2. VIPIN MISHRA
Address: House No. 2750, Sec-3,Ballabhgarh, Faridabad, Haryana.
Mobile: 9711843984 || E-Mail: vipin8044@ gmail.com
Seeking a re s p o n s i b l e p o s i t i on i n TelecomSector t o w a rd s professionalgrowthand developmentin a
renownedtelecommunication and organization.
SYNOPSIS
Presently associated with ALSTOM T&DINDIA Ltd.
Qualified B.TECH. Electronics and Communication from Aravali collegeof Engg &mgmt,Faridabad.
Acquired skillsof transmission and telecommunication systems as well as telephone switch systems.
Skilled in diagnosing and troubleshooting networking issues with strong knowledge of network technical specifications.
Possess strong interpersonal, analytical, communication skills and presentation & training skills.
CURENT ORGANIZATION
ALSTOM T&D Executive Testing & Commissioning Engineer since Oct’14
1. Responsible for Designing Testing & Commissioning a network based on NMS (Wide Band SDH, PDH
Handle the tasks of providing recommendations in handlingnetworking and routing issues.
2. Executing installing, testing and commissioning network configuration systems to ensure network integrity;
provisioning telephone switches as well as Data Transmission from Power Substation to LDC.
3. Maintaining and troubleshooting network Nodes and other devices.
4. Supplying standard maintenance support of control switching system as well as voice systems as per the requirements.
5. Responsible for Team management, Customer handling and Customer interaction on site.
6. Also responsible to givePresentation & trainingto customer on Site as well as in Office. Handle FAT (Factory acceptance
Test) & SAT (Site acceptance Test) of project with reports.
7. Commissioning and handover the linkto customer after Loop test and or Ping test of the Link.
8. To giveonline support to DATA, DSL and O&M team.
9. Uploading new Mux on NMS (in Ring or Linear).
10. Alarm monitoring, Fault Finding and resolution on Ethernet or Electrical Link.
11. Ability to create VLAN and to decide bandwidth of VLan.
12. Configurations of Router cards in Mux at L3 in various modes bridgemode, PVID VLAN etc.
PROJECTS
Project Title: Extension of Optical Link of UPPCL
Client: PGCB Utter Pradesh Corporation Limited
Project Location: U.P West Site: Onsite
Role: Project Leader Team Size: 4
Skill Used: Network topologies regarding Optical links
Role Description: My work of scope issupervision of installation and commissioning of network nodes. I have to give training to
customer on site (Hands on training).
Project Details: In thisproject Alstom have to connect 3 no. of sites of UPPCL Optical (SDH & PDH) Network and also responsible
for providing thedifferent services at SDH and PDH level,
3. Project Title: Fiber Networkfor Substation to report data at SLDC
Client: AP Transco
Project Location: Hyderabad Site: Onsite
Role: Project Leader Team Size: 4
Skill Used: Network Topology to establish an optical linkas per customer requirements in which I have to provide
services of SDH level (Ethernet over SDH VOIP phoneand E1 (HDB3 coding) channels etc. PDH Level (64 kbps to 2 Mbps
service which includevariousITU protocol areinvolved likeRS 232, V.35, voicecircuitsG.703 codirectional E&M circuits
etc. Presentation regarding Project and product.
Role Description: Wide band network linkestablishment between different sites of Customer to protect the High
voltage transmission system, to transfer thedata of Scada and also providethe NMS (Network Management System)
solution for monitoring theNodes of Network
Project Details: Wideband network linkestablishment
Project Title: GETCO FIBER NETWORK
Client: Getco Gujarat Electricity board
Project Location: All over Gujarat and planning of network in office Site: Onsite
Role: Project Leader Team Size: 4
Skill Used: Site Management, Team work on site, Customer interaction, and Commissioning of SDH, PDH,
Teleprotection & NMS server and to provideTraining to Customer. Also responsible for designing of cross-connects and
Network planning..
RoleDescription: Responsible for Commissioning & supervision of Installation work on site and final Handover to
Customer with
SiteAcceptance Test
Project Details: Establishment of Fiber Based Network with NMS Solution (Client-server based) and having 33
Nodes, in futuremore Nodes are also come in picture. there are lot of SDH and PDH service are involve likerouting
L2 and L3 layers and these all
service will run in aring protection topology.
PRIVIOUS ORGANIZATION
Huawei Telecommunications (india) co. pvt. ltd Project Engg. f r o m july’13 to Oct 2014
1. Executing installing,testing & commissioning of SDH MUX (OSN 500,OSN 550,OSN 1832 x8,1832 x16) to ensure
network integrity ,Maintainingand troubleshooting SDH equipments.
Linkquest Telecom Ltd R.F Engg. f r o m jan’13 to July 2013
1. Visiting thecell sites and performing EMF survey.updating the sites information and creating reports.
ACADEMIC
2012 B.Tech. Electronicsand Communication from Aravali collegeof engg. & mgmt.. Faridabad.
Affiliatedto MDU, Rohtakwith an aggregate of xx%
2008 Diploma in computer science from B.K.N Govt. college, Mahendragarh (Haryana) with xx%
2005 12th
from Bohra Public School, Faridabad (C.B.S.E Board) with xx %
2003 10th
from H.M.P School, Faridabad (H.B.S.E Board) with xx %
TRAINING
Attended summer in-plant trainingat:
o P r akan t E l ec t r o n i c s , Faridabad in 3rd
year.
o R . R E l ec t r o n i c s , Faridabad in 4th
year.
PERSONAL
Date of Birth: 10th
Jan 1988
Languages: Hindi, English
Nationality: Indian