REGIONAL SEMINAR ON THEREGIONAL SEMINAR ON THE
THEME:THEME:
INFRINGEMENTS OF THE ROAD HERITAGEINFRINGEMENTS OF THE ROAD HERITAGE
AND THE DRAWING UP OF THEAND THE DRAWING UP OF THE
INFRINGEMENT REPORTINFRINGEMENT REPORT
Organised by:Organised by:
THE REGIONAL DELEGATION OF PUBLIC WORKSTHE REGIONAL DELEGATION OF PUBLIC WORKS
SOUTHSOUTH--WESTWEST
LIMBE, 8LIMBE, 8thth –– 99thth April 2015April 2015 11
PRESENTATION NPRESENTATION N°°33
General Overview of the Situation inGeneral Overview of the Situation in
the Souththe South--West RegionWest Region
Presented by:Presented by:
HRH Chief TAMBE John BITAHRH Chief TAMBE John BITA
Regional SubRegional Sub--Director for OtherDirector for Other
Infrastructural WorksInfrastructural Works
(PWD(PWD -- LIMBE)LIMBE)
LIMBE, 8LIMBE, 8thth April 2015April 2015 22
GeneralitiesGeneralitiesGeneralitiesGeneralities
33
ROAD
MAP
REPUBLIC
OF
44
MAP
OF
CAMEROON
DESCRIPTION
LENGTH
(km)
PERCENTAGE
PAVED
Classified Roads
National Roads 7 055 50 %
Regional Roads 5 717 15 %
Divisional Roads 7 662 7 %
Roads pending Up-grading 295 44 %
Sub TOTAL: CR 20 729 (Approx. 25 % of CR)
55
Sub TOTAL: CR 20 729 (Approx. 25 % of CR)
Rural Roads 80 299
Sub TOTAL: RR 80 299 (Less than 2 % of RR)
TOTAL
(CLASSIFIED + RURAL)
101 028
From this Study:
(Approx. 7 % of Total)
EARTH
ROADS
PAVED
ROADS
66
77
WHY DO EARTH ROADS DETERIORATE ?WHY DO EARTH ROADS DETERIORATE ?
EXCESSIVE RAINFALL MAKES THE MOISTURE CONTENT OF THE
SOIL TOO SATURATED FOR OPTIMUM COMPACTION.
INCREASING SCARCITY OF GOOD QUALITY LATERITE FOR THE
WEARING COURSE.
DIFFICULT CONDITIONS IMPOSED BY THE VILLAGERS BEFORE
EXTRACTION OF LATERITE AT THE BORROW PIT.EXTRACTION OF LATERITE AT THE BORROW PIT.
POOR ATTITUDE OF THE POPULATION AND ROAD USERS TOWARDS
PROPER ROAD USAGE (E.G. DIGGING, OBSTRUCTION OF DITCHES
FOR PATH-WAYS, ETC.).
NON-RESPECT OF RAIN-GATES AND CONTINUOUS CIRCULATION
DURING RAINS BY TRUCK DRIVERS.
88
WHY DO EARTH ROADS DETERIORATE ?WHY DO EARTH ROADS DETERIORATE ?
ABUSIVE OVERLOADING (NO WEIGHING STATIONS INSTALLED ON
EARTH ROADS).
POOR PERFORMANCE OF SOME ROAD MAINTENANCE
CONTRACTORS (e.g. LACK OF FUNDS, EQUIPMENT).
INADEQUATE MONITORING & EVALUATION DURING THE EXECUTIONINADEQUATE MONITORING & EVALUATION DURING THE EXECUTION
OF WORKS (e.g. INSUFFICIENT LOGISTICS, PERSONNEL).
SURFACE RUNOFF WATER CROSSING THE ROAD.
LACK OF A SPOT MAINTENANCE POLICY [A STITCH IN TIME SAVES
NINE].
99
1010
1111
1212
1313
1414
DURING THE DRY SEASON:
MANY HEALTH HAZARDS OF DUSTY GRAVEL ROADS,
(EX. RESPIRATORY INFECTIONS).
REDUCED VISIBILITY IS A FREQUENT CAUSE OF ACCIDENTS.
DURING THE RAINY SEASON:
CRITICAL “BAD SPOTS” ON EARTH ROADS ARE A ROAD
ROAD SAFETY CONCERNS FOR EARTH ROADSROAD SAFETY CONCERNS FOR EARTH ROADS
CRITICAL “BAD SPOTS” ON EARTH ROADS ARE A ROAD
SAFETY NUISSANCE TO TRAVELLERS WHO OFTEN SPEND THE
NIGHT THERE AND ARE EXPOSED TO THIEVES.
TRAVEL TIME IS GREATLY INCREASED.
VERY HIGH IMPOSED TRANSPORT FARES.
INFLATED PRICES FOR HINTERLAND GOODS.
DIFFICULTIES IN EVACUATING PATIENTS.
OVER-LOADING OF TRANSPORT VEHICLES.
HIGH VEHICLE OPERATING COSTS.
1515
1616
1717
1818
1919
2020
SOME TECHNICALSOME TECHNICAL
TERMINOLOGYTERMINOLOGY
FRENCH & ENGLISH
EQUIVALENTS
2121
N°°°° FRENCH ENGLISH
1 EMPRISE RIGHT-OF-WAY
2 CHAUSSEE ROADWAY, CARRIAGEWAY
3 ACCOTEMENT SHOULDER, PAVEMENT
4 FOSSE DITCH
5 OUVRAGES D’ASSAINISSEMENT HYDRAULIC STRUCTURES
6 OUVRAGES D’ART ENGINEERING STRUCTURES
2222
6 OUVRAGES D’ART ENGINEERING STRUCTURES
7 STATION DE PEAGE TOLL-GATE
8 STATION DE PESAGE WEIGHING STATION
9 BARRIERE DE PLUIE RAIN-GATE
10 PLATELAGE EN BOIS WOODEN DECKING
11 PANNEAU DE SIGNALISATION ROAD SIGN, TRAFFIC SIGN
12 BALISES EN BOIS WOODEN BEACONS
N°°°° FRENCH ENGLISH
13 BALISES EN BETON CONCRETE BEACONS
14 BUSE MATALLIQUE METALLIC CULVERT
15 BUSE EN BETON CONCRETE CULVERT
16 TETE DE BUSE CULVERT HEAD
17 BORDURES DE TROTTOIR KERBS, CURBSTONES
18 GARDE CORPS HAND RAILS
2323
18 GARDE CORPS HAND RAILS
19 FOSSES MAÇONNE MASONRY DITCHES
20 FOSSES BETONNE CONCRETE DITCHES
21 DALLETTE EN BETON ARME REINFORCED CONCRETE SLAB
22
GLISSIERE DE SECURITE
METALLIQUE
METALLIC CRASH BARRIER
23 MURETTE EN BETON ARME
DWARF REINFORCED CONCRETE
WALL
24
GLISSIERE EN BETON ARME
(GBA)
REINFORCED CONCRETE CRASH
BARRIER
WHY DO PAVED ROADS DETERIORATE ?WHY DO PAVED ROADS DETERIORATE ?
OVERLOADING OF HEAVY DUTY VEHICLES.
ROAD TRAFFIC ACCIDENTS.
SPILLING OF FUEL AND LUBRICANTS ON THE CARRIAGEWAY
AND/OR SIDEWALKS.AND/OR SIDEWALKS.
BURNING OF TYRES ON THE CARRIAGEWAY/SIDEWALKS DURING
STRIKE ACTIONS.
POOR ATTITUDE OF THE POPULATION AND ROAD USERS TOWARDS
PROPER ROAD USAGE (E.G. SCOOPING OF AGGREGATES,
OBSTRUCTION OF DITCHES FOR PATH-WAYS, ETC.).
2424
WHY DO PAVED ROADS DETERIORATE ?WHY DO PAVED ROADS DETERIORATE ?
CONTINUOUS SURFACE RUNOFF WATER CROSSING THE ROAD.
POOR PERFORMANCE OF SOME ROAD MAINTENANCE
CONTRACTORS (e.g. LACK OF FUNDS, EQUIPMENT).
INADEQUATE MONITORING & EVALUATION DURING THE EXECUTIONINADEQUATE MONITORING & EVALUATION DURING THE EXECUTION
OF WORKS (e.g. INSUFFICIENT LOGISTICS, PERSONNEL).
LACK OF A SPOT MAINTENANCE POLICY [A STITCH IN TIME SAVES
NINE].
AGING OF THE ROAD.
2525
PHOTOGRAPHS
General Overview of theGeneral Overview of theGeneral Overview of theGeneral Overview of the
Situation in SWRSituation in SWR
2626
2727
2828
2929
3030
3131
3232
3333
3434
3535
3636
4040
PHOTOGRAPHS
ROAD SAFETY CONCERNSROAD SAFETY CONCERNS
(Accident Cases)
4141
4242
4343
4444
FOR MORE INFORMATIONFOR MORE INFORMATION
CONTACT
HRH Chief TAMBE John BITA
Mobile:Mobile:
+(237) 699 98 62 56
E-mail:
btambe2002@yahoo.co.uk
REPUBLIC OF CAMEROON
PPt - Seminar ROAD PROTECTION

More Related Content

Similar to PPt - Seminar ROAD PROTECTION

1 manual diseno camino minero 1977 kaufman&ault eua
1 manual diseno camino minero 1977 kaufman&ault eua1 manual diseno camino minero 1977 kaufman&ault eua
1 manual diseno camino minero 1977 kaufman&ault euaSierra Francisco Justo
 
Nkululeko Ncube CV.doc ABRIDGED
Nkululeko Ncube CV.doc ABRIDGEDNkululeko Ncube CV.doc ABRIDGED
Nkululeko Ncube CV.doc ABRIDGEDNkululeko Ncube
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET Journal
 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET Journal
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasUbaldoJGarca
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxMd. Mahmudor Rahman
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshLokesh Saini
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyKook Dean
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptswaongniyogi
 
Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Ousama Aloub
 
Westcott meadows development2011v2
Westcott meadows development2011v2Westcott meadows development2011v2
Westcott meadows development2011v2Natalie Foo
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfLeandroValdiviesoAnt
 

Similar to PPt - Seminar ROAD PROTECTION (20)

zPPt - Seminar NEF OK6
zPPt - Seminar NEF OK6zPPt - Seminar NEF OK6
zPPt - Seminar NEF OK6
 
Waggonner NOLA
Waggonner NOLAWaggonner NOLA
Waggonner NOLA
 
1 manual diseno camino minero 1977 kaufman&ault eua
1 manual diseno camino minero 1977 kaufman&ault eua1 manual diseno camino minero 1977 kaufman&ault eua
1 manual diseno camino minero 1977 kaufman&ault eua
 
Construction Notice - Bayview / Millwood 2011
Construction Notice - Bayview / Millwood 2011Construction Notice - Bayview / Millwood 2011
Construction Notice - Bayview / Millwood 2011
 
PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015
 
Nkululeko Ncube CV.doc ABRIDGED
Nkululeko Ncube CV.doc ABRIDGEDNkululeko Ncube CV.doc ABRIDGED
Nkululeko Ncube CV.doc ABRIDGED
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
T16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouseT16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouse
 
Pressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examplesPressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examples
 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling Methods
 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil Erosion
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap Study
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121Atlantis II Deep - Sander Steenbrink 20141121
Atlantis II Deep - Sander Steenbrink 20141121
 
Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
 
Westcott meadows development2011v2
Westcott meadows development2011v2Westcott meadows development2011v2
Westcott meadows development2011v2
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
 

PPt - Seminar ROAD PROTECTION

  • 1. REGIONAL SEMINAR ON THEREGIONAL SEMINAR ON THE THEME:THEME: INFRINGEMENTS OF THE ROAD HERITAGEINFRINGEMENTS OF THE ROAD HERITAGE AND THE DRAWING UP OF THEAND THE DRAWING UP OF THE INFRINGEMENT REPORTINFRINGEMENT REPORT Organised by:Organised by: THE REGIONAL DELEGATION OF PUBLIC WORKSTHE REGIONAL DELEGATION OF PUBLIC WORKS SOUTHSOUTH--WESTWEST LIMBE, 8LIMBE, 8thth –– 99thth April 2015April 2015 11
  • 2. PRESENTATION NPRESENTATION N°°33 General Overview of the Situation inGeneral Overview of the Situation in the Souththe South--West RegionWest Region Presented by:Presented by: HRH Chief TAMBE John BITAHRH Chief TAMBE John BITA Regional SubRegional Sub--Director for OtherDirector for Other Infrastructural WorksInfrastructural Works (PWD(PWD -- LIMBE)LIMBE) LIMBE, 8LIMBE, 8thth April 2015April 2015 22
  • 5. DESCRIPTION LENGTH (km) PERCENTAGE PAVED Classified Roads National Roads 7 055 50 % Regional Roads 5 717 15 % Divisional Roads 7 662 7 % Roads pending Up-grading 295 44 % Sub TOTAL: CR 20 729 (Approx. 25 % of CR) 55 Sub TOTAL: CR 20 729 (Approx. 25 % of CR) Rural Roads 80 299 Sub TOTAL: RR 80 299 (Less than 2 % of RR) TOTAL (CLASSIFIED + RURAL) 101 028 From this Study: (Approx. 7 % of Total)
  • 7. 77
  • 8. WHY DO EARTH ROADS DETERIORATE ?WHY DO EARTH ROADS DETERIORATE ? EXCESSIVE RAINFALL MAKES THE MOISTURE CONTENT OF THE SOIL TOO SATURATED FOR OPTIMUM COMPACTION. INCREASING SCARCITY OF GOOD QUALITY LATERITE FOR THE WEARING COURSE. DIFFICULT CONDITIONS IMPOSED BY THE VILLAGERS BEFORE EXTRACTION OF LATERITE AT THE BORROW PIT.EXTRACTION OF LATERITE AT THE BORROW PIT. POOR ATTITUDE OF THE POPULATION AND ROAD USERS TOWARDS PROPER ROAD USAGE (E.G. DIGGING, OBSTRUCTION OF DITCHES FOR PATH-WAYS, ETC.). NON-RESPECT OF RAIN-GATES AND CONTINUOUS CIRCULATION DURING RAINS BY TRUCK DRIVERS. 88
  • 9. WHY DO EARTH ROADS DETERIORATE ?WHY DO EARTH ROADS DETERIORATE ? ABUSIVE OVERLOADING (NO WEIGHING STATIONS INSTALLED ON EARTH ROADS). POOR PERFORMANCE OF SOME ROAD MAINTENANCE CONTRACTORS (e.g. LACK OF FUNDS, EQUIPMENT). INADEQUATE MONITORING & EVALUATION DURING THE EXECUTIONINADEQUATE MONITORING & EVALUATION DURING THE EXECUTION OF WORKS (e.g. INSUFFICIENT LOGISTICS, PERSONNEL). SURFACE RUNOFF WATER CROSSING THE ROAD. LACK OF A SPOT MAINTENANCE POLICY [A STITCH IN TIME SAVES NINE]. 99
  • 10. 1010
  • 11. 1111
  • 12. 1212
  • 13. 1313
  • 14. 1414
  • 15. DURING THE DRY SEASON: MANY HEALTH HAZARDS OF DUSTY GRAVEL ROADS, (EX. RESPIRATORY INFECTIONS). REDUCED VISIBILITY IS A FREQUENT CAUSE OF ACCIDENTS. DURING THE RAINY SEASON: CRITICAL “BAD SPOTS” ON EARTH ROADS ARE A ROAD ROAD SAFETY CONCERNS FOR EARTH ROADSROAD SAFETY CONCERNS FOR EARTH ROADS CRITICAL “BAD SPOTS” ON EARTH ROADS ARE A ROAD SAFETY NUISSANCE TO TRAVELLERS WHO OFTEN SPEND THE NIGHT THERE AND ARE EXPOSED TO THIEVES. TRAVEL TIME IS GREATLY INCREASED. VERY HIGH IMPOSED TRANSPORT FARES. INFLATED PRICES FOR HINTERLAND GOODS. DIFFICULTIES IN EVACUATING PATIENTS. OVER-LOADING OF TRANSPORT VEHICLES. HIGH VEHICLE OPERATING COSTS. 1515
  • 16. 1616
  • 17. 1717
  • 18. 1818
  • 19. 1919
  • 20. 2020
  • 22. N°°°° FRENCH ENGLISH 1 EMPRISE RIGHT-OF-WAY 2 CHAUSSEE ROADWAY, CARRIAGEWAY 3 ACCOTEMENT SHOULDER, PAVEMENT 4 FOSSE DITCH 5 OUVRAGES D’ASSAINISSEMENT HYDRAULIC STRUCTURES 6 OUVRAGES D’ART ENGINEERING STRUCTURES 2222 6 OUVRAGES D’ART ENGINEERING STRUCTURES 7 STATION DE PEAGE TOLL-GATE 8 STATION DE PESAGE WEIGHING STATION 9 BARRIERE DE PLUIE RAIN-GATE 10 PLATELAGE EN BOIS WOODEN DECKING 11 PANNEAU DE SIGNALISATION ROAD SIGN, TRAFFIC SIGN 12 BALISES EN BOIS WOODEN BEACONS
  • 23. N°°°° FRENCH ENGLISH 13 BALISES EN BETON CONCRETE BEACONS 14 BUSE MATALLIQUE METALLIC CULVERT 15 BUSE EN BETON CONCRETE CULVERT 16 TETE DE BUSE CULVERT HEAD 17 BORDURES DE TROTTOIR KERBS, CURBSTONES 18 GARDE CORPS HAND RAILS 2323 18 GARDE CORPS HAND RAILS 19 FOSSES MAÇONNE MASONRY DITCHES 20 FOSSES BETONNE CONCRETE DITCHES 21 DALLETTE EN BETON ARME REINFORCED CONCRETE SLAB 22 GLISSIERE DE SECURITE METALLIQUE METALLIC CRASH BARRIER 23 MURETTE EN BETON ARME DWARF REINFORCED CONCRETE WALL 24 GLISSIERE EN BETON ARME (GBA) REINFORCED CONCRETE CRASH BARRIER
  • 24. WHY DO PAVED ROADS DETERIORATE ?WHY DO PAVED ROADS DETERIORATE ? OVERLOADING OF HEAVY DUTY VEHICLES. ROAD TRAFFIC ACCIDENTS. SPILLING OF FUEL AND LUBRICANTS ON THE CARRIAGEWAY AND/OR SIDEWALKS.AND/OR SIDEWALKS. BURNING OF TYRES ON THE CARRIAGEWAY/SIDEWALKS DURING STRIKE ACTIONS. POOR ATTITUDE OF THE POPULATION AND ROAD USERS TOWARDS PROPER ROAD USAGE (E.G. SCOOPING OF AGGREGATES, OBSTRUCTION OF DITCHES FOR PATH-WAYS, ETC.). 2424
  • 25. WHY DO PAVED ROADS DETERIORATE ?WHY DO PAVED ROADS DETERIORATE ? CONTINUOUS SURFACE RUNOFF WATER CROSSING THE ROAD. POOR PERFORMANCE OF SOME ROAD MAINTENANCE CONTRACTORS (e.g. LACK OF FUNDS, EQUIPMENT). INADEQUATE MONITORING & EVALUATION DURING THE EXECUTIONINADEQUATE MONITORING & EVALUATION DURING THE EXECUTION OF WORKS (e.g. INSUFFICIENT LOGISTICS, PERSONNEL). LACK OF A SPOT MAINTENANCE POLICY [A STITCH IN TIME SAVES NINE]. AGING OF THE ROAD. 2525
  • 26. PHOTOGRAPHS General Overview of theGeneral Overview of theGeneral Overview of theGeneral Overview of the Situation in SWRSituation in SWR 2626
  • 27. 2727
  • 28. 2828
  • 29. 2929
  • 30. 3030
  • 31. 3131
  • 32. 3232
  • 33. 3333
  • 34. 3434
  • 35. 3535
  • 36. 3636
  • 37.
  • 38.
  • 39.
  • 40. 4040
  • 41. PHOTOGRAPHS ROAD SAFETY CONCERNSROAD SAFETY CONCERNS (Accident Cases) 4141
  • 42. 4242
  • 43. 4343
  • 44. 4444
  • 45. FOR MORE INFORMATIONFOR MORE INFORMATION CONTACT HRH Chief TAMBE John BITA Mobile:Mobile: +(237) 699 98 62 56 E-mail: btambe2002@yahoo.co.uk REPUBLIC OF CAMEROON