ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Derivation of Ground Models and Characteristic
Geotechnical Profiles in Offshore Wind Farms at pre-
FID stage
V A Terente, M J Owen, D M Higgs & G Ellery
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
• Brief Introduction to Cathie Associates
• Background and Key Terminology
• Pre - FID
• Ground Risk and Ground Models
• Geotechnical Profiles
• The Challenge of Deriving Ground Models for Offshore Windfarm Investment Decisions
• Current Practise for Investigations and Modelling
• Proposed Implementation Approach for Integrated Ground Models
• Adequate Specification of Surveys
• Geotechnical Interpretation and Unitisation
• Geophysical Data interpretation & Integration
• Application of required design codes for UB, LB, BE
• Project Example
Contents
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Cathie Associates
• Offshore Geotechnical Engineers, Geophysicists,
GIS Specialists and Engineering Geologists
• Medium size firm; one of the few offshore
European specialists with worldwide experience
(~50 staff)
• Offices in the UK, Belgium, France, Italy and
Germany
• Trusted by leading developers, operators and
contractors for our integrity and expertise
• Pushing the frontiers of offshore technology
http://www.cathie-associates.com/
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Background and Key Terminology
Pre-FID: Pre – Funding Investment Decision for
Offshore Wind Farms
1.5 – 2.5 Million Euro/MW or >1Billion Euro for a typical 100no. 6MW Turbine
development
Pre – FID Ground Models
http://www.bizmdosw.org/
UK trade and Investment 2015
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Background and Key Terminology
Ground Risk = Investment Risk
• The costs of foundation and cable
installation is approximately 30% of a
typical Offshore Windfarm.
• Controlling Ground Risk at an early stage is
is key for:
• Defining the right foundation solution
• Assess cable installation
requirements
• Complete the preliminary design of
foundations
• Quantifying material and construction
costs, etc.
Pre – FID Ground Models
http://www.bizmdosw.org/us-offshore-wind-faq/
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Background and Key Terminology
Ground Models
Fookes (1997) : ‘A representation of the
geology of a particular location...’
Author (applied to offshore wind
farms):
‘A spatial model of geological formations,
sufficiently robust as to allow an
assessment of their variability’
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Background and Key
Terminology
Geotechnical Profiles
‘Extrapolated Geotechnical
property profiles at turbine
locations’
Must be sufficiently accurate
as to allow the preliminary
sizing of foundations, or the
assessment of geotechnical
risks’
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
The Challenge of Deriving Suitable Ground Models:
Scale and Geological Complexity of Offshore Wind farms
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Current Practise
Ground Models for
Offshore Windfarms
OSIG - Guidance notes for
the planning and execution of
geophysical and geotechnical
ground investigations for
offshore renewable energy
developments, 2014
Pre-FID
Desk study > Preliminary GI >
Detailed GI > Pre-FID Ground
Model
Pre – FID Ground Models
OSIG Guidance notes for the planning and execution of geophysical and geotechnical ground investigations for offshore renewable energy developments, 2014
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Proposed Implementation
Approach
• Adequate Specification of
Surveys
• Geotechnical Interpretation and
Unitisation
• Geophysical Data interpretation
& Integration
Key targets:
• Determine Geological Unit
Boundaries
• Assign Geotechnical Profiles to
Each Unit
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Proposed Approach for Integrated
Ground Models
Adequate specification of surveys
• Vessel capability (downtime/weather
sensitivity)
• GI standards
• Sampling strategy
• Drilling requirements
• In situ testing
• Laboratory tests
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Proposed Approach for Integrated Ground Models
Geotechnical Interpretation and Unitisation
http://offshorewind.rvo.nl/file/download/43061512
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Proposed Approach for Integrated Ground Models
Geotechnical Interpretation and Unitisation
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Proposed Approach for Integrated Ground
Models
Geophysical Data Interpretation and
Integration
Pre – FID Ground Models
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Application of required design codes for UB, LB, BE
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Pre-FID Geotechnical Profiles
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Example Project – Hornsea OWF
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Example Project – Hornsea OWF
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Conclusions
• Implementation Method for the derivation of
Ground profiles based on:
1. Robust desk based ground model
2. Adequate specification of surveys
3. Integration of interpreted geophysical
and geotechnical data
4. Robust statistical assessment
5. Application of specific design codes
Key Outputs:
• Geological unit boundaries
• Extrapolated geotechnical profiles at each
turbine location
ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage
Pre – FID Ground Models
Thanks
Victor Terente
victor.terente@cathie-associates.com
www.Cathie-associates.com
1 von 20

Recomendados

Siteanalysisexample von
SiteanalysisexampleSiteanalysisexample
Siteanalysisexamplehedi_sahdi
41 views11 Folien
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti von
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiB2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiIceland Geothermal
119 views11 Folien
LinkedIn_Golder_Project_Experience von
LinkedIn_Golder_Project_ExperienceLinkedIn_Golder_Project_Experience
LinkedIn_Golder_Project_ExperienceAndrew Burton
114 views2 Folien
Ministry of-mines-and-steel-devt von
Ministry of-mines-and-steel-devtMinistry of-mines-and-steel-devt
Ministry of-mines-and-steel-devtLanre Bankole
532 views45 Folien
Minerals Sector Presentation - 12th Plan (2012 - 2017) von
Minerals Sector Presentation - 12th Plan (2012 - 2017)Minerals Sector Presentation - 12th Plan (2012 - 2017)
Minerals Sector Presentation - 12th Plan (2012 - 2017)NITI Aayog
2.1K views26 Folien
Neil Coyne and Anthony Jones - Data collection and presentation tools in real... von
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...IES / IAQM
190 views19 Folien

Más contenido relacionado

Similar a Pre fid ground profiles terente et all_isope 2016

Geoscience in Offshore Renewables von
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore RenewablesFarida Ismayilova
33 views39 Folien
Project Route Map - OMC South Kaliapani Chromite UG Mine von
Project Route Map - OMC South Kaliapani Chromite UG MineProject Route Map - OMC South Kaliapani Chromite UG Mine
Project Route Map - OMC South Kaliapani Chromite UG MineTapas Das
1.2K views34 Folien
EOR vs. Storage, Ed Steadman, EERC von
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCGlobal CCS Institute
921 views42 Folien
4th Year Project Proposal Presentation von
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentationewanbaird
648 views16 Folien
CV Colin Little_June2016 von
CV Colin Little_June2016CV Colin Little_June2016
CV Colin Little_June2016Colin Little
1.4K views16 Folien
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process... von
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Sergio A. Guerra
197 views28 Folien

Similar a Pre fid ground profiles terente et all_isope 2016(20)

Project Route Map - OMC South Kaliapani Chromite UG Mine von Tapas Das
Project Route Map - OMC South Kaliapani Chromite UG MineProject Route Map - OMC South Kaliapani Chromite UG Mine
Project Route Map - OMC South Kaliapani Chromite UG Mine
Tapas Das1.2K views
4th Year Project Proposal Presentation von ewanbaird
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentation
ewanbaird648 views
CV Colin Little_June2016 von Colin Little
CV Colin Little_June2016CV Colin Little_June2016
CV Colin Little_June2016
Colin Little1.4K views
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process... von Sergio A. Guerra
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Using Physical Modeling to Refine Downwash Inputs to AERMOD at a Food Process...
Sergio A. Guerra197 views
Evaluation of the Theoretical Problems with Building Downwash Using A New Met... von Sergio A. Guerra
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Sergio A. Guerra944 views
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions von Sergio A. Guerra
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building DimensionsEvaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Sergio A. Guerra82 views
Ianson von NASAPMC
IansonIanson
Ianson
NASAPMC13.6K views

Último

IWISS Catalog 2022 von
IWISS Catalog 2022IWISS Catalog 2022
IWISS Catalog 2022Iwiss Tools Co.,Ltd
24 views66 Folien
13_DVD_Latch-up_prevention.pdf von
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdfUsha Mehta
9 views16 Folien
Stone Masonry and Brick Masonry.pdf von
Stone Masonry and Brick Masonry.pdfStone Masonry and Brick Masonry.pdf
Stone Masonry and Brick Masonry.pdfMohammed Abdullah Laskar
19 views6 Folien
Art of Writing Research article slide share.pptx von
Art of Writing Research article slide share.pptxArt of Writing Research article slide share.pptx
Art of Writing Research article slide share.pptxsureshc91
14 views42 Folien
Object Oriented Programming with JAVA von
Object Oriented Programming with JAVAObject Oriented Programming with JAVA
Object Oriented Programming with JAVADemian Antony D'Mello
64 views28 Folien
Electrical Crimping von
Electrical CrimpingElectrical Crimping
Electrical CrimpingIwiss Tools Co.,Ltd
20 views22 Folien

Último(20)

13_DVD_Latch-up_prevention.pdf von Usha Mehta
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf
Usha Mehta9 views
Art of Writing Research article slide share.pptx von sureshc91
Art of Writing Research article slide share.pptxArt of Writing Research article slide share.pptx
Art of Writing Research article slide share.pptx
sureshc9114 views
Machine Element II Course outline.pdf von odatadese1
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdf
odatadese16 views
cloud computing-virtualization.pptx von RajaulKarim20
cloud computing-virtualization.pptxcloud computing-virtualization.pptx
cloud computing-virtualization.pptx
RajaulKarim2082 views
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) von Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... von AakashShakya12
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
AakashShakya1245 views

Pre fid ground profiles terente et all_isope 2016

  • 1. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre- FID stage V A Terente, M J Owen, D M Higgs & G Ellery
  • 2. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage • Brief Introduction to Cathie Associates • Background and Key Terminology • Pre - FID • Ground Risk and Ground Models • Geotechnical Profiles • The Challenge of Deriving Ground Models for Offshore Windfarm Investment Decisions • Current Practise for Investigations and Modelling • Proposed Implementation Approach for Integrated Ground Models • Adequate Specification of Surveys • Geotechnical Interpretation and Unitisation • Geophysical Data interpretation & Integration • Application of required design codes for UB, LB, BE • Project Example Contents
  • 3. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Cathie Associates • Offshore Geotechnical Engineers, Geophysicists, GIS Specialists and Engineering Geologists • Medium size firm; one of the few offshore European specialists with worldwide experience (~50 staff) • Offices in the UK, Belgium, France, Italy and Germany • Trusted by leading developers, operators and contractors for our integrity and expertise • Pushing the frontiers of offshore technology http://www.cathie-associates.com/
  • 4. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Background and Key Terminology Pre-FID: Pre – Funding Investment Decision for Offshore Wind Farms 1.5 – 2.5 Million Euro/MW or >1Billion Euro for a typical 100no. 6MW Turbine development Pre – FID Ground Models http://www.bizmdosw.org/ UK trade and Investment 2015
  • 5. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Background and Key Terminology Ground Risk = Investment Risk • The costs of foundation and cable installation is approximately 30% of a typical Offshore Windfarm. • Controlling Ground Risk at an early stage is is key for: • Defining the right foundation solution • Assess cable installation requirements • Complete the preliminary design of foundations • Quantifying material and construction costs, etc. Pre – FID Ground Models http://www.bizmdosw.org/us-offshore-wind-faq/
  • 6. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Background and Key Terminology Ground Models Fookes (1997) : ‘A representation of the geology of a particular location...’ Author (applied to offshore wind farms): ‘A spatial model of geological formations, sufficiently robust as to allow an assessment of their variability’ Pre – FID Ground Models
  • 7. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Background and Key Terminology Geotechnical Profiles ‘Extrapolated Geotechnical property profiles at turbine locations’ Must be sufficiently accurate as to allow the preliminary sizing of foundations, or the assessment of geotechnical risks’ Pre – FID Ground Models
  • 8. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage The Challenge of Deriving Suitable Ground Models: Scale and Geological Complexity of Offshore Wind farms Pre – FID Ground Models
  • 9. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Current Practise Ground Models for Offshore Windfarms OSIG - Guidance notes for the planning and execution of geophysical and geotechnical ground investigations for offshore renewable energy developments, 2014 Pre-FID Desk study > Preliminary GI > Detailed GI > Pre-FID Ground Model Pre – FID Ground Models OSIG Guidance notes for the planning and execution of geophysical and geotechnical ground investigations for offshore renewable energy developments, 2014
  • 10. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Proposed Implementation Approach • Adequate Specification of Surveys • Geotechnical Interpretation and Unitisation • Geophysical Data interpretation & Integration Key targets: • Determine Geological Unit Boundaries • Assign Geotechnical Profiles to Each Unit Pre – FID Ground Models
  • 11. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Proposed Approach for Integrated Ground Models Adequate specification of surveys • Vessel capability (downtime/weather sensitivity) • GI standards • Sampling strategy • Drilling requirements • In situ testing • Laboratory tests Pre – FID Ground Models
  • 12. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Proposed Approach for Integrated Ground Models Geotechnical Interpretation and Unitisation http://offshorewind.rvo.nl/file/download/43061512 Pre – FID Ground Models
  • 13. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Proposed Approach for Integrated Ground Models Geotechnical Interpretation and Unitisation Pre – FID Ground Models
  • 14. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Proposed Approach for Integrated Ground Models Geophysical Data Interpretation and Integration Pre – FID Ground Models
  • 15. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Application of required design codes for UB, LB, BE
  • 16. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Pre-FID Geotechnical Profiles
  • 17. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Example Project – Hornsea OWF
  • 18. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Example Project – Hornsea OWF
  • 19. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Conclusions • Implementation Method for the derivation of Ground profiles based on: 1. Robust desk based ground model 2. Adequate specification of surveys 3. Integration of interpreted geophysical and geotechnical data 4. Robust statistical assessment 5. Application of specific design codes Key Outputs: • Geological unit boundaries • Extrapolated geotechnical profiles at each turbine location
  • 20. ISOPE, Rhodes 2016 Derivation of Ground Models and Characteristic Geotechnical Profiles in Offshore Wind Farms at pre-FID stage Pre – FID Ground Models Thanks Victor Terente victor.terente@cathie-associates.com www.Cathie-associates.com