SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
XinLi Wu
Address: 8-254 Noble St., Fredericton, New Brunswick, Canada, E3A 3C3
Phone: (506) 476-1938; Email: wu.xinli@outlook.com; LinkedIn: ca.linkedin.com/in/wuxinli
************************************************************************************************
Education
Master of Science in Civil Engineering, Geotechnical Engineering· University of New Brunswick,
Canada· 2016
Master of Science in Civil Engineering, Hydraulic structure Engineering· Hohai University,
China· 2006
Bachelor of Science in Civil Engineering, Water Conservancy & Hydropower Engineering· Hohai
University, China· 2003
************************************************************************************************
Capabilities and Credentials
 7 years of work experience in hydraulic structure engineering.
 Design of gravity dam, earth-fill dam, and embankments.
 Design of retaining walls, including gravity, cantilever and counter-fort walls.
 Analyses of slope stability and design of reinforcement approaches for slopes.
 Excellent understanding on civil engineering fundamentals including but not limited to soil
mechanics, structural mechanics, hydraulics, and the design of concrete.
 Excellent skill on civil drafting software including AutoCAD, PLAXIS 2D, ANSYS, and GeoStudio.
 Fluent English communication, both oral & written; Good interpersonal skills.
 Possess initiative and ability to multi-task in a fast paced environment; have good organizational
skills to prioritize the multiple responsibilities; able to work under pressure and meet tight
deadlines with flexibility.
 Currently registered as EIT with APEGNB.
************************************************************************************************
Professional Work Experience
Shanghai Investigation, Design & Research Institute Co., Ltd. · 2006 - 2013
SIDRI, affiliated to China Three Gorges Corporation (hereinafter referred to as CTGC) and founded in
November 1954, is an A-grade institute with productive technical force, advanced technical equipment
and reliable quality products completed.
Engineering in Training
Nongling Hydropower Station, Yunnan province, China Jul. 2006-Oct. 2008
 Provided technical assistance to engineers, prepared engineering drawings, and produced
preliminary and detailed designs, drawings, and blueprints
 Coordinated and attended on-site design as a design representative, providing office support
to construction activities and coordinating with contractors Junior Hydraulic Structure
Engineer
Xiangshuijian Pumped Storage Power Station, Anhui province, China Mar. 2008-Jun. 2008
 Participated in the design of the embankment of the down reservoir, drew the detailed
drawings, and performed quantity take offs
 Designed a counterfort retaining wall and a sluice for the down reservoir
 Coordinated and attended on-site design reviews as a design representative, providing office
support to construction activities and overseeing the construction process, and modified and
discussed project drawings with project managers and contractors
Intermediate Hydraulic Structure Engineer
Xiangshuijian Pumped Storage Power Station, Anhui province, China Mar. 2008-Jun. 2008
 Participated in the design of the embankment of the down reservoir, drew the detailed
drawings, and performed quantity take offs
 Designed a counterfort retaining wall and a sluice for the down reservoir
 Coordinated and attended on-site design as a design representative, providing office support
to construction activities, overseeing the construction process, and modifying and discussing
project drawings with project managers and contractors
The Embankment to Suppress Spartina in Chongming Island, Shanghai, China Apr. 2008-Jul. 2009
 Designed the drainage approach for the embankment body and analyzed the stability of the
structure under different severe conditions
 Produced the detailed drawings of an 8-kilometer-long embankment, and performed quantity
take offs
The Dyke in the City of Shantou, Guangdong Province, China May. 2008-Sep. 2009
 Calculated the settlement of the embankment; analyzed the safety of the embankment
 Drew over 100 drawings, and performed quantity take offs of the dyke
The regulation the West Bank of Wangyu River in Jiangsu Province, China Mar. 2009-Apr. 2011
 Designed the sluices; regulated the river banks
 Produced the design drawings, and performed quantity take offs
The Protection of Soil Slopes in Resettlement Areas of Mianhuatan hydropower Station, Fujian
Province, China Mar. 2010-Mar. 2013
 Reviewed the analyses and calculation of the safety of slopes, and produced different
reinforcing approaches; prepared calculation reports and construction documents
 Supervised other junior engineers, and reviewed the design and detailed drawings of others

Weitere ähnliche Inhalte

Ähnlich wie XinLi Wu-Resume

Raphael Betit Resume July 2016
Raphael Betit Resume July 2016Raphael Betit Resume July 2016
Raphael Betit Resume July 2016Raphael Betit
 
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET Journal
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Design of Intze Water Tank by Using Staad Pro for Hathipur Village
Design of Intze Water Tank by Using Staad Pro for Hathipur VillageDesign of Intze Water Tank by Using Staad Pro for Hathipur Village
Design of Intze Water Tank by Using Staad Pro for Hathipur VillageIRJET Journal
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Dr.Subramanian Narayanan
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET Journal
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron Pistorius
 

Ähnlich wie XinLi Wu-Resume (20)

FARID CV
FARID CVFARID CV
FARID CV
 
Raphael Betit Resume July 2016
Raphael Betit Resume July 2016Raphael Betit Resume July 2016
Raphael Betit Resume July 2016
 
DameryJennifer-resume
DameryJennifer-resumeDameryJennifer-resume
DameryJennifer-resume
 
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
 
resume_2015
resume_2015resume_2015
resume_2015
 
RAHUL GOKHALE-CV
RAHUL GOKHALE-CVRAHUL GOKHALE-CV
RAHUL GOKHALE-CV
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Design of Intze Water Tank by Using Staad Pro for Hathipur Village
Design of Intze Water Tank by Using Staad Pro for Hathipur VillageDesign of Intze Water Tank by Using Staad Pro for Hathipur Village
Design of Intze Water Tank by Using Staad Pro for Hathipur Village
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
 
Elvin Ortiz Resume
Elvin Ortiz ResumeElvin Ortiz Resume
Elvin Ortiz Resume
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
CV_Kao_2015_Jan
CV_Kao_2015_JanCV_Kao_2015_Jan
CV_Kao_2015_Jan
 
CV_Kao_2015_Jan
CV_Kao_2015_JanCV_Kao_2015_Jan
CV_Kao_2015_Jan
 
CV HMS
CV HMSCV HMS
CV HMS
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 
CV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMANCV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMAN
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitae
 

XinLi Wu-Resume

  • 1. XinLi Wu Address: 8-254 Noble St., Fredericton, New Brunswick, Canada, E3A 3C3 Phone: (506) 476-1938; Email: wu.xinli@outlook.com; LinkedIn: ca.linkedin.com/in/wuxinli ************************************************************************************************ Education Master of Science in Civil Engineering, Geotechnical Engineering· University of New Brunswick, Canada· 2016 Master of Science in Civil Engineering, Hydraulic structure Engineering· Hohai University, China· 2006 Bachelor of Science in Civil Engineering, Water Conservancy & Hydropower Engineering· Hohai University, China· 2003 ************************************************************************************************ Capabilities and Credentials  7 years of work experience in hydraulic structure engineering.  Design of gravity dam, earth-fill dam, and embankments.  Design of retaining walls, including gravity, cantilever and counter-fort walls.  Analyses of slope stability and design of reinforcement approaches for slopes.  Excellent understanding on civil engineering fundamentals including but not limited to soil mechanics, structural mechanics, hydraulics, and the design of concrete.  Excellent skill on civil drafting software including AutoCAD, PLAXIS 2D, ANSYS, and GeoStudio.  Fluent English communication, both oral & written; Good interpersonal skills.  Possess initiative and ability to multi-task in a fast paced environment; have good organizational skills to prioritize the multiple responsibilities; able to work under pressure and meet tight deadlines with flexibility.  Currently registered as EIT with APEGNB. ************************************************************************************************ Professional Work Experience Shanghai Investigation, Design & Research Institute Co., Ltd. · 2006 - 2013 SIDRI, affiliated to China Three Gorges Corporation (hereinafter referred to as CTGC) and founded in November 1954, is an A-grade institute with productive technical force, advanced technical equipment and reliable quality products completed. Engineering in Training Nongling Hydropower Station, Yunnan province, China Jul. 2006-Oct. 2008  Provided technical assistance to engineers, prepared engineering drawings, and produced preliminary and detailed designs, drawings, and blueprints  Coordinated and attended on-site design as a design representative, providing office support to construction activities and coordinating with contractors Junior Hydraulic Structure Engineer
  • 2. Xiangshuijian Pumped Storage Power Station, Anhui province, China Mar. 2008-Jun. 2008  Participated in the design of the embankment of the down reservoir, drew the detailed drawings, and performed quantity take offs  Designed a counterfort retaining wall and a sluice for the down reservoir  Coordinated and attended on-site design reviews as a design representative, providing office support to construction activities and overseeing the construction process, and modified and discussed project drawings with project managers and contractors Intermediate Hydraulic Structure Engineer Xiangshuijian Pumped Storage Power Station, Anhui province, China Mar. 2008-Jun. 2008  Participated in the design of the embankment of the down reservoir, drew the detailed drawings, and performed quantity take offs  Designed a counterfort retaining wall and a sluice for the down reservoir  Coordinated and attended on-site design as a design representative, providing office support to construction activities, overseeing the construction process, and modifying and discussing project drawings with project managers and contractors The Embankment to Suppress Spartina in Chongming Island, Shanghai, China Apr. 2008-Jul. 2009  Designed the drainage approach for the embankment body and analyzed the stability of the structure under different severe conditions  Produced the detailed drawings of an 8-kilometer-long embankment, and performed quantity take offs The Dyke in the City of Shantou, Guangdong Province, China May. 2008-Sep. 2009  Calculated the settlement of the embankment; analyzed the safety of the embankment  Drew over 100 drawings, and performed quantity take offs of the dyke The regulation the West Bank of Wangyu River in Jiangsu Province, China Mar. 2009-Apr. 2011  Designed the sluices; regulated the river banks  Produced the design drawings, and performed quantity take offs The Protection of Soil Slopes in Resettlement Areas of Mianhuatan hydropower Station, Fujian Province, China Mar. 2010-Mar. 2013  Reviewed the analyses and calculation of the safety of slopes, and produced different reinforcing approaches; prepared calculation reports and construction documents  Supervised other junior engineers, and reviewed the design and detailed drawings of others