2. PZL „Warszawa-Okecie” 90 years of history
2
1928 2001
Acquisition by
EADS-CASA
of 77% of shares
90 years of aviation heritage
More than 22 aircraft models
More than 6000 units delivered
PM Józef Piłsudski ordered
the establishment of PZL
PZL-23 Karas
(1934)
PZL-37 Los
(1938)
PZL-104 Wilga
(1962)
PZL-106 Kruk
(1973)
PZL-130 Orlik
(1984)
PZL TS-11 Iskra
(1960)
3. Since 1928 we are pioneers
of Polish aerospace.
We design, build, service
and operate aircraft with
excellence and passion.
The expertise, flexibility
and efficiency of our people
create unique value for our
customers worldwide.
Our mission and vision
And now we are
ready for take-off,
so welcome on
board!
4. Specialize as end-to-end Tier 2
supplier of equipped metallic
aerostructures for low rate
programs
Develop Engineering services
Protect our
MRO business
Become #1 Polish supplier
of space harnesses and
equipped structures
Partner-up to
export Orlik
Focus on five opportunities to grow and diversify in the next five years
5. Space
PZL has invested 500 m2 ISO8 clean room assembly area in Poland
to be ready to manufacture a space flying components and in future
for integration of satellites.
• flexible production area and dedicated warehouse and area for cables cutting
We are focused on continuous development of our personnel for
space activities. We have already personnel capable to execute
projects for space harnesses:
• Design of harnesses, mock-ups, transport containers
• Operators with full range of skills for manufacturing, including soldering
and crimping in space requirements
• Quality inspectors
• Manufacturing process engineering
• Project management
5
6. ORLIK is a complete training system:
The Aircraft
• Stepped tandem cockpit with Martin-Baker
Ejection Seats
• P&W PT6-25C turboprop engine 750 SHP
• Cost effective IFR Avionics with Electronic Flight Instruments PFD, HSI
based on 2 AHRS platforms, with DME/ADF/GPS/VOR/ILS/GS navigation
systems and Communication System
The Flight Simulator (under development)
• 180 x 80 deg field of view dome projection system
• double operator station for formation flight training
• flight controls loads simulation and seat vibration included
The Computer Based Training
• For pilots
• For maintenance staff
6
PZL-130 Orlik – Turboprop Trainer
8. Military Services
Equipment and qualified personnel in Warsaw ensures:
• any level of maintenance for C295 aircraft
• technical support at the customer’s base
• logistic services regarding spare parts and repairs
Capabilities:
• C-295 base and line maintenance: 8Y/4Y/2Y/Y checks;
3C/ 2C/C checks; 3A/2A/A checks
• Retrofitting, modifications and SB implementation (structural + electrical),
defect repairs and engineering support including repair designs
• Management of inspection, repair and overhaul of LRU and accessories,
(including engines and propeller)
• Repair of electric control units (under development)
19 March, 20188 PZL „Warszawa-Okecie”
9. Aerostructures
Electrical harnesses
19 March, 20189
Sheet metal forming,
surface treatment and painting
• Cutting and marking cables
• Printing materials:
TMS-SCE, CM-SCE-TP, D-SCE
• Overbraiding
• Taping harnesses up to diam.
20 mm, tape width 9-19mm
• Harnesses manual manufacturing
• Continuity and isolation test
• Parts digitalization
• CNC cutting
• Rubber press forming
• Bending, milling, deburring
• Aluminum alloys heat treatment
• Penetrant and hardness inspection
• Anodizing in chromic acid and
alodine coating
PZL „Warszawa-Okecie”
Assembly
• Production airframe structural
assembly based on manufacturing
documents.
• Assembly of metal and composite
structures incl. surface protection.
• Fitting, adjustment and completion
operations.
• Manual drilling and riveting.
• Sealing and painting.
• C295: Wing, Front Cockpit
Fuselage, Colon, Cargo Door
and Ramp, Doors, Seats
• A330: Section 13 & HTP
Central Box
• Electrical Harnesses for A320
NEO, A330, C295, A400M
Products
10. Our digital transformation journey
10
Digital
backbone
Paperless
Factory
Smart
ToolsSmart
mgmt.
High-tech
Manuf.