Suche senden
Hochladen
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
•
3 gefällt mir
•
2,678 views
A
alipaiva
Folgen
Business
Wirtschaft & Finanzen
Melden
Teilen
Melden
Teilen
1 von 94
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Empfohlen
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmap
Helen Fisher
Hse oil and gas management services
Hse oil and gas management services
Lloyd's Register Energy
Sky Futures
Sky Futures
Helen Fisher
Risk Solutions for the Manager
Risk Solutions for the Manager
Edwin A Merrick
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Tony Ciliberti PE
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
Ricky Smith CMRP, CMRT
Plant Maintenance
Plant Maintenance
Anand Subramaniam
CCPS PERD Project
CCPS PERD Project
Tony Ciliberti PE
Empfohlen
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmap
Helen Fisher
Hse oil and gas management services
Hse oil and gas management services
Lloyd's Register Energy
Sky Futures
Sky Futures
Helen Fisher
Risk Solutions for the Manager
Risk Solutions for the Manager
Edwin A Merrick
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Tony Ciliberti PE
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
Ricky Smith CMRP, CMRT
Plant Maintenance
Plant Maintenance
Anand Subramaniam
CCPS PERD Project
CCPS PERD Project
Tony Ciliberti PE
The semantic web an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundation
Emerson Exchange
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
Chad Broussard
PID Advances in Industrial Control
PID Advances in Industrial Control
Emerson Exchange
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
ARC Advisory Group
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
Emerson Exchange
ISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAP
Tony Ciliberti PE
Simmco Presentation
Simmco Presentation
simmco
Application of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAP
Tony Ciliberti PE
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Stork
It Audit
It Audit
robinslides
Practical application of ISO 14224 methods in corporate software
Practical application of ISO 14224 methods in corporate software
Tony Ciliberti PE
Optimize profitability, safety, and compliance with iso 14224 methods r4
Optimize profitability, safety, and compliance with iso 14224 methods r4
Tony Ciliberti PE
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2
Emerson Exchange
Industry Standard Solution for Plant Maintenance (ISPM)
Industry Standard Solution for Plant Maintenance (ISPM)
Tony Ciliberti PE
MES - Preparation is the key to success
MES - Preparation is the key to success
NNE
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
Emerson Exchange
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and Technicians
Living Online
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
Emerson Exchange
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Sergey Mishin
Advanced Process Control for ARC
Advanced Process Control for ARC
anilkc12
Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1
Jacquie (Keith) Chischillie
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
alipaiva
Weitere ähnliche Inhalte
Was ist angesagt?
The semantic web an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundation
Emerson Exchange
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
Chad Broussard
PID Advances in Industrial Control
PID Advances in Industrial Control
Emerson Exchange
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
ARC Advisory Group
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
Emerson Exchange
ISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAP
Tony Ciliberti PE
Simmco Presentation
Simmco Presentation
simmco
Application of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAP
Tony Ciliberti PE
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Stork
It Audit
It Audit
robinslides
Practical application of ISO 14224 methods in corporate software
Practical application of ISO 14224 methods in corporate software
Tony Ciliberti PE
Optimize profitability, safety, and compliance with iso 14224 methods r4
Optimize profitability, safety, and compliance with iso 14224 methods r4
Tony Ciliberti PE
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2
Emerson Exchange
Industry Standard Solution for Plant Maintenance (ISPM)
Industry Standard Solution for Plant Maintenance (ISPM)
Tony Ciliberti PE
MES - Preparation is the key to success
MES - Preparation is the key to success
NNE
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
Emerson Exchange
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and Technicians
Living Online
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
Emerson Exchange
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Sergey Mishin
Advanced Process Control for ARC
Advanced Process Control for ARC
anilkc12
Was ist angesagt?
(20)
The semantic web an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundation
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
PID Advances in Industrial Control
PID Advances in Industrial Control
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
ISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAP
Simmco Presentation
Simmco Presentation
Application of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAP
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
It Audit
It Audit
Practical application of ISO 14224 methods in corporate software
Practical application of ISO 14224 methods in corporate software
Optimize profitability, safety, and compliance with iso 14224 methods r4
Optimize profitability, safety, and compliance with iso 14224 methods r4
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2
Industry Standard Solution for Plant Maintenance (ISPM)
Industry Standard Solution for Plant Maintenance (ISPM)
MES - Preparation is the key to success
MES - Preparation is the key to success
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
Practical Advanced Process Control for Engineers and Technicians
Practical Advanced Process Control for Engineers and Technicians
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Advanced Process Control for ARC
Advanced Process Control for ARC
Andere mochten auch
Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1
Jacquie (Keith) Chischillie
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
alipaiva
Scheduling Priority in Maximo
Scheduling Priority in Maximo
Jacquie (Keith) Chischillie
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset Management
Robert Zientara
Maximo competition
Maximo competition
Projetech
Maximo Training - Introduction
Maximo Training - Introduction
Bruno Portaluri
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
Robert Zientara
Andere mochten auch
(7)
Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Scheduling Priority in Maximo
Scheduling Priority in Maximo
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset Management
Maximo competition
Maximo competition
Maximo Training - Introduction
Maximo Training - Introduction
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
Ähnlich wie Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
Solution Manager Roadmaps
Solution Manager Roadmaps
Tony de Thomasis
ABB The road to Reliability and Efficiency
ABB The road to Reliability and Efficiency
Sammy Saba
Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01
Comarch
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
RobdeHeus
Ipscf2011 I K Price Infor10 Ea Mv10 1 Roadmap
Ipscf2011 I K Price Infor10 Ea Mv10 1 Roadmap
ricardorodalves
Itam Presentation by Cydney Davis
Itam Presentation by Cydney Davis
Cydney Davis
AH Introduction to CBM
AH Introduction to CBM
steveedgson1
Case Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise Change
Vincent Kwon
Envision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_me
Rama Raju
Enterprise Managment Operational Flow Mapped To OMB FEA and DoDAF
Enterprise Managment Operational Flow Mapped To OMB FEA and DoDAF
HolisticMeta (Self Employed, Part Time)
Axis Bank - SAS Forum India: Automation of Compliance Management – Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management – Implementa...
SAS Institute India Pvt. Ltd
Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010
Shanker Sareen
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
David O'Dowd
The Relationship Between ITG and ITSM Lifecycles
The Relationship Between ITG and ITSM Lifecycles
PradeepBhanot
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readiness
Michael Parsons
AIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data Analytics
prosenzw69
OpenErp for carpet industry
OpenErp for carpet industry
Gaurav Kumar
WebSphere Technical Conference 2009 : Enhancing your BPM Solution with ILOG J...
WebSphere Technical Conference 2009 : Enhancing your BPM Solution with ILOG J...
Dan Selman
Feb2008 Monthly Slides 1
Feb2008 Monthly Slides 1
Nadir Hussain
Sirris Digitale Fabriek IV - Informatiebrug tussen productieaansturing en het...
Sirris Digitale Fabriek IV - Informatiebrug tussen productieaansturing en het...
Sirris
Ähnlich wie Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
(20)
Solution Manager Roadmaps
Solution Manager Roadmaps
ABB The road to Reliability and Efficiency
ABB The road to Reliability and Efficiency
Comarch Technology Review Magazine 2011/01
Comarch Technology Review Magazine 2011/01
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
Ipscf2011 I K Price Infor10 Ea Mv10 1 Roadmap
Ipscf2011 I K Price Infor10 Ea Mv10 1 Roadmap
Itam Presentation by Cydney Davis
Itam Presentation by Cydney Davis
AH Introduction to CBM
AH Introduction to CBM
Case Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise Change
Envision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_me
Enterprise Managment Operational Flow Mapped To OMB FEA and DoDAF
Enterprise Managment Operational Flow Mapped To OMB FEA and DoDAF
Axis Bank - SAS Forum India: Automation of Compliance Management – Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management – Implementa...
Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
Gordon baisley - eircom - Introducing the EDM role with www.softtest.ie
The Relationship Between ITG and ITSM Lifecycles
The Relationship Between ITG and ITSM Lifecycles
The role of mro in enhancing operational capability and mission readiness
The role of mro in enhancing operational capability and mission readiness
AIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data Analytics
OpenErp for carpet industry
OpenErp for carpet industry
WebSphere Technical Conference 2009 : Enhancing your BPM Solution with ILOG J...
WebSphere Technical Conference 2009 : Enhancing your BPM Solution with ILOG J...
Feb2008 Monthly Slides 1
Feb2008 Monthly Slides 1
Sirris Digitale Fabriek IV - Informatiebrug tussen productieaansturing en het...
Sirris Digitale Fabriek IV - Informatiebrug tussen productieaansturing en het...
Mehr von alipaiva
Workflow Workshop 2012 Sep Leucir Marin
Workflow Workshop 2012 Sep Leucir Marin
alipaiva
MIF Workshop Raquel Bortoluci Sep 2012
MIF Workshop Raquel Bortoluci Sep 2012
alipaiva
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
alipaiva
Caractersticas Maximo 75 Workshop Alex Estevam Sep 2012
Caractersticas Maximo 75 Workshop Alex Estevam Sep 2012
alipaiva
Maximo Mobile Suite Workshop Regis Adamus Sep 2012
Maximo Mobile Suite Workshop Regis Adamus Sep 2012
alipaiva
Migration Manager Workshop Leucir Marin Sep 2012
Migration Manager Workshop Leucir Marin Sep 2012
alipaiva
Mehr von alipaiva
(6)
Workflow Workshop 2012 Sep Leucir Marin
Workflow Workshop 2012 Sep Leucir Marin
MIF Workshop Raquel Bortoluci Sep 2012
MIF Workshop Raquel Bortoluci Sep 2012
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
What's New in Maximo 7 Workshop Alex Estevam Sep 2012
Caractersticas Maximo 75 Workshop Alex Estevam Sep 2012
Caractersticas Maximo 75 Workshop Alex Estevam Sep 2012
Maximo Mobile Suite Workshop Regis Adamus Sep 2012
Maximo Mobile Suite Workshop Regis Adamus Sep 2012
Migration Manager Workshop Leucir Marin Sep 2012
Migration Manager Workshop Leucir Marin Sep 2012
Kürzlich hochgeladen
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
ssuserf63bd7
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
callgirls2057
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
Call girls in Goa, +91 9319373153 Escort Service in North Goa
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
ssuserf63bd7
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
saniyaimamuddin
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
Operational Excellence Consulting
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
ashishs7044
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
ashishs7044
Cyber Security Training in Office Environment
Cyber Security Training in Office Environment
elijahj01012
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
callgirls2057
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
richard876048
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
ashishs7044
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
appkodes
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
mbikashkanyari
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
NhtLNguyn9
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
ashishs7044
PSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
Anamaria Contreras
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
DallasHaselhorst
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
dollysharma2066
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
Call girls in Goa, +91 9319373153 Escort Service in North Goa
Kürzlich hochgeladen
(20)
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
Cyber Security Training in Office Environment
Cyber Security Training in Office Environment
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
PSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
1.
Maximo Product
Overview Maximo Oil and Gas 7.5 © 2009 IBM Corporation
2.
Maximo Oil &
Gas Agenda O&G - Product Overview Installation and Dependencies Description of O&G Main Applications Summary of Differences from O&G and HSE References © 2011 IBM Corporation
3.
Maximo Oil &
Gas IBM Maximo for Oil & Gas IBM Maximo for Oil & Gas helps manage assets, work and safety process related to O&G industry. IBM Maximo for Oil & Gas provides means for O&G companies to follow best practices to help improve the productivity and efficiency of their critical assets. Addresses the specialized needs of the oil & gas industry such as – failure codes, asset specifications, location details, prioritization matrix, regulatory compliance, and condition for work. Manages assets with a single approach. Manages each asset’s life cycle including acquisition, work management, inventory control, purchasing, and preventive maintenance. © 2011 IBM Corporation
4.
Maximo Oil &
Gas Product Overview - Integrated operations and maintenance process architecture Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
5.
Maximo Oil &
Gas Integrated process © 2011 IBM Corporation
6.
Maximo Oil &
Gas IBM Maximo for Oil & Gas Customer Update ADCO BP Zadco Shell Bluewater Placid Refining SouthWestern Energy Pearl Oil Petroci Williams Production OMV Flint Hills Resources Pasadena Refining Technip Cornhusker Burren Energy NCRA Korea National Oil Co Talisman Energy Applied Petroleum Resources Centrica Storage Repsol Alinta Taqa PlusPetrol Williams Midstream Sonatrach/Statoil/BP FPCC Takreer Trilogy Energy BG Baker Hughes Sunoco Skangass Gulf Drilling Petroamazonas Pharoanic Petroleum Kuwait Oil Company Atwood Oceanics ADWEA CNRL Mosaic © 2011 IBM Corporation Note: Partial list of customers
7.
Maximo Oil &
Gas Installation and Dependencies Installation is carried out on top of Maximo in the same way as any other Add-On Make sure latest cumulative hot fixes are installed including those for other Industry Solutions to be installed. There are no additional hardware requirements for Maximo for Oil and Gas over and above standard Maximo requirements. Requires Maximo Asset Management 7.5.0 Environments – fully supported on SQL Server, Oracle, DB2. Environments – fully supported on WebSphere and WebLogic. Environments – fully supported on same operating systems as standard Maximo. © 2011 IBM Corporation Note: Partial list of customers
8.
Maximo Oil &
Gas Investigations / Improvements Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
9.
Maximo Oil &
Gas Incidents (Oil) What is it? – An application to record incidents occurring during plant operation and maintenance Use cases – Failure of an isolation valve on a separator vessel causes a loss of containment. Standard operating procedures require an Incident to be raised and the cause of the containment incident identified Business Value – Improved process safety management © 2011 IBM Corporation
10.
Maximo Oil &
Gas Incidents (Oil) © 2011 IBM Corporation
11.
Maximo Oil &
Gas Defects (Oil) What is it? – A defect reporting and tracking application Use cases – Operator notices a generator cooling system running hot at 40 degrees higher than design temperature. Is concerned that this could impact long term reliability of the generator and raises a defect Business Value – Drives enhanced maintenance and operational performance © 2011 IBM Corporation
12.
Maximo Oil &
Gas Defects (Oil) © 2011 IBM Corporation
13.
Maximo Oil &
Gas Investigations (Oil) What is it? – Supports investigations of incidents or defects – A problem may be the result of one or many incidents Use cases – Could be initiated from an incident that requires further investigation into the cause of the incident Business value – Improved process safety management – A mechanism for initiating the recording of lessons learned by an organization © 2011 IBM Corporation
14.
Maximo Oil &
Gas Investigations (Oil) © 2011 IBM Corporation
15.
Maximo Oil &
Gas Cause Analysis and FMECA What is it? – Extensions to the existing Investigations application to support cause analysis and Failure Mode Effect and Criticality Analysis (FMECA) Use Cases – Conduct a 5 Whys root cause analysis against an investigation – Add a FMECA to an investigation – Document a cause and effect analysis within Maximo Business Value – Closely link analysis with follow up action – Reduces need for additional specialist applications © 2011 IBM Corporation
16.
Maximo Oil &
Gas Cause Analysis tab © 2011 IBM Corporation
17.
Maximo Oil &
Gas Risk Matrices What Is It? – Modelling of probability and consequences of events – Configurable by severity – Safety, environmental, asset – Works integrated with risk assessment application Use cases – Models a company risk matrix to determine risk ranking – A customer wants to drive priority of work based on probability of an event occurring and the consequences of the event eg RBI Business value – Improves the accuracy and consistency of risk assessment by using pre- built matrices – Leads to improved risk management © 2011 IBM Corporation
18.
Maximo Oil &
Gas Sample Consequence record © 2011 IBM Corporation
19.
Maximo Oil &
Gas Control of Work Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
20.
Maximo Oil &
Gas Hazards (Oil) What is it? – Oil and gas version of Hazards that adds new fields to support regulations, certifications and classifications Use cases – Identify the hazards and the precautions associated. Business value – Improved process safety management © 2011 IBM Corporation
21.
Maximo Oil &
Gas Hazards (Oil) © 2011 IBM Corporation
22.
Maximo Oil &
Gas Risk Assessment What is it? – Provides the ability to conduct and record risk assessments Use cases – Job Safety Analysis – Assess risk associated with Work Orders, Job Plans, Incidents, Investigations, Management of Change Business value – Improved process safety management – Earlier identification of risk © 2011 IBM Corporation
23.
Maximo Oil &
Gas Risk Assessment © 2011 IBM Corporation
24.
Maximo Oil &
Gas Risk Assessment on job plans © 2011 IBM Corporation
25.
Maximo Oil &
Gas Risk Assessment on Job Plan tasks © 2011 IBM Corporation
26.
Maximo Oil &
Gas Risk Assessment on Work Order Tracking © 2011 IBM Corporation
27.
Maximo Oil &
Gas Risk Assessment on Work Order tasks © 2011 IBM Corporation
28.
Maximo Oil &
Gas Risk Assessment on Incidents © 2011 IBM Corporation
29.
Maximo Oil &
Gas Risk Assessment on Investigations © 2011 IBM Corporation
30.
Maximo Oil &
Gas Risk Assessment on Locations © 2011 IBM Corporation
31.
Maximo Oil &
Gas Prioritization Matrix What is it? – A matrix based system of work or risk prioritization Use cases – Customers need to evaluate whether work needs to be carried out within say 24 hours, 3 days, or 1 week, based on the type of work to be performed, function and asset or location priority criteria – Implements the Ranking Index for Maintenance Expenditure (RIME) method of work prioritization Business Value – Ensures that critical assets are given priority maintenance – Takes the emotion out of criticality decisions © 2011 IBM Corporation
32.
Maximo Oil &
Gas Sample Prioritization Matrix Reason for Work RFW6 RFW5 RFW4 RFW3 Imminent Safety Environment Routine Danger Asset/Loc Matrix Matrix Matrix Matrix Matrix Matrix Matrix Matrix Index Priority Index Priority Index Priority Index Priority Priority 5 78 5 65 4 58 4 50 3 4 77 5 59 4 51 3 45 2 3 76 5 52 3 41 3 38 2 2 75 5 45 3 39 2 36 1 1 74 5 40 3 37 2 35 1 © 2011 IBM Corporation
33.
Maximo Oil &
Gas Prioritization Matrix – Reason For Work tab © 2011 IBM Corporation
34.
Maximo Oil &
Gas Prioritization Matrix – additions to Work Orders © 2011 IBM Corporation
35.
Maximo Oil &
Gas Improvements What is it? – An application to record suggestions for improvements to plant operation and maintenance – Supports Six Sigma or similar methodologies Use cases – Could arise from a defect identified by a maintenance technician or operator – Could be initiated from a Problem that requires improvement action to address the cause Business value – A mechanism to drive continuous improvement © 2011 IBM Corporation
36.
Maximo Oil &
Gas Improvements © 2011 IBM Corporation
37.
Maximo Oil &
Gas Improvements – Plans Tab © 2011 IBM Corporation
38.
Maximo Oil &
Gas Permit and Certificate Types What is it? – Provides the capability to define permit types and certificates for use on job plans, work orders and people applications Use cases – Permit planning – Personal certifications Business value – Ability to support planning of permits – Improved management of competency © 2011 IBM Corporation
39.
Maximo Oil &
Gas Permit and Certificate Types (Oil) © 2011 IBM Corporation
40.
Maximo Oil &
Gas Job Plans (Oil) Control of Work sub tab © 2011 IBM Corporation
41.
Maximo Oil &
Gas Job Plans (Oil) Task © 2011 IBM Corporation
42.
Maximo Oil &
Gas Work Order Tracking (Oil) © 2011 IBM Corporation
43.
Maximo Oil &
Gas Operations Management Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
44.
Maximo Oil &
Gas Operators Log What is it? – An application used by shift operators to record logs Use cases – Use to record events associated with a shift – Downtime and meter recording – Tracks personnel on shift Business value – Improved coordination between operations and maintenance – Enhanced organizational learning © 2011 IBM Corporation
45.
Maximo Oil &
Gas Operators Log - Shift Log tab and Shift Team sub tab © 2011 IBM Corporation
46.
Maximo Oil &
Gas Operators Log - Typical log entry © 2011 IBM Corporation
47.
Maximo Oil &
Gas Operators Log - Production Loss tab © 2011 IBM Corporation
48.
Maximo Oil &
Gas Operators Log - Create Incident © 2011 IBM Corporation
49.
Maximo Oil &
Gas Run Log What is it? – Application to provide a log for activities associated with drilling, production wells and process plant production data. Use Cases – User reports an incident associated with a downhole tool – Reporting daily production data for a well – Reporting data associated with a production run on process plant Business Value – Supports integrated operations between drilling, operations and maintenance – Leverage existing Maximo infrastructure for wells and downhole equipment © 2011 IBM Corporation
50.
Maximo Oil &
Gas Run Log (Oil) © 2011 IBM Corporation
51.
Maximo Oil &
Gas Operating Policies What is it? – Application to identify operating and maintenance strategies and link these to maintenance actions and operating procedures Use Cases – Set up a Performance Standard and link to assurance activities – Use to highlight a strategy driven by reliability centered maintenance – Identify assets maintained using risk based inspection techniques Business Value – Supports compliance by clearly linking strategy basis to specific assets/locations – Avoid the need for additional external applications to track maintenance strategy © 2011 IBM Corporation
52.
Maximo Oil &
Gas Operating Policy © 2011 IBM Corporation
53.
Maximo Oil &
Gas Operating Policies © 2011 IBM Corporation
54.
Maximo Oil &
Gas Operating Procedures What is it? – Application to document operating procedures within Maximo and link them to operating policy Use Cases – Assign an operating procedure against a task carried out by operations – Add an operating procedure to a Job Plan task Business Value – Integrated procedures shared by maintenance and operations – Improved procedural compliance © 2011 IBM Corporation
55.
Maximo Oil &
Gas Operating Procedures © 2011 IBM Corporation
56.
Maximo Oil &
Gas Operating procedure lines © 2011 IBM Corporation
57.
Maximo Oil &
Gas Operator Tasks What is it? – An application to support and view operator maintenance tasks Use Cases – Add operator driven tasks Business Value – Simplifies operator access to maintenance tasks allocated to operations © 2011 IBM Corporation
58.
Maximo Oil &
Gas Operator Tasks (Oil) © 2011 IBM Corporation
59.
Maximo Oil &
Gas Drilling and Completion What is it? – Application to support work associated with drilling and completing a well Use Cases – Use to set up all drilling activities associated with a well – Construction and completion activities associated with a well – In conjunction with Maximo Scheduler, show a Gantt chart of drilling schedule Business Value – Supports integrated operations between drilling, operations and maintenance – Use of Maximo existing infrastructure for wells and downhole equipment © 2011 IBM Corporation
60.
Maximo Oil &
Gas Drilling and Completion main tab © 2011 IBM Corporation
61.
Maximo Oil &
Gas Support for IS014224 (2006)/API 689 What is it? – Updates existing Failure Codes and Asset Specification applications with ISO14224/API 689 data Use cases – Customer already using ISO14224 (1999) wants to start using latest ISO14224 (2006) data – New customer wants to utilise latest international standard for failure reporting Business value – More consistent failure reporting – Improved availability of plant © 2011 IBM Corporation
62.
Maximo Oil &
Gas Organizations (Oil) © 2011 IBM Corporation
63.
Maximo Oil &
Gas Failure Codes What is it? – Contains the ISO 14224 (API 689) failure classes, problem, cause and remedy tables for each equipment type listed in the standard Use Cases – New oil and gas customer does not have standard failure classes and problem, cause, remedy structure. Wishes to use international standards – Existing customer not using MAXIMO failure reporting capability and wishing to do so. Business Value – Time take to gather and load failure classes, problems, causes and remedies would be significantly greater than cost of solution – Without standardized failure data, cannot implement reliability analysis © 2011 IBM Corporation
64.
Maximo Oil &
Gas Sample ISO14224/API689 Failure Codes © 2011 IBM Corporation
65.
Maximo Oil &
Gas Asset Specifications What is it? – Contains the ISO 14224 (API 689) Equipment Unit Subdivision and Equipment Unit specific data tables for every equipment type listed in the standard Use cases – New Oil and gas customer does not have standard asset specification templates for locations or equipment. Wishes to use international standards – Existing customer not using MAXIMO asset catalog capability and wishing to do so with an industry standard methodology Business Value – Time take to gather and load asset specifications would be significantly greater than cost of solution – Standardized asset specifications facilitate comparisons of equipment performance © 2011 IBM Corporation
66.
Maximo Oil &
Gas Change Management Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
67.
Maximo Oil &
Gas Management of Change What Is It? – An application to support management of changes process cycle, from request to closure Use cases – Management of engineering and plant change requests – Management of change associated with deferred work Business value – Greater process conformity through integration with work management process – Improves communication between operations and maintenance © 2011 IBM Corporation
68.
Maximo Oil &
Gas Full Cycle MOC MOC Details Risks and Projects Review Approve Pre-MOC actions Authorize Post-MOC actions Closure © 2011 IBM Corporation
69.
Maximo Oil &
Gas Management of Change Request screenshot © 2011 IBM Corporation
70.
Maximo Oil &
Gas Management of Change – Main tab © 2011 IBM Corporation
71.
Maximo Oil &
Gas Management of Change – Risk and Project © 2011 IBM Corporation
72.
Maximo Oil &
Gas Management of Change – Review and Approval © 2011 IBM Corporation
73.
Maximo Oil &
Gas Management of Change – Pre Start © 2011 IBM Corporation
74.
Maximo Oil &
Gas Management of Change - Authorize © 2011 IBM Corporation
75.
Maximo Oil &
Gas Management of Change – Post-Start © 2011 IBM Corporation
76.
Maximo Oil &
Gas Management of Change – Closure © 2011 IBM Corporation
77.
Maximo Oil &
Gas Compliance Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory Lessons Operator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear Asset Loss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
78.
Maximo Oil &
Gas Action Tracking What is it? – A way of following up Actions arising from Investigations or Improvements – A means of tracking Actions agreed with regulatory authorities or internal review teams Use cases – A HSE audit is carried out on an offshore oil platform. As a result of this audit a number of actions are required to maintain the platforms license to operate. These actions must be tracked and reported on within a specified time period – A Safety Notification is received which requires completion of a survey and review of all balanced bellows pressure relief valves by a specified date Business Value – Drives implementation of business critical actions © 2011 IBM Corporation
79.
Maximo Oil &
Gas Action Tracking © 2011 IBM Corporation
80.
Maximo Oil &
Gas Standard Actions What Is It? – An application to manage standard actions that can be associated with management of change processes and standard checklists Use cases – Create pre and post MOC type actions that can be listed in the Management of Change application – Use to create standard checklists that can be associated with work carried out in Maximo Business value – Provides greater process conformity through use of standard actions and checklists © 2011 IBM Corporation
81.
Maximo Oil &
Gas Standard Actions © 2011 IBM Corporation
82.
Maximo Oil &
Gas Regulatory Compliance What is it? – Provides ability to hold details of regulations relevant to work carried out in Maximo, and relate these regulations to both work planned in Maximo and actual work carried out Use cases – Provide documented proof that work carried out in Maximo was completed based on the required regulation – Provides the ability to demonstrate compliance with many statutory requirements covering safety, health and environment Business Value – Identifies compliance with relevant regulations – Simplifies work required to demonstrate compliance © 2011 IBM Corporation
83.
Maximo Oil &
Gas Regulatory Compliance main tab © 2011 IBM Corporation
84.
Maximo Oil &
Gas Regulatory Compliance tab on Locations © 2011 IBM Corporation
85.
Maximo Oil &
Gas Regulatory Compliance tab on Work Orders © 2011 IBM Corporation
86.
Maximo Oil &
Gas Regulatory Compliance - ‘Where Used’ tab © 2011 IBM Corporation
87.
Maximo Oil &
Gas Condition for Work What is it? – Establish the conditions necessary before work can commence e.g. plant shutdown, train shutdown, unit shutdown, isolated, depressurized,…. Use cases – A common element of the work planning process in downstream and offshore oil and gas Business Value – Supports planning of work associated with common plant – Facilitates opportunity maintenance © 2011 IBM Corporation
88.
Maximo Oil &
Gas Condition for Work main tab © 2011 IBM Corporation
89.
Maximo Oil &
Gas Condition For Work field on Job Plans © 2011 IBM Corporation
90.
IBM - Maximo
Health, Safety and Environment Manager Maximo HSE Manager © 2009 IBM Corporation
91.
Summary of Differences
from Oil and Gas 7.5.0 to HSE Manager 7.5.0 Drilling and Completion application removed Run Log application removed ISO14224 Failure Code and Asset Specification loading dialogs removed from Organizations (HSE) List Tab ISO14224 Taxonomy section removed from Locations (HSE) Operating Context tab All references to (Oil) changed to (HSE) on application screens and menus September 13, © 2009 IBM Corporation 2012
92.
References Information center is
at: http://publib.boulder.ibm.com/infocenter/tivihelp/v49r1/topic/com.ibm.hse.doc/welcome.html – The Welcome page contains links to the Installation Guide to the Quick Start Guide, and to application help. – The Reference section of the Information Center contains detailed information on integration error messages. From Maximo on IBM.com: – http://www.ibm.com/software/tivoli/products/maximo-health-safety-environment – Click Product documentation September 13, © 2009 IBM Corporation 2012
93.
Contacts Marcos Paulo Salvador
de Oliveira Ana Paula Brambila September 13, © 2009 IBM Corporation 2012
94.
Dúvidas? September 13,
© 2009 IBM Corporation 2012
Jetzt herunterladen