2. Orientation (Vision – Mission)
To supervise and control the PSC’s contracts’
implementation through partnership in order to ensure
effectiveness and efficiency of upstream oil & gas
business activities for the greatest welfare of the Nation
Be a proactive and trustworthy partner in optimizing the
benefit of the upstream oil & gas industry for all
stakeholders while becoming one of the nation’s engine
in mobilizing different economic and industrial
activities
3. Prudent Character
Professional Knowledge and Technology
Know what best to do
Responsive Communicative, online connectivity &
Aware and respond to the direct notification
situation
Unity Centralized and integrated information
Share and incorporate each other
Decisive Analytic decision, planning & reporting
Authorize and responsible
Best practice standard of procedures
Ethics
Know the way how to do
In house management &
Nation focused administration
Internal resources oriented
Trustworthy Accurate information, calculation, and
Reliable to be taken into account estimation
4. SWOT BPMIGAS
STRENGTH
– Orientation and Prudent Character
WEAKNESS
– Standard level of technology
implementation
– Offline connectivity & communication
– Separated & individual application system
– Non analytic decision, planning, and
reporting
– Incomprehensive SOP (PTPTK)
– Outsourced management & administration
– Unreliable information calculation and
estimation
OPPORTUNITY
– Contractor’s advanced technology
– Best practice standard in oil & gas
international community
– Unexplored oil & gas resources
THREAD
– National production declining
– Uncertainty of sustainable energy
availability
5. Future condition phase 1 - Internal
- “1st prudent realization” -
(Petroleum Resource Integration - PRI)
Advanced knowledge & technology Professional
– Internal dedicated GIS server for spatial and textual data management
Online communication and connectivity Responsive
– Internal system for KKKS data loader to BPMIGAS server
Centralized and integrated information system Unity
– Internal master textual database system
– Internal master spatial database system
Analytic decision, planning & reporting Decisive
– Internal Project Portfolio Management System
Best practice business standard and procedure Ethics
– Designed WP&B, AFE, POD Procedures and Tracking implementation
– Designed PTPTK for Common GIS coordinate system, data structure, and symbology
In house management & administration Nation Focused
– Local administration portal for data, information, and knowledge database system of textual and
spatial data
Secure and reliable textual - spatial information, calculation, and estimation Trustworthy
– Internal Project Portfolio Management System
–
6. How to Transfer Data?
Using text-column format
– SPS, LIS, LAS, etc.
Using Excel format
Using XML format
– MathML, GeoML, WitsML, etc.
Using Web Form
– BCA/Mandiri/Niaga Internet Banking
Using GIS portal
– WMS, USGS, Google Maps
10. Database Terminology
Table Where the data stored
Query Where the data calculated
Form Where to input data
Report Where the data published
*Macro To automate the process
11. App Build Procedure
Invention Concept User
(The Main Idea)
Organization Business Process User
(The Procedure)
Normalization Data Structure User / IT
(The Storage)
Programming Application IT
(The Process)
Configuration Infrastructure IT
(The Tools)
12. BPMIGAS Data Group & Status
00-Basin60/86………….. available
01-WK / KKS…………… available
02-Komitmen…………… available
03-WPNB……………….. unsynchronized
04-AFE………………….. unsynchronized
05-Study………………… unavailable
06-Survey………………. unavailable
07-EKS Drilling………… unavailable
08-P&L………………….. to be completed
09-POD…………………. unavailable
10-Field…………………. unavailable
13. 1ST PRUDENT PRI Realization
DOCUMENT CAPTURE ANALYSTICAL PROCESS PLANNING RECOMENDATION
Basin
User Monitor
Working
Panel COMMIT
MENT
EKS
EPT WP&B SIBEP
LETTER AFE PORTF DSS
DBEP SIE OLIO PRI
Prospek GIS
GIS LEad
Data K3S etc……
Pengem PERFOR
bangan MANCE
Katalog Lapangan
Data EKS
Project etc……
Progress etc……
etc……
(DATA WAREHOUSE) (DATA ANALYSIS) (EXPERIENCES)
14. Future condition phase 2 - External
- “2nd prudent realization” -
(Petroleum Resource Management - PRM)
Advanced knowledge & technology Professional
– BPMIGAS – KKKS connectivity with GIS to GIS communication technology
Online communication and connectivity Responsive
– BPMIGAS - KKKS online connectivity for data loading, capturing, query, retrieving and
notification
Centralized and integrated information system Unity
– BPMIGAS Regional E&P base map of spatial textual database server synchronized with
KKKS local E&P thematic map of spatial textual database server
Analytic decision, planning & reporting Decisive
– Cross BPMIGAS – KKKS Project Portfolio Management System
Best practice business standard and procedure Ethics
– Improved WP&B, AFE, POD Procedures PTPTK and Tracking
– Improved GIS management (PTPTK) for BPMIGAS - KKKS
In house management & administration Nation Focused
– Centralized administration portal for KKKS data, information, and knowledge database system
of textual and spatial data in BPMIGAS
Secure and reliable textual - spatial information, calculation, and estimation Trustworthy
– Cross BPMIGAS – KKKS Project Portfolio Management System
16. BPMIGAS – KKKS Management in order to maintain national
oil & gas production for sustainable energy supply
of 1.2 MMBOPD in 2015
BPMIGAS Office
KKKS Office GIS Interface
“..according to our
“..we propose drilling regional base map you
for the third year of shoul first d run 3D survey
contract situated surrounding the location
here..” to ensure the risk of
drilling…”
• prospect ranking … !
• exploration target … !
• cum production rate … !
• WP&B, AFE, POD…!
17. NATIONAL GIS CONCEPT PLAN
(Cloud Computing)
TRANS
PORTASI
PER
TAMBANGAN
PER
TANAHAN
BAKO
KKKS SURTANAL
BPMIGAS
KKKS
KEHUTANAN
KKKS
KESEHATAN
KKKS