Tim_Robb_Resume_PMS_ProjectDutyList_Mueller

T
T
R
TIMROBB
775-527-0642
robbtim176@gmail.com
Truckee Meadows Water Authority 		 Reno, NV 		 Project Management, Data Collection, GPS
Covington Water District 				 Covington, WA 		 Project Management, Data Collection, GPS
City of Yakima 	 				 Yakima, WA 		 Project Management, Data Collection, GPS
City of Olympia 					 Olympia, WA 		 Project Management, Data Collection, GPS
Incline Village General Improvement District 	 Incline Village, NV 	 Date Collection, GPS
City of Lodi 					 Lodi, CA 		 Data Collection, GPS
Placer County Water Authority 			 Placer County, CA 	 Data Collection, GPS
Paradise Irrigation District 			 Paradise, CA 		 Data Collection, GPS
Mt. Wheeler Power 				 Ely, NV 			 Data Collection, GPS
City of Reno 					 Reno, NV 		 Read, GPS
Grandview Terrace Water Company 		 Reno, NV 		 Read, GPS
City of St. Helena Water Department 		 St. Helena, CA 		 Data Collection
Pacific Meter Services - Project List
Pacific Meter Services - Duties
-Conducted project site review for pre-bid review and evaluation of project’s needs.
-Attended pre-bid meetings to get projects specifications, time lines, and desired outcomes.
-Helped prepare schedules and cost for bid packages.
-In conjunction with the utility’s billing staff prepared files and file format for data transfer.
-Developed a work plan and schedule to minimize projects impacts to utilities customers and their billing cycles.
-Attended pre-construction meetings to further define projects specifications, time lines, and procedures.
-Received materials for projects and conducted inventories.
-Prepared product for installation.
-Helped develop crew size and number of crews needed to meet the required production schedule.
-Performed data collection and reconciliation of removal reads, removed meter number, meter address, and all associated new product
information.
-As a crew leader, maintained daily inventories of installed and removed material.
-Preformed sub-meter accurate GPS location of meter installation. Ran real-time GPS collection and post processing protocol for position
location verification.
-Performed data verification queries nightly to ensure data integrity of daily work.
-Uploaded meter exchange data to FTP site for utility billing system update.
-Conducted quality audits during and after the project completion to ensure a quality long lasting installation.

Recomendados

Ryan Arendse von
Ryan ArendseRyan Arendse
Ryan ArendseRyanarendse
228 views33 Folien
shafaqat cv 1 von
shafaqat cv 1shafaqat cv 1
shafaqat cv 1shafaqat hussain
250 views4 Folien
RMP CV Feb 2015 von
RMP CV Feb 2015RMP CV Feb 2015
RMP CV Feb 2015Roxana Platon
437 views3 Folien
Shafaqat Hussain von
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain SHAFAQAT HUSSAIN
44 views6 Folien
CV (2) von
CV (2)CV (2)
CV (2)Abdul Waheed
279 views6 Folien
Kirk Doerr CB&I Resume (Updated 7/25/2017) von
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr
121 views3 Folien

Más contenido relacionado

Was ist angesagt?

Project Controller von
Project ControllerProject Controller
Project ControllerShenoy Vinayak
213 views4 Folien
Resume von
ResumeResume
ResumeKishore G
232 views6 Folien
John C. Shaw_LinkedIn von
John C. Shaw_LinkedInJohn C. Shaw_LinkedIn
John C. Shaw_LinkedInJohn Shaw
170 views4 Folien
2015 Resume von
2015 Resume2015 Resume
2015 ResumeJeff McAulay
249 views3 Folien
inayat ur rahman cv 1 von
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1mughal inayat ur rahman
269 views4 Folien
Wilson_Brad_Master_01072016 von
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Brad Wilson
86 views7 Folien

Was ist angesagt?(20)

John C. Shaw_LinkedIn von John Shaw
John C. Shaw_LinkedInJohn C. Shaw_LinkedIn
John C. Shaw_LinkedIn
John Shaw170 views
Wilson_Brad_Master_01072016 von Brad Wilson
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
Brad Wilson86 views
Resume Chris Tonkin Senior GIS Specialist Manager von Chris Tonkin
Resume Chris Tonkin Senior GIS Specialist ManagerResume Chris Tonkin Senior GIS Specialist Manager
Resume Chris Tonkin Senior GIS Specialist Manager
Chris Tonkin98 views
Land Development Improvement Process von Fairfax County
Land Development Improvement ProcessLand Development Improvement Process
Land Development Improvement Process
Fairfax County3.7K views

Destacado

Shaletha Hunt Resume von
Shaletha Hunt ResumeShaletha Hunt Resume
Shaletha Hunt Resumeshalethahunt
304 views2 Folien
2016 Graham Resume von
2016 Graham Resume2016 Graham Resume
2016 Graham ResumeGrahamclan25
132 views4 Folien
Kareem Green Resume 3 von
Kareem Green Resume 3Kareem Green Resume 3
Kareem Green Resume 3Kareem Green
95 views1 Folie
Jeff Green resume von
Jeff  Green resumeJeff  Green resume
Jeff Green resumeJeffrey Green
96 views2 Folien
1 angela hill resume 10 2015 von
1 angela hill resume 10 20151 angela hill resume 10 2015
1 angela hill resume 10 2015Angela Hill (ahill38@gmail.com)
336 views3 Folien
Casey Rogers Resume von
Casey Rogers ResumeCasey Rogers Resume
Casey Rogers ResumeCasey Rogers
271 views3 Folien

Similar a Tim_Robb_Resume_PMS_ProjectDutyList_Mueller

Marjorie Fox Resume-12_8_16 von
Marjorie Fox Resume-12_8_16Marjorie Fox Resume-12_8_16
Marjorie Fox Resume-12_8_16Marjorie Fox
356 views3 Folien
Sandra.Schneider(PM) Resume 11-15 von
Sandra.Schneider(PM) Resume 11-15Sandra.Schneider(PM) Resume 11-15
Sandra.Schneider(PM) Resume 11-15Sandy Schneider
226 views3 Folien
Victor Holderby - Project Manger von
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby
114 views6 Folien
Mitra_Pratt von
Mitra_PrattMitra_Pratt
Mitra_PrattMitra Pratt
309 views4 Folien
Sonny james daigrepont_resume' (6) von
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
374 views5 Folien
United Utilities and GIS von
United Utilities and GISUnited Utilities and GIS
United Utilities and GISEsri UK
2.8K views18 Folien

Similar a Tim_Robb_Resume_PMS_ProjectDutyList_Mueller(20)

Marjorie Fox Resume-12_8_16 von Marjorie Fox
Marjorie Fox Resume-12_8_16Marjorie Fox Resume-12_8_16
Marjorie Fox Resume-12_8_16
Marjorie Fox356 views
United Utilities and GIS von Esri UK
United Utilities and GISUnited Utilities and GIS
United Utilities and GIS
Esri UK2.8K views
Tobacco road meets the technology highway part iii ppt von p6academy
Tobacco road meets the technology highway part iii pptTobacco road meets the technology highway part iii ppt
Tobacco road meets the technology highway part iii ppt
p6academy346 views
City Of Newark Final von guest71633e
City Of Newark FinalCity Of Newark Final
City Of Newark Final
guest71633e290 views
Rims forum 2013 aspec data standards - george havakis gissa von INGENIUMrims
Rims forum 2013   aspec data standards - george havakis gissaRims forum 2013   aspec data standards - george havakis gissa
Rims forum 2013 aspec data standards - george havakis gissa
INGENIUMrims599 views
Project Plan_v1.2.pptx von Tech King
Project Plan_v1.2.pptxProject Plan_v1.2.pptx
Project Plan_v1.2.pptx
Tech King8 views
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015 von Donna Lee Cain
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Donna Lee Cain595 views
MitchRESUME 02_22_2016 von Mitch Taylor
MitchRESUME 02_22_2016MitchRESUME 02_22_2016
MitchRESUME 02_22_2016
Mitch Taylor119 views
From Field to Office: Streamlining the Management of Streetlight & Cover-ups ... von SSP Innovations
From Field to Office: Streamlining the Management of Streetlight & Cover-ups ...From Field to Office: Streamlining the Management of Streetlight & Cover-ups ...
From Field to Office: Streamlining the Management of Streetlight & Cover-ups ...
SSP Innovations648 views

Tim_Robb_Resume_PMS_ProjectDutyList_Mueller

  • 1. T R TIMROBB 775-527-0642 robbtim176@gmail.com Truckee Meadows Water Authority Reno, NV Project Management, Data Collection, GPS Covington Water District Covington, WA Project Management, Data Collection, GPS City of Yakima Yakima, WA Project Management, Data Collection, GPS City of Olympia Olympia, WA Project Management, Data Collection, GPS Incline Village General Improvement District Incline Village, NV Date Collection, GPS City of Lodi Lodi, CA Data Collection, GPS Placer County Water Authority Placer County, CA Data Collection, GPS Paradise Irrigation District Paradise, CA Data Collection, GPS Mt. Wheeler Power Ely, NV Data Collection, GPS City of Reno Reno, NV Read, GPS Grandview Terrace Water Company Reno, NV Read, GPS City of St. Helena Water Department St. Helena, CA Data Collection Pacific Meter Services - Project List Pacific Meter Services - Duties -Conducted project site review for pre-bid review and evaluation of project’s needs. -Attended pre-bid meetings to get projects specifications, time lines, and desired outcomes. -Helped prepare schedules and cost for bid packages. -In conjunction with the utility’s billing staff prepared files and file format for data transfer. -Developed a work plan and schedule to minimize projects impacts to utilities customers and their billing cycles. -Attended pre-construction meetings to further define projects specifications, time lines, and procedures. -Received materials for projects and conducted inventories. -Prepared product for installation. -Helped develop crew size and number of crews needed to meet the required production schedule. -Performed data collection and reconciliation of removal reads, removed meter number, meter address, and all associated new product information. -As a crew leader, maintained daily inventories of installed and removed material. -Preformed sub-meter accurate GPS location of meter installation. Ran real-time GPS collection and post processing protocol for position location verification. -Performed data verification queries nightly to ensure data integrity of daily work. -Uploaded meter exchange data to FTP site for utility billing system update. -Conducted quality audits during and after the project completion to ensure a quality long lasting installation.