Aggregate planning
 Aggregate planning involves planning the best quantity to
produce in the intermediate-range horizon (3 months to one
year)
 Aggregate production planning is the process of determining
output levels of product groups over the next 6 to 18 months
period.
Objectives of Aggregate Planning
 The overall objective is to balance conflicting objectives
involving customer service, work force stability, cost and
profit.
 To establish company-wide strategic plan for allocating
resources.
 To develop an economic strategy to meet customer
demand.
Inputs to and Outputs from Aggregate Production
Planning
Importance of Aggregate Plans
 The various inputs to aggregate plans that affect
the performance of production and operations
managers are:
i. Engineering
ii. Materials
iii. Operations
iv. Marketing and distribution
v. Accounting and finance
vi. Human resources
Aggregate Planning or Aggregate Capacity
Planning
 Need for Aggregate Capacity Planning
1. It facilitates fully loaded facilities and minimizes
overloading and underloading and keeps production costs
low.
2. Adequate production capacity is provided to meet
expected aggregate demand.
3. Orderly and systematic transition of production capacity
to meet the peaks and valleys of expected customer
demand is facilitated.
4. In times of Scarce resources, getting the maximum output
for the amount of resources is enhanced.
5. To manage change in operations management by
planning for production resources that adapt to the
changes in customer demand.
 Steps in Aggregate Capacity Planning
i. Determine the demand (i.e., sales forecast) for each product for
each time period (i.e., weeks or months or quarters) over the
planning horizon (6 to 12 months).
ii. Determine the aggregate demand by summing up the demand for
individual products.
iii. Transform the aggregate demand for each time period into workers,
materials, machines required to satisfy aggregate demand.
iv. Identify company policies that are pertinent (e.g., policy regarding
safety stock maintenance, maintaining stable workforce etc.).
v. Determine unit costs for regular time, overtime, subcontracting,
holding inventories, back orders, layoffs etc.
vi. Develop alternative resource plans for providing necessary
production capacity to support the cumulative aggregate demand
and compute the cost of each alternative plan.
vii. Select the resource plan from among the alternatives considered that
satisfies aggregate demand and best meets the objectives of the
firm.
Approaches to Aggregate Planning
1. Top down approach
2. A bottom-up approach or subplan consolidation
approach
 Rough-cut Capacity Planning
This is done in conjunction with the tentative
master production schedule to test its feasibility
in terms of capacity before the master
production schedule (MPS) is finalised.
Flow Chart for Rough-cut Capacity Planning
Capacity Planning and
Capacity Requirement Planning (CRP)
 Production capacity is defined as the maximum production
rate of a facility or a plant.
 Types of Capacity
1. Fixed capacity
2. Adjustable capacity
3. Design capacity
4. System capacity
5. Potential capacity
6. Immediate capacity
7. Effective capacity
8. Normal capacity or rated capacity
9. Actual or utilised capacity
Actual Output
 System efficiency is the ratio of the actual measured
output of goods/services to the system capacity
 System efficiency =
System capacity
 Capacity Decisions
 Major considerations in capacity decisions are
a. What size of plant? How much capacity to install?
b. When capacity is needed? When to phase-in capacity or
phase-out capacity?
c. At what cost? How to budget for the cost?
 Factors Affecting Determination of Plant Capacity
1. Market demand for a product/service.
2. The amount of capital that can be invested.
3. Degree of automation desired.
4. Level of integration (i.e., vertical integration).
5. Type of technology selected.
6. Flexibility for capacity additions.
Capacity Planning
 Capacity planning involves activities such as:
a. Assessing existing capacity
b. Forecasting future capacity needs
c. Identifying alternative ways to modify capacity
d. Evaluating financial, economical and technological
capacity alternatives
e. Selecting a capacity alternative most suited to achieve
the strategic mission of the firm. Capacity planning
involves capacity decisions that must merge consumer
demands with human, material and financial resources
of the organization.
4 Types of Capacity Planning are:
• Long term Capacity Planning
• Short-term Capacity Planing
• Finite Capacity Planning
• Infinite Capacity Planning.
 Two catagories of factors affecting capacity planning are:
• Controllable Factors
• Less Controllable Factors.
 Capacity Requirement Planning (CRP): A technique to
determine the labour and equipment capacities needed to
meet the objectives.
Capacity Requirement Planning (CRP) Process
Capacity Requirement Planning Process (Flow Chart)
Master Production Scheduling
 Sets the quantity of each finished product to be
completed in each time period of the short range
planning horizon.
 Objectives of Master Production Scheduling
1. To schedule end items to be completed promptly
and when promised to customers.
2. To avoid overloading or underloading the
production facility so that production capacity is
efficiently utilized and low production costs result.
Functions of MPS:
• Translating aggregate plans
• Evaluating alternative master schedules
• Generating material and capacity requirements
• Facilitating information processing
• Maintaining priorities
• Utilizing the capacity effectively.
Master Production Schedule - Flow Chart
Guidelines for Master Scheduling
1. Work from an aggregate production plan
2. Schedule common modules when possible
3. Load facilities realistically
4. Release orders on a timely basis
5. Monitor inventory levels closely
6. Reschedule as required
MPS in Produce-to-stock and Produce-to-
order Firms
 The elements of the MPS that are affected by
the type of production system are:
a. Demand management
b. Lot-sizing
c. Number of products to be scheduled (product-mix).
Practical Problems
 A work centre operates 5 days a week on a 2 shifts per
day basis, each shift of 8 hours duration. There are five
machines of the same capacity in this work centre. If
the machines are utilized 80 % of the time at a system
efficiency of 90%, what is the rated output in standard
hours per week.
 A steel plant has a design capacity of 50,000 tons of
steel per day, effective capacity of 40,000 tons of steel
per day and an actual output of 36,000 tons of steel per
day. Compute the efficiency of the plant and its
utilization.
 The following is a tentative master schedule for four
weeks:
The bill of Labour in key work centres for the company’s
three major products A, B and C is as below:
Product Week 1 Week 2 Week 3 Week 4
A 3000 4000 1200 2500
B 2000 1500 3000 3500
C 1200 1800 2500 2000
Determine the Load on deptt X, Y and Z over the next 4 weeks.
Deptt. Product A Product B Product C
X 0.20 hr 0.005 hr 0.10 hr
Y 0.08 hr 0.15 hr 0.20 hr
Z 0.11 hr 0.08 hr 0.05 hr
 A deptt. Works on 8 hours shift , 250 days a year and
has the usage data of a machine, as given below.
Determine the number of Machines required.
 Product Annual demand Std. Time (hrs)
X 300 4.0
Y 400 6.0
Z 500 3.0

More Related Content

What's hot

Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Capacity planning
Capacity planningCapacity planning
Capacity planningAkhil Lal
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production scheduleMRPeasy
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation schedulingKamal Subedi
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlNishant Agrawal
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planningNishant Agrawal
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 

What's hot (20)

CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Work study
Work studyWork study
Work study
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planning
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Types of layout
Types of layoutTypes of layout
Types of layout
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Production and operation management
Production and operation management Production and operation management
Production and operation management
 
Line balancing
Line balancingLine balancing
Line balancing
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 

Similar to Aggregate planning and production scheduling techniques for optimal capacity utilization

aggregate planning.ppt
aggregate planning.pptaggregate planning.ppt
aggregate planning.pptShitalVyas3
 
Aggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.pptAggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.pptvidhiat
 
Lec Aggregate Planning and MPS.ppt
Lec Aggregate Planning and MPS.pptLec Aggregate Planning and MPS.ppt
Lec Aggregate Planning and MPS.pptHarshitMaurya22
 
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptxFacility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptxMeetLalcheta
 
Capacity planning
Capacity planningCapacity planning
Capacity planningRatan479
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planningmubarak2009
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentationAkash Maurya
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxPeriMinstrel
 

Similar to Aggregate planning and production scheduling techniques for optimal capacity utilization (20)

aggregate planning.ppt
aggregate planning.pptaggregate planning.ppt
aggregate planning.ppt
 
Aggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.pptAggregrate_production_plan_operations.ppt
Aggregrate_production_plan_operations.ppt
 
Lec Aggregate Planning and MPS.ppt
Lec Aggregate Planning and MPS.pptLec Aggregate Planning and MPS.ppt
Lec Aggregate Planning and MPS.ppt
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Session 4
Session 4Session 4
Session 4
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptxFacility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planning
 
Production Planning
Production PlanningProduction Planning
Production Planning
 
prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentation
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and control
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and control
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 

Recently uploaded

Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663Call Girls Mumbai
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦anilsa9823
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 

Recently uploaded (20)

Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 

Aggregate planning and production scheduling techniques for optimal capacity utilization

  • 1.
  • 2. Aggregate planning  Aggregate planning involves planning the best quantity to produce in the intermediate-range horizon (3 months to one year)  Aggregate production planning is the process of determining output levels of product groups over the next 6 to 18 months period.
  • 3. Objectives of Aggregate Planning  The overall objective is to balance conflicting objectives involving customer service, work force stability, cost and profit.  To establish company-wide strategic plan for allocating resources.  To develop an economic strategy to meet customer demand.
  • 4. Inputs to and Outputs from Aggregate Production Planning
  • 5. Importance of Aggregate Plans  The various inputs to aggregate plans that affect the performance of production and operations managers are: i. Engineering ii. Materials iii. Operations iv. Marketing and distribution v. Accounting and finance vi. Human resources
  • 6. Aggregate Planning or Aggregate Capacity Planning  Need for Aggregate Capacity Planning 1. It facilitates fully loaded facilities and minimizes overloading and underloading and keeps production costs low. 2. Adequate production capacity is provided to meet expected aggregate demand. 3. Orderly and systematic transition of production capacity to meet the peaks and valleys of expected customer demand is facilitated. 4. In times of Scarce resources, getting the maximum output for the amount of resources is enhanced. 5. To manage change in operations management by planning for production resources that adapt to the changes in customer demand.
  • 7.  Steps in Aggregate Capacity Planning i. Determine the demand (i.e., sales forecast) for each product for each time period (i.e., weeks or months or quarters) over the planning horizon (6 to 12 months). ii. Determine the aggregate demand by summing up the demand for individual products. iii. Transform the aggregate demand for each time period into workers, materials, machines required to satisfy aggregate demand. iv. Identify company policies that are pertinent (e.g., policy regarding safety stock maintenance, maintaining stable workforce etc.). v. Determine unit costs for regular time, overtime, subcontracting, holding inventories, back orders, layoffs etc. vi. Develop alternative resource plans for providing necessary production capacity to support the cumulative aggregate demand and compute the cost of each alternative plan. vii. Select the resource plan from among the alternatives considered that satisfies aggregate demand and best meets the objectives of the firm.
  • 8. Approaches to Aggregate Planning 1. Top down approach 2. A bottom-up approach or subplan consolidation approach  Rough-cut Capacity Planning This is done in conjunction with the tentative master production schedule to test its feasibility in terms of capacity before the master production schedule (MPS) is finalised.
  • 9. Flow Chart for Rough-cut Capacity Planning
  • 10. Capacity Planning and Capacity Requirement Planning (CRP)  Production capacity is defined as the maximum production rate of a facility or a plant.  Types of Capacity 1. Fixed capacity 2. Adjustable capacity 3. Design capacity 4. System capacity 5. Potential capacity 6. Immediate capacity 7. Effective capacity 8. Normal capacity or rated capacity 9. Actual or utilised capacity
  • 11. Actual Output  System efficiency is the ratio of the actual measured output of goods/services to the system capacity  System efficiency = System capacity
  • 12.  Capacity Decisions  Major considerations in capacity decisions are a. What size of plant? How much capacity to install? b. When capacity is needed? When to phase-in capacity or phase-out capacity? c. At what cost? How to budget for the cost?  Factors Affecting Determination of Plant Capacity 1. Market demand for a product/service. 2. The amount of capital that can be invested. 3. Degree of automation desired. 4. Level of integration (i.e., vertical integration). 5. Type of technology selected. 6. Flexibility for capacity additions.
  • 13. Capacity Planning  Capacity planning involves activities such as: a. Assessing existing capacity b. Forecasting future capacity needs c. Identifying alternative ways to modify capacity d. Evaluating financial, economical and technological capacity alternatives e. Selecting a capacity alternative most suited to achieve the strategic mission of the firm. Capacity planning involves capacity decisions that must merge consumer demands with human, material and financial resources of the organization.
  • 14. 4 Types of Capacity Planning are: • Long term Capacity Planning • Short-term Capacity Planing • Finite Capacity Planning • Infinite Capacity Planning.  Two catagories of factors affecting capacity planning are: • Controllable Factors • Less Controllable Factors.  Capacity Requirement Planning (CRP): A technique to determine the labour and equipment capacities needed to meet the objectives.
  • 15. Capacity Requirement Planning (CRP) Process Capacity Requirement Planning Process (Flow Chart)
  • 16. Master Production Scheduling  Sets the quantity of each finished product to be completed in each time period of the short range planning horizon.  Objectives of Master Production Scheduling 1. To schedule end items to be completed promptly and when promised to customers. 2. To avoid overloading or underloading the production facility so that production capacity is efficiently utilized and low production costs result.
  • 17. Functions of MPS: • Translating aggregate plans • Evaluating alternative master schedules • Generating material and capacity requirements • Facilitating information processing • Maintaining priorities • Utilizing the capacity effectively.
  • 19. Guidelines for Master Scheduling 1. Work from an aggregate production plan 2. Schedule common modules when possible 3. Load facilities realistically 4. Release orders on a timely basis 5. Monitor inventory levels closely 6. Reschedule as required
  • 20. MPS in Produce-to-stock and Produce-to- order Firms  The elements of the MPS that are affected by the type of production system are: a. Demand management b. Lot-sizing c. Number of products to be scheduled (product-mix).
  • 21. Practical Problems  A work centre operates 5 days a week on a 2 shifts per day basis, each shift of 8 hours duration. There are five machines of the same capacity in this work centre. If the machines are utilized 80 % of the time at a system efficiency of 90%, what is the rated output in standard hours per week.  A steel plant has a design capacity of 50,000 tons of steel per day, effective capacity of 40,000 tons of steel per day and an actual output of 36,000 tons of steel per day. Compute the efficiency of the plant and its utilization.
  • 22.  The following is a tentative master schedule for four weeks: The bill of Labour in key work centres for the company’s three major products A, B and C is as below: Product Week 1 Week 2 Week 3 Week 4 A 3000 4000 1200 2500 B 2000 1500 3000 3500 C 1200 1800 2500 2000
  • 23. Determine the Load on deptt X, Y and Z over the next 4 weeks. Deptt. Product A Product B Product C X 0.20 hr 0.005 hr 0.10 hr Y 0.08 hr 0.15 hr 0.20 hr Z 0.11 hr 0.08 hr 0.05 hr
  • 24.  A deptt. Works on 8 hours shift , 250 days a year and has the usage data of a machine, as given below. Determine the number of Machines required.  Product Annual demand Std. Time (hrs) X 300 4.0 Y 400 6.0 Z 500 3.0