1. INTERFACE OF PHASE 1
一期工作界面
建造:
CONSTRUCTION:
1.支撑结构用于支撑一二期建筑。
1. Supporting structure for achitecture of
both phase 1 and phase 2.
2.场地围护栏杆。
2.Frence around site.
3.地下建筑与潜艇的连接部分以及从潜艇
通往船坞的螺旋楼梯。
3. The connection of underground building
and submarine and the spiral stairs con-
necting dock and submarine.
4.地下建筑(面积约450平方米)。
4.Underground Building (Area around 450
sqm).
5.部分场地景观水池。
5.Half of the water pools in site landscape.
6.场地北侧入口大台阶。
6.The entrance big stairs in the north
of the site.
修复:
REPAIR:
1.修复原有的沿坞壁四部楼梯。
1. Repairing the 4 existing stairs along the
dock wall.
2. INTERFACE OF PHASE 2
二期工作界面
建造:
CONSTRUCTION:
1.地下建筑(面积约1300平方米)。
1.Underground Building (Area around
1300 sqm).
2.地上建筑(面积约3000平方米)。
2.Above-ground Building (Area around
3000 sqm).
3.一期剩余部分场地景观水池。
3.Half of the water pools in site landscape
phase1 left.
拆除:
REMOVE:
1.拆除与一期相邻的幕墙和栏杆。
1. Removing the facade and frence along-
side the phase 1 buildi.