ASSISTANT PROFESSOR  LPU, PUNJAB  Software Project Management
Till far we have studied  ,[object Object],[object Object],[object Object],[object Object]
1.1  What is a Project? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1.2  Project vs Programme ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1.3  Project Success or Failure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1.4 Software project vs other project  ,[object Object],[object Object],[object Object],[object Object]
1.5 Type of Software  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1.6 Problem with software project  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1.7  Why Projects need to be Managed ? ,[object Object],[object Object],[object Object]
1.8  Project Management (Defn.) ,[object Object]
1.9 Activities in Software Project Management  ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
1.10 Step Wise Project planning  1. Identify project objectives 2. Identify project infrastructure 3. Analyse project  characteristics 4. Identify products  and activities   5. Estimate effort  for activity   8. Review/ publicize plan   6. Identify activity risks   7. Allocate resources   9. Execute plan   10. Lower level planning   Review Lower level detail For each activity 0.Select project
A project scenario ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 1 establish project scope and objectives ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 2 Establish project infrastructure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 3 Analysis of project characteristics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 4 Identify project products and activities ,[object Object],[object Object]
Products ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Product breakdown structure(PBS) ,[object Object],[object Object],Project Products System Project Module Products Management Projects Progress  Report Module Code Module Design doc Tested integrated software Overall specification
Product description (PD) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 4 continued ,[object Object],[object Object],[object Object],[object Object],[object Object],User Requirement  Overall system Specification Module design Integrated system test case Module code Integrated software
Step 4.3 Recognize product instances ,[object Object],[object Object],[object Object]
4.4. Produce ideal activity network ,[object Object],[object Object],[object Object]
An ‘ideal’ activity   Specify overall system Design Module A Design Integration  Test case Design Module B Code module  A Test Integration  software Code module  B
Step 4.5 Add check-points if needed Design module A Design module B Design system Design module C Code module A Code module B Code module C Test system Design module A Design module B Design system Design module C Code module A Code module B Code module C Test system Check-point put in a check point
Step 5:Estimate effort for each activity ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 6: Identify activity risks ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object]
Step 7: Allocate resources ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Gantt charts Select subjects Design questionnaire Book machine Conduct tests Analyse results Week commencing 5 12 19 26 MARCH APRIL 9 16 Plan testing 2 Draft changes LT TA LT TA LT LT TA LT = lead tester TA = testing assistant
Step 8: Review/publicise plan ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Step 9 and 10: Execute plan and create lower level plans
Step 9 &10: Execute plan/ low level of planning  ,[object Object],[object Object]
Step Wise Project planning  1. Identify project objectives 2. Identify project infrastructure 3. Analyse project  characteristics 4. Identify products  and activities   5. Estimate effort  for activity   8. Review/ publicize plan   6. Identify activity risks   7. Allocate resources   9. Execute plan   10. Lower level planning   Review Lower level detail For each activity 0.Select project
[object Object]
a product breakdown structure  of a computer.
EXAMPLE ,[object Object]
  product breakdown structure of the ‘old shed’ 
  Product Flow Diagram
[object Object],[object Object],[object Object]

More Related Content

What's hot

Software Engineering (Risk Management)
Software Engineering (Risk Management)Software Engineering (Risk Management)
Software Engineering (Risk Management)ShudipPal
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Stepwise Project planning in software development
Stepwise Project planning in software developmentStepwise Project planning in software development
Stepwise Project planning in software developmentProf Ansari
 
Managing contracts
Managing contractsManaging contracts
Managing contractstumetr1
 
Requirements Engineering Processes in Software Engineering SE6
Requirements Engineering Processes in Software Engineering SE6Requirements Engineering Processes in Software Engineering SE6
Requirements Engineering Processes in Software Engineering SE6koolkampus
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)Er. Shiva K. Shrestha
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project ManagementSaadi Jadoon
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23koolkampus
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Project Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software DevelopmentProject Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software DevelopmentProf Ansari
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approachtumetr1
 
Software Engineering Layered Technology Software Process Framework
Software Engineering  Layered Technology Software Process FrameworkSoftware Engineering  Layered Technology Software Process Framework
Software Engineering Layered Technology Software Process FrameworkJAINAM KAPADIYA
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation TechniquesSanthi thi
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimationHaitham Ahmed
 
Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9koolkampus
 

What's hot (20)

Software Engineering (Risk Management)
Software Engineering (Risk Management)Software Engineering (Risk Management)
Software Engineering (Risk Management)
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Stepwise Project planning in software development
Stepwise Project planning in software developmentStepwise Project planning in software development
Stepwise Project planning in software development
 
Managing contracts
Managing contractsManaging contracts
Managing contracts
 
Requirements Engineering Processes in Software Engineering SE6
Requirements Engineering Processes in Software Engineering SE6Requirements Engineering Processes in Software Engineering SE6
Requirements Engineering Processes in Software Engineering SE6
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)
 
Spm unit 2
Spm unit 2Spm unit 2
Spm unit 2
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Project Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software DevelopmentProject Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software Development
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approach
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
Software Engineering Layered Technology Software Process Framework
Software Engineering  Layered Technology Software Process FrameworkSoftware Engineering  Layered Technology Software Process Framework
Software Engineering Layered Technology Software Process Framework
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
software quality
software qualitysoftware quality
software quality
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9
 

Viewers also liked

PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Attra Partners Prince2 Intro
Attra Partners Prince2 IntroAttra Partners Prince2 Intro
Attra Partners Prince2 Introchouha
 
Product flow diagram
Product flow diagramProduct flow diagram
Product flow diagramdeepanker007
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Nurhazman Abdul Aziz
 
Activity planning
Activity planningActivity planning
Activity planningtumetr1
 
SPM Activity Planning Introduction
SPM Activity Planning IntroductionSPM Activity Planning Introduction
SPM Activity Planning IntroductionKanchana Devi
 
Planning & Decision making
Planning & Decision makingPlanning & Decision making
Planning & Decision makingImran Udas
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project ManagementRamesh Babu
 
PLANNING ,DECISION MAKING & ORGANIZING
PLANNING ,DECISION MAKING & ORGANIZINGPLANNING ,DECISION MAKING & ORGANIZING
PLANNING ,DECISION MAKING & ORGANIZINGsamsoncj999
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)tomeh
 
Financial Supply Chain Management
Financial Supply Chain ManagementFinancial Supply Chain Management
Financial Supply Chain ManagementArchana Kadam
 

Viewers also liked (20)

Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Attra Partners Prince2 Intro
Attra Partners Prince2 IntroAttra Partners Prince2 Intro
Attra Partners Prince2 Intro
 
Product flow diagram
Product flow diagramProduct flow diagram
Product flow diagram
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
 
Resource management
Resource managementResource management
Resource management
 
Activity planning
Activity planningActivity planning
Activity planning
 
SPM Activity Planning Introduction
SPM Activity Planning IntroductionSPM Activity Planning Introduction
SPM Activity Planning Introduction
 
Planning & Decision making
Planning & Decision makingPlanning & Decision making
Planning & Decision making
 
Visualizing Product Flow
Visualizing Product FlowVisualizing Product Flow
Visualizing Product Flow
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Spm unit 5
Spm unit 5Spm unit 5
Spm unit 5
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
PLANNING ,DECISION MAKING & ORGANIZING
PLANNING ,DECISION MAKING & ORGANIZINGPLANNING ,DECISION MAKING & ORGANIZING
PLANNING ,DECISION MAKING & ORGANIZING
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
 
Financial Supply Chain Management
Financial Supply Chain ManagementFinancial Supply Chain Management
Financial Supply Chain Management
 

Similar to 1 2. project management

Spm project planning
Spm project planning Spm project planning
Spm project planning Kanchana Devi
 
(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptxgarkapifye
 
Unit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfUnit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfAkshayDwivedi31
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project schedulinglokareminakshi
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - PresentationHassan Rizwan
 
Overview of project planning
Overview of project planningOverview of project planning
Overview of project planningNidhya Rangarajan
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2Future Managers
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software EngineeringMajane Padua
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdfShivareddyGangam
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management modelLatte Media
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept MuhammadTalha436
 
Software Life Cylce Model
Software Life Cylce ModelSoftware Life Cylce Model
Software Life Cylce ModelJegadeesh Sam
 

Similar to 1 2. project management (20)

Spm project planning
Spm project planning Spm project planning
Spm project planning
 
(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx
 
Unit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfUnit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdf
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project scheduling
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
Overview of project planning
Overview of project planningOverview of project planning
Overview of project planning
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Week_02.pptx
Week_02.pptxWeek_02.pptx
Week_02.pptx
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdf
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management model
 
Project Management Complete Concept
Project Management Complete Concept Project Management Complete Concept
Project Management Complete Concept
 
Process Models IN software Engineering
Process Models IN software EngineeringProcess Models IN software Engineering
Process Models IN software Engineering
 
Software Life Cylce Model
Software Life Cylce ModelSoftware Life Cylce Model
Software Life Cylce Model
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 

Recently uploaded

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 

Recently uploaded (20)

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 

1 2. project management

  • 1. ASSISTANT PROFESSOR LPU, PUNJAB Software Project Management
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.  
  • 13. 1.10 Step Wise Project planning 1. Identify project objectives 2. Identify project infrastructure 3. Analyse project characteristics 4. Identify products and activities 5. Estimate effort for activity 8. Review/ publicize plan 6. Identify activity risks 7. Allocate resources 9. Execute plan 10. Lower level planning Review Lower level detail For each activity 0.Select project
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. An ‘ideal’ activity Specify overall system Design Module A Design Integration Test case Design Module B Code module A Test Integration software Code module B
  • 26. Step 4.5 Add check-points if needed Design module A Design module B Design system Design module C Code module A Code module B Code module C Test system Design module A Design module B Design system Design module C Code module A Code module B Code module C Test system Check-point put in a check point
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. Gantt charts Select subjects Design questionnaire Book machine Conduct tests Analyse results Week commencing 5 12 19 26 MARCH APRIL 9 16 Plan testing 2 Draft changes LT TA LT TA LT LT TA LT = lead tester TA = testing assistant
  • 32.
  • 33.
  • 34. Step Wise Project planning 1. Identify project objectives 2. Identify project infrastructure 3. Analyse project characteristics 4. Identify products and activities 5. Estimate effort for activity 8. Review/ publicize plan 6. Identify activity risks 7. Allocate resources 9. Execute plan 10. Lower level planning Review Lower level detail For each activity 0.Select project
  • 35.
  • 36. a product breakdown structure of a computer.
  • 37.
  • 38.   product breakdown structure of the ‘old shed’ 
  • 39.   Product Flow Diagram
  • 40.

Editor's Notes

  1. Here we follow the PRINCE approach of firstly identifying the products to be created. These products could be deliverables that will eventually be handed over to the customer, or intermediate products such as specifications and design documents, that are produced along the way. The PBS is a way of listing these products. In the scenario, the need for usability testing was identified, and the example of planning a usability test is used here. In order to do the testing, we need a set of selected subjects , a group of people who have similar characteristics to those who will finally use the system and who have agreed to try out the application. We need to have a booked PC that is available for testing when we need it. We are going to give each subject a questionnaire to complete when they have tried out the application ( completed questionnaire ), but we will need to have a questionnaire design first. We are also to observe the subjects using the application and collect details of things like the time taken to complete standard tasks and the errors they make ( test results ). These will then be analysed and the results put in an analysis report which will then be used to suggest changes to the application ( change requests ). All the boxes in the diagram which are not sub-divided at a lower level represent products. Boxes that are sub-divided (i.e. usability testing and testing arrangements ) are names given to the group of activities that are connected to them lower in the hierarchy.
  2. The names of products on the PBS can be rather vague. If you were to ask someone to produce, for example, the ‘analysis report’ in the usability testing scenario, then you would need to explain exactly what you mean by that. This is done via a Product Description. PDs can usually be re-used from one project to another. Note that they are different from specifications – the explain in general terms what a product is and the description is relevant to all instances of that product. A specification describes a particular instance within the class of products.
  3. The product flow diagram shows the order in which the products have to be completed. Effectively it defines a method of working. Note that as we drew up the PFD for the usability testing scenario, we identified an additional product called ‘testing plan’. The flow of the PFD is generally from top to bottom and left to right. We do no put in lines which loop back. This is not because iterative and back-tracking is not accepted. Rather it is that you can in theory jump back to any preceding product. For example, when producing the analysis report we might realise that there is a particular type of user that we have not included in our tests. We could go back and find some more selected subjects . However this would potentially mean that all the products that follow the one we have jumped back to would have to be reworked.
  4. You now need to allocate resources (in particular, staff) to the activities in the plan. Where there is a resource constraint, that is there are not enough staff (or other resource) of the right type to start all the activities that run in parallel at the planned time, then the start of some activities may need to be delayed until the appropriate resources are available.
  5. We now have the basic information needed to produce a plan. One way of presenting the plan is by means of a Gantt chart (named after Henry Gantt).
  6. We have noted already that it is not feasible to produce a detailed plan for all stages of the project right at the beginning of the project planning process and not all the information needed for the detailed planning of the later stages is available at the outset. Initially an outline plan for the whole project would be produced, plus a detailed plan for the first stage.