Suche senden
Hochladen
OLD ARAMCO ID
•
Als DOCX, PDF herunterladen
•
0 gefällt mir
•
94 views
W
Warry Carpitanos
Folgen
Melden
Teilen
Melden
Teilen
1 von 2
Jetzt herunterladen
Empfohlen
Eterno drummond
Eterno drummond
denisep2014
This slide deck was used during day one of the Electives Principles and Practices workshop at NTAC 2016. The three day workshop was lead by New Tech Network Coach, Matt Thompson, and Satellite Center Digital Media Facilitator, Rhitt Growl. The purpose of the workshop was to familiarize participants with the key components of project based learning and for them to begin developing a project idea that they can implement in their classrooms.
NTAC 2016 Electives Principles and Practices Day 1 Slide Deck
NTAC 2016 Electives Principles and Practices Day 1 Slide Deck
Rhitt Growl
resume
resume
Angel Silva
CCC Executive Summary
Center City Connector Executive Summary
Center City Connector Executive Summary
Zach Shaner
1.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
1.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
ARAMCO SAP NO
ARAMCO SAP NO
Warry Carpitanos
iki bab 1
bab 1 ms power point 2007
bab 1 ms power point 2007
lutfi nurefendi
Case Study helpful for MBA students
Re sistors ap
Re sistors ap
King Abidi
Empfohlen
Eterno drummond
Eterno drummond
denisep2014
This slide deck was used during day one of the Electives Principles and Practices workshop at NTAC 2016. The three day workshop was lead by New Tech Network Coach, Matt Thompson, and Satellite Center Digital Media Facilitator, Rhitt Growl. The purpose of the workshop was to familiarize participants with the key components of project based learning and for them to begin developing a project idea that they can implement in their classrooms.
NTAC 2016 Electives Principles and Practices Day 1 Slide Deck
NTAC 2016 Electives Principles and Practices Day 1 Slide Deck
Rhitt Growl
resume
resume
Angel Silva
CCC Executive Summary
Center City Connector Executive Summary
Center City Connector Executive Summary
Zach Shaner
1.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
1.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
ARAMCO SAP NO
ARAMCO SAP NO
Warry Carpitanos
iki bab 1
bab 1 ms power point 2007
bab 1 ms power point 2007
lutfi nurefendi
Case Study helpful for MBA students
Re sistors ap
Re sistors ap
King Abidi
Recount text is the text that aims to recount an experience or event in the past, famous person, some where, and unforgetable activity.
Majapahit Recount text
Majapahit Recount text
Mohamad Nur Faizi
Model predictive (MP) control as a novel active queue management (AQM) algorithm in dynamic computer networks is proposed. According to the predicted future queue length in the data buffer, early packets at the router are dropped reasonably by the MPAQM controller so that the queue length reaches the desired value with minimal tracking error. The drop probability is obtained by optimizing the network performance. Further, randomized algorithms are applied to analyze the robustness of MPAQM successfully, and also to provide the stability domain of systems with uncertain network parameters. The performances of MPAQM are evaluated through a series of simulations in NS2. The simulation results show that the MPAQM algorithm outperforms RED, PI, and REM algorithms in terms of stability, disturbance rejection, and robustness.
Design and analysis of a model predictive controller for active queue management
Design and analysis of a model predictive controller for active queue management
ISA Interchange
AS Media.
Analysis of Different Thriller Opening Sequences
Analysis of Different Thriller Opening Sequences
Jessica Howie
Étude GEA en alternance chez EDF
POWER POINT Entreprise
POWER POINT Entreprise
GaelleTAUSSACROSINOL
Sprint Statistics (Oleg Barenboim) Community Update (Carol Chen) Classic UI (Dan Clarizio) Service UI (Chris Kacerguis) Providers (Greg Blomquist) Automate (Greg McCullough) Platform (Gregg Tanzillo) API (Alberto Bellotti) Quality Engineering (Dave Johnson)
Sprint 54
Sprint 54
ManageIQ
Case Study helpful for MBA students
Search engine
Search engine
King Abidi
Case Study helpful for MBA students
National foods (nk) case study
National foods (nk) case study
King Abidi
[PDF] Pressemitteilung: Daimler feiert den 125. Geburtstag des Automobils [http://www.lifepr.de?boxid=205301]
PI 125 Jahre_dt.pdf
PI 125 Jahre_dt.pdf
unn | UNITED NEWS NETWORK GmbH
[PDF] Pressemitteilung: Luftfahrt fliegt wieder in die Gewinnzone [http://www.lifepr.de?boxid=180546]
pi987.pdf
pi987.pdf
unn | UNITED NEWS NETWORK GmbH
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
SHAYBAH ARAMCO PROJECT APPROVAL
SHAYBAH ARAMCO PROJECT APPROVAL
Warry Carpitanos
FAST SAFETY AWARD - WARRY B. CARPITANOS
FAST SAFETY AWARD - WARRY B. CARPITANOS
Warry Carpitanos
Second Safety Award
Second Safety Award
Warry Carpitanos
Experience Certificate - FAST
Experience Certificate - FAST
Warry Carpitanos
Weitere ähnliche Inhalte
Andere mochten auch
Recount text is the text that aims to recount an experience or event in the past, famous person, some where, and unforgetable activity.
Majapahit Recount text
Majapahit Recount text
Mohamad Nur Faizi
Model predictive (MP) control as a novel active queue management (AQM) algorithm in dynamic computer networks is proposed. According to the predicted future queue length in the data buffer, early packets at the router are dropped reasonably by the MPAQM controller so that the queue length reaches the desired value with minimal tracking error. The drop probability is obtained by optimizing the network performance. Further, randomized algorithms are applied to analyze the robustness of MPAQM successfully, and also to provide the stability domain of systems with uncertain network parameters. The performances of MPAQM are evaluated through a series of simulations in NS2. The simulation results show that the MPAQM algorithm outperforms RED, PI, and REM algorithms in terms of stability, disturbance rejection, and robustness.
Design and analysis of a model predictive controller for active queue management
Design and analysis of a model predictive controller for active queue management
ISA Interchange
AS Media.
Analysis of Different Thriller Opening Sequences
Analysis of Different Thriller Opening Sequences
Jessica Howie
Étude GEA en alternance chez EDF
POWER POINT Entreprise
POWER POINT Entreprise
GaelleTAUSSACROSINOL
Sprint Statistics (Oleg Barenboim) Community Update (Carol Chen) Classic UI (Dan Clarizio) Service UI (Chris Kacerguis) Providers (Greg Blomquist) Automate (Greg McCullough) Platform (Gregg Tanzillo) API (Alberto Bellotti) Quality Engineering (Dave Johnson)
Sprint 54
Sprint 54
ManageIQ
Case Study helpful for MBA students
Search engine
Search engine
King Abidi
Case Study helpful for MBA students
National foods (nk) case study
National foods (nk) case study
King Abidi
[PDF] Pressemitteilung: Daimler feiert den 125. Geburtstag des Automobils [http://www.lifepr.de?boxid=205301]
PI 125 Jahre_dt.pdf
PI 125 Jahre_dt.pdf
unn | UNITED NEWS NETWORK GmbH
[PDF] Pressemitteilung: Luftfahrt fliegt wieder in die Gewinnzone [http://www.lifepr.de?boxid=180546]
pi987.pdf
pi987.pdf
unn | UNITED NEWS NETWORK GmbH
Andere mochten auch
(9)
Majapahit Recount text
Majapahit Recount text
Design and analysis of a model predictive controller for active queue management
Design and analysis of a model predictive controller for active queue management
Analysis of Different Thriller Opening Sequences
Analysis of Different Thriller Opening Sequences
POWER POINT Entreprise
POWER POINT Entreprise
Sprint 54
Sprint 54
Search engine
Search engine
National foods (nk) case study
National foods (nk) case study
PI 125 Jahre_dt.pdf
PI 125 Jahre_dt.pdf
pi987.pdf
pi987.pdf
Mehr von Warry Carpitanos
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
Warry Carpitanos
SHAYBAH ARAMCO PROJECT APPROVAL
SHAYBAH ARAMCO PROJECT APPROVAL
Warry Carpitanos
FAST SAFETY AWARD - WARRY B. CARPITANOS
FAST SAFETY AWARD - WARRY B. CARPITANOS
Warry Carpitanos
Second Safety Award
Second Safety Award
Warry Carpitanos
Experience Certificate - FAST
Experience Certificate - FAST
Warry Carpitanos
Mehr von Warry Carpitanos
(6)
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
1.) QC CIVIL INSPECTOR APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
2.) QC MANAGER APPROVAL - ROYAL COMMISSION PROJECT FOR JUBAIL
SHAYBAH ARAMCO PROJECT APPROVAL
SHAYBAH ARAMCO PROJECT APPROVAL
FAST SAFETY AWARD - WARRY B. CARPITANOS
FAST SAFETY AWARD - WARRY B. CARPITANOS
Second Safety Award
Second Safety Award
Experience Certificate - FAST
Experience Certificate - FAST
Jetzt herunterladen