1. Lab 10: Boom Construction
Competition
EG1003 Section F1
Date of Experiment: November 12th, 2014
Date Due: November 16th, 2014
D’Asia Fleming, Tia Moore, Tyler Simon
3. Experimental Objective
• Design and construct boom
• Enter boom in competition against other booms
• Learn how booms are used and factors
considers while designing
• Create a boom that extends 1.5 meters from the
edge of the anchor
4. Introduction
• Booms lift and move heavy loads
– Loads even heavier than the actual boom
• Some examples of booms
– Cantilever Boom
– Rotating Boom
– Telescoping Forklift Boom
– Architecture Boom
Figure 1: Queensboro
Bridge (double cantilever)
5. Background Information
• When constructing a boom engineers must be
aware of stress and strain
• Stress is the external force acting upon an object
• Strain is the measure of deformation cause by
stress
10. Procedure
Figure 4: Formula used to calculate the weight ratio
Figure 5: Formula used to find the design ratio
11. Data/Observation
Boom Construction Competition
Section Date
F1 11/12/2014
Boom Wt. Boom Length Anchor Time Wt. Held
Meriam, Michaela, Ashley
245.00 g 1.50 m 31.00 s 222.00 g
Unweighted
Ratio:
0.91
Weighted
Ratio:
0.89 Rank: 2
Lucindia, Giselle, Anisa
252.00 g 1.50 m 120.00 s 357.00 g
Unweighted
Ratio:
1.42
Weighted
Ratio:
0.57 Rank: 4
Ciarra, Alexia, Leane
241.00 g 1.50 m 70.00 s 332.00 g
Unweighted
Ratio:
1.38
Weighted
Ratio:
0.83 Rank: 3
Tia, D'Asia, Tyler
273.00 g 1.45 m 120.00 s 0.00 g
Unweighted
Ratio:
0.00
Weighted
Ratio:
0.00 Rank: 5
Delisa, Veronica, Ayshia
215.00 g 1.53 m 10.00 s 212.00 g
Unweighted
Ratio:
0.99
Weighted
Ratio:
1.51 Rank: 1
Anna, Tahamina, Brianna
222.00 g 0.00 m 0.00 s 0.00 g
Unweighted
Ratio:
0.00
Weighted
Ratio:
0.00 Rank: 5
12. Results
• Our boom was tied in 5th
place.
– Weight of boom: 273.000g
– Anchor time 120 sec.
– Length 1.45 m
Figure 6: Final boom design
13. Conclusion
• Boom came in 5th place
• Future improvements include:
- Build a stronger boom
- Test trial the design before entering it into
the competition
- Plan out time
14. Lab 10: Boom Construction
Competition
EG1003 Section F1
Date of Experiment: November 12th, 2014
Date Due: November 16th, 2014
D’Asia Fleming, Tia Moore, Tyler Simon