Chapter-08

Operation Research Techniques
       in Transportation
North West Corner Rule
• Model to determine the optimum solution to a
  problem of separate demand points being
  supplied from separate points
• Let us take a situation where there are 3 supply
  sources S1,S2,S3 and S4 and demand sinks
  D1,D2,D3,D4
• The costs associate with 12 combinations as
  well as the supplies ex each supply point and
  demands at each demand center are depicted in
  the figure on next slide

                                 Ch-08 - 0peration Research Techniques in
                                                 Transportation
North West Corner Rule fig-1
Destinations
/origins
               D1   D2   D3   D4         D5              D6

S1             3    7    12   10         9               9

S2             14   20   13   6          12              4

S3             12   15   13   9          6               8

Demand
               3    5    4    6          3               21

                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
North West Corner Rule fig-1
• The three supply points S1,S2 and S3 can
  supply 9 units, 4 units, and 8 units respectively,
  whereas the three demand points D1, D2, D3,
  and D4 require 3,5,4,6 and 3 units respectively
• The cost at the point of calculation will be treated
  as negative figures, because they are basically
  items whose negative impact the exercise is
  trying to minimize, in this case the total demand
  is 21units and the supply available is also 21
  units



                                    Ch-08 - 0peration Research Techniques in
                                                    Transportation
North West Corner Rule
• Where the supply may be more than demand,
  an additional dummy demand column has to be
  put with the residual supply being shown as
  units required by this demand center, and in the
  boxes for costs zero should be put
• Similarly, in case demand exceeds shown there
  against, and again in the cost zero should be put
  in the respective additional squares.



                                  Ch-08 - 0peration Research Techniques in
                                                  Transportation
North West Corner Rule Figure-
              2
Destinations/                                             Supply
origins
                D1   D2   D3   D4         D5

S1              11   12   13   14         15              9

S2              21   22   23   24         25              4

S3              31   32   33   34         35              8

Demand
                3    5    4    6          3               21

                                    Ch-08 - 0peration Research Techniques in
                                                    Transportation
North West Corner Rule Figure-
              2
• In fig2 we shall give the 15 squares
  individual numbers for easier identification
• The five squares across supply point 1 will
  have no. 11 to 15, against supply point 2
  the numbers will be 21 to 25, and for the
  3rd one the no. will be 31 to 35.



                               Ch-08 - 0peration Research Techniques in
                                               Transportation
North West Corner Rule Figure-
              2
• Allocate supplies fro the supply sources to the demand
  sinks
• The process starts form the north west corner i.e. square
  11, and hence the name north west corner rule
• Demand sink 1 has requirement for 3 units, and supply
  source 1 can supply 9 units, the total requirement of D1
  from S1, when the situation is such that after meeting the
  demand of D1 from S1 , units remain, then the next
  allotment should be made horizontally, i.e. the next
  supply from S1 should go to D2




                                        Ch-08 - 0peration Research Techniques in
                                                        Transportation
Deploying vehicles-Listing Method



            C        D

    A                                                G


                E
        B                          F


                      Ch-08 - 0peration Research Techniques in
                                      Transportation
Deploying vehicles-Listing Method
• A is the starting point from where materials are
  sent out for delivery to various points B,C, D,E,F
  and G.
• The distance between
• A and B is 9 km, A and C is 11 km
• B & C is 9 km, C & D is 14 km
• C & E is 11 km, D & E is 7 km
• E & F is 10 km, D & F is 10 km
• D & G is 15 km, F & G is 11 km

                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
Listing Method
 A       B        C      D       E               F               G


AB=9    BA=9    CA=11   DC=14   EB=14        FD=10           GD=15


AC=11   BC=9     CB=9   DE=7    EC=11        FE=10           GF=11


        BE=14   CD=14   DF=10   ED=7        FG=11


                CE=11   DG=15   EF=10



                                     Ch-08 - 0peration Research Techniques in
                                                     Transportation
Listing Method
• To initiate the solution procedure , a value of
  zero is assigned to the starting point, in this case
  A.
• Thereafter select the shortest distance from
  origin A which in this case is AB as AC is longer
  at 11. In case both the distances are the same
  then selecting either will do
• The value of B will be the total of value for A
  Zero plus the value AB which is 9 i.e.9

                                    Ch-08 - 0peration Research Techniques in
                                                    Transportation
Listing Method
A=0   B=9       C      D       E               F               G


              CA=11   DC=14   EB=14        FD=10           GD=15


      BC=9     CB=9   DE=7    EC=11        FE=10           GF=11


      BE=14   CD=14   DF=10   ED=7        FG=11


              CE=11   DG=15   EF=10



                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
Listing Method
• Thereafter from B we again choose the
  shortest of the alternate routes
• You would have noted that under B, the
  route BA has been removed because that
  is no longer an option




                           Ch-08 - 0peration Research Techniques in
                                           Transportation
Listing Method
A=0   B=9      C=18    D       E               F               G


                      DC=14   EB=14        FD=10           GD=15


                      DE=7    EC=11        FE=10           GF=11


      BE=14   CD=14   DF=10   ED=7        FG=11


              CE=11   DG=15   EF=10



                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
Listing Method
A=0   B=9      C=18    D       E               F               G


                      DC=14   EB=14        FD=10           GD=15


                      DE=7    EC=11        FE=10           GF=11


      BE=14   CD=14   DF=10   ED=7        FG=11


              CE=11   DG=15   EF=10



                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
Next we observe that from C E is a
      shorter route hence
A=0   B=9     C=18     D      E=29           F               G


                                         FD=10           GD=15


                      DE=7               FE=10           GF=11


      BE=14   CD=14   DF=10   ED=7      FG=11


                      DG=15   EF=10



                                 Ch-08 - 0peration Research Techniques in
                                                 Transportation
Listing Method
• The route becomes A-B-C-E=29 km.
  proceeding this way you will finally find
  that the shortest route is
• A-B-C-E-D-F-G=9+9+11+7+10+11=57




                               Ch-08 - 0peration Research Techniques in
                                               Transportation
Listing Method
• The importance of this model is listing
• Unless they are plotted systematically and
  eliminated sequentially the above
  apparently simple exercise may be difficult
  in real life




                              Ch-08 - 0peration Research Techniques in
                                              Transportation
PERT & CPM
• In order to realize valid results within time
  and budget expectations, one has to
  schedule jobs and tasks
• Through scheduling one not only plans
  tasks, but also checks that resources are
  utilized optimally
• Above two techniques are very commonly
  used


                                Ch-08 - 0peration Research Techniques in
                                                Transportation
Critical Path Method
• In CPM the entire project work plan is
  graphically portrayed. This graph or network
  displays the interdependencies between
  activities that will lead to successful completion
  of the project. It must satisfy the following
  objectives
   – Evaluate progress towards attainment of project
     completion
   – Focus attention on potential and actual problems
     during work



                                       Ch-08 - 0peration Research Techniques in
                                                       Transportation
Critical Path Method
– Provide frequent, accurate status reports at
  critical check points
– Provide a regular and updated prediction of
  when the project will be completed
– Provide at any time during the project
  determination of the shortest completion time
  if priorities and resources are shifted




                               Ch-08 - 0peration Research Techniques in
                                               Transportation
Preparing a flow chart
• The project events joined by lines
  (activities)
• The activities are depicted by lines
  illustrate project relationships and inter
  dependences




                                Ch-08 - 0peration Research Techniques in
                                                Transportation
Preparing a flow chart
• The events depict significant occurrences or
  milestones in the completion of the project
• Activities may be real or dummy, when it
  signifies an actual task that has be done, which
  means resources to be needed whereas dummy
  activities depicted in the flow chart just to show
  that the dummy activity needs to be completed
  before another activity can be taken up, which
  means in terms of resource the dummy will not
  extent any


                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
PERT network


                                            7
        3


1   2       5         6


      4
    Real Activites        8         9                  10
    Dummy Activites
                              Ch-08 - 0peration Research Techniques in
                                              Transportation
PERT

• Circles with numbers are events
• The dark continues lines depict real activities
  and the hyphenated lines depict dummy
  activities
• The next step is to assign time to the
  activities as well as resources and costs.
• This is where CPM comes in,
• While in PERT probabilistic time estimates
  are put in while preparing the flow chart, CPM
  will use exact deterministic times with cost
  benefit trade offs
                              Ch-08 - 0peration Research Techniques in
                                              Transportation
Example of putting up a new systems
  set up at a manufacturing location
1. Studying the existing system in details and
   documenting all the current procedures
2. Customizing the system to suit the
   organizational requirement
3. Configuring the hardware requirement
4. Making application to exercise authorities
5. Training staff for new system
6. Preparing new master data
7. Setting date for change over
8. Uploading old data on new server

                                  Ch-08 - 0peration Research Techniques in
                                                  Transportation
This brings up the issue of
• Optimistic time
  – The time estimate if activity proceeds perfectly (a)
• Pessimistic time
  – The time estimate if extreme difficulties are
    experienced (b)
• Most Likely Time
  – The expected time (c) the expected time as a mean
    can be calculated by apportioning weights to the 3
    times, for instance giving weights of 1 each to (a) and
    (b) and 3 to (c) one can calculate the mean time




                                        Ch-08 - 0peration Research Techniques in
                                                        Transportation
Activity                  (a)   (b)          (c)          Expected
                                                                          mean time
1.Studying the existing system in         1     3            1.5                1.7
details and documenting all the current
procedures
2.Customizing the system to suit the      2     4             3                  3
organizational requirement
3.Configuring the hardware                .25   .1            .5                .75
requirement
4. Making application to exercise         1     4            1.5                1.9
authorities
5. Training staff for new system          1     2             1                 1.2


6. Preparing new master data


7. Setting date for change over

8.Uploading old data on new server        1.5   3             2                 2.1
                                                 Ch-08 - 0peration Research Techniques in
                                                                 Transportation
Network Representation

                              4

        2

                      5
1   3



           6
    Real Activites        8                         7
    Dummy Activites
                                  Ch-08 - 0peration Research Techniques in
                                                  Transportation
Interpretation
• Linkage between (2) and (4) and (8) does not
  require allotment of a resources from the
  organization, save may be follow ups but non
  completion of event (4) will not bring about event
  (8) and finally (7) now on the basis of the
  expected mean time if we track the path from (1)
  to (7) via the three routes we shall get three sets
  of time. The one with longest time is the critical
  path, while the others are the slack paths



                                   Ch-08 - 0peration Research Techniques in
                                                   Transportation
Summary
• To determine optimum solution to a
  distribution problem, we need to employ
  suitable operation research technique
• North-west corner rule, listing method are
  suitable for planning and assigning
  vehicles for different routes
• PERT and CPM are useful for timely
  completion of a project


                              Ch-08 - 0peration Research Techniques in
                                              Transportation

More Related Content

What's hot

Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation MethodUsharaniRavikumar
 
NORTH WEST CORNER METHOD
NORTH WEST CORNER METHODNORTH WEST CORNER METHOD
NORTH WEST CORNER METHODRashiPandey16
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemAlvin Niere
 
Transportation model and assignment model
Transportation model and assignment modelTransportation model and assignment model
Transportation model and assignment modelpriyanka yadav
 
Transportation model
Transportation modelTransportation model
Transportation modelLokesh Payasi
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)Dinesh Suthar
 
Transportation Method Operation Research
Transportation Method Operation ResearchTransportation Method Operation Research
Transportation Method Operation ResearchR A Shah
 
Transportation model
Transportation modelTransportation model
Transportation modelmsn007
 
North West Corner Method
North West Corner MethodNorth West Corner Method
North West Corner MethodMuhammad Waleed
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsKrupesh Shah
 
Transportation model
Transportation modelTransportation model
Transportation modelSATISH
 
Transportation problem
Transportation problem Transportation problem
Transportation problem Reshma BJ
 
North west corner method
North west corner method North west corner method
North west corner method Akash Jadhav
 
MODI Method (Operations Research)
MODI Method (Operations Research) MODI Method (Operations Research)
MODI Method (Operations Research) Nilraj Vasandia
 
Travelling salesman problem ( Operation Research)
Travelling salesman problem ( Operation Research)Travelling salesman problem ( Operation Research)
Travelling salesman problem ( Operation Research)Muhammed Abdulla N C
 
Transportation Problem In Linear Programming
Transportation Problem In Linear ProgrammingTransportation Problem In Linear Programming
Transportation Problem In Linear ProgrammingMirza Tanzida
 

What's hot (20)

Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation Method
 
Transportation problems
Transportation problemsTransportation problems
Transportation problems
 
NORTH WEST CORNER METHOD
NORTH WEST CORNER METHODNORTH WEST CORNER METHOD
NORTH WEST CORNER METHOD
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
Transportation model and assignment model
Transportation model and assignment modelTransportation model and assignment model
Transportation model and assignment model
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)
 
Assignment model
Assignment modelAssignment model
Assignment model
 
Transportation Method Operation Research
Transportation Method Operation ResearchTransportation Method Operation Research
Transportation Method Operation Research
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Assignment problems
Assignment problemsAssignment problems
Assignment problems
 
North West Corner Method
North West Corner MethodNorth West Corner Method
North West Corner Method
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Transportation problem
Transportation problem Transportation problem
Transportation problem
 
North west corner method
North west corner method North west corner method
North west corner method
 
North West Corner Method
North West Corner MethodNorth West Corner Method
North West Corner Method
 
MODI Method (Operations Research)
MODI Method (Operations Research) MODI Method (Operations Research)
MODI Method (Operations Research)
 
Travelling salesman problem ( Operation Research)
Travelling salesman problem ( Operation Research)Travelling salesman problem ( Operation Research)
Travelling salesman problem ( Operation Research)
 
Transportation Problem In Linear Programming
Transportation Problem In Linear ProgrammingTransportation Problem In Linear Programming
Transportation Problem In Linear Programming
 

More from We Learn - A Continuous Learning Forum from Welingkar's Distance Learning Program.

More from We Learn - A Continuous Learning Forum from Welingkar's Distance Learning Program. (20)

PGDM in Supply Chain Management
PGDM in Supply Chain ManagementPGDM in Supply Chain Management
PGDM in Supply Chain Management
 
PGDM in Rural & Agribusiness Management
PGDM in Rural & Agribusiness ManagementPGDM in Rural & Agribusiness Management
PGDM in Rural & Agribusiness Management
 
PGDM in E-Commerce Management
PGDM in E-Commerce ManagementPGDM in E-Commerce Management
PGDM in E-Commerce Management
 
PGDM in Service Excellence
PGDM in Service ExcellencePGDM in Service Excellence
PGDM in Service Excellence
 
PGDM in International Management
PGDM in International ManagementPGDM in International Management
PGDM in International Management
 
PGDM in IT Project Management
PGDM in IT Project ManagementPGDM in IT Project Management
PGDM in IT Project Management
 
Distance Learning PGDM in E-Business Management
Distance Learning PGDM in E-Business ManagementDistance Learning PGDM in E-Business Management
Distance Learning PGDM in E-Business Management
 
Distance Learning PGDM in Business Administration
Distance Learning PGDM in Business AdministrationDistance Learning PGDM in Business Administration
Distance Learning PGDM in Business Administration
 
PGDM in Finance Management
PGDM in Finance ManagementPGDM in Finance Management
PGDM in Finance Management
 
PGDM in Marketing Management
PGDM in Marketing ManagementPGDM in Marketing Management
PGDM in Marketing Management
 
PGDM in Operation Management
PGDM in Operation ManagementPGDM in Operation Management
PGDM in Operation Management
 
Marketing Management
Marketing ManagementMarketing Management
Marketing Management
 
PGDM in Media & Advertising
PGDM in Media & AdvertisingPGDM in Media & Advertising
PGDM in Media & Advertising
 
We School HR Management
We School HR ManagementWe School HR Management
We School HR Management
 
WE SCHOOL TRAVEL & TOURISM MANAGEMENT
WE SCHOOL TRAVEL & TOURISM MANAGEMENTWE SCHOOL TRAVEL & TOURISM MANAGEMENT
WE SCHOOL TRAVEL & TOURISM MANAGEMENT
 
Personal budgeting
Personal budgetingPersonal budgeting
Personal budgeting
 
Maintaining the financial health of businesses through financial accounting
Maintaining the financial health of businesses through financial accountingMaintaining the financial health of businesses through financial accounting
Maintaining the financial health of businesses through financial accounting
 
Asset Management Case Sstudy
Asset Management  Case SstudyAsset Management  Case Sstudy
Asset Management Case Sstudy
 
Team management’ scored on the football
Team management’ scored on the footballTeam management’ scored on the football
Team management’ scored on the football
 
Mc donalds Recruitment Case Study
Mc donalds Recruitment Case StudyMc donalds Recruitment Case Study
Mc donalds Recruitment Case Study
 

Recently uploaded

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 

Recently uploaded (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 

Operation Research Technique in Transportation

  • 2. North West Corner Rule • Model to determine the optimum solution to a problem of separate demand points being supplied from separate points • Let us take a situation where there are 3 supply sources S1,S2,S3 and S4 and demand sinks D1,D2,D3,D4 • The costs associate with 12 combinations as well as the supplies ex each supply point and demands at each demand center are depicted in the figure on next slide Ch-08 - 0peration Research Techniques in Transportation
  • 3. North West Corner Rule fig-1 Destinations /origins D1 D2 D3 D4 D5 D6 S1 3 7 12 10 9 9 S2 14 20 13 6 12 4 S3 12 15 13 9 6 8 Demand 3 5 4 6 3 21 Ch-08 - 0peration Research Techniques in Transportation
  • 4. North West Corner Rule fig-1 • The three supply points S1,S2 and S3 can supply 9 units, 4 units, and 8 units respectively, whereas the three demand points D1, D2, D3, and D4 require 3,5,4,6 and 3 units respectively • The cost at the point of calculation will be treated as negative figures, because they are basically items whose negative impact the exercise is trying to minimize, in this case the total demand is 21units and the supply available is also 21 units Ch-08 - 0peration Research Techniques in Transportation
  • 5. North West Corner Rule • Where the supply may be more than demand, an additional dummy demand column has to be put with the residual supply being shown as units required by this demand center, and in the boxes for costs zero should be put • Similarly, in case demand exceeds shown there against, and again in the cost zero should be put in the respective additional squares. Ch-08 - 0peration Research Techniques in Transportation
  • 6. North West Corner Rule Figure- 2 Destinations/ Supply origins D1 D2 D3 D4 D5 S1 11 12 13 14 15 9 S2 21 22 23 24 25 4 S3 31 32 33 34 35 8 Demand 3 5 4 6 3 21 Ch-08 - 0peration Research Techniques in Transportation
  • 7. North West Corner Rule Figure- 2 • In fig2 we shall give the 15 squares individual numbers for easier identification • The five squares across supply point 1 will have no. 11 to 15, against supply point 2 the numbers will be 21 to 25, and for the 3rd one the no. will be 31 to 35. Ch-08 - 0peration Research Techniques in Transportation
  • 8. North West Corner Rule Figure- 2 • Allocate supplies fro the supply sources to the demand sinks • The process starts form the north west corner i.e. square 11, and hence the name north west corner rule • Demand sink 1 has requirement for 3 units, and supply source 1 can supply 9 units, the total requirement of D1 from S1, when the situation is such that after meeting the demand of D1 from S1 , units remain, then the next allotment should be made horizontally, i.e. the next supply from S1 should go to D2 Ch-08 - 0peration Research Techniques in Transportation
  • 9. Deploying vehicles-Listing Method C D A G E B F Ch-08 - 0peration Research Techniques in Transportation
  • 10. Deploying vehicles-Listing Method • A is the starting point from where materials are sent out for delivery to various points B,C, D,E,F and G. • The distance between • A and B is 9 km, A and C is 11 km • B & C is 9 km, C & D is 14 km • C & E is 11 km, D & E is 7 km • E & F is 10 km, D & F is 10 km • D & G is 15 km, F & G is 11 km Ch-08 - 0peration Research Techniques in Transportation
  • 11. Listing Method A B C D E F G AB=9 BA=9 CA=11 DC=14 EB=14 FD=10 GD=15 AC=11 BC=9 CB=9 DE=7 EC=11 FE=10 GF=11 BE=14 CD=14 DF=10 ED=7 FG=11 CE=11 DG=15 EF=10 Ch-08 - 0peration Research Techniques in Transportation
  • 12. Listing Method • To initiate the solution procedure , a value of zero is assigned to the starting point, in this case A. • Thereafter select the shortest distance from origin A which in this case is AB as AC is longer at 11. In case both the distances are the same then selecting either will do • The value of B will be the total of value for A Zero plus the value AB which is 9 i.e.9 Ch-08 - 0peration Research Techniques in Transportation
  • 13. Listing Method A=0 B=9 C D E F G CA=11 DC=14 EB=14 FD=10 GD=15 BC=9 CB=9 DE=7 EC=11 FE=10 GF=11 BE=14 CD=14 DF=10 ED=7 FG=11 CE=11 DG=15 EF=10 Ch-08 - 0peration Research Techniques in Transportation
  • 14. Listing Method • Thereafter from B we again choose the shortest of the alternate routes • You would have noted that under B, the route BA has been removed because that is no longer an option Ch-08 - 0peration Research Techniques in Transportation
  • 15. Listing Method A=0 B=9 C=18 D E F G DC=14 EB=14 FD=10 GD=15 DE=7 EC=11 FE=10 GF=11 BE=14 CD=14 DF=10 ED=7 FG=11 CE=11 DG=15 EF=10 Ch-08 - 0peration Research Techniques in Transportation
  • 16. Listing Method A=0 B=9 C=18 D E F G DC=14 EB=14 FD=10 GD=15 DE=7 EC=11 FE=10 GF=11 BE=14 CD=14 DF=10 ED=7 FG=11 CE=11 DG=15 EF=10 Ch-08 - 0peration Research Techniques in Transportation
  • 17. Next we observe that from C E is a shorter route hence A=0 B=9 C=18 D E=29 F G FD=10 GD=15 DE=7 FE=10 GF=11 BE=14 CD=14 DF=10 ED=7 FG=11 DG=15 EF=10 Ch-08 - 0peration Research Techniques in Transportation
  • 18. Listing Method • The route becomes A-B-C-E=29 km. proceeding this way you will finally find that the shortest route is • A-B-C-E-D-F-G=9+9+11+7+10+11=57 Ch-08 - 0peration Research Techniques in Transportation
  • 19. Listing Method • The importance of this model is listing • Unless they are plotted systematically and eliminated sequentially the above apparently simple exercise may be difficult in real life Ch-08 - 0peration Research Techniques in Transportation
  • 20. PERT & CPM • In order to realize valid results within time and budget expectations, one has to schedule jobs and tasks • Through scheduling one not only plans tasks, but also checks that resources are utilized optimally • Above two techniques are very commonly used Ch-08 - 0peration Research Techniques in Transportation
  • 21. Critical Path Method • In CPM the entire project work plan is graphically portrayed. This graph or network displays the interdependencies between activities that will lead to successful completion of the project. It must satisfy the following objectives – Evaluate progress towards attainment of project completion – Focus attention on potential and actual problems during work Ch-08 - 0peration Research Techniques in Transportation
  • 22. Critical Path Method – Provide frequent, accurate status reports at critical check points – Provide a regular and updated prediction of when the project will be completed – Provide at any time during the project determination of the shortest completion time if priorities and resources are shifted Ch-08 - 0peration Research Techniques in Transportation
  • 23. Preparing a flow chart • The project events joined by lines (activities) • The activities are depicted by lines illustrate project relationships and inter dependences Ch-08 - 0peration Research Techniques in Transportation
  • 24. Preparing a flow chart • The events depict significant occurrences or milestones in the completion of the project • Activities may be real or dummy, when it signifies an actual task that has be done, which means resources to be needed whereas dummy activities depicted in the flow chart just to show that the dummy activity needs to be completed before another activity can be taken up, which means in terms of resource the dummy will not extent any Ch-08 - 0peration Research Techniques in Transportation
  • 25. PERT network 7 3 1 2 5 6 4 Real Activites 8 9 10 Dummy Activites Ch-08 - 0peration Research Techniques in Transportation
  • 26. PERT • Circles with numbers are events • The dark continues lines depict real activities and the hyphenated lines depict dummy activities • The next step is to assign time to the activities as well as resources and costs. • This is where CPM comes in, • While in PERT probabilistic time estimates are put in while preparing the flow chart, CPM will use exact deterministic times with cost benefit trade offs Ch-08 - 0peration Research Techniques in Transportation
  • 27. Example of putting up a new systems set up at a manufacturing location 1. Studying the existing system in details and documenting all the current procedures 2. Customizing the system to suit the organizational requirement 3. Configuring the hardware requirement 4. Making application to exercise authorities 5. Training staff for new system 6. Preparing new master data 7. Setting date for change over 8. Uploading old data on new server Ch-08 - 0peration Research Techniques in Transportation
  • 28. This brings up the issue of • Optimistic time – The time estimate if activity proceeds perfectly (a) • Pessimistic time – The time estimate if extreme difficulties are experienced (b) • Most Likely Time – The expected time (c) the expected time as a mean can be calculated by apportioning weights to the 3 times, for instance giving weights of 1 each to (a) and (b) and 3 to (c) one can calculate the mean time Ch-08 - 0peration Research Techniques in Transportation
  • 29. Activity (a) (b) (c) Expected mean time 1.Studying the existing system in 1 3 1.5 1.7 details and documenting all the current procedures 2.Customizing the system to suit the 2 4 3 3 organizational requirement 3.Configuring the hardware .25 .1 .5 .75 requirement 4. Making application to exercise 1 4 1.5 1.9 authorities 5. Training staff for new system 1 2 1 1.2 6. Preparing new master data 7. Setting date for change over 8.Uploading old data on new server 1.5 3 2 2.1 Ch-08 - 0peration Research Techniques in Transportation
  • 30. Network Representation 4 2 5 1 3 6 Real Activites 8 7 Dummy Activites Ch-08 - 0peration Research Techniques in Transportation
  • 31. Interpretation • Linkage between (2) and (4) and (8) does not require allotment of a resources from the organization, save may be follow ups but non completion of event (4) will not bring about event (8) and finally (7) now on the basis of the expected mean time if we track the path from (1) to (7) via the three routes we shall get three sets of time. The one with longest time is the critical path, while the others are the slack paths Ch-08 - 0peration Research Techniques in Transportation
  • 32. Summary • To determine optimum solution to a distribution problem, we need to employ suitable operation research technique • North-west corner rule, listing method are suitable for planning and assigning vehicles for different routes • PERT and CPM are useful for timely completion of a project Ch-08 - 0peration Research Techniques in Transportation