TeamStation AI System Report LATAM IT Salaries 2024
Power factor solution,presentation
1. POWER FACTOR SOLUTION
saving your money by saving your energy
G-12, PRESTIGE PLAZA, NEAR S.B.I, MUL ROAD,
CHANDRAPUR-442 401 (M.S.)
Email-solutionpf@rediffmail.com, solutionpf@gmail.com
Ph.No. 07172-270950, +91 9657389889, 9850373110
Follow us -www.facebook.com/solutionpf
2. Contents
About us
Field of Operations,
About Power Factor Improvement and Harmonics
Product Range
Our Parent Collaborators
From the Photo Gallery
Case Studies
Clientele
3. About us
POWER FACTOR SOLUTION (PFS) which itself defines MORE POWER BY
SAVING ENERGY.PFS gives you saving your money by saving your energy. Since past
five years we are in service to our valued clients with our quality and result oriented
products of reactive power compensation along with harmonic suppression, substation
automation, Illumination Study and Designing, Complete Electrical Panels.
We along with our parent collaborator companies have developed and implemented a
quality management system that never compromise quality for price. Our services with our
quality products assure our clients get the job done on time and on budget, while still
providing
quality
of
service
and
exactly
what
they
want.
We are for your service in collaboration with Claritas Power System Solution Pvt Ltd
(CPSSPL), Kokban Automation & Greenovative Energy Solutions.
Work place do not matter for us, we serve our clients across India and Abroad.
4. Our Vision
Our VISION is “To evolve as a trusted supplier for energy efficient
solutions by harnessing state of the art technology, innovation and
competitive professionals with clear focus on delivering highest quality
service”
We believe, “Business is Relationship & we strengthen on
management of Relationship.” With this looking forward for
opportunity to meet you for further discussion & long term fruitful
association.
5. Field of Operation
Cement,Tyre,Automobile
Steel,Textiles
Power Plants,
Oil, Paper,
Telecom,
Infrastructure,
Hospitality,
Engineering,
Stone Crushers,
Rice Mill
Sugar
Ginning and Pressing
Chemical and
All types of industries who bothers for huge electricity
losses.
6. Improving your power Factor can reduce operating costs by eliminating or deferring the need for
new equipment, help existing equipment last longer and make future expansion less costly. Also
lower rating sized equipment can be used, saving unnecessary capital expense. All this is in addition
to a quick return on installing capacitor systems to improve power factor.
From the Electricity utility point of view, raising the average operating power factor of entire grid
network from 0.90 to 0.99 means,
-Reduced costs from inefficiencies in the network.
-Increased generation and distribution potential
-Lower demand on the grid
This means the utility can save hundreds of tons of fuel (and produce fewer emission), have more
transformers available and reduce the likelihood of building new power plants and their support
systems. For this reason many electricity utility companies pass a power factor incentive to consumer so
that they can save the additional cost required to support efficient system
In connection with reactive power compensation, power quality should also be considered.
Harmonic filtering reduces the risk of technical faults and disturbances.Voltage distortions
resulting from harmonic currents are caused by inverters, DC drives, fluorescent lighting,
converters, UPS, arc furnaces, etc. In practice harmonic filtering brings a number of bonuses:
Disturbances in telecommunications and data transmission are minimized.
Electronics, control systems, converters, motors and generators operate without
interruption.
No risk of overloading cables, nuisance tripping of relays or fuses
Poor quality may remain unnoticed for a long time. Quality deficiency may easily bring extra costs in
the form of high electricity bills and an oversized power system.
7. Our Product Range
Power (LT & HT) Capacitors,
LT & HT APFC Panels with Harmonic Filters
(Contactor and Thysristor Based),
Harmonics Solution
Harmonic Analysis Study
Fire Detection Systems
Access Controls, Security & Surveillance,
Lighting Controls,
Substation Automation
MCC, PCC, PLC, Distribution Panels,
Low Voltage Switchgears,
Illumination,
Annual Maintenance Contracts
8. Claritas Power System Solution Pvt Ltd.(CPSSPL) is incorporated in the year 1998 and is
certified by ISO 9001:2008 and who have signed a joint venture with FRAKO, Germany for
distribution and sales are one of the well known manufacturer, supplier, exporter and service
provider of a huge gamut of Power Systems. Our comprehensive range of these systems consists of
Electronic Active Filters, Thyristor Switched Capacitor Banks, Automatic Harmonic Filter Panel,
Tuned Harmonic Filters, Detuned Filters, Power Factor Control Relays, Capacitor Switching
Contactors, LT Capacitors, HT Reactors, and Power Quality Analysis etc.
CPSSPL customize these products as per the specifications of the clients. Our range is made in
advanced manufacturing unit under the guidance of experts.. CPSSPL captured market for products
in various areas like Zambia, UAE,Dubai, Iran, South Africa, Sri Lanka, South Arabia, Rome, Nigeria
and Turkey. CPSSPL achieved strong Foothold in the market for our products. Industrial experience
and ability to cater the needs of the clients made CPSSPL successful in the market.
In collaboration with Greenovative Energy Solution(GES), we provide effective solutions for
significant reduction in energy costs for Industrial, Infrastructure & Commercial facilities through the
Lighting solutions.GES are authorized member of Indian society of Lighting Engineers(ISLE).ISLE is a
professional body in the field of illuminating engineering and having Team of BEE Certified Energy
auditors with more than 25 years of experience.
We involved in supply and distributing ELECTRICAL PANELS with a reputed brand which match
the optimum quality standards. The range of products includes Control Panel,MCC,PCC,Distribution
Panels and Boards,PLC,Main LT Panels,etc and many more. We ensure to follow all the industry
guidelines and standards while manufacturing these panels.
9. Kokban offers varied RTU based SCADA solutions using ABB , ERL & Beckhoff RTU to meet your
application needs, from simple RTUs to comprehensive substation automation systems. All are designed to
enable you to monitor, control and protect your substations in the most effective manner possible with the
lowest operations and maintenance cost combined with minimum downtime.
Kokban Automation has partnered with ABB to provide world class process automation solutions using
state of the art PLC, DCS and SCADA products from ABB. The systems are tested & proven across
industries in varied environments and applications. We can provide solutions for Power, Cement, Metals,
Chemical, Pharmaceutical and Water applications. Above all the solutions deployed by Kokban are future
proof as they are designed keeping in view the long term interest of the end user.
Kokban Automation leverages the in house automation expertise to design and build Fire Detection
System for clients in diverse industries, IT offices, Commercial establishments and shopping malls. The
solutions range from conventional detectors to the most advanced detectors using dual scattering
(Forward & Backward) sensing principal from Honeywell. Kokban Automation has wide range of
Honeywell products that are suitable for specific customer requirements in terms of detection principles,
hazardous area requirements and safety budgets.
Keeping in line with our vision of providing energy efficient solutions to the client, we offer Lighting
Control using Honeywell make occupancy detectors. These detectors are extremely easy to install and the
considerable energy savings resulting from this ensures that the return on investment is very fast. The
solution is extremely rugged and proven across continents. Once installed, this system can function
smoothly with minimal maintenance.
16. Recommendations and results over observations during study
Sr.No.
1
2
3
4
Nature of Problem
Observations during study
Recommendation
Results
Furnace & Rolling Mill were Presence of Higher order
not running simultaneously Harmonics
resulting in production loss.
Installation of Tuned
Harmonic Filter bank on HT
side to suppress higher order
Harmonics generated due to
Furnace load
After implementation of
recommended schemes % of
Harmonic in network is
reduced as IEEE 519-1992
Failure of Electronic Meter, Existing scheme of LT
Indicators, UPS system &
capacitors on LT bus are
inadequately designed
Drive Cards
Installation of Fast acting
(RTPFC) Tuned filter bank to
be connected on
Transformer having
fluctuating load
Furnace & Rolling mill running
simultaneously at Full load
conditions satisfactory on
continuous basis resulting in
enhancing production
Varying Harmonic spectrum &
High Energy charges & poor fluctuating load exerts
dangerous overload on network
load factor
& affect life of connected
switchgears & cables
Poor Power Factor & High Voltage sensitive equipments &
KVA demand
electronic card failure caused
due to resonance effect &
Harmonic amplification
Installation of capacitor filter No failure of Electronic
(Tuned) panel for Power
meters, Indicators, UPS, Drive
Factor improvement &
cards
Harmonic Suppression
Centralized Power Factor
Low Energy charges &
sensing for entire 33 KV bus Improved load factor
(Furnace + Rolling mill) by
optimizing Reactive power &
harmonic control
This Harmonic amplification
may lead to premature failure
of DC drives, motors along with
Transformers
Power Factor improved to
0.997 & above upto unity &
optimized Demand
overall Power factor is low
6
Improved quality of Power by
reduction in Harmonics &
improved power Factor
7
All system supplied by Claritas
are running giving desired
result
5
Bad quality of power due to
high level of Current &
Voltage harmonics
generated due to 25 Tonne,
12 pulse Induction Furnace
17. At Reputed Textile ind.in Maharashtra
Sr.
No
Location
1
Power House 1
a
Main Incomer
Without Harmonic Filter
Main Incomer
With Harmonic Filter
Voltage
Current
(A)
V THD
A THD
%
Power
Factor
%
Power
KWH Readings
KWh Difference
KW
Start
End
For 5 mins
For 1 Hr.
2
a
Power House 2(Weaving
Unit)
Main Incomer
Without Harmonic Filter
Main Incomer
With Harmonic Filter
70
1.8
5.1
0.991 (lag)
3627
15.03
312.4
297.37
3568.44
30.84 KV
68.4
1.1
2.9
0.997 (lag)
3585
9.93
305.28
295.35
3544.2
KWH
b
30.42 KV
Reduction
for 1 Hr.
24.24
3
Transformer 1
Without Harmonic Filter
Transformer 1
With Harmonic Filter
52.6
4.1
15.6
0.982 (lag)
2889.9
7.81
245.11
237.3
2847.6
32.31 KV
51.5
2.1
3.3
0.998 (lag)
2791.1
26.96
257.81
230.85
2770.2
Reduction
for 1 Hr.
77.4
581.76
1857.6
Power House 3 (PC II )
3A
32.28 KV
KWH
b
for 24 Hrs
2201.7
6.6
12
0.969 (lag)
1506.6
8.63
133.8
125.17
1502.04
414 V
2088.4
3.8
5.5
0.995 (lag)
1489.9
16.29
140.2
123.91
1486.92
KWH
3B
408.4 V
Reduction
for 1 Hr.
15.12
Transformer 2
403.7 V
2265.5
8.0
12.1
0.906 (lag)
1458.8
2.01
124.2
122.19
1466.28
Without Harmonic Filter
Transformer 2
With Harmonic Filter
410.6 V
2104
3.8
3.7
0.993 (lag)
1436.11
0.785
119.3
118.515
1422.18
KWH
Reduction
for 1 Hr.
44.1
362.88
Abbreviations:
V: Volts
A: Ampere
KW: Kilo Watts
KWH: Kilo Watt Hour
V THD: Voltage Total Harmonic
Distortion
A THD: Current Total Harmonic
Distortion
1058.4
18. 1. In Power House 1 (at main Incomer)
A. Voltage harmonic distortion is reduced to 1.1 % from 1.8 % & current harmonic distortion is reduced to 2.9 % from 5.1 %
B. These percent of harmonics are within specified limit defined by Utility board
C. Current reduction is about 2 Ampere
D. Voltage is improved.
E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 560 to 600 KWh per day.
F. About 0.79 % saving in Kwh. (Only 3 three Harmonics filters installed. & load is more )
2. In Power House 2 (at main Incomer)
A. Voltage harmonic distortion is reduced to 2.1 % from 4.1 % & current harmonic distortion is reduced to 3.3 % from 15.6 %
B. These percent of harmonics are within specified limit defined by Utility board
C. Current reduction is about 2 Ampere
D. Voltage is improved.
E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1800 to 2000 KWh per day.
F. About 2.8 % to 2.9 % saving in Kwh.
3. In Power House 3
At Transformer 1 Incomer:
A. Voltage harmonic distortion is reduced to 3.8 % from 6.6 % & current harmonic distortion is reduced to 5.5 % from 12 %
B. Power Factor is improved to 0.995 (lag) from 0.969 (lag)
C. Current reduction is about 113 Ampere.
D. Voltage is improved and found stable.
E.As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 360 to 400 KWh per day.
F. About 1.5 % to 2 % saving in Kwh.
At Transformer 2 Incomer:
A. Voltage harmonic distortion is reduced to 3.8 % from 8 % & current harmonic distortion is reduced to 3.7 % from 12.1 %
B. Power Factor is improved to 0.993 (lag) from 0.906 (lag)
C. Current reduction is about 150 Ampere.
D. Voltage is improved and found stable.
E. As current is reduced, harmonics are within specified limit & installation of new Harmonic filter banks , net KWh unit reduction is about 1050 to 1100 KWh per day.
F. About 3.5 % to 4 % saving in Kwh.
At Transformer 3 Incomer:
A. On this transformer, only one RTPFC filter panel is installed which is running satisfactory in auto as well as manual mode.
B. The load on this transformer is not stabilized as many new machines are under commissioning on PDBs.
C. Still Power factor is improved to 0.995 (lag).
D. New filters to be installed after load stabilization to maintain the power factor & harmonic suppression to achieve substantial reduction in KWh.
Note: Observed readings are for 10 mins only, during which it is assumed that load is fairly constant.
Thus power savings indicated above will have to be observed over a long Period.
So it is observed that all the Harmonic Filter Bank supplied by M/s.Claritas Power System Solution Pvt Ltd,Pune are working properly and delivering
satisfactory results.
19. At Govt. Power Plant,