SlideShare a Scribd company logo
1 of 1
Download to read offline
PIPE INSULATION SYSTEM
SCALE 1 / 1.5
DETAIL K
SCALE 2:1
K
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
CLIENT
CONTRACTOR
REVISIONS TABLE
SYM. DESCRIPTION DATE APPROVED
GENERAL NOTES
US ARMY CORPS OF ENGINEER AIR FORCE
AL UDEID AIR BASE QATAR
DRAWING NAME DRAWING NO.
SCALE.
SIZE.
A 3
CONSTR. CONTR. NO.
DESIGNED BY:
REV.
CHECKED BY
WAFIK R. ZAKHARY
1
SHEET DATE
MIDDLE EAST DISTRICT
PIPE INSULATION SYSTEM MS1001
1 OF 1
AS SHOWN
MAR
2014
TACTICAL RAMP & VEHICLE
MAINTENANCE FACILITY
WZ
SERVICE PIPE:
1- COLD WATER SUPPLY
2- HOT WATER SUPPLY.
3- CHILLED WATER SYSTEM.
KIMMCO RIGID PIPE INSULATION
"MINERAL FIBER INSULATION"
CONFORM TO STANDARD ASTM C 547 (CLASS-1)
AS PER SPECIFICATION SECTION 23 07 00 PARA. 2.3 1 - 2.3.2
SERVICES:
COLD WATER/CHILLED AS PER PARA. 2.3.1 (c) Aboveground Cold Pipeline (-34 to 16 deg. C).
HOT WATER AS PER PARA. 2.3.2 (a) Aboveground Hot Pipeline (Above 16 deg. C).
"ALSO AS PER TABLE 1 MINERAL FIBER INSULATION IS SPECIFIED FOR ALL THIS SERVICES"
FSK FACING (JACKET)
KIMMCO RIGID PIPE SUPPLIED WITH
FSK /KRAFT PAPER LAMINATE FACTORY APPLIED:
FUNCTION:
1- VAPOUR BARRIER AND WEATHER PROOF.
2- PROTECTION FOR SLEEVE PENETRATIONS.
AS PER MICA STANDARD PLATE 1-610, ITEM 4
HIGH DENSITY INSERT
"2 HALF OF WOOD SECTION
SIZE EQUAL TO THE INSUALTION"
FSK TAPE
FSK TAPE WILL BE APPLIED OVER
THE HIGH DENSITY INSERT, AND EXTENDED
FROM BOTH SIDES TO MAINTAIN THE VAPOR
BARRIER.
A
B
C
D
TYPE 40 PROTECTION SHIELD
FOR INSULATED PIPES (360 )
12" LENGTH GI PROTECTION
SHIELD GUAGE 18
AS PER TABLE 5 (MSS SP-69) &
MICA STANDARD, PLATE 1-610, ITEM 6 E
U-BOLT OR HANGER SUPPORT
TO CONFIRM WITH MSS SP 58 - 69
TYPE 24
DUCTLINE
(LOW VOC WATER & HEAT RESISTANT
CR BASED DUCT LINER &
ISULATION ADHESIVE)

More Related Content

What's hot

Guidebook for the design of Asme Section VIII Pressure Vessel
Guidebook for the design of Asme Section VIII Pressure VesselGuidebook for the design of Asme Section VIII Pressure Vessel
Guidebook for the design of Asme Section VIII Pressure Vesselmarco garofanello
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course materialTASSIO DOURADO
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overviewAshifuddinAli
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingVarun Patel
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.Dilip Kumar
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
API 510 Practise Question Nov 07 rev1.ppt
API 510 Practise Question Nov 07 rev1.pptAPI 510 Practise Question Nov 07 rev1.ppt
API 510 Practise Question Nov 07 rev1.pptSeptianHariPradana1
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design trainingSam Jose
 
ipec.info | Pfd p&id
ipec.info | Pfd p&idipec.info | Pfd p&id
ipec.info | Pfd p&idIPEC
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0Mohammad Mahrous
 

What's hot (20)

Electrode selection
Electrode selection  Electrode selection
Electrode selection
 
Guidebook for the design of Asme Section VIII Pressure Vessel
Guidebook for the design of Asme Section VIII Pressure VesselGuidebook for the design of Asme Section VIII Pressure Vessel
Guidebook for the design of Asme Section VIII Pressure Vessel
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.U#3 BOILER CHEMICAL CLEANING.
U#3 BOILER CHEMICAL CLEANING.
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
API 510 Practise Question Nov 07 rev1.ppt
API 510 Practise Question Nov 07 rev1.pptAPI 510 Practise Question Nov 07 rev1.ppt
API 510 Practise Question Nov 07 rev1.ppt
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
 
ipec.info | Pfd p&id
ipec.info | Pfd p&idipec.info | Pfd p&id
ipec.info | Pfd p&id
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 

Viewers also liked

Class O Armaflex Plus With Microban
Class O Armaflex Plus With MicrobanClass O Armaflex Plus With Microban
Class O Armaflex Plus With Microbanashish_arora71
 
Drainage systerm
Drainage systerm Drainage systerm
Drainage systerm dezyneecole
 
Hydrant flushing programs
Hydrant flushing programsHydrant flushing programs
Hydrant flushing programsBrian Gongol
 
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
2   louis p. pollono - 4046169-  pipe support for use in a nuclear system2   louis p. pollono - 4046169-  pipe support for use in a nuclear system
2 louis p. pollono - 4046169- pipe support for use in a nuclear systemMello_Patent_Registry
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...Britt Bettell
 
Hydrant bags
Hydrant bagsHydrant bags
Hydrant bagsmvfd2380
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plansamson oakley
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2Wafik Zakhary
 
Chapter9 Hydrant Bradburn
Chapter9 Hydrant BradburnChapter9 Hydrant Bradburn
Chapter9 Hydrant Bradburnmjbradburn
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installationtoverwater
 
20100514 pipe arch presentation to iem may 2010
20100514 pipe arch presentation to iem   may 201020100514 pipe arch presentation to iem   may 2010
20100514 pipe arch presentation to iem may 2010forcepraxeum
 
804 query-short-spools-support
804 query-short-spools-support804 query-short-spools-support
804 query-short-spools-supportAlaa Altaie
 
Ms for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workMs for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workthanhuce
 

Viewers also liked (20)

Pipe shields for beginners
Pipe shields for beginnersPipe shields for beginners
Pipe shields for beginners
 
Class O Armaflex Plus With Microban
Class O Armaflex Plus With MicrobanClass O Armaflex Plus With Microban
Class O Armaflex Plus With Microban
 
Basic piping
Basic pipingBasic piping
Basic piping
 
To Date Stef CV
To Date Stef CVTo Date Stef CV
To Date Stef CV
 
EFAC's toilet block
EFAC's toilet blockEFAC's toilet block
EFAC's toilet block
 
Drainage systerm
Drainage systerm Drainage systerm
Drainage systerm
 
Vietnam Auto Expo 2016
Vietnam Auto Expo 2016Vietnam Auto Expo 2016
Vietnam Auto Expo 2016
 
Hydrant flushing programs
Hydrant flushing programsHydrant flushing programs
Hydrant flushing programs
 
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
2   louis p. pollono - 4046169-  pipe support for use in a nuclear system2   louis p. pollono - 4046169-  pipe support for use in a nuclear system
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
Hydrant bags
Hydrant bagsHydrant bags
Hydrant bags
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plan
 
Ukuran hanger road
Ukuran hanger roadUkuran hanger road
Ukuran hanger road
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
 
Prof. thomas pogge
Prof. thomas poggeProf. thomas pogge
Prof. thomas pogge
 
Chapter9 Hydrant Bradburn
Chapter9 Hydrant BradburnChapter9 Hydrant Bradburn
Chapter9 Hydrant Bradburn
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
 
20100514 pipe arch presentation to iem may 2010
20100514 pipe arch presentation to iem   may 201020100514 pipe arch presentation to iem   may 2010
20100514 pipe arch presentation to iem may 2010
 
804 query-short-spools-support
804 query-short-spools-support804 query-short-spools-support
804 query-short-spools-support
 
Ms for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-workMs for-mechanical-piping-system-installation-work
Ms for-mechanical-piping-system-installation-work
 

Similar to Pipe Insulation System

MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAWafik Zakhary
 
Chimney present
Chimney presentChimney present
Chimney presentmathusaran
 
Quality Circle_ PRAYAAS_ 2023.pptx
Quality Circle_ PRAYAAS_ 2023.pptxQuality Circle_ PRAYAAS_ 2023.pptx
Quality Circle_ PRAYAAS_ 2023.pptxPiyushDas59
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specificationskristinemassey
 
PSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentPSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentJamie Emmart
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 
Fluid mechanics material
Fluid mechanics materialFluid mechanics material
Fluid mechanics materialDarya khan
 
Target committee review meeting
Target committee review meetingTarget committee review meeting
Target committee review meetingmallareddy1975
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationsurajkumar844960
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Anuj Ranjan
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-ajulio-civil
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfDeniseMathre1
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 

Similar to Pipe Insulation System (20)

MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CA
 
Chimney present
Chimney presentChimney present
Chimney present
 
Quality Circle_ PRAYAAS_ 2023.pptx
Quality Circle_ PRAYAAS_ 2023.pptxQuality Circle_ PRAYAAS_ 2023.pptx
Quality Circle_ PRAYAAS_ 2023.pptx
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specifications
 
PSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentPSG WPSR Generator Refurbishment
PSG WPSR Generator Refurbishment
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Saes s-060
Saes s-060Saes s-060
Saes s-060
 
Fluid mechanics material
Fluid mechanics materialFluid mechanics material
Fluid mechanics material
 
Target committee review meeting
Target committee review meetingTarget committee review meeting
Target committee review meeting
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdf
 
Well.Construction.pptx
Well.Construction.pptxWell.Construction.pptx
Well.Construction.pptx
 
1998 04 pop_full_ops
1998 04 pop_full_ops1998 04 pop_full_ops
1998 04 pop_full_ops
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 

Pipe Insulation System

  • 1. PIPE INSULATION SYSTEM SCALE 1 / 1.5 DETAIL K SCALE 2:1 K 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D CLIENT CONTRACTOR REVISIONS TABLE SYM. DESCRIPTION DATE APPROVED GENERAL NOTES US ARMY CORPS OF ENGINEER AIR FORCE AL UDEID AIR BASE QATAR DRAWING NAME DRAWING NO. SCALE. SIZE. A 3 CONSTR. CONTR. NO. DESIGNED BY: REV. CHECKED BY WAFIK R. ZAKHARY 1 SHEET DATE MIDDLE EAST DISTRICT PIPE INSULATION SYSTEM MS1001 1 OF 1 AS SHOWN MAR 2014 TACTICAL RAMP & VEHICLE MAINTENANCE FACILITY WZ SERVICE PIPE: 1- COLD WATER SUPPLY 2- HOT WATER SUPPLY. 3- CHILLED WATER SYSTEM. KIMMCO RIGID PIPE INSULATION "MINERAL FIBER INSULATION" CONFORM TO STANDARD ASTM C 547 (CLASS-1) AS PER SPECIFICATION SECTION 23 07 00 PARA. 2.3 1 - 2.3.2 SERVICES: COLD WATER/CHILLED AS PER PARA. 2.3.1 (c) Aboveground Cold Pipeline (-34 to 16 deg. C). HOT WATER AS PER PARA. 2.3.2 (a) Aboveground Hot Pipeline (Above 16 deg. C). "ALSO AS PER TABLE 1 MINERAL FIBER INSULATION IS SPECIFIED FOR ALL THIS SERVICES" FSK FACING (JACKET) KIMMCO RIGID PIPE SUPPLIED WITH FSK /KRAFT PAPER LAMINATE FACTORY APPLIED: FUNCTION: 1- VAPOUR BARRIER AND WEATHER PROOF. 2- PROTECTION FOR SLEEVE PENETRATIONS. AS PER MICA STANDARD PLATE 1-610, ITEM 4 HIGH DENSITY INSERT "2 HALF OF WOOD SECTION SIZE EQUAL TO THE INSUALTION" FSK TAPE FSK TAPE WILL BE APPLIED OVER THE HIGH DENSITY INSERT, AND EXTENDED FROM BOTH SIDES TO MAINTAIN THE VAPOR BARRIER. A B C D TYPE 40 PROTECTION SHIELD FOR INSULATED PIPES (360 ) 12" LENGTH GI PROTECTION SHIELD GUAGE 18 AS PER TABLE 5 (MSS SP-69) & MICA STANDARD, PLATE 1-610, ITEM 6 E U-BOLT OR HANGER SUPPORT TO CONFIRM WITH MSS SP 58 - 69 TYPE 24 DUCTLINE (LOW VOC WATER & HEAT RESISTANT CR BASED DUCT LINER & ISULATION ADHESIVE)