2. TA B L E O F C O N T E N T S
1) BRIEF INTRODUCTION TO COMPANY’S KEY PERSONNEL
2) FIELD MAP AND PIPELINE ROUTE
3) SCOPE OF WORKS
4) PIPELINE CONSTRUCTION AND INSTALLATION OVERVIEW
5) PROJECT SCHEDULE AND DURATIONS
6) PROPOSED PROJECT MANAGEMENT TEAM (PMT)
7) PIPELAY BARGE ‘OMBAK BIRU SATU’
1) PIPELAY BARGE ‘OMBAK BIRU SATU’ SPECIFICATIONS AND BARGE LAYOUT
2) BARGE WELDING STATIONS AND BARGE ROLLER ARRANGEMENT
3) STINGER DETAILS
4) PIPELAY BARGE PHOTOS
8) ONSHORE PIPELINE INSTALLATION FROM LANDFALL POINT TO LANDFALL STATION
(APPROXIMATELY 5.3KM)
9) SHORE APPROACH & BEACHPULL METHODOLOGY AT LANDFALL POINT
10) SUBSEA PIPELAYING BY PIPELAY BARGE ‘OMBAK BIRU SATU 1 (APPROXIMATELY 12 KM)
1) ENGINEERING ANALYSIS
11) RISER INSTALLATION AT TBDP-A PLATFORM
12) PRE-COMMISSIONING METHODOLOGY
13) PRE AND POST TRENCHING WORKS SCOPE AND METHODOLOGY
14) SUMMARY OF MARINE SPREAD & MAJOR EQUIPMENT
15) PROJECT RELATED PHOTOS
Thai Binh-Ham Rong Gas Pipeline
3. LINEAR
WINCH AT
LANDFALL
POINT
PRE-TRENCH PRIOR TO PIPE PULLING FROM
KP11.0 TO KP13.03
SUBSEA PIPELINE= 13.03 km = 1,056 joints
KP0.00
KP13.03
LAYING DIRECTION
300 Linear
Winch
LAY BARGE
LINEAR WINCH
SUBSEA
SPOOL TIE-IN
LAUNCHER
AT TBDP-A
KP0.00
LAYING DIRECTION
Pulling Direction
KP5.283
LAND PIPE = 5.283 km
= 428 joints
SUBSEA PIPELINE
LANDFALL
STATION
(KP5.283)
LANDFALL
POINT
TBDP-A
EXCAVATION
USING
AMPHIBIOUS
EXCAVATOR
RECEIVER AT
LANDFALL
STATION
4. NO. DESIGNATION NO.OF PERSON
1 PROJECT MANAGER 1
2 CONSTRUCTION MANAGER (OCS) 1
3 OPERATION MANAGER 1
4 HEAD OF PLANNING AND COST CONTROL 1
5 HEAD OF PROCUREMENT AND SUB-CONTRACTING 1
6 HEAD OF MARINE AND LOGISTIC 1
7 LOGISTIC COORDINATOR 1
8 ENGINEERING MANAGER 1
9 FIELD ENGINEER 4
10 QA/QC COORDINATOR 1
11 SAFETY COORDINATOR 1
12 DRAUGHTMAN 1
13 DOCUMENT CONTROLLER 1
TOTAL OF PMT 16 PERSONS
28. TRENCHER
Water for ballasting
Air for deballasting
Previous contain material been
push out
POST-TRENCHING WORKS AT MUD-FLAT AREA USING
JET-SLED TRENCHING SYSTEM