This document discusses pile installation methods and equipment. It covers the main installation methods of driving piles and boring piles. For driven piles, it describes the key components of pile driving systems including hammers, rigs, and other accessories. For bored piles, it outlines the equipment used including drilling rigs, augers, and accessories. It also provides details on pile installation procedures for both driven and bored piles.
4. INTRODUCTION :
The commonest function of piles is to
transfer a load that cannot be adequately
supported at shallow depths to a depth
where adequate support becomes available.
5.
6. The two main installation methods are :
1) Installation by driving
2) Installation by drilling (or boring) .
14. 2- EQUIPMENT FOR DRIVEN PILES :
The two key players in pile driving are the pile and
hammer.
1) Rigs
2) Hammers
3)Vibratory pile drivers
4)Other driving accessories
15. 2-2 Hammers :
There are various type of pile-driving hammers that can be
used to install piles :
1) Drop hammers
2) Single- acting hammers ( steam or air )
3) Double acting hammers (steam or air )
4) Differential hammers (steam , air or hydraulic power )
5) Diesel hammer ( single or double acting )
6) Vibratory pile drivers
26. Drilling rig can have one of the following mounting :
1) Truck
2) Crane
3) Crawler
4) Skid
5) Wheeled trailer
27. Other drilling accessories :
- Auger
- Belling Tools
- Coring Tools
- Hole Bottom Cleaning Tools and Casing
28. 4-Procedure for pile installation
4-1 Planning prior to installation
-Preparing pile specifications
-Office planning
-Field planning prior to installation
-Field planning consist of pile preparation
-Pile installation
4-2 Installation of driven piles
-Driving of timber piles
-Driving of Precast and pre stressed concrete piles
-Splicing of precast pre stressed concrete piles