SlideShare a Scribd company logo
1 of 2
CE "Termoelektrane i kopovi Personal ID No.: 2110975762014
Kostolac" d.o.o. Kostolac Reg. No.: 26552
MANAGER OFFICE
Number: 81
Date: February 24th
, 2015
Kostolac
Pursuant to Article 171 and 172 of Law on Labour ("Official Gazette of the Republic of Serbia"
No. 24/05, 61/05, 54/09, 32/13 and 75/14)
1) Corporate Enterprise "Termoelektrane i kopovi Kostolac" d.o.o. Kostolac, represented by
Acting Manager Mr. Goran Horvat, (hereinafter: Employer), and
2) VLADIMIR KORAĆ, with residence at KOSTOLAC, No. 1 TRG BRAT. JED. Street,
with 4. degree of professional qualification, MECHANICAL profession,
(hereinafter: Employee)
concluded
ANNEX V
TO WORK AGREEMENT No. 1218/1 dated June 11th
, 2007
Article 1
Reassignment of employee is performed due to process needs and business organization within
Corporate Enterprise, to vacancy job.
Article 2 of the above stated Agreement is modified and wording is the following:
EMPLOYEE performs works 223 – HEAD OF GROUP FOR AUXILIARY DEVICES
MAINTENANCE, DEPARTMENT FOR MAINTENANCE EXECUTION FOR TURBINE PLANT,
MAINTENANCE EXECUTION SERVICE, MAINTENANCE DEPARTMENT OF THERMAL
POWER PLANT KOSTOLAC A, THERMAL POWER PLANT "KOSTOLAC A", POWER
GENERATION DEPARTMENT
which includes the following:
- coordination with responsible employees of the team (Foreman, Head Engineer and
Engineer), and with responsible employees of operative preparation, for the purpose of
solving issues regarding most complex mechanical works at TPP
- coordination with responsible employees from production department in order to provide
conditions for work and conditions for devices start-up after repair; - direct control of
protection measures application;
- provides special tools, fittings, spare parts and other preconditions for execution of tasks
in terms of organization and transportation, orders supplies etc.;
- reviews technological documentation and participates within preparation of defect
inspection lists for devices;
- organizes and performs most difficult mechanical works at TPP devices (dismantling and
assembly of devices, centering adjustment, all types of measurements) during
preventive inspection of devices, during regular and capital overhauls and repairs;
- quality control regarding performed works;
- organizes and cleans working area after performed work;
- returns or organizes returning of unused material and spare parts to warehouse;
- fills in work lists and work orders;
He is under obligation and is responsible for application of QMS procedures.
He also performs other works ordered by direct manager.
Employee is under obligation to perform works from paragraph 1 of this Article, even during
strike.

More Related Content

Viewers also liked

Email about some European client satisfaction from GLG
Email about some European client satisfaction from GLGEmail about some European client satisfaction from GLG
Email about some European client satisfaction from GLGJorge C. Palma
 
Organization structure training nbc
Organization structure training nbcOrganization structure training nbc
Organization structure training nbcDean Mandis
 
Chinese numbers 1 100
Chinese numbers 1 100Chinese numbers 1 100
Chinese numbers 1 100Joanne Chen
 
A imoralidade sexual dos anjos
A imoralidade sexual dos anjosA imoralidade sexual dos anjos
A imoralidade sexual dos anjosBiblioteca Virtual
 
Univercidad de los valles
Univercidad de los vallesUnivercidad de los valles
Univercidad de los vallessami flores
 

Viewers also liked (9)

Bashar New CV
Bashar New CVBashar New CV
Bashar New CV
 
Email about some European client satisfaction from GLG
Email about some European client satisfaction from GLGEmail about some European client satisfaction from GLG
Email about some European client satisfaction from GLG
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Organization structure training nbc
Organization structure training nbcOrganization structure training nbc
Organization structure training nbc
 
Levelling
LevellingLevelling
Levelling
 
OPES SIWES
OPES SIWESOPES SIWES
OPES SIWES
 
Chinese numbers 1 100
Chinese numbers 1 100Chinese numbers 1 100
Chinese numbers 1 100
 
A imoralidade sexual dos anjos
A imoralidade sexual dos anjosA imoralidade sexual dos anjos
A imoralidade sexual dos anjos
 
Univercidad de los valles
Univercidad de los vallesUnivercidad de los valles
Univercidad de los valles
 

Similar to WORK AGREEMENT

jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015Manolito Jordan
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxssusera85eeb1
 
CV_Sayan_Tuleshov_Updated 1
CV_Sayan_Tuleshov_Updated 1CV_Sayan_Tuleshov_Updated 1
CV_Sayan_Tuleshov_Updated 1Sayan Tuleshov
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CVAhmed Samir
 
Time and Motion Study Guidelines by DOLE
Time and Motion Study Guidelines by DOLETime and Motion Study Guidelines by DOLE
Time and Motion Study Guidelines by DOLEPoL Sangalang
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521Assen Antov
 
Itt 1.4 20124-010-sr-4110-801-a
Itt 1.4   20124-010-sr-4110-801-aItt 1.4   20124-010-sr-4110-801-a
Itt 1.4 20124-010-sr-4110-801-aDanil Babash
 

Similar to WORK AGREEMENT (20)

jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
 
CV_Sayan_Tuleshov_Updated 1
CV_Sayan_Tuleshov_Updated 1CV_Sayan_Tuleshov_Updated 1
CV_Sayan_Tuleshov_Updated 1
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
 
Cv of nilesh rk
Cv of nilesh rkCv of nilesh rk
Cv of nilesh rk
 
kkalema
kkalemakkalema
kkalema
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Time and Motion Study Guidelines by DOLE
Time and Motion Study Guidelines by DOLETime and Motion Study Guidelines by DOLE
Time and Motion Study Guidelines by DOLE
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
 
C.V (1)
C.V (1)C.V (1)
C.V (1)
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
MCV
MCVMCV
MCV
 
Sop mpcb etp
Sop  mpcb etpSop  mpcb etp
Sop mpcb etp
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521
 
Itt 1.4 20124-010-sr-4110-801-a
Itt 1.4   20124-010-sr-4110-801-aItt 1.4   20124-010-sr-4110-801-a
Itt 1.4 20124-010-sr-4110-801-a
 

WORK AGREEMENT

  • 1. CE "Termoelektrane i kopovi Personal ID No.: 2110975762014 Kostolac" d.o.o. Kostolac Reg. No.: 26552 MANAGER OFFICE Number: 81 Date: February 24th , 2015 Kostolac Pursuant to Article 171 and 172 of Law on Labour ("Official Gazette of the Republic of Serbia" No. 24/05, 61/05, 54/09, 32/13 and 75/14) 1) Corporate Enterprise "Termoelektrane i kopovi Kostolac" d.o.o. Kostolac, represented by Acting Manager Mr. Goran Horvat, (hereinafter: Employer), and 2) VLADIMIR KORAĆ, with residence at KOSTOLAC, No. 1 TRG BRAT. JED. Street, with 4. degree of professional qualification, MECHANICAL profession, (hereinafter: Employee) concluded ANNEX V TO WORK AGREEMENT No. 1218/1 dated June 11th , 2007 Article 1 Reassignment of employee is performed due to process needs and business organization within Corporate Enterprise, to vacancy job. Article 2 of the above stated Agreement is modified and wording is the following: EMPLOYEE performs works 223 – HEAD OF GROUP FOR AUXILIARY DEVICES MAINTENANCE, DEPARTMENT FOR MAINTENANCE EXECUTION FOR TURBINE PLANT, MAINTENANCE EXECUTION SERVICE, MAINTENANCE DEPARTMENT OF THERMAL POWER PLANT KOSTOLAC A, THERMAL POWER PLANT "KOSTOLAC A", POWER GENERATION DEPARTMENT which includes the following: - coordination with responsible employees of the team (Foreman, Head Engineer and Engineer), and with responsible employees of operative preparation, for the purpose of solving issues regarding most complex mechanical works at TPP - coordination with responsible employees from production department in order to provide conditions for work and conditions for devices start-up after repair; - direct control of protection measures application; - provides special tools, fittings, spare parts and other preconditions for execution of tasks in terms of organization and transportation, orders supplies etc.; - reviews technological documentation and participates within preparation of defect inspection lists for devices; - organizes and performs most difficult mechanical works at TPP devices (dismantling and assembly of devices, centering adjustment, all types of measurements) during preventive inspection of devices, during regular and capital overhauls and repairs; - quality control regarding performed works;
  • 2. - organizes and cleans working area after performed work; - returns or organizes returning of unused material and spare parts to warehouse; - fills in work lists and work orders; He is under obligation and is responsible for application of QMS procedures. He also performs other works ordered by direct manager. Employee is under obligation to perform works from paragraph 1 of this Article, even during strike.