Permeable
Paving
by
Tom Barrett
Green Water Infrastructure, Inc.


www.ThinkGWI.com
Follow on Twitter @TomBarrett_GWI
(317) 674-3494
                                    Copyright © Tom Barrett, 2011
                                    All Rights Reserved
TheGREEN
Economy
LOW IMPACT SITE DEVELOPMENT
How Much Rain Falls in Chicago?

January 
     - 
 1.86"   Image of Rain Falling
February 
    - 
 1.58"
March
        - 
 2.59"
April
        - 
 3.28"
May
          - 
 3.75"
June
         - 
4.08"
July 
        - 
 3.39"
August 
      - 
 3.38"
September 
   - 
 2.91"
October 
     - 2.65"
November 
    - 
2.09"
December 
    - 
1.88"
Total
        
 33.44"
Thirty Year Average Monthly Rain Fall Chicago (1971 - 2000)
         5.00




         3.75
Inches




         2.50




         1.25




           0
           January   February   March    April    May      June           July   August   September   October   November   December
                                                                  Month




                                        Graph of Chicago Rain Fall
How Much Water Falls in Chicago?
                     2,500 sq. ft. Roof

January 
 - 
 ,727 gallons
               2                    Image of Rain Falling
February 
 - 
 ,540
               2
March
     - 
 ,130
               4
April
     - 5,735
May
       - 
 ,268
               5
June
      - 
 5,657
July 
     - 
 ,470
               5
August 
   - 
 ,200
               7
September
- 
 ,096
               5
October 
 - 
 ,223
               4
November 
- 
 4,691
December 
- 3,787
Total 
      
 6,525
             5
How Much Water Falls in Chicago?
                   ¼ Acre Residential Property

January 
     - 
1,880 gallons
                  1                     Image of Rain Falling
February 
    - 
1,065
                  1
March
        - 
 7,990
                  1
April
        - 24,982
May
          - 
 2,945
                  2
June
         - 
 24,642
July 
        - 
 3,828
                  2
August 
      - 
 1,363
                  3
September 
   - 
 2,199
                  2
October 
     - 
 8,397
                  1
November 
    - 
 20,434
December 
    - 16,496
Total 
         
 46,221
                2
How Much Water Falls in Chicago?
                 3 Acre Commercial Property

January 
 - 
 42,560 gallons
               1                     Image of Rain Falling
February 
 - 
 32,784
               1
March
     - 
 15,876
               2
April
     - 299,783
May
       - 
 75,344
               2
June
      - 
 295,710
July 
     - 
 85,934
               2
August 
   - 
 76,358
               3
September 
- 
 66,383
               2
October 
 - 
 20,764
               2
November 
 - 
 245,203
December 
 - 197,954
Total 
     2,954,654
How Much Water Falls in Chicago?
                           City Block
                    (660’ x 660’ – 10 acres)
January 
 - 
 75,195 gallons
                4
February 
 - 
 42,610
                4
March
     - 
 19,581
                7
April
     - 999,267
May
       - 
 17,805
                9
June
      - 
 985,690
July 
     - 
 53,105
                9
August 
   - 
 ,254,515
             1
September 
- 
 87,936
                8
October 
 - 
 35,873
                7
November 
 - 
 817,335
December 
 - 659,842
Total 
      9,848,756
How Much Water is in Rain Event?
                 ¼” Rain       ½” Rain        1” Rain

2,500 ft. sq.   390 gallons   779 gallons   1,558 gallons
Roof

¼ Acre            1,697         3,994          67,789
Residential
Property
3 Acre            20,366        40,731        135,770
Commercial
Property
Chicago City      67,885       135,770        271,540
Block
Landscape Ecology

Size the landscape to the
80% of the average rain
water production.
– Roof Runoff

– Hardscape Runoff

Balancing rain water to
  landscape creates a
  functional landscape that
  utilizes the site’s water
  production.
Stormwater Mitigation
Stormwater Mitigation

Stormwater Mitigation

Stormwater Mitigation

Stormwater Mitigation
Stormwater Mitigation

– Collection runoff near the
  source

– Slow it down

– Soak it in

– Filter it

– Apply it to the landscape

– Create habitats
Peak Flow
                   (1 Acre Site)
                           Grass Field          Roof

1 Year Storm                  1.4 cfs          4.3 cfs
2 Year Storm                  2.1 cfs          5.4 cfs
10 Year Storm                 4.3 cfs          8.0 cfs
25 Year Storm                 5.7 cfs          9.5 cfs
100 Year Storm                8.0 cfs          12.0 cfs


                 cfs – cubic feet per second
Peak Flow
                  (1 Acre Site)
                         Grass Field         Roof

1 Year Storm               10.5 gps         32.2 gps
2 Year Storm               15.7 gps         40.4 gps
10 Year Storm              32.2 gps         59.8 gps
25 Year Storm              42.6 gps         71.1 gps
100 Year Storm             59.8 gps         89.8 gps


                 gps – gallons per second
Peak Flow
                   (1 Acre Site)
                         Grass Field          Roof

1 Year Storm               630 gpm          1,932 gpm
2 Year Storm               942 gpm          2,424 gpm
10 Year Storm             1,932 gpm         3,588 gpm
25 Year Storm             2,556 gpm         4,266 gpm
100 Year Storm            3,588 gpm         5,388 gpm


                 gpm – gallons per minute
Peak Flow
                 (2,500 sq. ft. Roof)
                            Grass Field          Roof

1 Year Storm                  0.08 cfs          0.25 cfs
2 Year Storm                  0.12 cfs          0.31 cfs
10 Year Storm                 0.25 cfs          0.46 cfs
25 Year Storm                 0.33 cfs          0.55 cfs
100 Year Storm                0.46 cfs          0.69 cfs


                  cfs – cubic feet per second
Peak Flow
                 (2,500 sq. ft. Roof)
                           Grass Field         Roof

1 Year Storm                 0.60 gps         1.85 gps
2 Year Storm                 0.90 gps         2.32 gps
10 Year Storm                1.85 gps         3.43 gps
25 Year Storm                2.44 gps         4.08 gps
100 Year Storm               3.43 gps         5.15 gps


                   gps – gallons per second
Peak Flow
                 (2,500 ft. sq. Roof)
                           Grass Field         Roof

1 Year Storm                  36 gpm          111 gpm
2 Year Storm                  54 gpm          139 gpm
10 Year Storm                111 gpm          206 gpm
25 Year Storm                147 gpm          245 gpm
100 Year Storm               206 gpm          309 gpm


                   gpm – gallons per minute
Change in Peak Runoff Flow Before and after Development
   300%


   225%


   150%


    75%


     0%
    1 Year Storm Year Storm Year Storm Year Storm Year Storm
               2          10        25        100



          Stormwater Effects of Urbanization
Detention and Volume Control


  Stormwater Mitigation


  Detention Underneath


  Elimination of Detention
  Ponds
How Much Water ?

  Rainfall   Surface Area   Water Volume


   1/4”       43,560 ft2    6,800 gallons


   1/2”       43,560 ft2    13,600 gallons


    1”        43,560 ft2    27,200 gallons
Base Storage Capacity
                                        Storage
Base Depth Surface Area Void Space
                                        Capacity

   12”       43,560 ft2    40%       130,300 gallons


   18”       43,560 ft2    40%       195,500 gallons


   24”       43,560 ft2    40%       260,700 gallons
Infiltration

 Replenishes the
 Groundwater Supply
 Currently 50% of our
 Drinking Water
 In the Future 80% of
 our Drinking Water
Soil Infiltration Rates
     Soil Texture   Infiltration (in/hour)
 Sand                        8.30”
 Loamy Sand                  2.41”
 Sandy Loam                  1.02”
 Loam                        0.52”
 Silt Loam                   0.27”
 Sandy Clay Loam             0.17”
 Clay Loam                   0.09”
 Silty Clay Loam             0.09”
 Clay                        0.06”
Improved Water Quality

Removes Suspended
Solids
Removes Phosphorus,
Nitrogen, and Metals
Removes Harmful
Pollutants - Oil
Water Polishing - the final
step in cleaning
Pollutant Removal
             Pollutant                      Median Pollutant Removal*
 Suspended Solids
                                                      95%
 Phosphorus
                                                      70%
 Nitrogen
                                                      51%
 Metals
                                                      99%

 *Infiltration Trenches & Porous Pavement
Roadside Traction



Less Water
Roadside Traction



Less Ice
Design Considerations
Rainfall Intensity
Rainfall Duration
Runoff Coefficient is
Zero
Underdrain for Soil
Infiltration Rates of less
than 1/2” per Hour
Release Rate
strength, no-
units instead
ver options,
he Americans
ents, and allows
ration.
                      2
                                                      4




.8
ead of sand,
                          1
d additional
ting bed
0” (12,700 mm )               3                   7
t be avoided as
                                      4


                                                  9
                                          5


                                                      6
                                  8
r ASTM No. 2,
                                              6
ness. Installation
y on sites with
m ) is required for

ust be designed
ature, the ASTM
 r runoff in the
 also has an
UNILOCK PERMEABLE INTERLOCKING
                                                                                         Nine Components of a Highly Successful
Components of Permeable
1
        CONCRETE PAVER
        With various aesthetically pleasing colors and textures, creative
        choices are not compromised by function. Permeable Interlocking
        Concrete Pavers (PICPs) are the most durable of any porous pavement
                                                                                         Permeable Pavement

Pavement
        material. Unilock’s minimum 8,500 psi (57 MPa), high-strength, no-
        slump concrete allows water to infiltrate between paver units instead
        of through the material. The joint sizes vary between paver options,
        ranging from 0.25” (6 mm ) to 0.5” (13 mm ), which meet the Americans
        with Disabilities Act specifications for permeable pavements, and allows
        a minimum of 100” (2,540 mm ) per hour of surface infiltration.
                                                                                                       2


1) Pavement
3       SETTING BED AGGREGATE – ASTM NO. 8
2) Joint Aggregate
        Using the 0.25” (6 mm ) crushed, angular, chip stone, instead of sand,
        provides a smooth leveling course for placing pavers and additional
                                                                                                           1

        structural interlocking of the PICPs. Unlike sand, the setting bed
        aggregate allows for rapid water infiltration with over 500” (12,700 mm )                               3                       7

3) Setting Bed
        per hour through the 40 percent void-space. Sand must be avoided as
        a setting bed in a PICP application.                                                                           4


   Aggregate                                                                                                               5
                                                                                                                                       9




4) SUBBASE AGGREGATE – ASTM NO. 2
5     Base Aggregate
        Subsoil conditions will dictate the necessity of this larger ASTM No. 2,
                                                                                                                   8
                                                                                                                               6
        crushed, angular, open-graded subbase aggregate thickness. Installation
        of such material will provide increased structural stability on sites with
5) Subbase
        poor soil conditions. A minimum thickness of 8” (203 mm ) is required for
        effective performance. Subbase aggregate thickness must be designed
        to sufficiently support anticipated loads. As an added feature, the ASTM
   Aggregate
        No. 2 subbase aggregate temporarily detains stormwater runoff in the
        40 percent void-space of the material. The ASTM No. 2 also has an
        infiltration rate of over 500” (12,700 mm ) per hour.




    7    EDGE RESTRAINT                                                              8    UNDERDRAIN                           9   GEOTEXTILE FABRIC
Pavement

• Pavers
• Concrete
• Asphalt
• Single-sized
 Aggregate
• Resin Bound
Joint Aggregate

• Pavers only
• Initial Filter
• 1/4” crushed,
  angular, chip stone
• ASTM No. 8
Setting Bed Aggregate

• Used in all systems
• Smooth Leveling
 Course
• No Sand
• ASTM No. 8
Base Aggregate

• Used when subsoil
 conditions allow
• Minimum thickness
 4”
• ASTM No. 57
Subbase Aggregate

• Not always
 necessary
• Dictated by Subsoil
 Conditions
• Used for additional
 structural stability
• ASTM No. 2
Subgrade

• Existing Soil
• Percolation
• California Bearing
 Ratio
• Penetrometer
Edge Restraint

• Vitally Important
• Concrete Curb for
 Vehicular Traffic
• Plastic may be
 Sufficient for Non-
 vehicular areas.
Underdrain Pipe

• Subsoil Permeablity
• Detention
 Requirements
• Release Rates
• Not Always
 Necessary
Geotextile Fabric

• Based Upon Existing
 Soil Characteristics


• Between Subsoil and
 Base Aggregate
UNILOCK PERMEABLE INTERLOCKING
                                                                                         Nine Components of a Highly Successful
Components of Permeable
1
        CONCRETE PAVER
        With various aesthetically pleasing colors and textures, creative
        choices are not compromised by function. Permeable Interlocking
        Concrete Pavers (PICPs) are the most durable of any porous pavement
                                                                                         Permeable Pavement

Pavement
        material. Unilock’s minimum 8,500 psi (57 MPa), high-strength, no-
        slump concrete allows water to infiltrate between paver units instead
        of through the material. The joint sizes vary between paver options,
        ranging from 0.25” (6 mm ) to 0.5” (13 mm ), which meet the Americans
        with Disabilities Act specifications for permeable pavements, and allows
        a minimum of 100” (2,540 mm ) per hour of surface infiltration.
                                                                                                       2


1) Pavement
3       SETTING BED AGGREGATE – ASTM NO. 8
2) Joint Aggregate
        Using the 0.25” (6 mm ) crushed, angular, chip stone, instead of sand,
        provides a smooth leveling course for placing pavers and additional
                                                                                                           1

        structural interlocking of the PICPs. Unlike sand, the setting bed
        aggregate allows for rapid water infiltration with over 500” (12,700 mm )                               3                       7

3) Setting Bed
        per hour through the 40 percent void-space. Sand must be avoided as
        a setting bed in a PICP application.                                                                           4


   Aggregate                                                                                                               5
                                                                                                                                       9




4) SUBBASE AGGREGATE – ASTM NO. 2
5     Base Aggregate
        Subsoil conditions will dictate the necessity of this larger ASTM No. 2,
                                                                                                                   8
                                                                                                                               6
        crushed, angular, open-graded subbase aggregate thickness. Installation
        of such material will provide increased structural stability on sites with
5) Subbase
        poor soil conditions. A minimum thickness of 8” (203 mm ) is required for
        effective performance. Subbase aggregate thickness must be designed
        to sufficiently support anticipated loads. As an added feature, the ASTM
   Aggregate
        No. 2 subbase aggregate temporarily detains stormwater runoff in the
        40 percent void-space of the material. The ASTM No. 2 also has an
        infiltration rate of over 500” (12,700 mm ) per hour.




    7    EDGE RESTRAINT                                                              8    UNDERDRAIN                           9   GEOTEXTILE FABRIC
strength, no-
units instead
ver options,
he Americans
ents, and allows
ration.
                      2
                                                      4




.8
ead of sand,
                          1
d additional
ting bed
0” (12,700 mm )               3                   7
t be avoided as
                                      4


                                                  9
                                          5


                                                      6
                                  8
r ASTM No. 2,
                                              6
ness. Installation
y on sites with
m ) is required for

ust be designed
ature, the ASTM
 r runoff in the
 also has an
Police Station
Aurora, Illinois
Buckingham Fountain
Chicago, Illinois
POROUS PAVING • GREEN ROOFS • RAIN GARDENS • RAINWATER HARVESTING
NEW TOOLS FOR SUSTAINABLE SITE DEVELOPMENT
Green • Water • Infrastructure

Green • Water • Infrastructure

Green • Water • Infrastructure

Green • Water • Infrastructure

Green • Water • Infrastructure
Special Thanks
Thank You




P.O. BOX 124 WESTFIELD, INDIANA 46074
           317-674-34949

More Related Content

Viewers also liked

MODELLING AND FABRICATION OF GENEVA MECHANISM
MODELLING AND FABRICATION OF GENEVA MECHANISMMODELLING AND FABRICATION OF GENEVA MECHANISM
MODELLING AND FABRICATION OF GENEVA MECHANISMvignesh waran
 
Box transport mechanism
Box transport mechanismBox transport mechanism
Box transport mechanismawadhesh yadav
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Fairfax County
 
application of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionapplication of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionZIYAD AMBALANGADAN
 
UTM_SWMM_KAMAL
UTM_SWMM_KAMALUTM_SWMM_KAMAL
UTM_SWMM_KAMALsjyeol84
 
Transfer machines
Transfer machines Transfer machines
Transfer machines Suresh Lal
 
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Mohammed Naseeruddin Shah
 
Control Valves And Actuators
Control Valves And ActuatorsControl Valves And Actuators
Control Valves And ActuatorsBinit Goenka
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Valves presentation
Valves presentationValves presentation
Valves presentationmohdalaamri
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-omg
 

Viewers also liked (14)

MODELLING AND FABRICATION OF GENEVA MECHANISM
MODELLING AND FABRICATION OF GENEVA MECHANISMMODELLING AND FABRICATION OF GENEVA MECHANISM
MODELLING AND FABRICATION OF GENEVA MECHANISM
 
Box transport mechanism
Box transport mechanismBox transport mechanism
Box transport mechanism
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016
 
application of Direction control valve in automatic transmission
application of Direction control valve in automatic transmissionapplication of Direction control valve in automatic transmission
application of Direction control valve in automatic transmission
 
UTM_SWMM_KAMAL
UTM_SWMM_KAMALUTM_SWMM_KAMAL
UTM_SWMM_KAMAL
 
Transfer machines
Transfer machines Transfer machines
Transfer machines
 
airport drainage
airport drainageairport drainage
airport drainage
 
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
Design, Fabrication and Analysis of Crank and Slotted Lever Quick Return Mech...
 
Control Valves And Actuators
Control Valves And ActuatorsControl Valves And Actuators
Control Valves And Actuators
 
Planar Mechanisms
Planar MechanismsPlanar Mechanisms
Planar Mechanisms
 
Control valve ppt
Control valve pptControl valve ppt
Control valve ppt
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Valves presentation
Valves presentationValves presentation
Valves presentation
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
 

Similar to Permeable Paving: A New Tool for Sustainable Site Development

Women as Change Agents in the Emerging Green Economy
Women as Change Agents in the Emerging Green EconomyWomen as Change Agents in the Emerging Green Economy
Women as Change Agents in the Emerging Green EconomyTom Barrett
 
RWH for Bangalore Metro
RWH for Bangalore MetroRWH for Bangalore Metro
RWH for Bangalore Metrobiomeshubha
 
Rainwater Harvesting & Condesate Recovery(Presentation Format)
Rainwater Harvesting & Condesate Recovery(Presentation Format)Rainwater Harvesting & Condesate Recovery(Presentation Format)
Rainwater Harvesting & Condesate Recovery(Presentation Format)guestf2bf84
 
Eric Clark Hydro Final Project
Eric Clark Hydro Final ProjectEric Clark Hydro Final Project
Eric Clark Hydro Final ProjectEric Clark
 
Brian Leib, Managed Depletion Irrigation
Brian Leib, Managed Depletion IrrigationBrian Leib, Managed Depletion Irrigation
Brian Leib, Managed Depletion IrrigationMETER Group, Inc. USA
 
Weather Modification, Todd Flanagan
Weather Modification, Todd FlanaganWeather Modification, Todd Flanagan
Weather Modification, Todd FlanaganTXGroundwaterSummit
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Stormwater Management (USGBC-IL)
Stormwater Management (USGBC-IL)Stormwater Management (USGBC-IL)
Stormwater Management (USGBC-IL)Tom Barrett
 
Global disaster preparedness and response 2012 03 25 [compat
Global disaster preparedness and response 2012 03 25 [compatGlobal disaster preparedness and response 2012 03 25 [compat
Global disaster preparedness and response 2012 03 25 [compatmarx christian sorino
 
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterHydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterTXGroundwaterSummit
 
Rainwater harvesting & irrigation
Rainwater harvesting & irrigationRainwater harvesting & irrigation
Rainwater harvesting & irrigationseanmullarkey
 
SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KIndia Water Portal
 
All purpose worksheet (conversions)
All purpose worksheet (conversions)All purpose worksheet (conversions)
All purpose worksheet (conversions)Sunil Girdhar
 

Similar to Permeable Paving: A New Tool for Sustainable Site Development (15)

Women as Change Agents in the Emerging Green Economy
Women as Change Agents in the Emerging Green EconomyWomen as Change Agents in the Emerging Green Economy
Women as Change Agents in the Emerging Green Economy
 
KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .
 
RWH for Bangalore Metro
RWH for Bangalore MetroRWH for Bangalore Metro
RWH for Bangalore Metro
 
Rainwater Harvesting & Condesate Recovery(Presentation Format)
Rainwater Harvesting & Condesate Recovery(Presentation Format)Rainwater Harvesting & Condesate Recovery(Presentation Format)
Rainwater Harvesting & Condesate Recovery(Presentation Format)
 
Eric Clark Hydro Final Project
Eric Clark Hydro Final ProjectEric Clark Hydro Final Project
Eric Clark Hydro Final Project
 
Brian Leib, Managed Depletion Irrigation
Brian Leib, Managed Depletion IrrigationBrian Leib, Managed Depletion Irrigation
Brian Leib, Managed Depletion Irrigation
 
Weather Modification, Todd Flanagan
Weather Modification, Todd FlanaganWeather Modification, Todd Flanagan
Weather Modification, Todd Flanagan
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Stormwater Management (USGBC-IL)
Stormwater Management (USGBC-IL)Stormwater Management (USGBC-IL)
Stormwater Management (USGBC-IL)
 
Global disaster preparedness and response 2012 03 25 [compat
Global disaster preparedness and response 2012 03 25 [compatGlobal disaster preparedness and response 2012 03 25 [compat
Global disaster preparedness and response 2012 03 25 [compat
 
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterHydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
 
Prasari west bengal
Prasari west bengalPrasari west bengal
Prasari west bengal
 
Rainwater harvesting & irrigation
Rainwater harvesting & irrigationRainwater harvesting & irrigation
Rainwater harvesting & irrigation
 
SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-K
 
All purpose worksheet (conversions)
All purpose worksheet (conversions)All purpose worksheet (conversions)
All purpose worksheet (conversions)
 

More from Tom Barrett

Capture the Growth - Capitalizing on the Growth in the Landscape Industry
Capture the Growth - Capitalizing on the Growth in the Landscape IndustryCapture the Growth - Capitalizing on the Growth in the Landscape Industry
Capture the Growth - Capitalizing on the Growth in the Landscape IndustryTom Barrett
 
Retirement Plan for Small Practices
Retirement Plan for Small PracticesRetirement Plan for Small Practices
Retirement Plan for Small PracticesTom Barrett
 
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...Tom Barrett
 
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...Brave New World - Trends & Opportunities in the Emerging Green Environment (O...
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...Tom Barrett
 
Internet Marketing & Social Media Presentation for Irrigation Contractors
Internet Marketing & Social Media Presentation for Irrigation ContractorsInternet Marketing & Social Media Presentation for Irrigation Contractors
Internet Marketing & Social Media Presentation for Irrigation ContractorsTom Barrett
 
Holeman Landscapes Before and After
Holeman Landscapes Before and AfterHoleman Landscapes Before and After
Holeman Landscapes Before and AfterTom Barrett
 
Escape Garden Design Tranquility Corner - A Garden to Awake the Senses
Escape Garden Design Tranquility Corner - A Garden to Awake the SensesEscape Garden Design Tranquility Corner - A Garden to Awake the Senses
Escape Garden Design Tranquility Corner - A Garden to Awake the SensesTom Barrett
 
Bridge the Gap Villages - Fiji
Bridge the Gap Villages - FijiBridge the Gap Villages - Fiji
Bridge the Gap Villages - FijiTom Barrett
 
Windridge Condo Stormwater Study (4 16-2012)
Windridge Condo Stormwater Study (4 16-2012)Windridge Condo Stormwater Study (4 16-2012)
Windridge Condo Stormwater Study (4 16-2012)Tom Barrett
 
Trends in the Landscape Industry (ITODA)
Trends in the Landscape Industry (ITODA)Trends in the Landscape Industry (ITODA)
Trends in the Landscape Industry (ITODA)Tom Barrett
 
Brave New World: Trends & Opportunities in the Emerging Green Environment(IT...
Brave New World:  Trends & Opportunities in the Emerging Green Environment(IT...Brave New World:  Trends & Opportunities in the Emerging Green Environment(IT...
Brave New World: Trends & Opportunities in the Emerging Green Environment(IT...Tom Barrett
 
Why a Website? Why not Camel? I would Walk a Mile for Camel.
Why a Website? Why not Camel? I would Walk a Mile for Camel.Why a Website? Why not Camel? I would Walk a Mile for Camel.
Why a Website? Why not Camel? I would Walk a Mile for Camel.Tom Barrett
 
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)Native Plants for Rain Gardens from Fischer Design (April 23, 2011)
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)Tom Barrett
 
Rain Garden Construction from Frazee Gardens (April 23, 2011)
Rain Garden Construction from Frazee Gardens (April 23, 2011)Rain Garden Construction from Frazee Gardens (April 23, 2011)
Rain Garden Construction from Frazee Gardens (April 23, 2011)Tom Barrett
 
Tenbarge Seed Presentation - Trends in the Landscape Industry
Tenbarge Seed Presentation - Trends in the Landscape IndustryTenbarge Seed Presentation - Trends in the Landscape Industry
Tenbarge Seed Presentation - Trends in the Landscape IndustryTom Barrett
 
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)Tom Barrett
 
Irrigation Association State Affairs Indiana Presentation(02 15-2011)
Irrigation Association State Affairs Indiana Presentation(02 15-2011)Irrigation Association State Affairs Indiana Presentation(02 15-2011)
Irrigation Association State Affairs Indiana Presentation(02 15-2011)Tom Barrett
 
SMART Landscape Irrigation (Orlando, February 2011)
SMART Landscape Irrigation (Orlando, February 2011)SMART Landscape Irrigation (Orlando, February 2011)
SMART Landscape Irrigation (Orlando, February 2011)Tom Barrett
 
Sustainable Landscapes
Sustainable LandscapesSustainable Landscapes
Sustainable LandscapesTom Barrett
 
Resource Efficient Landscape Irrigation
Resource Efficient Landscape IrrigationResource Efficient Landscape Irrigation
Resource Efficient Landscape IrrigationTom Barrett
 

More from Tom Barrett (20)

Capture the Growth - Capitalizing on the Growth in the Landscape Industry
Capture the Growth - Capitalizing on the Growth in the Landscape IndustryCapture the Growth - Capitalizing on the Growth in the Landscape Industry
Capture the Growth - Capitalizing on the Growth in the Landscape Industry
 
Retirement Plan for Small Practices
Retirement Plan for Small PracticesRetirement Plan for Small Practices
Retirement Plan for Small Practices
 
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...
Trends and Opportunities in Growing Together (Ohio Irrigation Association Key...
 
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...Brave New World - Trends & Opportunities in the Emerging Green Environment (O...
Brave New World - Trends & Opportunities in the Emerging Green Environment (O...
 
Internet Marketing & Social Media Presentation for Irrigation Contractors
Internet Marketing & Social Media Presentation for Irrigation ContractorsInternet Marketing & Social Media Presentation for Irrigation Contractors
Internet Marketing & Social Media Presentation for Irrigation Contractors
 
Holeman Landscapes Before and After
Holeman Landscapes Before and AfterHoleman Landscapes Before and After
Holeman Landscapes Before and After
 
Escape Garden Design Tranquility Corner - A Garden to Awake the Senses
Escape Garden Design Tranquility Corner - A Garden to Awake the SensesEscape Garden Design Tranquility Corner - A Garden to Awake the Senses
Escape Garden Design Tranquility Corner - A Garden to Awake the Senses
 
Bridge the Gap Villages - Fiji
Bridge the Gap Villages - FijiBridge the Gap Villages - Fiji
Bridge the Gap Villages - Fiji
 
Windridge Condo Stormwater Study (4 16-2012)
Windridge Condo Stormwater Study (4 16-2012)Windridge Condo Stormwater Study (4 16-2012)
Windridge Condo Stormwater Study (4 16-2012)
 
Trends in the Landscape Industry (ITODA)
Trends in the Landscape Industry (ITODA)Trends in the Landscape Industry (ITODA)
Trends in the Landscape Industry (ITODA)
 
Brave New World: Trends & Opportunities in the Emerging Green Environment(IT...
Brave New World:  Trends & Opportunities in the Emerging Green Environment(IT...Brave New World:  Trends & Opportunities in the Emerging Green Environment(IT...
Brave New World: Trends & Opportunities in the Emerging Green Environment(IT...
 
Why a Website? Why not Camel? I would Walk a Mile for Camel.
Why a Website? Why not Camel? I would Walk a Mile for Camel.Why a Website? Why not Camel? I would Walk a Mile for Camel.
Why a Website? Why not Camel? I would Walk a Mile for Camel.
 
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)Native Plants for Rain Gardens from Fischer Design (April 23, 2011)
Native Plants for Rain Gardens from Fischer Design (April 23, 2011)
 
Rain Garden Construction from Frazee Gardens (April 23, 2011)
Rain Garden Construction from Frazee Gardens (April 23, 2011)Rain Garden Construction from Frazee Gardens (April 23, 2011)
Rain Garden Construction from Frazee Gardens (April 23, 2011)
 
Tenbarge Seed Presentation - Trends in the Landscape Industry
Tenbarge Seed Presentation - Trends in the Landscape IndustryTenbarge Seed Presentation - Trends in the Landscape Industry
Tenbarge Seed Presentation - Trends in the Landscape Industry
 
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)
Brave New World: Trends in the Landscape Irrigation IICC (02-115-2-2011)
 
Irrigation Association State Affairs Indiana Presentation(02 15-2011)
Irrigation Association State Affairs Indiana Presentation(02 15-2011)Irrigation Association State Affairs Indiana Presentation(02 15-2011)
Irrigation Association State Affairs Indiana Presentation(02 15-2011)
 
SMART Landscape Irrigation (Orlando, February 2011)
SMART Landscape Irrigation (Orlando, February 2011)SMART Landscape Irrigation (Orlando, February 2011)
SMART Landscape Irrigation (Orlando, February 2011)
 
Sustainable Landscapes
Sustainable LandscapesSustainable Landscapes
Sustainable Landscapes
 
Resource Efficient Landscape Irrigation
Resource Efficient Landscape IrrigationResource Efficient Landscape Irrigation
Resource Efficient Landscape Irrigation
 

Recently uploaded

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 

Recently uploaded (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 

Permeable Paving: A New Tool for Sustainable Site Development

  • 1. Permeable Paving by Tom Barrett Green Water Infrastructure, Inc. www.ThinkGWI.com Follow on Twitter @TomBarrett_GWI (317) 674-3494 Copyright © Tom Barrett, 2011 All Rights Reserved
  • 3. LOW IMPACT SITE DEVELOPMENT
  • 4.
  • 5. How Much Rain Falls in Chicago? January - 1.86" Image of Rain Falling February - 1.58" March - 2.59" April - 3.28" May - 3.75" June - 4.08" July - 3.39" August - 3.38" September - 2.91" October - 2.65" November - 2.09" December - 1.88" Total 33.44"
  • 6. Thirty Year Average Monthly Rain Fall Chicago (1971 - 2000) 5.00 3.75 Inches 2.50 1.25 0 January February March April May June July August September October November December Month Graph of Chicago Rain Fall
  • 7. How Much Water Falls in Chicago? 2,500 sq. ft. Roof January - ,727 gallons 2 Image of Rain Falling February - ,540 2 March - ,130 4 April - 5,735 May - ,268 5 June - 5,657 July - ,470 5 August - ,200 7 September - ,096 5 October - ,223 4 November - 4,691 December - 3,787 Total 6,525 5
  • 8. How Much Water Falls in Chicago? ¼ Acre Residential Property January - 1,880 gallons 1 Image of Rain Falling February - 1,065 1 March - 7,990 1 April - 24,982 May - 2,945 2 June - 24,642 July - 3,828 2 August - 1,363 3 September - 2,199 2 October - 8,397 1 November - 20,434 December - 16,496 Total 46,221 2
  • 9. How Much Water Falls in Chicago? 3 Acre Commercial Property January - 42,560 gallons 1 Image of Rain Falling February - 32,784 1 March - 15,876 2 April - 299,783 May - 75,344 2 June - 295,710 July - 85,934 2 August - 76,358 3 September - 66,383 2 October - 20,764 2 November - 245,203 December - 197,954 Total 2,954,654
  • 10. How Much Water Falls in Chicago? City Block (660’ x 660’ – 10 acres) January - 75,195 gallons 4 February - 42,610 4 March - 19,581 7 April - 999,267 May - 17,805 9 June - 985,690 July - 53,105 9 August - ,254,515 1 September - 87,936 8 October - 35,873 7 November - 817,335 December - 659,842 Total 9,848,756
  • 11. How Much Water is in Rain Event? ¼” Rain ½” Rain 1” Rain 2,500 ft. sq. 390 gallons 779 gallons 1,558 gallons Roof ¼ Acre 1,697 3,994 67,789 Residential Property 3 Acre 20,366 40,731 135,770 Commercial Property Chicago City 67,885 135,770 271,540 Block
  • 12. Landscape Ecology Size the landscape to the 80% of the average rain water production. – Roof Runoff – Hardscape Runoff Balancing rain water to landscape creates a functional landscape that utilizes the site’s water production.
  • 13. Stormwater Mitigation Stormwater Mitigation Stormwater Mitigation Stormwater Mitigation Stormwater Mitigation
  • 14. Stormwater Mitigation – Collection runoff near the source – Slow it down – Soak it in – Filter it – Apply it to the landscape – Create habitats
  • 15. Peak Flow (1 Acre Site) Grass Field Roof 1 Year Storm 1.4 cfs 4.3 cfs 2 Year Storm 2.1 cfs 5.4 cfs 10 Year Storm 4.3 cfs 8.0 cfs 25 Year Storm 5.7 cfs 9.5 cfs 100 Year Storm 8.0 cfs 12.0 cfs cfs – cubic feet per second
  • 16. Peak Flow (1 Acre Site) Grass Field Roof 1 Year Storm 10.5 gps 32.2 gps 2 Year Storm 15.7 gps 40.4 gps 10 Year Storm 32.2 gps 59.8 gps 25 Year Storm 42.6 gps 71.1 gps 100 Year Storm 59.8 gps 89.8 gps gps – gallons per second
  • 17. Peak Flow (1 Acre Site) Grass Field Roof 1 Year Storm 630 gpm 1,932 gpm 2 Year Storm 942 gpm 2,424 gpm 10 Year Storm 1,932 gpm 3,588 gpm 25 Year Storm 2,556 gpm 4,266 gpm 100 Year Storm 3,588 gpm 5,388 gpm gpm – gallons per minute
  • 18. Peak Flow (2,500 sq. ft. Roof) Grass Field Roof 1 Year Storm 0.08 cfs 0.25 cfs 2 Year Storm 0.12 cfs 0.31 cfs 10 Year Storm 0.25 cfs 0.46 cfs 25 Year Storm 0.33 cfs 0.55 cfs 100 Year Storm 0.46 cfs 0.69 cfs cfs – cubic feet per second
  • 19. Peak Flow (2,500 sq. ft. Roof) Grass Field Roof 1 Year Storm 0.60 gps 1.85 gps 2 Year Storm 0.90 gps 2.32 gps 10 Year Storm 1.85 gps 3.43 gps 25 Year Storm 2.44 gps 4.08 gps 100 Year Storm 3.43 gps 5.15 gps gps – gallons per second
  • 20. Peak Flow (2,500 ft. sq. Roof) Grass Field Roof 1 Year Storm 36 gpm 111 gpm 2 Year Storm 54 gpm 139 gpm 10 Year Storm 111 gpm 206 gpm 25 Year Storm 147 gpm 245 gpm 100 Year Storm 206 gpm 309 gpm gpm – gallons per minute
  • 21. Change in Peak Runoff Flow Before and after Development 300% 225% 150% 75% 0% 1 Year Storm Year Storm Year Storm Year Storm Year Storm 2 10 25 100 Stormwater Effects of Urbanization
  • 22. Detention and Volume Control Stormwater Mitigation Detention Underneath Elimination of Detention Ponds
  • 23. How Much Water ? Rainfall Surface Area Water Volume 1/4” 43,560 ft2 6,800 gallons 1/2” 43,560 ft2 13,600 gallons 1” 43,560 ft2 27,200 gallons
  • 24. Base Storage Capacity Storage Base Depth Surface Area Void Space Capacity 12” 43,560 ft2 40% 130,300 gallons 18” 43,560 ft2 40% 195,500 gallons 24” 43,560 ft2 40% 260,700 gallons
  • 25. Infiltration Replenishes the Groundwater Supply Currently 50% of our Drinking Water In the Future 80% of our Drinking Water
  • 26. Soil Infiltration Rates Soil Texture Infiltration (in/hour) Sand 8.30” Loamy Sand 2.41” Sandy Loam 1.02” Loam 0.52” Silt Loam 0.27” Sandy Clay Loam 0.17” Clay Loam 0.09” Silty Clay Loam 0.09” Clay 0.06”
  • 27. Improved Water Quality Removes Suspended Solids Removes Phosphorus, Nitrogen, and Metals Removes Harmful Pollutants - Oil Water Polishing - the final step in cleaning
  • 28. Pollutant Removal Pollutant Median Pollutant Removal* Suspended Solids 95% Phosphorus 70% Nitrogen 51% Metals 99% *Infiltration Trenches & Porous Pavement
  • 31. Design Considerations Rainfall Intensity Rainfall Duration Runoff Coefficient is Zero Underdrain for Soil Infiltration Rates of less than 1/2” per Hour Release Rate
  • 32. strength, no- units instead ver options, he Americans ents, and allows ration. 2 4 .8 ead of sand, 1 d additional ting bed 0” (12,700 mm ) 3 7 t be avoided as 4 9 5 6 8 r ASTM No. 2, 6 ness. Installation y on sites with m ) is required for ust be designed ature, the ASTM r runoff in the also has an
  • 33. UNILOCK PERMEABLE INTERLOCKING Nine Components of a Highly Successful Components of Permeable 1 CONCRETE PAVER With various aesthetically pleasing colors and textures, creative choices are not compromised by function. Permeable Interlocking Concrete Pavers (PICPs) are the most durable of any porous pavement Permeable Pavement Pavement material. Unilock’s minimum 8,500 psi (57 MPa), high-strength, no- slump concrete allows water to infiltrate between paver units instead of through the material. The joint sizes vary between paver options, ranging from 0.25” (6 mm ) to 0.5” (13 mm ), which meet the Americans with Disabilities Act specifications for permeable pavements, and allows a minimum of 100” (2,540 mm ) per hour of surface infiltration. 2 1) Pavement 3 SETTING BED AGGREGATE – ASTM NO. 8 2) Joint Aggregate Using the 0.25” (6 mm ) crushed, angular, chip stone, instead of sand, provides a smooth leveling course for placing pavers and additional 1 structural interlocking of the PICPs. Unlike sand, the setting bed aggregate allows for rapid water infiltration with over 500” (12,700 mm ) 3 7 3) Setting Bed per hour through the 40 percent void-space. Sand must be avoided as a setting bed in a PICP application. 4 Aggregate 5 9 4) SUBBASE AGGREGATE – ASTM NO. 2 5 Base Aggregate Subsoil conditions will dictate the necessity of this larger ASTM No. 2, 8 6 crushed, angular, open-graded subbase aggregate thickness. Installation of such material will provide increased structural stability on sites with 5) Subbase poor soil conditions. A minimum thickness of 8” (203 mm ) is required for effective performance. Subbase aggregate thickness must be designed to sufficiently support anticipated loads. As an added feature, the ASTM Aggregate No. 2 subbase aggregate temporarily detains stormwater runoff in the 40 percent void-space of the material. The ASTM No. 2 also has an infiltration rate of over 500” (12,700 mm ) per hour. 7 EDGE RESTRAINT 8 UNDERDRAIN 9 GEOTEXTILE FABRIC
  • 34. Pavement • Pavers • Concrete • Asphalt • Single-sized Aggregate • Resin Bound
  • 35. Joint Aggregate • Pavers only • Initial Filter • 1/4” crushed, angular, chip stone • ASTM No. 8
  • 36. Setting Bed Aggregate • Used in all systems • Smooth Leveling Course • No Sand • ASTM No. 8
  • 37. Base Aggregate • Used when subsoil conditions allow • Minimum thickness 4” • ASTM No. 57
  • 38. Subbase Aggregate • Not always necessary • Dictated by Subsoil Conditions • Used for additional structural stability • ASTM No. 2
  • 39. Subgrade • Existing Soil • Percolation • California Bearing Ratio • Penetrometer
  • 40. Edge Restraint • Vitally Important • Concrete Curb for Vehicular Traffic • Plastic may be Sufficient for Non- vehicular areas.
  • 41. Underdrain Pipe • Subsoil Permeablity • Detention Requirements • Release Rates • Not Always Necessary
  • 42. Geotextile Fabric • Based Upon Existing Soil Characteristics • Between Subsoil and Base Aggregate
  • 43. UNILOCK PERMEABLE INTERLOCKING Nine Components of a Highly Successful Components of Permeable 1 CONCRETE PAVER With various aesthetically pleasing colors and textures, creative choices are not compromised by function. Permeable Interlocking Concrete Pavers (PICPs) are the most durable of any porous pavement Permeable Pavement Pavement material. Unilock’s minimum 8,500 psi (57 MPa), high-strength, no- slump concrete allows water to infiltrate between paver units instead of through the material. The joint sizes vary between paver options, ranging from 0.25” (6 mm ) to 0.5” (13 mm ), which meet the Americans with Disabilities Act specifications for permeable pavements, and allows a minimum of 100” (2,540 mm ) per hour of surface infiltration. 2 1) Pavement 3 SETTING BED AGGREGATE – ASTM NO. 8 2) Joint Aggregate Using the 0.25” (6 mm ) crushed, angular, chip stone, instead of sand, provides a smooth leveling course for placing pavers and additional 1 structural interlocking of the PICPs. Unlike sand, the setting bed aggregate allows for rapid water infiltration with over 500” (12,700 mm ) 3 7 3) Setting Bed per hour through the 40 percent void-space. Sand must be avoided as a setting bed in a PICP application. 4 Aggregate 5 9 4) SUBBASE AGGREGATE – ASTM NO. 2 5 Base Aggregate Subsoil conditions will dictate the necessity of this larger ASTM No. 2, 8 6 crushed, angular, open-graded subbase aggregate thickness. Installation of such material will provide increased structural stability on sites with 5) Subbase poor soil conditions. A minimum thickness of 8” (203 mm ) is required for effective performance. Subbase aggregate thickness must be designed to sufficiently support anticipated loads. As an added feature, the ASTM Aggregate No. 2 subbase aggregate temporarily detains stormwater runoff in the 40 percent void-space of the material. The ASTM No. 2 also has an infiltration rate of over 500” (12,700 mm ) per hour. 7 EDGE RESTRAINT 8 UNDERDRAIN 9 GEOTEXTILE FABRIC
  • 44. strength, no- units instead ver options, he Americans ents, and allows ration. 2 4 .8 ead of sand, 1 d additional ting bed 0” (12,700 mm ) 3 7 t be avoided as 4 9 5 6 8 r ASTM No. 2, 6 ness. Installation y on sites with m ) is required for ust be designed ature, the ASTM r runoff in the also has an
  • 47. POROUS PAVING • GREEN ROOFS • RAIN GARDENS • RAINWATER HARVESTING NEW TOOLS FOR SUSTAINABLE SITE DEVELOPMENT
  • 48.
  • 49. Green • Water • Infrastructure Green • Water • Infrastructure Green • Water • Infrastructure Green • Water • Infrastructure Green • Water • Infrastructure
  • 51. Thank You P.O. BOX 124 WESTFIELD, INDIANA 46074 317-674-34949

Editor's Notes

  1. Tom Barrett is owner of Green Water Infrastructure. He has over thirty years of successful landscape industry experience and is known as an accomplished corporate growth and change agent.\n\nMr. Barrett has held various leadership positions at such industry leaders as Rain Bird, Kenney Machinery, Ewing, Netafim, and MacAllister Machinery. He has worked with such projects as Animal Kingdom at Walt Disney World in Florida. He has won numerous awards in Quality and Process Improvement, and is a frequent contributor of articles for numerous publications.\n\nMr. Barrett holds a Bachelor of Science in Agronomy and Plant Genetics from the University of Arizona. He furthered his studies in architecture at Syracuse Univ. He holds multiple certifications in irrigation and water conservation. Tom is a member of the Indiana Nursery and Landscape Association, as well as the International Irrigation Association, in which he chairs the Communications Committee. He is an approved instructor for the Irrigation Association.\n\nTom Barrett has been sharing his expertise and his ideas in energetic and dynamic presentations for over twenty years. He is a master trainer. His presentations empower people to become masters of change, rather than victims of circumstance by developing tools for transformative thinking. \n\nCurrently, Tom delivers over thirty presentations each year to organizations around the country. He is well-suited to talk to us today about Permeable Paving. Please join me in welcoming, TOM BARRETT!\n\n
  2. Green Infrastructure, Green Highways, and Green Streets will be the foundation for the rebuilding and expansion of our nations infrastructure and a key to our economic growth in the 21st Century. Green is the development of innovative approaches and strategies on how to integrate integrate grey and green infrastructure in order to protect water resources and promote sustainable design and community development. We have an opportunity to use a comprehensive approach that takes advantage of our experience on pilot projects, research, the development of standards and specifications, manuals of practice, training, and environmental management systems in order to integrate and institutionalize green approaches.\n\n
  3. At the largest scale, the preservation and restoration of natural landscape features (such as forests, floodplains and wetlands) are critical components of green stormwater infrastructure. By protecting these ecologically sensitive areas, communities can improve water quality while providing wildlife habitat and opportunities for outdoor recreation.\nOn a smaller scale, green infrastructure practices include rain gardens, porous pavements, green roofs, infiltration planters, trees and tree boxes, and rainwater harvesting for non-potable uses such as toilet flushing and landscape irrigation.\n\nPicture the grime of city streets -- oil, grease and soot from cars and trucks; pet waste; trash and litter; sediment and debris from construction sites; and a mix of toxic chemicals. Now picture the same streets after a rainstorm. They look cleaner, right? Sure, but the debris and contaminants haven't just disappeared -- they've been swept through street drains and underground pipes then washed directly into the nearby river, lake or bay.\nWherever humans have paved or built over the natural world, dirty rainwater tends to run straight into our waterways, contaminating the water, destroying habitat and damaging property. Known as urban runoff, this type of pollution can have serious consequences, from fouling drinking water to closing beaches and poisoning shellfish beds. Indeed, the U.S. Environmental Protection Agency now considers urban runoff and pollution from other diffuse sources the greatest contaminant threat to our nation's waters. The good news is that there are a number of proven solutions that towns and cities can use to reduce runoff pollution.\nOne new and exciting approach has emerged in recent years. Called "low-impact development," it uses both simple common sense and technology -- strategically placed beds of native plants, rain barrels, "green roofs," porous surfaces for parking lots and roads, and other tools -- to help rainfall evaporate back into the atmosphere or soak into the ground, rather than polluting the nearest water body. In effect, low-impact development mimics nature's own filtering systems. The result is less water pollution from dirty runoff, less flooding, replenished groundwater supplies -- and often, more natural-looking, aesthetically pleasing cityscapes.\n\n\n\n
  4. Floods. Droughts. Sewage overflows. Leaky pipes. Failing levees. Unsafe dams.  America’s water infrastructure is crumbling and outdated, and communities big and small across the country are feeling the impacts. \nIn its Report Card for America’s Infrastructure, the American Society of Civil Engineers gives the nation’s dams a D grade, and wastewater and drinking water systems a D-, the lowest grades of any infrastructure category. The U.S. Environmental Protection Agency states that the public health and environmental gains achieved since passage of the Clean Water Act are rapidly being reversed due to crumbling infrastructure. \nCommenting on the current state of the nation’s infrastructure, New York Mayor Bloomberg said, “We under-invest, and we invest badly.” Clearly, we need to invest more to upgrade and maintain our failing water infrastructure. But we need to invest more wisely, too. We will make a terrible mistake if we simply rebuild 19th and 20th century water systems that are costly and inflexible. \nInstead, we need a 21st century approach that integrates green solutions and helps ensure community safety and security. We need to invest in approaches that utilize “green infrastructure” as a first line of defense along with engineered structures that together can effectively meet multiple needs, at lower cost, and help communities and natural systems be better prepared for the impacts of climate change. \nWhat is Green Infrastructure?\nGreen infrastructure is a term that can encompass a wide array of specific practices, and a number of definitions exist (see the EPA’s definition here). In our view:\nGreen infrastructure is an approach to water management that protects, restores, or mimics the natural water cycle. Green infrastructure is effective, economical, and enhances community safety and quality of life.\nIt means planting trees and restoring wetlands, rather than building a costly new water treatment plant. It means choosing water efficiency instead of building a new water supply dam. It means restoring floodplains instead of building taller levees. \nGreen infrastructure incorporates both the natural environment and engineered systems to provide clean water, conserve ecosystem values and functions, and provide a wide array of benefits to people and wildlife. \nGreen infrastructure solutions can be applied on different scales, from the house or building level, to the broader landscape level. On the local level, green infrastructure practices include rain gardens, permeable pavements, green roofs, infiltration planters, trees and tree boxes, and rainwater harvesting systems. At the largest scale, the preservation and restoration of natural landscapes (such as forests, floodplains and wetlands) are critical components of green infrastructure.\nGreen infrastructure investments boost the economy, enhance community health and safety, and provide recreation, wildlife, and other benefits.Many forward-looking cities are already embracing green infrastructure, including New York, Indianapolis, Portland, Seattle, San Francisco, Minneapolis-St. Paul, Milwaukee, Kansas City, Toledo, Cincinnati, and Philadelphia, as well as many others.\n\n
  5. \n
  6. \n
  7. \n
  8. \n
  9. \n
  10. \n
  11. \n
  12. \n
  13. \n
  14. \n
  15. \n
  16. \n
  17. \n
  18. \n
  19. \n
  20. \n
  21. \n
  22. Using permeable paving base for stormwater detention is a very efficient use of land. With this system, the surface is pervious, allowing detention to be contained underneath. Detention is under every square foot of permeable paving, as deep as necessary Traditional surface detention ponds which act as holding facilities for rainfall are a waste of space. For most land uses and all impervious areas, such as roof, roads, and parking lots, stormwater runoff flows through a system of pips that release it into detention or retention ponds. This valuable surface area can be utilized for more important uses.\n\nPermeable pavement systems used crushed, angular, open-grade aggregate base materials. These materials are entirely different than those used for traditional impervious roads and parking lots. These traditional systems use dense-graded aggregates containing fines, making them extremely slow draining. Conversely, the use of open-graded aggregates provide a void space or porosity of approximately 40 percent. This is utilize for detention and allows for a rapid infiltration rate of over 500” per hour.\n
  23. \n
  24. \n
  25. Infiltration is extremely important to the groundwater supply. According to the U.S. Geological Survey, one of America’s mot important natural resource is groundwater. Half of the drinking water in the the U.S. comes from ground water, with the balance coming from lakes and rivers. Groundwater as a source of drinking water is projected to grow to 80 percent. Ground water is vital to agricultre and other industries, as well as essential for ensuring the health of rivers, streams, wetlands, and other bodies of water. Urban sprawl contributes to a decrease pervious area for rainwater infiltration and reduced groundwater levels. Soil infiltration is a simple method for ensuring future water availability.\n\nInstalling a permeable paving system above porous soils allows for stormwater infiltration, reducing runoff and flooding. Most soils, even clay, allow for infiltration.\n
  26. A soil with 1/4” per hour infiltration rate will have complete infiltration after about four hours of rainfall. However, most rain events generate only 1/2” of water.\n
  27. The EPA recognizes permeable paving as a Best Management Practice for non-point source pollution. Utilizing permeable paving ensures cleaner water. Many municipalities have begun to implement strategies to improve water quality by using Best Management Practices like permeable paving.\n
  28. The Interlocking Concrete Paving Institute has conducted test in which they examine water quality. Their findings indicate that cleaner, cooler water results from being filtered through a permeable paving system.\n
  29. \n
  30. \n
  31. For traditional non-permeable paving surfaces, rainfall intensity and duration are normally analyzed together. However, with a permeable paving surface, intensity is less of a factor because the surface infiltration rate will exceed most rainfall events. A permeable paving surface are capable of capture more than 100” per hour. For larger rainfall events, duration is important to recognize. A heavy rainfall event could produce 6” of rain per hour but the duration may be only ten minutes. Longer duration rain events can be more demanding. Permeable paving system, when properly designed and installed, can usually contain most rainfall events.\n\nA runoff coefficient is used to measure the percentage of water that runs off different surfaces. Asphalt has a runoff coefficient of 85%. Turfgrass has a runoff coefficient of 15%.\nThe runoff coefficient of permeable paving is zero unless the rainfall intensity exceeds the surface infiltration rate or the entire open-graded base reaches capacity. With a properly designed and installed permeable surface, capacity will rarely be reached.\n\nDuring the site investigation phase, conducting a geotechnical or porosity test will determine the soil infiltration rate, which will establish the stormwater design requirements. Typical industry recommendations suggest an under-drain for soils with an infiltration rate of less than 1/2” per hour. It is possible to eliminate the under-drain system for soils with infiltration rates greater than 1/2” per hour.\n\nThe Release Rate refers to the volume of water that is allowed to be discharged into a municipal system or waterway. Many stormwater regulatory agencies require that post-development release rate does not exceed the pre-development conditions. Permeable paving slows and detains stormwater in the open-graded base so that it can be gradually released. Local jurisdiction should be contacted for required release rate.\n\n\n\n\n
  32. \n
  33. \n
  34. There are three distinct materials used in permeable paving\nFirst, pavers are the most common. They come in a wide variety of textures and patterns. Interlocking pavers increases the structural performance of the paving system and reduces annual maintenance cost. Interlocking pavers prevent shifting or twisting due to vehicle braking and turning. L-shaped pavers can be mechanically installed, significantly reducing the initial installation cost when compared to manual installation.\n\nPorous concrete is the second most common material used in porous paving systems. The void space of porous concrete ranges between 15% and 22%, compared to a three to five percent void space in conventional concrete.\n\nAlthough not as common, porous asphalt has been successfully used as a permeable paving material. Porous asphalt consists of standard bituminous asphalt in which the fines have been screened and reduced, creating void space to make it highly permeable to water. The void space of porous asphalt is approximately 16%, as opposed to two to three percent for conventional asphalt.\n\nSingle-sized aggregate without any binder is the most permeable paving material in existence, and the least expensive. Although it can be used only in very low-traffic settings such as seldom-used parking stalls, its potential cumulative area is great.\nPorous turf, if properly constructed, can be used for occasional parking like that at churches and stadiums. Living turf transpires water, actively counteracting the "heat island" with what appears to be a green open lawn.\n\nResin Bound Paving is a mixture of resin binder and aggregate. Clear resin is used to fully coat each aggregate particle before laying. Enough resin is used to allow each aggregate particle to adhere to one another and to the base yet leave voids for water to permeate through. With resin bound paving you have a strong and durable surface that is suitable for pedestrian and vehicular traffic in applications such as pathways, driveways, car parks and access roads.\n\n\n
  35. Used primarily for paving systems. This material acts as the initial filtering layer, the 1/4” crushed, angular, chip stone captures 80% of the debris in the first 1” to 2”. The secondary function is to increase the interlock between the paver units to create the structural stability. The joint aggregate must always remain filled to the lip of the paver units to reduce clogging.\n
  36. Using the 1/4” crushed, angular chip stone, instead of sand, provides a smooth leveling course for setting the pavers. Unlike sand, the setting bed aggregate allows for rapid water infiltration with over 500” per hour through the 40% void-space. The use of sand must be avoided as a setting bed.\n
  37. When subsoil conditions are conducive to supporting the ASTM no. 57 crushed, angular, open-graded base material without migration, it can be used without ASTM No.2 subbase aggregate. Minimum thickness must be determined by sufficiently supporting anticipated loads, as well as accommodating stormwater detention in the 40 percent void space of the material. The ASTM No. 57 base aggregate, with a minimum thickness of 4”, serves as a transition material between the ASTM No. 2 subbase aggregate The infiltration rate of the ASTM no. 57 is over 500” per hour.\n
  38. Subsoil conditions will dictate the necessity of this larger ASTM No. 2, crushed, angular, open-graded subbase aggregate thickness. Installation of this material will provide increased structural stability on sites with poor soil conditions. A minimum thickness of 8” is required for effective performance. Subgrade aggregate thickness must be designed to sufficiently support anticipated loads. As an additional feature, the ASTM No. 2 subbase aggergate temporarily detains stormwater runoff in the 40 percent void-space of the material. The ASTM No. 2 has an infiltration rate over 500” per hour.\n
  39. Existing soil materials will determine the performance capabilities of the porous paving system. Pre-construction soil analysis , including percolation, California Bearing ratio, and penetrometer measurement (blow counts) are necessary for proper design. Subsoils with less than 1/2” per hour of infiltration may require underdrainage, scarification, and potentially, amendments. Subsoils with infiltration rates greater than 1/2” per hour are considered highly permeable. Subsoil compaction can cause a detrimental reduction in permeability and could be eliminated.\n\nThe California bearing ratio (CBR) is a penetration test for evaluation of the mechanical strength of road subgrades and basecourses.\n\nThe CBR rating was developed for measuring the load-bearing capacity of soils used for building roads. The CBR can also be used for measuring the load-bearing capacity of unimproved airstrips or for soils under paved airstrips. The harder the surface, the higher the CBR rating. A CBR of 3 equates to tilled farmland, a CBR of 4.75 equates to turf or moist clay, while moist sand may have a CBR of 10. High quality crushed rock has a CBR over 80. The standard material for this test is crushed California limestone which has a value of 100.\n
  40. Edge restraint is vitally important to the success of a porous paving surface. This is especially true for interlocking pavers. The failure of the edge restraint will negatively impact the integrity of the paving surface. For all vehicular applications a concrete curb is required. For non vehicular and pedestrian areas, a plastic edging may be sufficient when properly anchored to the subbase.\n
  41. The underdrain pipe is based on several factors, such as the subsoil permeability, detention requirements and stormwater release rates. With highly permeable soils over 1/2” per hour, the underdrain pipe could be eliminated. Underdrain pipe size is inconsequential, provided the flow rate is greater than the release rate.\n
  42. \n
  43. \n
  44. \n
  45. \n
  46. \n
  47. \n
  48. \n
  49. Why Choose Green Infrastructure?\nNature works best: Rivers, streams, wetlands, floodplains, and forests provide a suite of critical services like clean water and flood protection, and should be viewed as essential and effective components of our water infrastructure. New York City has great quality tap water because the city invested in water protection by purchasing land around its Catskills reservoirs to ensure that polluted runoff from roads and lawns doesn’t enter the water supply.The city’s $600 million investment in Catskills land protection and restoration did the job of $6 billion in capital costs to construct a water filtration plant as well as $200-300 million in annual operation and maintenance costs.\nWe can’t waste money: Spending money wisely means investing in multi-purpose solutions that lower costs and provide more benefits. Recently, the City of Indianapolis announced that by using wetlands, trees, and downspout disconnection to reduce stormwater flows into their combined sewer system, the City will be able to reduce the diameter of the planned new sewer pipe from 33’ to 26’, saving over $300 million. \nWe must enhance community safety and enjoyment: Traditional infrastructure isn’t designed to handle the increased floods and droughts that come with global warming, so we need a modern approach to protect public health, safety, and quality of life. Green solutions give communities the security and flexibility they need. Napa, CA solved flooding problems by choosing to restore the Napa River’s natural channel and wetlands, rather than lining the river with concrete. The effort has protected 2,700 homes and prevented $26 million in flood damage each year, and has created new parks and open space.\nReturn to Top\nGreen Infrastructure is Good for Jobs and the Economy\nThese green solutions create good jobs in many sectors, including plumbing, landscaping, engineering, building, and design. Green infrastructure also supports supply chains and the jobs connected with manufacturing of materials including roof membranes, rainwater harvesting systems, and permeable pavement. \nNew York City’s broad sustainability plan, PlaNYC, includes substantial investments in green infrastructure to reduce stormwater and sewage overflows and protect drinking water supplies. The City estimates that full implementation of PlaNYC will create 4,449 water infrastructure jobs of all types per year.\nOther countries are utilizing green water technologies at a much higher rate than the United States. We cannot afford to fall behind other nations in this vital area, it is a matter of economic competitiveness as well as quality of life and community security.A New Vision for Water\nWe are at a crossroads today in how we manage our water. Traditional water infrastructure will continue to play a role, but it is static, solves only a single problem, and requires a huge expense to build and maintain. We must use this transformational moment to move from old 19th Century infrastructure to a wiser combination of green and traditional infrastructure that will meet the needs of the 21st Century. \n