INDL PPT 1.pptx

DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY
(Aryabhatt DSEU Ashok Vihar Campus)
Hospital Building Construction
Under Guidance of
PWD Engineer
Department of Civil Engineering
Smt. Riniyo Nani
(Senior lecturer)
Mr. Vagish kumar
H.O.D (Civil Engg)
CERTIFICATE
This is certify that the practical training work entitled “
Construction of Hospital Building” BY “Swadeshi Civil
Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav
(10521417), Vivek kumar (10521476), Yash (10521417), Vivek
kumar(10521477), in partial fulfillments of the requirements for
the award of Diploma in Civil Engineering at Aryabhatt DSEU
Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record
of the student’s own work carried out in this form under my
supervision and guidance.
Mr. Vagish kumar
H.O.D (Civil Engg)
Smt. Riniyo Nani
(Senior lecturer)
We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo
Nani, for their meticulous guidance and Constance
encouragement at all stages of practical training work.
We grateful indebted to Mr. Amarjeet ( Assistant Executive
Engineer PWD) and Mr. Ankit (third party Quality Engineer) who
helped us.
We are thankful to our parents and our friends for the support
they extended us during entire duration of practical Industrial
Training.
Sourav (10521417
Vivek kumar (10621476)
Yash (10521416
Vivek kumar (10521477)
Contents
About the Hospital Building
D-wall
Foundations
Composite structure
Fire paint
Bolted Connection
Parts of Bolted connection
Scaffolding
Masonry work
AAC block
C&D Block
Our Proposed site is located at Lok nayak
hospital near Delhi gate metro station Delhi-
110054.
The total area of Building spanning is about
84,840 sq metres.
The building has two tower which have target
of total floor is 22, in on each tower.
This building is proposed to have total
number of Beds to be available is 1500.
This building is composite structure of Mild
Steel and RCC (Reinforced Cement Concrete).
D-wall is known as Diaphragm wall, it is designed to retain soils
during the construction of underground structure.
It helps to control the movement of ground during construction.
It is intended to take up high vertical loads from above ground
structures.
It is play important role in Active earth pressure as well as in passive
earth pressure.
The lower and very important part of any structure is foundations.
And after doing soil testing depend upon bearing capacity of soil
Engineer decide to construct Raft foundation.
Raft foundations also known as Mat foundations, it is a type of
combined footing that covers the entire area and supports all the
wall and columns.
This foundations is use because soil on that location is found to be
sandy , clay, silt and hard stone.
This structure is made up with RCC
(Reinforced Cement concrete) and
Mild Steel. Thatswhy also known
composite structure.
RCC is good in taking Compressive
as well as Tensile Stress But also in
Shear Stress thatswhy it is built
End to end of building, and middle
structure is of MS.
Engineer decides this to built
building as soon as possible. And
reduce time of delay, Because Mild
steel structure can be early as
compare to RCC structure.
Mild steel cannot be come into contact of moisture, water, and fire.
 To prevent corrosion and fire damaged, a layer is provide on beam
and column of mild steel, fire resistance material is used.
This material is very costly and become hard after drying. It is apply
like a paint with the help of compressor machine. Which is apply this
paint with high pressure.
Column and beam is connected by bolted joint. This joint are many
advantage such as :-
•They can easy to install, inspect, and maintain.
•They also allow for flexibility and adjustability in design and erection.
•Skill labourer not mandatory.
•Grade of this Nutt and bolt is 10.9s
•Due to high grade of bolt, this connection is strong, durable etc.
Parts of Bolted connection
A bolt is a metal rod for fastenings objects together it consist of :-
•Thread of outer side
•Head on its top
•Nut
•Washer
This complete nut bolt connection called HDFG (High Strength
Friction Grip).
Inner dia of nutt is known as Nominal dia
Where Bolt dia is known as Crest dia.
Scaffolding, also called scaffold or stagging, use for to do masonry work,
Brick work, Plastering etc.
There are different type of scaffolding depend upon material which type of
work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding
etc.
Aluminium Scaffolding were used at out site project.
Vertical rod of scaffolding known as PROP.
Whereas horizontal is known as LEDGER
Prop and ledger is tied using a clip.
MASONRY WORK
For partition work three type of brick use such as :-
First class brick
AAC block
CND block
First Class Brick
This brick is used in this project for HALF BRICK wall
And for ONE BRICK wall.
We know that two type of bond use such as English bond
and Flemish bond.
But mostly English bond were used.
AAC BLOCK
AAC stand for Autoclaved Aerated concrete.
This is widely use in this building due to following
advantages:-
•Lightweight
•Precast
•Foam concrete
•No need to curing
C&D waste Block
•C&D waste (construction and Demolition waste) block is made up
of wood ,steel, concrete, gypsum, plaster, metal etc.
•This block is used to reduce construction waste to safe our
environment.
•Their size is large than Brick. So more volume is cover in width and
heght.
…….To be continued.
1 von 16

Recomendados

report-on-emmar.docx13 von
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13Minhal Haider
212 views16 Folien
Site visit report 2017 von
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
5.6K views14 Folien
Ct 1 report von
Ct 1 reportCt 1 report
Ct 1 reportAh Lai
1.5K views25 Folien
Ct report von
Ct reportCt report
Ct reportTee Joanne
820 views25 Folien
Ct report von
Ct reportCt report
Ct reportBoon Xiong Yong
398 views25 Folien
Site Report von
Site Report Site Report
Site Report Sow Wei Henn
306 views16 Folien

Más contenido relacionado

Similar a INDL PPT 1.pptx

Speedy construction presentation von
Speedy construction presentationSpeedy construction presentation
Speedy construction presentationsomitra bhardwaj
939 views48 Folien
Wall materials von
Wall materialsWall materials
Wall materialsSaloniHosmani
60 views27 Folien
Ishfaq Rashid.pptx von
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptxlovish34
6 views51 Folien
Site visit report von
Site visit reportSite visit report
Site visit reportDoreen Yeo
2.4K views16 Folien
PRE-CAST-CONSTRUCTION.pptx von
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxLokeswarSaha1
84 views55 Folien
Shinchan presentation.pptx von
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptxRAKESHPANDEY754083
155 views28 Folien

Similar a INDL PPT 1.pptx(20)

Ishfaq Rashid.pptx von lovish34
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
lovish346 views
Site visit report von Doreen Yeo
Site visit reportSite visit report
Site visit report
Doreen Yeo2.4K views
Speedy construction- FORMS AND MATERIALS von SOUMYA KHANDELWAL
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
SOUMYA KHANDELWAL4.8K views
Ctw site report(pg 1 to 8, 14) von Chin Tze Wei
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei707 views
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES von Saleh Ahmed
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
Saleh Ahmed512 views
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res... von IJERA Editor
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
IJERA Editor1K views

Último

Climate Change and Health von
Climate Change and HealthClimate Change and Health
Climate Change and Healthipcc-media
73 views43 Folien
IPCC Scholarship Programme von
IPCC Scholarship ProgrammeIPCC Scholarship Programme
IPCC Scholarship Programmeipcc-media
62 views6 Folien
ORAL_PRESENTATION.pdf von
ORAL_PRESENTATION.pdfORAL_PRESENTATION.pdf
ORAL_PRESENTATION.pdfahmadalfalasim
37 views5 Folien
green manuring ppt.pptx von
green manuring ppt.pptxgreen manuring ppt.pptx
green manuring ppt.pptxShubham Temgire
6 views34 Folien
Smart Grids von
Smart GridsSmart Grids
Smart GridsDr. Salem Baidas
14 views30 Folien
Storytelling_101 von
Storytelling_101Storytelling_101
Storytelling_101Global Landscapes Forum (GLF)
54 views16 Folien

Último(20)

Climate Change and Health von ipcc-media
Climate Change and HealthClimate Change and Health
Climate Change and Health
ipcc-media73 views
IPCC Scholarship Programme von ipcc-media
IPCC Scholarship ProgrammeIPCC Scholarship Programme
IPCC Scholarship Programme
ipcc-media62 views
Supporting Climate Science and strengthening IPCC engagement in under-represe... von ipcc-media
Supporting Climate Science and strengthening IPCC engagement in under-represe...Supporting Climate Science and strengthening IPCC engagement in under-represe...
Supporting Climate Science and strengthening IPCC engagement in under-represe...
ipcc-media87 views
Challenges for WG1 von ipcc-media
Challenges for WG1Challenges for WG1
Challenges for WG1
ipcc-media38 views
Climate Change 2022: Mitigation of Climate Change von ipcc-media
Climate Change 2022: Mitigation of Climate ChangeClimate Change 2022: Mitigation of Climate Change
Climate Change 2022: Mitigation of Climate Change
ipcc-media38 views
Energy System Transitions in the context of sustainable development: Findings... von ipcc-media
Energy System Transitions in the context of sustainable development: Findings...Energy System Transitions in the context of sustainable development: Findings...
Energy System Transitions in the context of sustainable development: Findings...
ipcc-media52 views
Exceeding-returning-Intro-v1Dec-final.pptx von ipcc-media
Exceeding-returning-Intro-v1Dec-final.pptxExceeding-returning-Intro-v1Dec-final.pptx
Exceeding-returning-Intro-v1Dec-final.pptx
ipcc-media70 views
Physical Science Challenges for AR7 von ipcc-media
Physical Science Challenges for AR7Physical Science Challenges for AR7
Physical Science Challenges for AR7
ipcc-media262 views
Low-emission food system perspectives in Viet Nam von CIFOR-ICRAF
Low-emission food system perspectives in Viet NamLow-emission food system perspectives in Viet Nam
Low-emission food system perspectives in Viet Nam
CIFOR-ICRAF8 views

INDL PPT 1.pptx

  • 1. DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY (Aryabhatt DSEU Ashok Vihar Campus) Hospital Building Construction Under Guidance of PWD Engineer Department of Civil Engineering Smt. Riniyo Nani (Senior lecturer) Mr. Vagish kumar H.O.D (Civil Engg)
  • 2. CERTIFICATE This is certify that the practical training work entitled “ Construction of Hospital Building” BY “Swadeshi Civil Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav (10521417), Vivek kumar (10521476), Yash (10521417), Vivek kumar(10521477), in partial fulfillments of the requirements for the award of Diploma in Civil Engineering at Aryabhatt DSEU Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record of the student’s own work carried out in this form under my supervision and guidance. Mr. Vagish kumar H.O.D (Civil Engg) Smt. Riniyo Nani (Senior lecturer)
  • 3. We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo Nani, for their meticulous guidance and Constance encouragement at all stages of practical training work. We grateful indebted to Mr. Amarjeet ( Assistant Executive Engineer PWD) and Mr. Ankit (third party Quality Engineer) who helped us. We are thankful to our parents and our friends for the support they extended us during entire duration of practical Industrial Training. Sourav (10521417 Vivek kumar (10621476) Yash (10521416 Vivek kumar (10521477)
  • 4. Contents About the Hospital Building D-wall Foundations Composite structure Fire paint Bolted Connection Parts of Bolted connection Scaffolding Masonry work AAC block C&D Block
  • 5. Our Proposed site is located at Lok nayak hospital near Delhi gate metro station Delhi- 110054. The total area of Building spanning is about 84,840 sq metres. The building has two tower which have target of total floor is 22, in on each tower. This building is proposed to have total number of Beds to be available is 1500. This building is composite structure of Mild Steel and RCC (Reinforced Cement Concrete).
  • 6. D-wall is known as Diaphragm wall, it is designed to retain soils during the construction of underground structure. It helps to control the movement of ground during construction. It is intended to take up high vertical loads from above ground structures. It is play important role in Active earth pressure as well as in passive earth pressure.
  • 7. The lower and very important part of any structure is foundations. And after doing soil testing depend upon bearing capacity of soil Engineer decide to construct Raft foundation. Raft foundations also known as Mat foundations, it is a type of combined footing that covers the entire area and supports all the wall and columns. This foundations is use because soil on that location is found to be sandy , clay, silt and hard stone.
  • 8. This structure is made up with RCC (Reinforced Cement concrete) and Mild Steel. Thatswhy also known composite structure. RCC is good in taking Compressive as well as Tensile Stress But also in Shear Stress thatswhy it is built End to end of building, and middle structure is of MS. Engineer decides this to built building as soon as possible. And reduce time of delay, Because Mild steel structure can be early as compare to RCC structure.
  • 9. Mild steel cannot be come into contact of moisture, water, and fire.  To prevent corrosion and fire damaged, a layer is provide on beam and column of mild steel, fire resistance material is used. This material is very costly and become hard after drying. It is apply like a paint with the help of compressor machine. Which is apply this paint with high pressure.
  • 10. Column and beam is connected by bolted joint. This joint are many advantage such as :- •They can easy to install, inspect, and maintain. •They also allow for flexibility and adjustability in design and erection. •Skill labourer not mandatory. •Grade of this Nutt and bolt is 10.9s •Due to high grade of bolt, this connection is strong, durable etc.
  • 11. Parts of Bolted connection A bolt is a metal rod for fastenings objects together it consist of :- •Thread of outer side •Head on its top •Nut •Washer This complete nut bolt connection called HDFG (High Strength Friction Grip). Inner dia of nutt is known as Nominal dia Where Bolt dia is known as Crest dia.
  • 12. Scaffolding, also called scaffold or stagging, use for to do masonry work, Brick work, Plastering etc. There are different type of scaffolding depend upon material which type of work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding etc. Aluminium Scaffolding were used at out site project. Vertical rod of scaffolding known as PROP. Whereas horizontal is known as LEDGER Prop and ledger is tied using a clip.
  • 13. MASONRY WORK For partition work three type of brick use such as :- First class brick AAC block CND block First Class Brick This brick is used in this project for HALF BRICK wall And for ONE BRICK wall. We know that two type of bond use such as English bond and Flemish bond. But mostly English bond were used.
  • 14. AAC BLOCK AAC stand for Autoclaved Aerated concrete. This is widely use in this building due to following advantages:- •Lightweight •Precast •Foam concrete •No need to curing
  • 15. C&D waste Block •C&D waste (construction and Demolition waste) block is made up of wood ,steel, concrete, gypsum, plaster, metal etc. •This block is used to reduce construction waste to safe our environment. •Their size is large than Brick. So more volume is cover in width and heght.