1. Possible solutions and financing options for energy conservation projects implementation.
2. Energy management system development & implementation expert advisory and services
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Total energy conservation and energy management solutions for intensive energy users
1.
2. Introduction To CNS Group & Project References
Engineering Solutions:
Energy Saving Projects Implementation
Management Solutions : energy Management System
Consultancy & Training Services
Registered Electrical Energy Manager Services
What’s next?
3. An Energy Services Company (ESCO)
Performance Driven through investments in EE&RE projects implementation since
2001
Strong domestic ®ional presence
With PROVEN TRACK RECORDS, experienced & specialized in-house expertise
CNS/Vesta Group
Investments through Energy Performance
Contracting(EPC) investment model
Computer-Aided Energy Resource
Management System(CERMS)
Energy Conservation & sustainable
energy technologies & solutions
Private Financing Initiative (PFI) for Green
Project s Development & Implementation
EnMS Development & Implementation based
on ISO50001 Standard
Energy audit & performance measurement
Training program for in-house capacity
building
Registered Electrical Energy Manager Services:
Expert guidance & compliance
Energy management policy studies &
development of implementation plan
ENGINEERING SOLUTIONS
Project Implementation
MANAGEMENT SOLUTIONS
Energy Management
Consultancy & Training
4.
5. COMMMON
BMS/BAS
Data collection &
monitoring
Basic analysis &
controls
For new &
existing
buildings/
facilities
CERMS - CUSTOMIZED & SMART CONTROLS
FOR ENERGY EFFICIENT OPERATIONS
HVAC Systems
Motors, pump & fans systems
Lighting system
Heating & heat recovery systems
Compressed air systems
Internal electrical incoming supply system
In-house developed system
with MSC Status
9. Energy Saving Micro Ballast
and HP Fluorescent T8-28 watts
LED Fluorescent Tubes LED Down Light
LED Ceiling Light High Performance LED
Street Light
LED Spot/Flood Light
11. Measurement of Actual Electricity Consumption Reduction
Achieved
Saving = 40%
(7.8 – 4.7)/7.8
Saving = 42.5%
(8.0 – 4.6)/8.0
12. Sharing Saving Basis through Energy
Performance Contracting(EPC)
Model/Private Financing
Initiative(PFI)
Zero upfront costs from building the
facilities owner
Or
Standard Project Procurement
13. DETAILED
ENERGY AUDIT
•Site assessment & data analysis –
active systems
•Energy saving potential
identification
PRESENT
AUDIT
FINDINGS
•Confirmed energy saving
potentials proposal
•Measurement &Verification
Method
•Agree on EPC proposal &
contractual conditions -
sharing ratio, period &
implementation plan
IMPLEMENT
SAVING
MEASURES
•Monitoring &
maintenance
•Savings
measurement &
verification
•Share savings
“ZERO Cost”
to the client
14. time
(year)
Energy Bills
During
contract
period
Lower
Electricity Bill
After Contract
period
Electricity
bill saved
Before Contract
Period
Electricity bill
before energy
saving
measures
implementation
Payment to
CNS
Savings for
Client
Baseline
Lower
Electricity Bill
Total Savings
for Client
Energy Audit
19. 1. Development & implementation energy
management system based on ISO 50001:
2011 Standard
2. Preparatory works & assistance towards
ISO50001: 2011 Standard certification
3. Detailed energy audit & energy
performance evaluation
4. Strategic energy policy studies &
implementation plan
In-house EnMS Expert certified by United Nation
Industrial Development Organization(UNIDO)
20. Training and awareness
programs
EnMS awareness,
development &
implementation
energy efficient operations
& technology applications
Customized training
modules & materials
for different target groups in
the organization cover
management and
technical areas
21. No. Type Topics Target Group
1 ½ Day Awareness
Seminar
Overview On Energy, EnMS And Its
Benefits, Case Studies
Middle & Top management
personnel
2 One day Workshop Introduction to energy management
system development & implementation
Operational & management
executives
2 2-day EnMS User
Training based on ISO
50001:2011 Standard
Step by step EnMS Development,
Implementation & monitoring
Management Representative
Energy Management Committee
members
In-house internal auditor
3 3-5 Days System
Optimization Training
Identification of Energy conservation
Measures And Practices, financial
evaluation, monitoring & verification and
etc
Key operational & technical
personnel
4 2-day Internal Auditor
Training
for ISO 50001
Standard
Customized training for internal auditing
to check conformance towards the
standards requirements
Internal auditors
5 Coaching/Workshop for REEM Application & Interview REEM Candidates and technical
executives in EnMS implementation
Expert trainers registered with HRDF and companies are eligible to apply for refund at HRDF’s conditions
22.
23. COMPLIANCE
To perform functions & duties to fulfil
requirements of Efficient Management of
Electrical Energy Regulations 2008
EXPERT ASSISTANCE & ADVISORY
For clients to achieve energy cost savings
through the development & adoption of
sustainable energy management system
BUILD IN-HOUSE CAPACITY
To train & develop key personnel to
implement & sustain energy conservation
initiatives & to comply with EMEER 2008 in
a long term
24. Deployment of experienced &competent REEM to engage with
the client
Propose and assist the client to develop & implement in-house
system
to achieve energy saving targets through EnMS, efficient
operations & technologies;
Identify competency requirements and develop in-house
competencies through capacity development program
Our REEM will be a mentor to selected in-house candidates aimed
to apply to be a REEM with Energy Commission
who will assume the functions and duties as REEM after our
service period at agreed timeline to monitor for continual
improvement of the system
25. For Energy Conservation Project Implementation
with EPC Model
1. Your consent to conduct a detailed energy
audit at your building/manufacturing facilities
at NO COST to you
2. Then, the time from your key management
and technical team members - for CNS
Group to findings & EPC investment proposal
for your consideration & approval
Energy Management System Consultancy &
Training Services
Pre-evaluation & submission of detailed proposal
REEM services
Submission of service proposal upon your request
26. THANK YOU!
Connecsys Sdn Bhd
3, Cubic Technology, No.6, JalanTeknologi 3/4
Selangor Science Park 1, 47810 Kota Damansara
Petaling Jaya, Selangor Darul Ehsan, Malaysia
Tel: +603 6156 1881 Fax: +603 2772 0975
Website: www.cnsgroup.com.my