SlideShare ist ein Scribd-Unternehmen logo
1 von 14
VIKRAM SINGH
Location:-Gurugram
Ph- 9519957979
Vikuu_04@yahoo.com
Rewari, Haryana
• Operation Management
• 2015
MBA
• Mechanical Engineering
• 2009
B-Tech.
• Mechanical Engineering
• 2000
Diploma
Education Chapter
• 6 Sigma Black Belt
• American society for Quality-2012
6 Sigma
• Lead Auditor [ISO 9001:2008]
• Intertek -Oct-2013
Lead Auditor
• IATF 16949:2016 , ISO 14001:2004
• 2017
Internal Auditor
Certification
Sept-2003
June-2010
Sept-2006
May-2019
2.5 Year- Till Date
8.11 Year
3.9 Year
3.0 Year
Professional Chapter
Total Exp.-18
-HOD Manufacturing
-100% Japanese
-Injection moulding Plant
-Location: Gurugram
-HMSI, TVS, Hero, MSIL, Nissan
-Engine plastic component
-Transmission belt
-HOD Manufacturing
-100% Japanese
-Assy. Line, Die casting
-Location: Ahmedabad
-HMSI, SMG
-Transmission cables, Power
window system
-HOD Manufacturing
-100% Japanese
-Hot Coil Suspension spring
-Location: Gurugram
-MSIL, Toyota, Nissan, Ford
Honda car,
-Front & Rear Suspension part
-HOD Manufacturing
-India Manufacturer
-Injection Moulding, Die casting
-Location: Gurugram
-MSIL,Tata, Mahindra
-Lightings device
-Locking device
CUSTOMER EXPERIENCE
PRODUCT EXPERIENCE
CVT CLUTCH & ENGINE PLASTIC PART
TRANSMISSION BELT, CVT BELT, ALTERNATOR
BELT
TRANSMISSION CABLES [ BREAK, THROTTLE,
CLUTCH. GEAR SHIFT CABLE, POWER WINDOW
SYSTEM
SUSPENSION COIL SPRINGS
AREA OF EXPERIENCE
PLASTIC INJECTION MOULDING
HOT COIL SUSPENSION SPRING
ASSEMBLY LINE
DIE CASTING
CURRENT WORK
Hi-lex India Pvt Ltd.
[Unit-4] Gujrat.
Hi-Lex Corporation
Japan[Takarazuka]
U-1
U-2
U-4
U-3
Plant Manpower :- 700 Nos.
Customer-Suzuki Motors Gujrat, Honda Motor Cycle.
Product-Transmission Cable, Break, Throttle, Clutch, Power
window system
Monthly average Sales- 95 million
Team size- 10 Nos.
CURRENT ROLE
1] Proactive action on bottleneck process to prevent future capacity issue.
2] Optimize day to day process cost factor.
3] Plant productivity factor identification and improvement plan capacity & line flexibility.
4] Control Manpower & material cost to achieve business plan.
5] Control Plant consumable cost to achieve budgeted figure.
6] Multi-departmental support and ensure Plant level Team work.
7] Leadership for various project to ensure Quality & productivity improvement.
NOTABLES
1] Improvement Plan capacity by
productivity. 70% to 85 %
3] Scrap cost reduction 1.16% to 0.65%.
4] Manpower cost reduction [378 Nos. to 296
Nos].
2] Plant 4S condition improvement by score
76% to 86%
PROJECT
Project Title: Plant Relocation
1] Customer information and approval
2] New Plan layout
3] Mover Finalization
4] Detail activity preparation
5] Phase wise M/c machine shifting
5] Customers QAV approval
6] SOP
ROLE: PROJECT MANGAR
PROJECT BUDGET:- 19.0 MILLION
PROJECT COMPLETION- 17.5 MILLION
ACHIEVEMENT- 1.5 MILLION(8%)
INTERNATIONAL FOOTPRINT
Leaner of Japanese language
[今、 日本語 お べきよ して 今します、 JLPT の ん5
五格しました、 JLPT 4 便器ヨア して 今酒].
Hindi Japanese
English
Global BPS training for Production
Managers’ Held at Japan in 2018
Asian Quality circle convention’-
Taiwan in 2016.
Asian Quality circle convention
Thailand in 2012.
LANGUAGE KNOWN
Leaner of Japanese language
[今、 日本語 お べきよ して 今します、 JLPT の ん5
五格しました、 JLPT 4 便器ヨア して 今酒].
Hindi Japanese
English
THANKS FOR YOUR TIME.

Weitere ähnliche Inhalte

Was ist angesagt? (20)

ME_currycj
ME_currycjME_currycj
ME_currycj
 
varun singh expereicd resume
varun singh expereicd resumevarun singh expereicd resume
varun singh expereicd resume
 
Resume
ResumeResume
Resume
 
Resume - Copy 1
Resume - Copy 1Resume - Copy 1
Resume - Copy 1
 
Prime
PrimePrime
Prime
 
naukri Rusme
naukri Rusmenaukri Rusme
naukri Rusme
 
Avdhesh Shukla
Avdhesh ShuklaAvdhesh Shukla
Avdhesh Shukla
 
Seasoned Operations/ Supply Chain Professional (Engineering Industry) 02 06 2011
Seasoned Operations/ Supply Chain Professional (Engineering Industry) 02 06 2011Seasoned Operations/ Supply Chain Professional (Engineering Industry) 02 06 2011
Seasoned Operations/ Supply Chain Professional (Engineering Industry) 02 06 2011
 
Kumaravel_R_Resume-v01b-2015-06-30
Kumaravel_R_Resume-v01b-2015-06-30Kumaravel_R_Resume-v01b-2015-06-30
Kumaravel_R_Resume-v01b-2015-06-30
 
cv
cvcv
cv
 
Resume - NABA
Resume - NABAResume - NABA
Resume - NABA
 
Sadaiappan Kandasamy CV
Sadaiappan Kandasamy CVSadaiappan Kandasamy CV
Sadaiappan Kandasamy CV
 
Locke Bryan CV3 latest version
Locke Bryan CV3 latest versionLocke Bryan CV3 latest version
Locke Bryan CV3 latest version
 
Antwon Toy
Antwon ToyAntwon Toy
Antwon Toy
 
1. Resume NIK AHMAD FAKRIE
1. Resume NIK AHMAD FAKRIE 1. Resume NIK AHMAD FAKRIE
1. Resume NIK AHMAD FAKRIE
 
Gurunath.S.
Gurunath.S.Gurunath.S.
Gurunath.S.
 
Resume Parag Potdar
Resume Parag PotdarResume Parag Potdar
Resume Parag Potdar
 
MTE presentation
MTE presentationMTE presentation
MTE presentation
 
CV_NEW
CV_NEWCV_NEW
CV_NEW
 
Resume 1
Resume 1Resume 1
Resume 1
 

Ähnlich wie Vikram profile (20)

Resume Production
Resume ProductionResume Production
Resume Production
 
Resume
ResumeResume
Resume
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
MPK Resume.
MPK Resume.MPK Resume.
MPK Resume.
 
Resume
Resume Resume
Resume
 
Abhishek Kumar
Abhishek KumarAbhishek Kumar
Abhishek Kumar
 
MHCCV_02-08-16
MHCCV_02-08-16MHCCV_02-08-16
MHCCV_02-08-16
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Rajiv cv
Rajiv cv Rajiv cv
Rajiv cv
 
Resume_K.L.Neelakandan
Resume_K.L.NeelakandanResume_K.L.Neelakandan
Resume_K.L.Neelakandan
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
Kamal singh-15.09.15
Kamal singh-15.09.15Kamal singh-15.09.15
Kamal singh-15.09.15
 
dapski042116
dapski042116dapski042116
dapski042116
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Resume sales engineer
Resume sales  engineerResume sales  engineer
Resume sales engineer
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Roy sayre 01.2016
Roy sayre 01.2016Roy sayre 01.2016
Roy sayre 01.2016
 
Resume settu
Resume settuResume settu
Resume settu
 
Success story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CIISuccess story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CII
 
Manivannan Resume
Manivannan ResumeManivannan Resume
Manivannan Resume
 

Kürzlich hochgeladen

Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Mint Automotive
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGVikrantPawar37
 
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESsriharshaganjam1
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsRowlett Motorwerks
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdfkushkruthik555
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxjennifermiller8137
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfAditiMishra247289
 
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesA Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesROJANE BERNAS, PhD.
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hhmhamadhawlery16
 
Lighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceLighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceImport Car Center
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreForth
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientationxlr8sales
 

Kürzlich hochgeladen (12)

Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAG
 
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptx
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdf
 
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesA Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh
 
Lighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceLighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light Service
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientation
 

Vikram profile

  • 2. • Operation Management • 2015 MBA • Mechanical Engineering • 2009 B-Tech. • Mechanical Engineering • 2000 Diploma Education Chapter
  • 3. • 6 Sigma Black Belt • American society for Quality-2012 6 Sigma • Lead Auditor [ISO 9001:2008] • Intertek -Oct-2013 Lead Auditor • IATF 16949:2016 , ISO 14001:2004 • 2017 Internal Auditor Certification
  • 4. Sept-2003 June-2010 Sept-2006 May-2019 2.5 Year- Till Date 8.11 Year 3.9 Year 3.0 Year Professional Chapter Total Exp.-18 -HOD Manufacturing -100% Japanese -Injection moulding Plant -Location: Gurugram -HMSI, TVS, Hero, MSIL, Nissan -Engine plastic component -Transmission belt -HOD Manufacturing -100% Japanese -Assy. Line, Die casting -Location: Ahmedabad -HMSI, SMG -Transmission cables, Power window system -HOD Manufacturing -100% Japanese -Hot Coil Suspension spring -Location: Gurugram -MSIL, Toyota, Nissan, Ford Honda car, -Front & Rear Suspension part -HOD Manufacturing -India Manufacturer -Injection Moulding, Die casting -Location: Gurugram -MSIL,Tata, Mahindra -Lightings device -Locking device
  • 6. PRODUCT EXPERIENCE CVT CLUTCH & ENGINE PLASTIC PART TRANSMISSION BELT, CVT BELT, ALTERNATOR BELT TRANSMISSION CABLES [ BREAK, THROTTLE, CLUTCH. GEAR SHIFT CABLE, POWER WINDOW SYSTEM SUSPENSION COIL SPRINGS
  • 7. AREA OF EXPERIENCE PLASTIC INJECTION MOULDING HOT COIL SUSPENSION SPRING ASSEMBLY LINE DIE CASTING
  • 8. CURRENT WORK Hi-lex India Pvt Ltd. [Unit-4] Gujrat. Hi-Lex Corporation Japan[Takarazuka] U-1 U-2 U-4 U-3 Plant Manpower :- 700 Nos. Customer-Suzuki Motors Gujrat, Honda Motor Cycle. Product-Transmission Cable, Break, Throttle, Clutch, Power window system Monthly average Sales- 95 million Team size- 10 Nos.
  • 9. CURRENT ROLE 1] Proactive action on bottleneck process to prevent future capacity issue. 2] Optimize day to day process cost factor. 3] Plant productivity factor identification and improvement plan capacity & line flexibility. 4] Control Manpower & material cost to achieve business plan. 5] Control Plant consumable cost to achieve budgeted figure. 6] Multi-departmental support and ensure Plant level Team work. 7] Leadership for various project to ensure Quality & productivity improvement.
  • 10. NOTABLES 1] Improvement Plan capacity by productivity. 70% to 85 % 3] Scrap cost reduction 1.16% to 0.65%. 4] Manpower cost reduction [378 Nos. to 296 Nos]. 2] Plant 4S condition improvement by score 76% to 86%
  • 11. PROJECT Project Title: Plant Relocation 1] Customer information and approval 2] New Plan layout 3] Mover Finalization 4] Detail activity preparation 5] Phase wise M/c machine shifting 5] Customers QAV approval 6] SOP ROLE: PROJECT MANGAR PROJECT BUDGET:- 19.0 MILLION PROJECT COMPLETION- 17.5 MILLION ACHIEVEMENT- 1.5 MILLION(8%)
  • 12. INTERNATIONAL FOOTPRINT Leaner of Japanese language [今、 日本語 お べきよ して 今します、 JLPT の ん5 五格しました、 JLPT 4 便器ヨア して 今酒]. Hindi Japanese English Global BPS training for Production Managers’ Held at Japan in 2018 Asian Quality circle convention’- Taiwan in 2016. Asian Quality circle convention Thailand in 2012.
  • 13. LANGUAGE KNOWN Leaner of Japanese language [今、 日本語 お べきよ して 今します、 JLPT の ん5 五格しました、 JLPT 4 便器ヨア して 今酒]. Hindi Japanese English