OM1435 Project CP and crashing HW For the project with the activates and costs given below a. Draw the network b. Calculate the CP c. The slacks for each activity d. The project cost e. Project cost with most aggressive schedule f. Probability that the project could finish in 31 days g. 95% confidence for project completion time.
OM1435 Project CP and crashing HW For the project with the activates and costs given below a. Draw the network b. Calculate the CP c. The slacks for each activity d. The project cost e. Project cost with most aggressive schedule f. Probability that the project could finish in 31 days g. 95% confidence for project completion time.