CAPACITY
MANAGEMENT
Hello!
Luke D’Silva (5)
Yash Vardhan Lohia (9)
Madhurima Paul (10)
“
“The world has enough for every
one’s needs, but not enough for
everyone’s greed.”
-Mahatma Gandhi.
CAPACITY MANAGEMENT
 Capacity is a very relative term. In
operations, it is defined as the amount of
resource inputs available relative to output
requirement over a particular period of time.
 Strategic Capacity Planning is an approach
taken to determine the overall capacity level
of capital-intensive resources- facilities,
equipments and the labour force size- that
best supports the companies strategy.
CAPACITY PLANNING
Long Range
Greater than one
year. In this case,
the resources take
a long time to
acquire and
dipose.
e.g., building,
equipment, etc.
Intermediate
Range
Monthly or
quarterly planning.
Capacity may vary
due to hiring,
layoff, new tools
and changes, or
subcontracting.
Short Range
Less than a month.
This is tied into
weekly or daily
process and
involves making
adjustments to
decrease variance
between planned
and actual output.
CAPACITY UTILIZATION
 By capacity, we mean an attainable output,
e.g., 4 lakh tablets per day, but it does not
provide information that how long the rate
can be sustained. Therefore, we do not know
wether this rate is sustainable or not.
 To avoid such problems, the concept of Best
Operating Level is used.
 It is a level of capacity at which the output
level minimizes the average cost per unit.
CAPACITY UTILIZATION
 The important measure is the capacity utilization
rate. It reveals the best operating level.
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑒 =
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑠𝑒𝑑
𝐵𝑒𝑠𝑡 𝑂𝑝𝑒𝑟𝑎𝑡𝑖𝑛𝑔 𝐿𝑒𝑣𝑒𝑙
 For example, if a company’s best operating level is
4.5 lakh tablets per day, and it makes 4 lakh
tablets per day, the capacity utilization rate is
89%.
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑒 =
400000
450000
= 89%
Market demand is
just the tip of the
iceberg.
The real problem lies
with managing the
resources and providing
a correct supply to the
demands in the market.
ECONOMIES OF SCALE
 Economics of scale is the basic idea that as
the plant gets larger and volume increases,
the average cost of unit drops.
 This happens due to lower costs of operation
and capital because the equipment with
twice the capacity does not cost twice as
much to purchase or operate.
 Plants also gain efficiency when they learn
how to utilize their dedicated resources-
people and equipment- for IT, material
handling and administrative support.
DISECONOMIES OF SCALE
 Sometimes, a size of a plant may become too
large and cause diseconomies of scale.
 Diseconomies may surface due to many
reasons. Maintaining the demand required
to keep the large facility busy requires
significant discounting of the product.
 E.g., M&M Mars has highly automated high
volume equipment to make M&Ms. A sinngle
equppment moves 2.6 million M&Ms a day.
Even if the labour required to operate is low,
the labour for maintainance is high.
LEARNING CURVE
 A line which displays the relationship between
unit production time and cumulative number
units produced.
 It is used to estimate the time for product
design and production, as well as costs.
 Integral part of planning corporate strategy
such as decisions concerning pricing, capital
investment and operating cost based on
experience curves.
 Applied to both individuals and organization.
TYPES OF LEARNING
 Individual Learning is the improvement that
the results when people repeat the process
and gain efficiency from their own experience.
“Practice makes Perfect”
 Organizational Learning results from practice
as well, but also comes from changes in
administration, equipment and product
design.
THEORY
Learning curve theory is based on three
assumptions:
 The amount of time given to complete a given
task or, the unit of a product will be less each
time a task is undertaken.
 The unit time will decrease at a decreasing rate.
 The reduction in time will follow a predictable
pattern
PROGRESS CURVE
INDUSTRIAL LEARNING
CAPACITY FOCUS
 Focus Factory is a facility designed around a
limited set of production objectives.
Typically, the focus relates to a specific
product or a product group.
 A focused factory can be operationalized
through the mechanism of Plant within a
Plant.
 A focus factory may have several PWPs, each
of which may perform separate tasks and
produce diferrentiated products.
PRODUCT LINE A
ASSEMBLY
B
MACHINE SHOP
PRODUCT LINE
B
ASSEMBLY
PLANT WITHIN A PLANT
Low Volume
High Variety
High Skill
High Volume
Low Variety
Low Skill
CAPACITY FLEXIBILITY
 The means of having the ability to rapidly
increase or decrease production levels, or to
shift production capacity quickly from one
product service to another.
 This is achieved through:
1. Flexible Plants
2. Flexible Processes
3. Flexible Workers
CAPACITY ANALYSIS
 Considerations in capacity change requires:
1. Maintaining System Balance- Balance between
output and input of different stages.
2. Frequency Of Capacity Additions- Frequent and
Infrequent.
3. Use of External Capacity- Sharing capacity or
no addition at all.
DETERMINING CAPACITY REQUIREMENTS
 Capacity requirement is essential for every
business.
 The determination of the units is done by:
1. Using forecasting techniques for predicting
Sales for individual product in a product
line.
2. Calculate equipment and labour
requirements to meet product line forecasts.
3. Project labour and equipment availabilities
according to planning.
Also, capacity in excess of demand is kept for
precaution- Capacity Cushion.
DETERMINING CAPACITY
REQUIREMENTS: Example.
Stewart company produces two type of salad
dressings. They are available in a plastic bottle
with a single serving bag. The brands are:
 PAUL’s
 NEWMAN’s
2010 2011 2012
PAUL’s
Bottles(000s)
Bags (000s)
60
100
100
200
150
300
NEWMAN’s
Bottles(000s)
Bags (000s)
75
200
85
400
95
600
DETERMINING CAPACITY
REQUIREMENTS: Example.
Total Forecast:
 If, capacity is 450000 per year, then 135,000
bottles will take 135/450= 0.9 machines.
 Similarly, for bags, 1,250,000 per capacity is
available, then for 300 bags it becomes 1.2
machines.
2010 2011 2012
Bottles (000s)
Bags (000s)
135
300
185
600
245
900
DETERMINING CAPACITY
REQUIREMENTS: Example.
 Now, if 2 operators are required for bottle
making and 3 operators for bags, the
equations comes as:
0.9 bottle machine x 2 operators = 1.8 op.
1.2 bag machines x 3 operators = 3.6 op.
 This is further balanced and operated in
excess, which is used as the cushion
capacity.
DECISION TREE
 A decision tree is a schematic representation
of the alternatives available to a decision
maker and their possible consequences.
 The term gets its name from the treelike
appearance of the diagram.
 They are particularly useful for analyzing
situations that involve sequential decisions.
 Square nodes denote decision points, and
circular nodes denote chance events.
 Branches leaving square nodes represent
alternatives; branches leaving circular
nodes represent chance events.
 After the tree has been drawn, it is analyzed
from right to left; that is, starting with the
last decision that might be made.
 For each decision, choose the alternative
that will yield the greatest return (or the
lowest cost).
DECISION TREE
 EXAMPLE:
A manager must decide on the size of a video
arcade to construct. The manager has narrowed
the choices to two: large or small. Information has
been collected on payoffs, and a decision tree has
been constructed.
 The decision tree is analyzed to find out which
initial alternative (build small or build large)
should be chosen in order to maximize
expected monetary value.
DECISION TREE
DECISION TREE
 The dollar amounts at the branch ends indicate the
estimated payoffs if the sequence of chance events and
decisions that is traced back to the initial decision occurs.
 For example, if the initial decision is to build a small facility
and it turns out that demand is low, the payoff will be $40
(thousand).
 Similarly, if a small facility is built, demand turns out high,
and a later decision is made to expand, the payoff will be
$55 (thousand).
 The figures in parentheses on branches leaving the chance
nodes indicate the probabilities of those states of nature.
 Hence, the probability of low demand is .4, and the
probability of high demand is .6. Payoffs in parentheses
indicate losses.
DECISION TREE
 Analyze the decisions from right to left:
1. Determine which alternative would be selected for
each possible second decision. For a small facility with
high demand, there are three choices: do nothing,
work overtime, and expand. Because expand has the
highest payoff, you would choose it. Indicate this by
placing a double slash through each of the other
alternatives.
Similarly, for a large facility with low demand, there are
two choices: do nothing and reduce prices. You would
choose reduce prices because it has the higher expected
value, so a double slash is placed on the other branch.
DECISION TREE
2. Determine the product of the chance probabilities and
their respective payoffs for the remaining branches:
Build small
Low demand = .4 ($40) = $16
High demand = .6 ($55) = $33
Build large
Low demand = .4 ($50) = $20
High demand = .6 ($70) = $42
3. Determine the expected value of each initial alternative:
Build small $16 + $33 = $49
Build large $20 + $42 = $62
Hence, the choice should be to build the large facility
because it has a larger expected value than the small facility.
SERVICE CAPACITY PLANNING
 Service capacity is different to manufacturing
capacity planning and facility sizing.
 The variables which are critical in service are:
1. Time
2. Location
3. Volatality of Demand.
TIME
 Unlike goods,services cannot be stored for
later use.
 Managers must consider time as one of their
supplies.
 The capacity must be available to produce a
service when it is needed.
LOCATION
 The service capacity must be located near
the customer.
 The capacity to deliver a service must first be
distributed to the customer(either physically
or through some communications medium),
then the service must be delivered.
VOLATALITY OF DEMAND
 Volatility of demand on a delivery system is
much higher than on a manufacturing
production system.
1. Services cannot be strored
2. Customers interact directly with the
production system
3. Directly affected by consumer behavior
CAPACITY UTILIZATION
AND SERVICE QUALITY
 Planning capacity levels for services must
consider day-to-day relationship between
service utilization and service quality.
CAPACITY UTILIZATION AND QUALITY
Relationship between Rate of Service Utilization (ρ) and
Service Quality.
HOSPITAL EMERGENCY ROOMS AND FIRE
DEPARTMENTS
COMMUTER TRAINS
STADIUM AND PERFORMANCE SELLOUTS
Thanks!
Have a nice evening ahead!

More Related Content

What's hot

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Atif Ghayas
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
Akhil Lal
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
senthil.G
 

What's hot (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
6. process selection and facility layout
6. process selection and facility layout6. process selection and facility layout
6. process selection and facility layout
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Inventory management
Inventory managementInventory management
Inventory management
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Facility Capacity & Layout Planning
Facility Capacity & Layout PlanningFacility Capacity & Layout Planning
Facility Capacity & Layout Planning
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysis
 
TYPES OF FACILITY LAYOUT AND ITS ADVANTAGES AND DISADVANTAGES - OPERATIONS MA...
TYPES OF FACILITY LAYOUT AND ITS ADVANTAGES AND DISADVANTAGES - OPERATIONS MA...TYPES OF FACILITY LAYOUT AND ITS ADVANTAGES AND DISADVANTAGES - OPERATIONS MA...
TYPES OF FACILITY LAYOUT AND ITS ADVANTAGES AND DISADVANTAGES - OPERATIONS MA...
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning process
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Facility Location Planning
Facility Location PlanningFacility Location Planning
Facility Location Planning
 
Process Selection And Facility Layout
Process Selection And Facility LayoutProcess Selection And Facility Layout
Process Selection And Facility Layout
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Operations management ii
Operations management   iiOperations management   ii
Operations management ii
 

Viewers also liked

Capacity planning in project and HR management. Bertrand Hanot, BHC
Capacity planning in project and HR management. Bertrand Hanot, BHCCapacity planning in project and HR management. Bertrand Hanot, BHC
Capacity planning in project and HR management. Bertrand Hanot, BHC
Odoo
 
An Availability Management Guide
An Availability Management GuideAn Availability Management Guide
An Availability Management Guide
Simon Pritchard
 
Increase your resource capacity without hiring ppt
Increase your resource capacity without hiring pptIncrease your resource capacity without hiring ppt
Increase your resource capacity without hiring ppt
p6academy
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
Sai Praveen Chettupalli
 
Service operation ppt
Service operation pptService operation ppt
Service operation ppt
Bhaskar Das
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
MOHD ARISH
 

Viewers also liked (20)

Production capacity – planning and control
Production capacity – planning and controlProduction capacity – planning and control
Production capacity – planning and control
 
Adam Grummitt - Capacity Management: Guided Practitioner Satnav
Adam Grummitt - Capacity Management: Guided Practitioner SatnavAdam Grummitt - Capacity Management: Guided Practitioner Satnav
Adam Grummitt - Capacity Management: Guided Practitioner Satnav
 
Capacity planning in project and HR management. Bertrand Hanot, BHC
Capacity planning in project and HR management. Bertrand Hanot, BHCCapacity planning in project and HR management. Bertrand Hanot, BHC
Capacity planning in project and HR management. Bertrand Hanot, BHC
 
Enterprise Capacity Optimization - Capacity Management Over Everything
Enterprise Capacity Optimization - Capacity Management Over EverythingEnterprise Capacity Optimization - Capacity Management Over Everything
Enterprise Capacity Optimization - Capacity Management Over Everything
 
Vendor Selection Matrix - Capacity Management - Top 15 Vendors in 2016
Vendor Selection Matrix - Capacity Management - Top 15 Vendors in 2016Vendor Selection Matrix - Capacity Management - Top 15 Vendors in 2016
Vendor Selection Matrix - Capacity Management - Top 15 Vendors in 2016
 
An Integrated Approach to ITIL Aligned Capacity Management
An Integrated Approach to ITIL Aligned Capacity ManagementAn Integrated Approach to ITIL Aligned Capacity Management
An Integrated Approach to ITIL Aligned Capacity Management
 
Case Study: HCL Technologies On Capacity Planning for Cloud and Virtualized E...
Case Study: HCL Technologies On Capacity Planning for Cloud and Virtualized E...Case Study: HCL Technologies On Capacity Planning for Cloud and Virtualized E...
Case Study: HCL Technologies On Capacity Planning for Cloud and Virtualized E...
 
An Availability Management Guide
An Availability Management GuideAn Availability Management Guide
An Availability Management Guide
 
Управление ресурсами проекта: опыт Северной Америки. Making time. Creating R...
Управление ресурсами проекта: опыт  Северной Америки. Making time. Creating R...Управление ресурсами проекта: опыт  Северной Америки. Making time. Creating R...
Управление ресурсами проекта: опыт Северной Америки. Making time. Creating R...
 
Increase your resource capacity without hiring ppt
Increase your resource capacity without hiring pptIncrease your resource capacity without hiring ppt
Increase your resource capacity without hiring ppt
 
Resource mgmt capacity to planning to reporting actuals - Oracle Primavera Co...
Resource mgmt capacity to planning to reporting actuals - Oracle Primavera Co...Resource mgmt capacity to planning to reporting actuals - Oracle Primavera Co...
Resource mgmt capacity to planning to reporting actuals - Oracle Primavera Co...
 
DECISION MAKING AND TECHNIQUES OF DECISION MAKING
DECISION MAKING AND TECHNIQUES OF DECISION MAKINGDECISION MAKING AND TECHNIQUES OF DECISION MAKING
DECISION MAKING AND TECHNIQUES OF DECISION MAKING
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
 
Service operation ppt
Service operation pptService operation ppt
Service operation ppt
 
Capacity and Demand Management
Capacity and Demand ManagementCapacity and Demand Management
Capacity and Demand Management
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Servqual model
Servqual modelServqual model
Servqual model
 
What Makes Great Infographics
What Makes Great InfographicsWhat Makes Great Infographics
What Makes Great Infographics
 
Masters of SlideShare
Masters of SlideShareMasters of SlideShare
Masters of SlideShare
 
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to SlideshareSTOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
STOP! VIEW THIS! 10-Step Checklist When Uploading to Slideshare
 

Similar to Capacity Management

8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx
blondellchancy
 
8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx
sodhi3
 
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptxChapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
amanuel236786
 
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docxBeck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
ikirkton
 
Operations ppt
Operations pptOperations ppt
Operations ppt
Pritam RW
 
Operations ppt
Operations pptOperations ppt
Operations ppt
Pritam RW
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Pritam RW
 
Operations management1
Operations management1Operations management1
Operations management1
Patrick Rubix
 

Similar to Capacity Management (20)

Reading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdfReading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdf
 
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptxGroup 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx
 
8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx8©FotosearchSuperStockCapacity DecisionsLearning .docx
8©FotosearchSuperStockCapacity DecisionsLearning .docx
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
lay out
lay outlay out
lay out
 
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptxChapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
Chapter-8 Capacity Planning, Aggregate Planning and Scheduling.pptx
 
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docxBeck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
Beck Manufacturing and Plant CapacityRead the Beck Manufacturin.docx
 
Bus 630 preview full class
Bus 630 preview full classBus 630 preview full class
Bus 630 preview full class
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Chapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
Chapter 16 Lean Accounting, Target Costing, And The Balanced ScorecardChapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
Chapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Capacity planning1
Capacity planning1Capacity planning1
Capacity planning1
 
Ch09
Ch09Ch09
Ch09
 
Operations management1
Operations management1Operations management1
Operations management1
 

More from Yash Vardhan Lohia (6)

3D Printing in Pharmaceuticals
3D Printing in Pharmaceuticals3D Printing in Pharmaceuticals
3D Printing in Pharmaceuticals
 
Operation Research in Basketball Player Analysis
Operation Research in Basketball Player AnalysisOperation Research in Basketball Player Analysis
Operation Research in Basketball Player Analysis
 
Reliance JIO Infocomm Limited
Reliance JIO Infocomm LimitedReliance JIO Infocomm Limited
Reliance JIO Infocomm Limited
 
Medical Tourism
Medical TourismMedical Tourism
Medical Tourism
 
Employee benefits
Employee benefitsEmployee benefits
Employee benefits
 
Pfizer project management
Pfizer project managementPfizer project management
Pfizer project management
 

Recently uploaded

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 

Capacity Management

  • 2. Hello! Luke D’Silva (5) Yash Vardhan Lohia (9) Madhurima Paul (10)
  • 3. “ “The world has enough for every one’s needs, but not enough for everyone’s greed.” -Mahatma Gandhi.
  • 4. CAPACITY MANAGEMENT  Capacity is a very relative term. In operations, it is defined as the amount of resource inputs available relative to output requirement over a particular period of time.  Strategic Capacity Planning is an approach taken to determine the overall capacity level of capital-intensive resources- facilities, equipments and the labour force size- that best supports the companies strategy.
  • 5. CAPACITY PLANNING Long Range Greater than one year. In this case, the resources take a long time to acquire and dipose. e.g., building, equipment, etc. Intermediate Range Monthly or quarterly planning. Capacity may vary due to hiring, layoff, new tools and changes, or subcontracting. Short Range Less than a month. This is tied into weekly or daily process and involves making adjustments to decrease variance between planned and actual output.
  • 6. CAPACITY UTILIZATION  By capacity, we mean an attainable output, e.g., 4 lakh tablets per day, but it does not provide information that how long the rate can be sustained. Therefore, we do not know wether this rate is sustainable or not.  To avoid such problems, the concept of Best Operating Level is used.  It is a level of capacity at which the output level minimizes the average cost per unit.
  • 7. CAPACITY UTILIZATION  The important measure is the capacity utilization rate. It reveals the best operating level. 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑒 = 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑠𝑒𝑑 𝐵𝑒𝑠𝑡 𝑂𝑝𝑒𝑟𝑎𝑡𝑖𝑛𝑔 𝐿𝑒𝑣𝑒𝑙  For example, if a company’s best operating level is 4.5 lakh tablets per day, and it makes 4 lakh tablets per day, the capacity utilization rate is 89%. 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑈𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑒 = 400000 450000 = 89%
  • 8. Market demand is just the tip of the iceberg. The real problem lies with managing the resources and providing a correct supply to the demands in the market.
  • 9. ECONOMIES OF SCALE  Economics of scale is the basic idea that as the plant gets larger and volume increases, the average cost of unit drops.  This happens due to lower costs of operation and capital because the equipment with twice the capacity does not cost twice as much to purchase or operate.  Plants also gain efficiency when they learn how to utilize their dedicated resources- people and equipment- for IT, material handling and administrative support.
  • 10. DISECONOMIES OF SCALE  Sometimes, a size of a plant may become too large and cause diseconomies of scale.  Diseconomies may surface due to many reasons. Maintaining the demand required to keep the large facility busy requires significant discounting of the product.  E.g., M&M Mars has highly automated high volume equipment to make M&Ms. A sinngle equppment moves 2.6 million M&Ms a day. Even if the labour required to operate is low, the labour for maintainance is high.
  • 11. LEARNING CURVE  A line which displays the relationship between unit production time and cumulative number units produced.  It is used to estimate the time for product design and production, as well as costs.  Integral part of planning corporate strategy such as decisions concerning pricing, capital investment and operating cost based on experience curves.  Applied to both individuals and organization.
  • 12. TYPES OF LEARNING  Individual Learning is the improvement that the results when people repeat the process and gain efficiency from their own experience. “Practice makes Perfect”  Organizational Learning results from practice as well, but also comes from changes in administration, equipment and product design.
  • 13. THEORY Learning curve theory is based on three assumptions:  The amount of time given to complete a given task or, the unit of a product will be less each time a task is undertaken.  The unit time will decrease at a decreasing rate.  The reduction in time will follow a predictable pattern
  • 16. CAPACITY FOCUS  Focus Factory is a facility designed around a limited set of production objectives. Typically, the focus relates to a specific product or a product group.  A focused factory can be operationalized through the mechanism of Plant within a Plant.  A focus factory may have several PWPs, each of which may perform separate tasks and produce diferrentiated products.
  • 17. PRODUCT LINE A ASSEMBLY B MACHINE SHOP PRODUCT LINE B ASSEMBLY PLANT WITHIN A PLANT Low Volume High Variety High Skill High Volume Low Variety Low Skill
  • 18. CAPACITY FLEXIBILITY  The means of having the ability to rapidly increase or decrease production levels, or to shift production capacity quickly from one product service to another.  This is achieved through: 1. Flexible Plants 2. Flexible Processes 3. Flexible Workers
  • 19. CAPACITY ANALYSIS  Considerations in capacity change requires: 1. Maintaining System Balance- Balance between output and input of different stages. 2. Frequency Of Capacity Additions- Frequent and Infrequent. 3. Use of External Capacity- Sharing capacity or no addition at all.
  • 20. DETERMINING CAPACITY REQUIREMENTS  Capacity requirement is essential for every business.  The determination of the units is done by: 1. Using forecasting techniques for predicting Sales for individual product in a product line. 2. Calculate equipment and labour requirements to meet product line forecasts. 3. Project labour and equipment availabilities according to planning. Also, capacity in excess of demand is kept for precaution- Capacity Cushion.
  • 21. DETERMINING CAPACITY REQUIREMENTS: Example. Stewart company produces two type of salad dressings. They are available in a plastic bottle with a single serving bag. The brands are:  PAUL’s  NEWMAN’s 2010 2011 2012 PAUL’s Bottles(000s) Bags (000s) 60 100 100 200 150 300 NEWMAN’s Bottles(000s) Bags (000s) 75 200 85 400 95 600
  • 22. DETERMINING CAPACITY REQUIREMENTS: Example. Total Forecast:  If, capacity is 450000 per year, then 135,000 bottles will take 135/450= 0.9 machines.  Similarly, for bags, 1,250,000 per capacity is available, then for 300 bags it becomes 1.2 machines. 2010 2011 2012 Bottles (000s) Bags (000s) 135 300 185 600 245 900
  • 23. DETERMINING CAPACITY REQUIREMENTS: Example.  Now, if 2 operators are required for bottle making and 3 operators for bags, the equations comes as: 0.9 bottle machine x 2 operators = 1.8 op. 1.2 bag machines x 3 operators = 3.6 op.  This is further balanced and operated in excess, which is used as the cushion capacity.
  • 24. DECISION TREE  A decision tree is a schematic representation of the alternatives available to a decision maker and their possible consequences.  The term gets its name from the treelike appearance of the diagram.  They are particularly useful for analyzing situations that involve sequential decisions.
  • 25.  Square nodes denote decision points, and circular nodes denote chance events.  Branches leaving square nodes represent alternatives; branches leaving circular nodes represent chance events.
  • 26.  After the tree has been drawn, it is analyzed from right to left; that is, starting with the last decision that might be made.  For each decision, choose the alternative that will yield the greatest return (or the lowest cost).
  • 27. DECISION TREE  EXAMPLE: A manager must decide on the size of a video arcade to construct. The manager has narrowed the choices to two: large or small. Information has been collected on payoffs, and a decision tree has been constructed.  The decision tree is analyzed to find out which initial alternative (build small or build large) should be chosen in order to maximize expected monetary value.
  • 29. DECISION TREE  The dollar amounts at the branch ends indicate the estimated payoffs if the sequence of chance events and decisions that is traced back to the initial decision occurs.  For example, if the initial decision is to build a small facility and it turns out that demand is low, the payoff will be $40 (thousand).  Similarly, if a small facility is built, demand turns out high, and a later decision is made to expand, the payoff will be $55 (thousand).  The figures in parentheses on branches leaving the chance nodes indicate the probabilities of those states of nature.  Hence, the probability of low demand is .4, and the probability of high demand is .6. Payoffs in parentheses indicate losses.
  • 30. DECISION TREE  Analyze the decisions from right to left: 1. Determine which alternative would be selected for each possible second decision. For a small facility with high demand, there are three choices: do nothing, work overtime, and expand. Because expand has the highest payoff, you would choose it. Indicate this by placing a double slash through each of the other alternatives. Similarly, for a large facility with low demand, there are two choices: do nothing and reduce prices. You would choose reduce prices because it has the higher expected value, so a double slash is placed on the other branch.
  • 31. DECISION TREE 2. Determine the product of the chance probabilities and their respective payoffs for the remaining branches: Build small Low demand = .4 ($40) = $16 High demand = .6 ($55) = $33 Build large Low demand = .4 ($50) = $20 High demand = .6 ($70) = $42 3. Determine the expected value of each initial alternative: Build small $16 + $33 = $49 Build large $20 + $42 = $62 Hence, the choice should be to build the large facility because it has a larger expected value than the small facility.
  • 32. SERVICE CAPACITY PLANNING  Service capacity is different to manufacturing capacity planning and facility sizing.  The variables which are critical in service are: 1. Time 2. Location 3. Volatality of Demand.
  • 33. TIME  Unlike goods,services cannot be stored for later use.  Managers must consider time as one of their supplies.  The capacity must be available to produce a service when it is needed.
  • 34. LOCATION  The service capacity must be located near the customer.  The capacity to deliver a service must first be distributed to the customer(either physically or through some communications medium), then the service must be delivered.
  • 35. VOLATALITY OF DEMAND  Volatility of demand on a delivery system is much higher than on a manufacturing production system. 1. Services cannot be strored 2. Customers interact directly with the production system 3. Directly affected by consumer behavior
  • 36. CAPACITY UTILIZATION AND SERVICE QUALITY  Planning capacity levels for services must consider day-to-day relationship between service utilization and service quality.
  • 37. CAPACITY UTILIZATION AND QUALITY Relationship between Rate of Service Utilization (ρ) and Service Quality.
  • 38. HOSPITAL EMERGENCY ROOMS AND FIRE DEPARTMENTS
  • 41. Thanks! Have a nice evening ahead!