SlideShare a Scribd company logo
1 of 2
Download to read offline
INTERNSHIP REPORT
COMPANY BACKGROUND
Shanghai Volkswagen Co. Ltd. was formed in 1984, as a joint venture between
Volkswagen and SAIC. This was a 25-year contract to make passenger cars in Shanghai
with a limit of 50 per cent foreign ownership. Shanghai Volkswagen's Shanghai plant was
by the far the winner among all new JVs, as it produced cars that could function as taxis,
vehicles for government officials and transport for the newly emerging business elite
under the Volkswagen and Škoda marques. It reached 1,527,008 units (1,305,450 from
VW brand such as Lamando, Cross Polo, New Polo, and Passat etc and 221,558 from
Skoda brand such as Octavia, Rapid, Fabia etc).
INTERNSHIP OBJECTIVE
 Study and practice manufacturing, CAD, communication skills in daily operation
on site during internship period.
 Improve self-problem solving and data analysis skills to identify root causes of
cars’ defects.
 Develop a strong sense of responsibility and initiative to deal with technical issues
in production.
DESCRIPTION OF DUTIES
 Continuously communicated with Quality Engineering, Vendor, Purchasing
Engineering and Workers at the assembly site to monitor and improved related
quality and processing areas as well as provided problem solving assistance for
improvements in process-ability, quality, performance, productivity and cost.
 Assisted to analyze statistical data and CAD measurement to identify root causes
of defects with Purchasing Engineering and Body Construction Engineering to
implement appropriate countermeasures at associated facility, such as vendor,
body construction, and final assembly.
 Continuously made suggestions, communicates with all facilities and met with
Germany Engineers to improve processes in regards to quality and productivity at
the assembly site.
 Assisted instrument technicians to take care of daily equipment’s operation, such
as maintain, update, analyze maintenance records and troubleshooting production
line on site.
 Studied and analyzed troubleshooting cases to remove the root cause and avoid
reappearance.
SUMMARY
In the beginning of 2015, I officially started my internship as a manufacturing
engineering role in such a great company, Shanghai Volkswagen Co. Ltd. During the one
to two month, I shadowed several professional engineering, belong to manufacturing and
maintenance department, to study areas including auto final assembly, manufacturing
process, quality and productivity improvement, production line supervision, data analysis,
CAD design, equipment maintenance and troubleshooting as well as communication and
association between varies departments and vendors, etc. According to this valuable
experience, I improved problem solving, team work and project execution skills, which
achieved a high performance evaluation from team leaders and project managers. Due to
the security treaty between Shanghai Volkswagen and me, these relative work and
achievement cannot be presented in this report; however, I would sincerely appreciate
this opportunity to develop a strong sense of self responsibility, technology innovation,
time management, and team leadership. Finally, great thanks to the colleagues, leaders
as well as relative partners of Shanghai Volkswagen.
Intern: Ziyu WANG
Supervisor: Guoquan Zhu
Date: 2/10/2015

More Related Content

What's hot (20)

Boeing Team Teach Uprm
Boeing Team Teach UprmBoeing Team Teach Uprm
Boeing Team Teach Uprm
 
worasit_cv
worasit_cvworasit_cv
worasit_cv
 
Anderson Darrell Visual Resume
Anderson Darrell Visual ResumeAnderson Darrell Visual Resume
Anderson Darrell Visual Resume
 
Nupur_Mungikar_Internship_Poster_Fall
Nupur_Mungikar_Internship_Poster_FallNupur_Mungikar_Internship_Poster_Fall
Nupur_Mungikar_Internship_Poster_Fall
 
CV Dec 2015
CV Dec 2015CV Dec 2015
CV Dec 2015
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CV-Adrian Costin
CV-Adrian CostinCV-Adrian Costin
CV-Adrian Costin
 
Simon CRAIGE_ Profile
Simon CRAIGE_ ProfileSimon CRAIGE_ Profile
Simon CRAIGE_ Profile
 
References and certificates
References and certificatesReferences and certificates
References and certificates
 
CV RaymondBertelsen English
CV RaymondBertelsen EnglishCV RaymondBertelsen English
CV RaymondBertelsen English
 
Company profile 2017 of Biadi cable
Company profile 2017 of Biadi cableCompany profile 2017 of Biadi cable
Company profile 2017 of Biadi cable
 
SSPC PCI comparison
SSPC PCI comparisonSSPC PCI comparison
SSPC PCI comparison
 
Minca nicolae marius-2
Minca nicolae marius-2Minca nicolae marius-2
Minca nicolae marius-2
 
Advanced Work Packaging Myths and Realities
Advanced Work Packaging Myths and Realities Advanced Work Packaging Myths and Realities
Advanced Work Packaging Myths and Realities
 
Dba7206
Dba7206Dba7206
Dba7206
 
Erstaunliche Autos
Erstaunliche AutosErstaunliche Autos
Erstaunliche Autos
 
Advanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation ChallengesAdvanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation Challenges
 
Gaa Bi Lateral Coverage
Gaa Bi Lateral CoverageGaa Bi Lateral Coverage
Gaa Bi Lateral Coverage
 
STA ENGINE TRAINING COURSE 2015
STA ENGINE TRAINING COURSE 2015STA ENGINE TRAINING COURSE 2015
STA ENGINE TRAINING COURSE 2015
 
CV
CVCV
CV
 

Viewers also liked

Six Sigma Green Belt - A company’s accounts payable department is trying to r...
Six Sigma Green Belt - A company’s accounts payable department is trying to r...Six Sigma Green Belt - A company’s accounts payable department is trying to r...
Six Sigma Green Belt - A company’s accounts payable department is trying to r...Suma Kamadod
 
Internship Report on the Company Overview of
Internship Report on the Company Overview ofInternship Report on the Company Overview of
Internship Report on the Company Overview ofVishal Singh
 
Project Report of Accounts Department
Project Report of Accounts DepartmentProject Report of Accounts Department
Project Report of Accounts DepartmentSagar Malik
 
Intern ship report report final
Intern ship report report finalIntern ship report report final
Intern ship report report finalruquia shah
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc roaddeepak athwal
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship ReportHari Krishnan
 
Strategic Account Management Presentation
Strategic Account Management PresentationStrategic Account Management Presentation
Strategic Account Management Presentationmalleway
 

Viewers also liked (9)

Six Sigma Green Belt - A company’s accounts payable department is trying to r...
Six Sigma Green Belt - A company’s accounts payable department is trying to r...Six Sigma Green Belt - A company’s accounts payable department is trying to r...
Six Sigma Green Belt - A company’s accounts payable department is trying to r...
 
Internship Report on the Company Overview of
Internship Report on the Company Overview ofInternship Report on the Company Overview of
Internship Report on the Company Overview of
 
Report
ReportReport
Report
 
Project Report of Accounts Department
Project Report of Accounts DepartmentProject Report of Accounts Department
Project Report of Accounts Department
 
Intern ship report report final
Intern ship report report finalIntern ship report report final
Intern ship report report final
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc road
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship Report
 
Site Survey Report
Site Survey ReportSite Survey Report
Site Survey Report
 
Strategic Account Management Presentation
Strategic Account Management PresentationStrategic Account Management Presentation
Strategic Account Management Presentation
 

Similar to 王紫宇大众实习小结英文版

Similar to 王紫宇大众实习小结英文版 (20)

Kumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-ResumeKumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-Resume
 
Kiran Talele Resume 2017
Kiran Talele Resume 2017Kiran Talele Resume 2017
Kiran Talele Resume 2017
 
R. Venkatraman-Resume
R. Venkatraman-ResumeR. Venkatraman-Resume
R. Venkatraman-Resume
 
IOM assignment
IOM assignment IOM assignment
IOM assignment
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
KARTHIK CV
KARTHIK CVKARTHIK CV
KARTHIK CV
 
VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY
VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRYVOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY
VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY
 
Oracle EBS Man truck & bus ag
Oracle EBS Man truck & bus agOracle EBS Man truck & bus ag
Oracle EBS Man truck & bus ag
 
Atlas Honda
Atlas HondaAtlas Honda
Atlas Honda
 
JAMAL CV updated docx
JAMAL CV updated  docxJAMAL CV updated  docx
JAMAL CV updated docx
 
David Boland Oct 15 2016
David Boland Oct 15 2016David Boland Oct 15 2016
David Boland Oct 15 2016
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Case study SVW by UZMA AZHAR
Case study SVW by UZMA AZHARCase study SVW by UZMA AZHAR
Case study SVW by UZMA AZHAR
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CV
 
anchal cv
anchal cvanchal cv
anchal cv
 
varsha arora (2)
varsha arora (2)varsha arora (2)
varsha arora (2)
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
 
My cv
My cvMy cv
My cv
 
Disha Roy
Disha RoyDisha Roy
Disha Roy
 
Farshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resumeFarshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resume
 

王紫宇大众实习小结英文版

  • 1. INTERNSHIP REPORT COMPANY BACKGROUND Shanghai Volkswagen Co. Ltd. was formed in 1984, as a joint venture between Volkswagen and SAIC. This was a 25-year contract to make passenger cars in Shanghai with a limit of 50 per cent foreign ownership. Shanghai Volkswagen's Shanghai plant was by the far the winner among all new JVs, as it produced cars that could function as taxis, vehicles for government officials and transport for the newly emerging business elite under the Volkswagen and Škoda marques. It reached 1,527,008 units (1,305,450 from VW brand such as Lamando, Cross Polo, New Polo, and Passat etc and 221,558 from Skoda brand such as Octavia, Rapid, Fabia etc). INTERNSHIP OBJECTIVE  Study and practice manufacturing, CAD, communication skills in daily operation on site during internship period.  Improve self-problem solving and data analysis skills to identify root causes of cars’ defects.  Develop a strong sense of responsibility and initiative to deal with technical issues in production. DESCRIPTION OF DUTIES  Continuously communicated with Quality Engineering, Vendor, Purchasing Engineering and Workers at the assembly site to monitor and improved related quality and processing areas as well as provided problem solving assistance for improvements in process-ability, quality, performance, productivity and cost.  Assisted to analyze statistical data and CAD measurement to identify root causes of defects with Purchasing Engineering and Body Construction Engineering to implement appropriate countermeasures at associated facility, such as vendor, body construction, and final assembly.
  • 2.  Continuously made suggestions, communicates with all facilities and met with Germany Engineers to improve processes in regards to quality and productivity at the assembly site.  Assisted instrument technicians to take care of daily equipment’s operation, such as maintain, update, analyze maintenance records and troubleshooting production line on site.  Studied and analyzed troubleshooting cases to remove the root cause and avoid reappearance. SUMMARY In the beginning of 2015, I officially started my internship as a manufacturing engineering role in such a great company, Shanghai Volkswagen Co. Ltd. During the one to two month, I shadowed several professional engineering, belong to manufacturing and maintenance department, to study areas including auto final assembly, manufacturing process, quality and productivity improvement, production line supervision, data analysis, CAD design, equipment maintenance and troubleshooting as well as communication and association between varies departments and vendors, etc. According to this valuable experience, I improved problem solving, team work and project execution skills, which achieved a high performance evaluation from team leaders and project managers. Due to the security treaty between Shanghai Volkswagen and me, these relative work and achievement cannot be presented in this report; however, I would sincerely appreciate this opportunity to develop a strong sense of self responsibility, technology innovation, time management, and team leadership. Finally, great thanks to the colleagues, leaders as well as relative partners of Shanghai Volkswagen. Intern: Ziyu WANG Supervisor: Guoquan Zhu Date: 2/10/2015