SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
POWER FACTOR SOLUTION
saving your money by saving your energy
G-12, PRESTIGE PLAZA, NEAR S.B.I, MUL ROAD,
CHANDRAPUR-442 401 (M.S.)
Email-solutionpf@rediffmail.com, solutionpf@gmail.com
Ph.No. 07172-270950, +91 9657389889, 9850373110
Follow us -www.facebook.com/solutionpf
Contents
About us
Field of Operations,
About Power Factor Improvement and Harmonics

Product Range
Our Parent Collaborators
From the Photo Gallery
Case Studies
Clientele
About us
POWER FACTOR SOLUTION (PFS) which itself defines MORE POWER BY
SAVING ENERGY.PFS gives you saving your money by saving your energy. Since past
five years we are in service to our valued clients with our quality and result oriented
products of reactive power compensation along with harmonic suppression, substation
automation, Illumination Study and Designing, Complete Electrical Panels.
We along with our parent collaborator companies have developed and implemented a
quality management system that never compromise quality for price. Our services with our
quality products assure our clients get the job done on time and on budget, while still
providing
quality
of
service
and
exactly
what
they
want.
We are for your service in collaboration with Claritas Power System Solution Pvt Ltd
(CPSSPL), Kokban Automation & Greenovative Energy Solutions.
Work place do not matter for us, we serve our clients across India and Abroad.
Our Vision
Our VISION is “To evolve as a trusted supplier for energy efficient
solutions by harnessing state of the art technology, innovation and
competitive professionals with clear focus on delivering highest quality
service”
We believe, “Business is Relationship & we strengthen on
management of Relationship.” With this looking forward for
opportunity to meet you for further discussion & long term fruitful
association.
Field of Operation
Cement,Tyre,Automobile
Steel,Textiles
Power Plants,
Oil, Paper,
Telecom,
Infrastructure,
Hospitality,
Engineering,
Stone Crushers,
Rice Mill
Sugar
Ginning and Pressing
Chemical and
All types of industries who bothers for huge electricity
losses.
Improving your power Factor can reduce operating costs by eliminating or deferring the need for
new equipment, help existing equipment last longer and make future expansion less costly. Also
lower rating sized equipment can be used, saving unnecessary capital expense. All this is in addition
to a quick return on installing capacitor systems to improve power factor.
From the Electricity utility point of view, raising the average operating power factor of entire grid
network from 0.90 to 0.99 means,
-Reduced costs from inefficiencies in the network.
-Increased generation and distribution potential
-Lower demand on the grid
This means the utility can save hundreds of tons of fuel (and produce fewer emission), have more
transformers available and reduce the likelihood of building new power plants and their support
systems. For this reason many electricity utility companies pass a power factor incentive to consumer so
that they can save the additional cost required to support efficient system
In connection with reactive power compensation, power quality should also be considered.
Harmonic filtering reduces the risk of technical faults and disturbances.Voltage distortions
resulting from harmonic currents are caused by inverters, DC drives, fluorescent lighting,
converters, UPS, arc furnaces, etc. In practice harmonic filtering brings a number of bonuses:
Disturbances in telecommunications and data transmission are minimized.
Electronics, control systems, converters, motors and generators operate without
interruption.
No risk of overloading cables, nuisance tripping of relays or fuses
Poor quality may remain unnoticed for a long time. Quality deficiency may easily bring extra costs in
the form of high electricity bills and an oversized power system.
Our Product Range
Power (LT & HT) Capacitors,
LT & HT APFC Panels with Harmonic Filters
(Contactor and Thysristor Based),
Harmonics Solution
Harmonic Analysis Study
Fire Detection Systems
Access Controls, Security & Surveillance,
Lighting Controls,
Substation Automation
MCC, PCC, PLC, Distribution Panels,
Low Voltage Switchgears,
Illumination,
Annual Maintenance Contracts
Claritas Power System Solution Pvt Ltd.(CPSSPL) is incorporated in the year 1998 and is
certified by ISO 9001:2008 and who have signed a joint venture with FRAKO, Germany for
distribution and sales are one of the well known manufacturer, supplier, exporter and service
provider of a huge gamut of Power Systems. Our comprehensive range of these systems consists of
Electronic Active Filters, Thyristor Switched Capacitor Banks, Automatic Harmonic Filter Panel,
Tuned Harmonic Filters, Detuned Filters, Power Factor Control Relays, Capacitor Switching
Contactors, LT Capacitors, HT Reactors, and Power Quality Analysis etc.
CPSSPL customize these products as per the specifications of the clients. Our range is made in
advanced manufacturing unit under the guidance of experts.. CPSSPL captured market for products
in various areas like Zambia, UAE,Dubai, Iran, South Africa, Sri Lanka, South Arabia, Rome, Nigeria
and Turkey. CPSSPL achieved strong Foothold in the market for our products. Industrial experience
and ability to cater the needs of the clients made CPSSPL successful in the market.

In collaboration with Greenovative Energy Solution(GES), we provide effective solutions for
significant reduction in energy costs for Industrial, Infrastructure & Commercial facilities through the
Lighting solutions.GES are authorized member of Indian society of Lighting Engineers(ISLE).ISLE is a
professional body in the field of illuminating engineering and having Team of BEE Certified Energy
auditors with more than 25 years of experience.

We involved in supply and distributing ELECTRICAL PANELS with a reputed brand which match
the optimum quality standards. The range of products includes Control Panel,MCC,PCC,Distribution
Panels and Boards,PLC,Main LT Panels,etc and many more. We ensure to follow all the industry
guidelines and standards while manufacturing these panels.
Kokban offers varied RTU based SCADA solutions using ABB , ERL & Beckhoff RTU to meet your
application needs, from simple RTUs to comprehensive substation automation systems. All are designed to
enable you to monitor, control and protect your substations in the most effective manner possible with the
lowest operations and maintenance cost combined with minimum downtime.
Kokban Automation has partnered with ABB to provide world class process automation solutions using
state of the art PLC, DCS and SCADA products from ABB. The systems are tested & proven across
industries in varied environments and applications. We can provide solutions for Power, Cement, Metals,
Chemical, Pharmaceutical and Water applications. Above all the solutions deployed by Kokban are future
proof as they are designed keeping in view the long term interest of the end user.
Kokban Automation leverages the in house automation expertise to design and build Fire Detection
System for clients in diverse industries, IT offices, Commercial establishments and shopping malls. The
solutions range from conventional detectors to the most advanced detectors using dual scattering
(Forward & Backward) sensing principal from Honeywell. Kokban Automation has wide range of
Honeywell products that are suitable for specific customer requirements in terms of detection principles,
hazardous area requirements and safety budgets.
Keeping in line with our vision of providing energy efficient solutions to the client, we offer Lighting
Control using Honeywell make occupancy detectors. These detectors are extremely easy to install and the
considerable energy savings resulting from this ensures that the return on investment is very fast. The
solution is extremely rugged and proven across continents. Once installed, this system can function
smoothly with minimal maintenance.
Photo GalleryIndustry we serve
Case Studies
At Reputed steel, Furnace Ind.in Tamilnadu
Recommendations and results over observations during study
Sr.No.

1

2

3

4

Nature of Problem

Observations during study

Recommendation

Results

Furnace & Rolling Mill were Presence of Higher order
not running simultaneously Harmonics
resulting in production loss.

Installation of Tuned
Harmonic Filter bank on HT
side to suppress higher order
Harmonics generated due to
Furnace load

After implementation of
recommended schemes % of
Harmonic in network is
reduced as IEEE 519-1992

Failure of Electronic Meter, Existing scheme of LT
Indicators, UPS system &
capacitors on LT bus are
inadequately designed
Drive Cards

Installation of Fast acting
(RTPFC) Tuned filter bank to
be connected on
Transformer having
fluctuating load

Furnace & Rolling mill running
simultaneously at Full load
conditions satisfactory on
continuous basis resulting in
enhancing production

Varying Harmonic spectrum &
High Energy charges & poor fluctuating load exerts
dangerous overload on network
load factor
& affect life of connected
switchgears & cables
Poor Power Factor & High Voltage sensitive equipments &
KVA demand
electronic card failure caused
due to resonance effect &
Harmonic amplification

Installation of capacitor filter No failure of Electronic
(Tuned) panel for Power
meters, Indicators, UPS, Drive
Factor improvement &
cards
Harmonic Suppression
Centralized Power Factor
Low Energy charges &
sensing for entire 33 KV bus Improved load factor
(Furnace + Rolling mill) by
optimizing Reactive power &
harmonic control

This Harmonic amplification
may lead to premature failure
of DC drives, motors along with
Transformers

Power Factor improved to
0.997 & above upto unity &
optimized Demand

overall Power factor is low
6

Improved quality of Power by
reduction in Harmonics &
improved power Factor

7

All system supplied by Claritas
are running giving desired
result

5

Bad quality of power due to
high level of Current &
Voltage harmonics
generated due to 25 Tonne,
12 pulse Induction Furnace
At Reputed Textile ind.in Maharashtra
Sr.
No

Location

1

Power House 1

a

Main Incomer
Without Harmonic Filter
Main Incomer
With Harmonic Filter

Voltage

Current
(A)

V THD

A THD

%

Power
Factor

%

Power

KWH Readings

KWh Difference

KW

Start

End

For 5 mins

For 1 Hr.

2
a

Power House 2(Weaving
Unit)
Main Incomer
Without Harmonic Filter
Main Incomer
With Harmonic Filter

70

1.8

5.1

0.991 (lag)

3627

15.03

312.4

297.37

3568.44

30.84 KV

68.4

1.1

2.9

0.997 (lag)

3585

9.93

305.28

295.35

3544.2

KWH

b

30.42 KV

Reduction

for 1 Hr.

24.24

3

Transformer 1
Without Harmonic Filter
Transformer 1
With Harmonic Filter

52.6

4.1

15.6

0.982 (lag)

2889.9

7.81

245.11

237.3

2847.6

32.31 KV

51.5

2.1

3.3

0.998 (lag)

2791.1

26.96

257.81

230.85

2770.2

Reduction

for 1 Hr.

77.4

581.76

1857.6

Power House 3 (PC II )

3A

32.28 KV

KWH

b

for 24 Hrs

2201.7

6.6

12

0.969 (lag)

1506.6

8.63

133.8

125.17

1502.04

414 V

2088.4

3.8

5.5

0.995 (lag)

1489.9

16.29

140.2

123.91

1486.92

KWH
3B

408.4 V

Reduction

for 1 Hr.

15.12

Transformer 2

403.7 V

2265.5

8.0

12.1

0.906 (lag)

1458.8

2.01

124.2

122.19

1466.28

Without Harmonic Filter
Transformer 2
With Harmonic Filter

410.6 V

2104

3.8

3.7

0.993 (lag)

1436.11

0.785

119.3

118.515

1422.18

KWH

Reduction

for 1 Hr.

44.1

362.88

Abbreviations:
V: Volts
A: Ampere
KW: Kilo Watts
KWH: Kilo Watt Hour
V THD: Voltage Total Harmonic
Distortion
A THD: Current Total Harmonic
Distortion

1058.4
1. In Power House 1 (at main Incomer)
A. Voltage harmonic distortion is reduced to 1.1 % from 1.8 % & current harmonic distortion is reduced to 2.9 % from 5.1 %
B. These percent of harmonics are within specified limit defined by Utility board
C. Current reduction is about 2 Ampere
D. Voltage is improved.
E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 560 to 600 KWh per day.
F. About 0.79 % saving in Kwh. (Only 3 three Harmonics filters installed. & load is more )
2. In Power House 2 (at main Incomer)
A. Voltage harmonic distortion is reduced to 2.1 % from 4.1 % & current harmonic distortion is reduced to 3.3 % from 15.6 %
B. These percent of harmonics are within specified limit defined by Utility board
C. Current reduction is about 2 Ampere
D. Voltage is improved.
E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1800 to 2000 KWh per day.
F. About 2.8 % to 2.9 % saving in Kwh.
3. In Power House 3
At Transformer 1 Incomer:
A. Voltage harmonic distortion is reduced to 3.8 % from 6.6 % & current harmonic distortion is reduced to 5.5 % from 12 %
B. Power Factor is improved to 0.995 (lag) from 0.969 (lag)
C. Current reduction is about 113 Ampere.
D. Voltage is improved and found stable.
E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 360 to 400 KWh per day.
F. About 1.5 % to 2 % saving in Kwh.
At Transformer 2 Incomer:
A. Voltage harmonic distortion is reduced to 3.8 % from 8 % & current harmonic distortion is reduced to 3.7 % from 12.1 %
B. Power Factor is improved to 0.993 (lag) from 0.906 (lag)
C. Current reduction is about 150 Ampere.
D. Voltage is improved and found stable.
E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1050 to 1100 KWh per day.
F. About 3.5 % to 4 % saving in Kwh.

At Transformer 3 Incomer:
A. On this transformer, only one RTPFC filter panel is installed which is running satisfactory in auto as well as manual mode.
B. The load on this transformer is not stabilized as many new machines are under commissioning on PDBs.
C. Still Power factor is improved to 0.995 (lag).
D. New filters to be installed after load stabilization to maintain the power factor & harmonic suppression to achieve substantial reduction in KWh.
Note: Observed readings are for 10 mins only, during which it is assumed that load is fairly constant.
Thus power savings indicated above will have to be observed over a long Period.
So it is observed that all the Harmonic Filter Bank supplied by M/s.Claritas Power System Solution Pvt Ltd,Pune are working properly and delivering
satisfactory results.
At Govt. Power Plant,
Before Installation Electricity Bill
At Govt. Power Plant,
After Installation Electricity Bill
At Govt. Power Plant,
Performance Certificate issued
At Cement Industry,
Performance Certificate
Our Clientele
Power factor solution,presentation

Weitere ähnliche Inhalte

Was ist angesagt?

power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+nirajsoham patel
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction VIKAS KUMAR MANJHI
 
Automatic Power Factor Corrector Using Arduino report
Automatic Power Factor Corrector Using Arduino reportAutomatic Power Factor Corrector Using Arduino report
Automatic Power Factor Corrector Using Arduino reportSelf-employed
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500Navyasri Jiguru
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Pulse Energy
 
Minimizing losses in power distribution system
Minimizing losses in power distribution systemMinimizing losses in power distribution system
Minimizing losses in power distribution systemharshal567
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final manpreetsingh1076
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportTheory to Practical
 
Power factor & Power factor correction
Power factor & Power factor correctionPower factor & Power factor correction
Power factor & Power factor correctionLong Thang Pham
 
Power factor
Power factorPower factor
Power factorwkugubre
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAhmed Aslam
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationMircea Gingu
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Lokesh Singh
 
Bosch Project
Bosch ProjectBosch Project
Bosch ProjectAkash Roy
 

Was ist angesagt? (20)

power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+niraj
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction
 
Automatic Power Factor Corrector Using Arduino report
Automatic Power Factor Corrector Using Arduino reportAutomatic Power Factor Corrector Using Arduino report
Automatic Power Factor Corrector Using Arduino report
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...
 
Minimizing losses in power distribution system
Minimizing losses in power distribution systemMinimizing losses in power distribution system
Minimizing losses in power distribution system
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Sme apfc panel catalogue
Sme apfc panel catalogueSme apfc panel catalogue
Sme apfc panel catalogue
 
Power factor & Power factor correction
Power factor & Power factor correctionPower factor & Power factor correction
Power factor & Power factor correction
 
Power factor
Power factorPower factor
Power factor
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR Requirement
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction Presentation
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7
 
Power factor(r)
Power factor(r)Power factor(r)
Power factor(r)
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Bosch Project
Bosch ProjectBosch Project
Bosch Project
 

Andere mochten auch

Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalStaco Energy
 
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentationProduct: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentationStaco Energy
 
Product: Power Factor & Harmonics: StacoSine: Harmonics
Product: Power Factor & Harmonics: StacoSine: HarmonicsProduct: Power Factor & Harmonics: StacoSine: Harmonics
Product: Power Factor & Harmonics: StacoSine: HarmonicsStaco Energy
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentationAzhar Abbas
 
Power Factor Basics
Power Factor BasicsPower Factor Basics
Power Factor Basicsno suhaila
 
power quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcompower quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcom7867867869
 
Capacitor bank and improvement of power factor
Capacitor bank and improvement of power factorCapacitor bank and improvement of power factor
Capacitor bank and improvement of power factorAhshan Kabir
 
Power factor improvement of an induction motor
Power factor improvement of an induction motorPower factor improvement of an induction motor
Power factor improvement of an induction motorIIT Roorkee
 
Resonance in parallel rlc circuit
Resonance in parallel rlc circuitResonance in parallel rlc circuit
Resonance in parallel rlc circuitShivam Gupta
 

Andere mochten auch (12)

Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentationProduct: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
 
Product: Power Factor & Harmonics: StacoSine: Harmonics
Product: Power Factor & Harmonics: StacoSine: HarmonicsProduct: Power Factor & Harmonics: StacoSine: Harmonics
Product: Power Factor & Harmonics: StacoSine: Harmonics
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
Power factor
Power factorPower factor
Power factor
 
Power Factor Basics
Power Factor BasicsPower Factor Basics
Power Factor Basics
 
Ps harmonics
Ps harmonicsPs harmonics
Ps harmonics
 
power quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcompower quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcom
 
Capacitor bank and improvement of power factor
Capacitor bank and improvement of power factorCapacitor bank and improvement of power factor
Capacitor bank and improvement of power factor
 
Power Factor
Power FactorPower Factor
Power Factor
 
Power factor improvement of an induction motor
Power factor improvement of an induction motorPower factor improvement of an induction motor
Power factor improvement of an induction motor
 
Resonance in parallel rlc circuit
Resonance in parallel rlc circuitResonance in parallel rlc circuit
Resonance in parallel rlc circuit
 

Ähnlich wie Power factor solution,presentation

Ähnlich wie Power factor solution,presentation (20)

ELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INCELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INC
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae Systems
 
AMTL LT Panel leaflet jan 2015
AMTL LT Panel leaflet jan 2015AMTL LT Panel leaflet jan 2015
AMTL LT Panel leaflet jan 2015
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email
 
ABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMDABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMD
 
Capacitors and filters
Capacitors and filtersCapacitors and filters
Capacitors and filters
 
control tech brochure
control tech brochurecontrol tech brochure
control tech brochure
 
Organization Profile
Organization ProfileOrganization Profile
Organization Profile
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
 
Power and meter
Power and meterPower and meter
Power and meter
 
Pyrotech World Profile
Pyrotech World ProfilePyrotech World Profile
Pyrotech World Profile
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
Sdmo telecoms-generator-solutions
Sdmo telecoms-generator-solutionsSdmo telecoms-generator-solutions
Sdmo telecoms-generator-solutions
 
Catalog busbar Legrand
Catalog busbar LegrandCatalog busbar Legrand
Catalog busbar Legrand
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
E cwith scada
E cwith scadaE cwith scada
E cwith scada
 
Digital meters
Digital metersDigital meters
Digital meters
 
AEIL Company profile
AEIL Company profileAEIL Company profile
AEIL Company profile
 
Cotopaxi Presentation - India
Cotopaxi Presentation - IndiaCotopaxi Presentation - India
Cotopaxi Presentation - India
 
WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)
 

Kürzlich hochgeladen

Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 

Kürzlich hochgeladen (20)

Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 

Power factor solution,presentation

  • 1. POWER FACTOR SOLUTION saving your money by saving your energy G-12, PRESTIGE PLAZA, NEAR S.B.I, MUL ROAD, CHANDRAPUR-442 401 (M.S.) Email-solutionpf@rediffmail.com, solutionpf@gmail.com Ph.No. 07172-270950, +91 9657389889, 9850373110 Follow us -www.facebook.com/solutionpf
  • 2. Contents About us Field of Operations, About Power Factor Improvement and Harmonics Product Range Our Parent Collaborators From the Photo Gallery Case Studies Clientele
  • 3. About us POWER FACTOR SOLUTION (PFS) which itself defines MORE POWER BY SAVING ENERGY.PFS gives you saving your money by saving your energy. Since past five years we are in service to our valued clients with our quality and result oriented products of reactive power compensation along with harmonic suppression, substation automation, Illumination Study and Designing, Complete Electrical Panels. We along with our parent collaborator companies have developed and implemented a quality management system that never compromise quality for price. Our services with our quality products assure our clients get the job done on time and on budget, while still providing quality of service and exactly what they want. We are for your service in collaboration with Claritas Power System Solution Pvt Ltd (CPSSPL), Kokban Automation & Greenovative Energy Solutions. Work place do not matter for us, we serve our clients across India and Abroad.
  • 4. Our Vision Our VISION is “To evolve as a trusted supplier for energy efficient solutions by harnessing state of the art technology, innovation and competitive professionals with clear focus on delivering highest quality service” We believe, “Business is Relationship & we strengthen on management of Relationship.” With this looking forward for opportunity to meet you for further discussion & long term fruitful association.
  • 5. Field of Operation Cement,Tyre,Automobile Steel,Textiles Power Plants, Oil, Paper, Telecom, Infrastructure, Hospitality, Engineering, Stone Crushers, Rice Mill Sugar Ginning and Pressing Chemical and All types of industries who bothers for huge electricity losses.
  • 6. Improving your power Factor can reduce operating costs by eliminating or deferring the need for new equipment, help existing equipment last longer and make future expansion less costly. Also lower rating sized equipment can be used, saving unnecessary capital expense. All this is in addition to a quick return on installing capacitor systems to improve power factor. From the Electricity utility point of view, raising the average operating power factor of entire grid network from 0.90 to 0.99 means, -Reduced costs from inefficiencies in the network. -Increased generation and distribution potential -Lower demand on the grid This means the utility can save hundreds of tons of fuel (and produce fewer emission), have more transformers available and reduce the likelihood of building new power plants and their support systems. For this reason many electricity utility companies pass a power factor incentive to consumer so that they can save the additional cost required to support efficient system In connection with reactive power compensation, power quality should also be considered. Harmonic filtering reduces the risk of technical faults and disturbances.Voltage distortions resulting from harmonic currents are caused by inverters, DC drives, fluorescent lighting, converters, UPS, arc furnaces, etc. In practice harmonic filtering brings a number of bonuses: Disturbances in telecommunications and data transmission are minimized. Electronics, control systems, converters, motors and generators operate without interruption. No risk of overloading cables, nuisance tripping of relays or fuses Poor quality may remain unnoticed for a long time. Quality deficiency may easily bring extra costs in the form of high electricity bills and an oversized power system.
  • 7. Our Product Range Power (LT & HT) Capacitors, LT & HT APFC Panels with Harmonic Filters (Contactor and Thysristor Based), Harmonics Solution Harmonic Analysis Study Fire Detection Systems Access Controls, Security & Surveillance, Lighting Controls, Substation Automation MCC, PCC, PLC, Distribution Panels, Low Voltage Switchgears, Illumination, Annual Maintenance Contracts
  • 8. Claritas Power System Solution Pvt Ltd.(CPSSPL) is incorporated in the year 1998 and is certified by ISO 9001:2008 and who have signed a joint venture with FRAKO, Germany for distribution and sales are one of the well known manufacturer, supplier, exporter and service provider of a huge gamut of Power Systems. Our comprehensive range of these systems consists of Electronic Active Filters, Thyristor Switched Capacitor Banks, Automatic Harmonic Filter Panel, Tuned Harmonic Filters, Detuned Filters, Power Factor Control Relays, Capacitor Switching Contactors, LT Capacitors, HT Reactors, and Power Quality Analysis etc. CPSSPL customize these products as per the specifications of the clients. Our range is made in advanced manufacturing unit under the guidance of experts.. CPSSPL captured market for products in various areas like Zambia, UAE,Dubai, Iran, South Africa, Sri Lanka, South Arabia, Rome, Nigeria and Turkey. CPSSPL achieved strong Foothold in the market for our products. Industrial experience and ability to cater the needs of the clients made CPSSPL successful in the market. In collaboration with Greenovative Energy Solution(GES), we provide effective solutions for significant reduction in energy costs for Industrial, Infrastructure & Commercial facilities through the Lighting solutions.GES are authorized member of Indian society of Lighting Engineers(ISLE).ISLE is a professional body in the field of illuminating engineering and having Team of BEE Certified Energy auditors with more than 25 years of experience. We involved in supply and distributing ELECTRICAL PANELS with a reputed brand which match the optimum quality standards. The range of products includes Control Panel,MCC,PCC,Distribution Panels and Boards,PLC,Main LT Panels,etc and many more. We ensure to follow all the industry guidelines and standards while manufacturing these panels.
  • 9. Kokban offers varied RTU based SCADA solutions using ABB , ERL & Beckhoff RTU to meet your application needs, from simple RTUs to comprehensive substation automation systems. All are designed to enable you to monitor, control and protect your substations in the most effective manner possible with the lowest operations and maintenance cost combined with minimum downtime. Kokban Automation has partnered with ABB to provide world class process automation solutions using state of the art PLC, DCS and SCADA products from ABB. The systems are tested & proven across industries in varied environments and applications. We can provide solutions for Power, Cement, Metals, Chemical, Pharmaceutical and Water applications. Above all the solutions deployed by Kokban are future proof as they are designed keeping in view the long term interest of the end user. Kokban Automation leverages the in house automation expertise to design and build Fire Detection System for clients in diverse industries, IT offices, Commercial establishments and shopping malls. The solutions range from conventional detectors to the most advanced detectors using dual scattering (Forward & Backward) sensing principal from Honeywell. Kokban Automation has wide range of Honeywell products that are suitable for specific customer requirements in terms of detection principles, hazardous area requirements and safety budgets. Keeping in line with our vision of providing energy efficient solutions to the client, we offer Lighting Control using Honeywell make occupancy detectors. These detectors are extremely easy to install and the considerable energy savings resulting from this ensures that the return on investment is very fast. The solution is extremely rugged and proven across continents. Once installed, this system can function smoothly with minimal maintenance.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15. Case Studies At Reputed steel, Furnace Ind.in Tamilnadu
  • 16. Recommendations and results over observations during study Sr.No. 1 2 3 4 Nature of Problem Observations during study Recommendation Results Furnace & Rolling Mill were Presence of Higher order not running simultaneously Harmonics resulting in production loss. Installation of Tuned Harmonic Filter bank on HT side to suppress higher order Harmonics generated due to Furnace load After implementation of recommended schemes % of Harmonic in network is reduced as IEEE 519-1992 Failure of Electronic Meter, Existing scheme of LT Indicators, UPS system & capacitors on LT bus are inadequately designed Drive Cards Installation of Fast acting (RTPFC) Tuned filter bank to be connected on Transformer having fluctuating load Furnace & Rolling mill running simultaneously at Full load conditions satisfactory on continuous basis resulting in enhancing production Varying Harmonic spectrum & High Energy charges & poor fluctuating load exerts dangerous overload on network load factor & affect life of connected switchgears & cables Poor Power Factor & High Voltage sensitive equipments & KVA demand electronic card failure caused due to resonance effect & Harmonic amplification Installation of capacitor filter No failure of Electronic (Tuned) panel for Power meters, Indicators, UPS, Drive Factor improvement & cards Harmonic Suppression Centralized Power Factor Low Energy charges & sensing for entire 33 KV bus Improved load factor (Furnace + Rolling mill) by optimizing Reactive power & harmonic control This Harmonic amplification may lead to premature failure of DC drives, motors along with Transformers Power Factor improved to 0.997 & above upto unity & optimized Demand overall Power factor is low 6 Improved quality of Power by reduction in Harmonics & improved power Factor 7 All system supplied by Claritas are running giving desired result 5 Bad quality of power due to high level of Current & Voltage harmonics generated due to 25 Tonne, 12 pulse Induction Furnace
  • 17. At Reputed Textile ind.in Maharashtra Sr. No Location 1 Power House 1 a Main Incomer Without Harmonic Filter Main Incomer With Harmonic Filter Voltage Current (A) V THD A THD % Power Factor % Power KWH Readings KWh Difference KW Start End For 5 mins For 1 Hr. 2 a Power House 2(Weaving Unit) Main Incomer Without Harmonic Filter Main Incomer With Harmonic Filter 70 1.8 5.1 0.991 (lag) 3627 15.03 312.4 297.37 3568.44 30.84 KV 68.4 1.1 2.9 0.997 (lag) 3585 9.93 305.28 295.35 3544.2 KWH b 30.42 KV Reduction for 1 Hr. 24.24 3 Transformer 1 Without Harmonic Filter Transformer 1 With Harmonic Filter 52.6 4.1 15.6 0.982 (lag) 2889.9 7.81 245.11 237.3 2847.6 32.31 KV 51.5 2.1 3.3 0.998 (lag) 2791.1 26.96 257.81 230.85 2770.2 Reduction for 1 Hr. 77.4 581.76 1857.6 Power House 3 (PC II ) 3A 32.28 KV KWH b for 24 Hrs 2201.7 6.6 12 0.969 (lag) 1506.6 8.63 133.8 125.17 1502.04 414 V 2088.4 3.8 5.5 0.995 (lag) 1489.9 16.29 140.2 123.91 1486.92 KWH 3B 408.4 V Reduction for 1 Hr. 15.12 Transformer 2 403.7 V 2265.5 8.0 12.1 0.906 (lag) 1458.8 2.01 124.2 122.19 1466.28 Without Harmonic Filter Transformer 2 With Harmonic Filter 410.6 V 2104 3.8 3.7 0.993 (lag) 1436.11 0.785 119.3 118.515 1422.18 KWH Reduction for 1 Hr. 44.1 362.88 Abbreviations: V: Volts A: Ampere KW: Kilo Watts KWH: Kilo Watt Hour V THD: Voltage Total Harmonic Distortion A THD: Current Total Harmonic Distortion 1058.4
  • 18. 1. In Power House 1 (at main Incomer) A. Voltage harmonic distortion is reduced to 1.1 % from 1.8 % & current harmonic distortion is reduced to 2.9 % from 5.1 % B. These percent of harmonics are within specified limit defined by Utility board C. Current reduction is about 2 Ampere D. Voltage is improved. E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 560 to 600 KWh per day. F. About 0.79 % saving in Kwh. (Only 3 three Harmonics filters installed. & load is more ) 2. In Power House 2 (at main Incomer) A. Voltage harmonic distortion is reduced to 2.1 % from 4.1 % & current harmonic distortion is reduced to 3.3 % from 15.6 % B. These percent of harmonics are within specified limit defined by Utility board C. Current reduction is about 2 Ampere D. Voltage is improved. E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1800 to 2000 KWh per day. F. About 2.8 % to 2.9 % saving in Kwh. 3. In Power House 3 At Transformer 1 Incomer: A. Voltage harmonic distortion is reduced to 3.8 % from 6.6 % & current harmonic distortion is reduced to 5.5 % from 12 % B. Power Factor is improved to 0.995 (lag) from 0.969 (lag) C. Current reduction is about 113 Ampere. D. Voltage is improved and found stable. E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 360 to 400 KWh per day. F. About 1.5 % to 2 % saving in Kwh. At Transformer 2 Incomer: A. Voltage harmonic distortion is reduced to 3.8 % from 8 % & current harmonic distortion is reduced to 3.7 % from 12.1 % B. Power Factor is improved to 0.993 (lag) from 0.906 (lag) C. Current reduction is about 150 Ampere. D. Voltage is improved and found stable. E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1050 to 1100 KWh per day. F. About 3.5 % to 4 % saving in Kwh. At Transformer 3 Incomer: A. On this transformer, only one RTPFC filter panel is installed which is running satisfactory in auto as well as manual mode. B. The load on this transformer is not stabilized as many new machines are under commissioning on PDBs. C. Still Power factor is improved to 0.995 (lag). D. New filters to be installed after load stabilization to maintain the power factor & harmonic suppression to achieve substantial reduction in KWh. Note: Observed readings are for 10 mins only, during which it is assumed that load is fairly constant. Thus power savings indicated above will have to be observed over a long Period. So it is observed that all the Harmonic Filter Bank supplied by M/s.Claritas Power System Solution Pvt Ltd,Pune are working properly and delivering satisfactory results.
  • 19. At Govt. Power Plant, Before Installation Electricity Bill
  • 20. At Govt. Power Plant, After Installation Electricity Bill
  • 21. At Govt. Power Plant, Performance Certificate issued