PRESUPUESTO NECESARIO PARA CONCLUIR.pdf

  1. COSTO DIRECTO DE OBRA S/. 2,606,866.79 S/. 41,264.39 S/. 315,080.88 S/. GASTOS GENERALES 10.85% S/. 282,845.05 S/. 4,477.19 S/. 34,186.28 S/. SUB TOTAL S/. 2,889,711.84 S/. 45,741.58 S/. 349,267.16 S/. SUPERVISION 3.66% S/. 105,763.45 1,674.14 12,783.18 LIQUIDACION S/. 30,510.00 SUB TOTAL S/. 3,025,985.29 S/. 47,415.72 S/. 362,050.33 S/. 2,711,350.67 S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. 2,100,000.00 S/. 600,000.00 S/. 371,726.00 S/. 3,071,726.00 S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. 2,711,350.67 S/. 3,071,726.00 S/. 360,375.33 TOTAL ASIGNADO 99.95% PRESUPUESTO TOTAL EJECUTADO DEL PROYECTO 89.60% TOTAL ASIGNADO 99.95% SALDO DE PRESUPUESTO A DEVOLVER 11.73% RESUMEN DE PRESUPUESTO SEGÚN EXP. MODIFICADO N°01 MONTO DEDUCTIVO 11.96% SEGÚN EXP. MODIFICADO N°02 MONTO PRIMIGENIO MONTO 3ER DEVENGADO TOTAL 12.28% MONTOS ASIGNADOS PRESUPUESTO TOTAL EJECUTADO DEL PROYECTO 89.60% RESUMEN DE PRESUPUESTO MONTO 1ER DEVENGADO TOTAL MONTO ADICIONAL 69.40% 1.57% MONTO 2DO DEVENGADO TOTAL 19.83%