatory agencies, contracting & legal personals. Plan Procurement Management->Output-> Document updates
  • 48. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) OPA updates Updated information on qualified sellers. Below table shows comparison of procurement documents. Plan Procurement Management -> Output -> OPA updates
  • 49. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Plan Procurement Management -> Review Procurement Management plan Plan Procurement Management -> ITTO Procurement SOW Build vs Buy Source selection criteria's Bid documents
  • 50. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)