4. 1. Space the cables with a 3” opening between cables
2. Support cables vertically every 42”
3. Tension the cables to 300-400 lbs
4” Sphere Code Guidelines
1013.3 Opening limitations. Required guards shall not have
openings which allow passage of a sphere 4 inches (102 mm) in
diameter from the walking surface to the required guard height.
International Building Code 2009 (Sixth Printing)
7. Kit 300 Series for Inside Post to Inside Post
This kit can go through one corner
with posts offset on the corner.
8. Factory Installed Tensioner
Swaging Ferrule is attached
to one end of the cable.
Slide the body over the
bare end of the cable
and over the Ferrule.
Thread the Lag Bolt
end into the wood
post.