Reliability-based inspection planning in view
of both crack initiation and propagation
· Presenter Guang Zou (research fellow, PhD student)
· Authors Guang Zou (Lloyd’s Register, UK)
Dr Kian Banisoleiman (Lloyd’s Register, UK)
Dr Arturo González (University College Dublin, IR)
The funding from the EU’s Horizon 2020 programme
under the Marie Sklodowska-Curie grant agreement
No. 642453 is greatly appreciated.
ESREL, 20 Jun, 2017
 Serious consequences of fatigue and fracture failure
 Significant uncertainties associated with wave loads and fatigue
degradation
 Design assumptions cannot be fully satisfied during operation.
 Inspection/monitoring results can be utilized to support optimal
decisions on operation and maintenance.
Motivation(Structural integrity management)
Structural Integrity management (SIM) for ships
ESREL, 20 Jun, 2017
Fatigue design & S-N model
One and two-segment characteristic S-N curve
Miner’s Rule
Limit-state function
Long-term stress range
Equivalent stress range
𝑔 = 𝑁 − 𝑁𝑆<0
∆, 𝐴, 𝐵 are variables: ∆ reflect the uncrtainty in damage accumulation
𝐴 reflect the uncrtainty in fatigue capacity
𝐵 reflect the uncrtainty in stress calculation
Limitations: too general, no link with inspection results
ESREL, 20 Jun, 2017
Inspection planning & FM model
Crack propagation (Paris’s law)
Limit-state function
Strengths:
1. detailed information
2. comparable with inspections
Limitations:
1. 𝑎0 is hard to obtain
2. 𝑇0 is not accounted for
Three stages of crack development
ESREL, 20 Jun, 2017
Time-To-Crack-Initiation (𝑁𝐼)
 For critical components, 𝑎0 may be smaller than 𝑎 𝑑, and hard to measure
 𝑁𝐼 may account for a large part of fatigue life of critical components
 Crack size under 𝑎 𝑑 is not important, but 𝑁𝐼 is important for inspection planning
 Obtain info. on 𝑁𝐼 by specimen test (e.g. Lassen and Sørensen (2002a))
𝑁𝐹 = 𝑁𝐼 + 𝑁 𝑃
𝑁𝐹 = 𝑁𝐼 +
1
𝜋 𝑚 2 𝐶∆𝜎 𝑚
𝑎 𝑑
𝑎 𝑐 𝑑𝑎
𝑎 𝑚 2 𝑌 𝑎 𝑚
𝑎 𝑡
𝑎 𝑑
𝑁𝐼
𝑎0
N
ESREL, 20 Jun, 2017
Inspection strategies
 Inspection timing
fixed inspection interval approach vs. target reliability approach
 Inspection method
close visual inspection (CVI) vs. magnetic particle inspection (MPI)
𝑡
𝛽𝑡
𝑡
𝛽𝑡
𝛽
𝛽 𝑇𝑆𝐿
∆𝑇 ∆𝑇 ∆𝑇
𝑇𝑆𝐿𝑇𝑖𝑛𝑠𝑝 1 𝑇𝑖𝑛𝑠𝑝 2
𝑃𝑜𝐷 = 𝐹 𝑎 𝑑 = 1 − exp − 𝑎 𝑑 𝜈 𝑑
Probability of detection curves for CVI & MPI
ESREL, 20 Jun, 2017
Illustrative example
 Fatigue-prone welded T joints
 Inspection plans allowing for 𝑁𝐼
 Reliability based & time based inspection
 Visual inspection & MPI
ESREL, 20 Jun, 2017
Results(reliability-based plans)
βt = 2.5, CVI βt = 2.5, MPI
βt = 3.5, CVI βt = 3.5, MPI
ESREL, 20 Jun, 2017
Results(time-based plans)
ICI, CVI ICI, MPI
NCI, CVI NCI, MPI
ESREL, 20 Jun, 2017
Discussions(reliability-based plans)
 𝑛𝑖𝑛𝑠𝑝 may be decreased while allowing for 𝑁𝐼. But if 𝛽𝑡 is
high, regular inspections are necessary.
ESREL, 20 Jun, 2017
Discussions(reliability-based plans)
 ∆𝑇𝑖𝑛𝑠𝑝1 can be prolonged while allowing for 𝑁𝐼. Fail to take this into
account may result in waste of inspection resources.
 There isn’t much difference in the following inspection intervals
∆𝑇𝑖𝑛𝑠𝑝2, ∆𝑇𝑖𝑛𝑠𝑝3, …, whether considering 𝑁𝐼 or not.
 No indication from MPI supports longer inspection interval,
compared with no indication from CVI.
ESREL, 20 Jun, 2017
Discussions(time-based plans)
 Fixed inspection interval is preferred from the point of logistics. The
fixed interval is also be determined based on reliability analysis.
 Reliability-based plans are able to keep safety margin above a certain
level more even than time-based plans.
ESREL, 20 Jun, 2017
Conclusions
 𝑁𝐼 may account for a significant part of 𝑁𝐹 for some critical joints, and
should be taken into account in inspection planning.
 𝑁𝐼 can be obtained based on specimen tests, and be added to 𝑁 𝑃, so
that crack initiation life is included, without having to know statistical
information on 𝑎0.
 Allowing for 𝑁𝐼, ∆𝑇𝑖𝑛𝑠𝑝 1 can be prolonged, but there isn’t much
difference in ∆𝑇𝑖𝑛𝑠𝑝2, ∆𝑇𝑖𝑛𝑠𝑝3, …, .
 Allowing for 𝑁𝐼, 𝑛𝑖𝑛𝑠𝑝 may be decreased, depending on 𝛽𝑡.
ESREL, 20 Jun, 2017
Thank you for your attention!
· Presenter Guang Zou (Lloyd’s Register, research fellow)
guang.zou@lr.org
The funding from the EU’s Horizon 2020 programme
under the Marie Sklodowska-Curie grant agreement
No. 642453 is greatly appreciated.
ESREL, 20 Jun, 2017

Weitere ähnliche Inhalte

Ähnlich wie "Reliability-based inspection planning in view of both crack initiation and propagation" presented at ESREL2017 by Guang Zou

Trends in Computer Science and Information Technology
Trends in Computer Science and Information TechnologyTrends in Computer Science and Information Technology
Trends in Computer Science and Information Technologypeertechzpublication
 
Risk based inspection planning for for steel structures
Risk based inspection planning for for steel structuresRisk based inspection planning for for steel structures
Risk based inspection planning for for steel structuresjoseluisgutierrezgar3
 
Study on Structural Optimization of truss members using Meta- heuristic Algor...
Study on Structural Optimization of truss members using Meta- heuristic Algor...Study on Structural Optimization of truss members using Meta- heuristic Algor...
Study on Structural Optimization of truss members using Meta- heuristic Algor...IRJET Journal
 
stouffl_hyo13rapport
stouffl_hyo13rapportstouffl_hyo13rapport
stouffl_hyo13rapportLoïc Stouff
 
Is robustness really robust? how different definitions of robustness impact d...
Is robustness really robust? how different definitions of robustness impact d...Is robustness really robust? how different definitions of robustness impact d...
Is robustness really robust? how different definitions of robustness impact d...Environmental Intelligence Lab
 
Reliability based selection of standard steel beams
Reliability based selection of standard steel beamsReliability based selection of standard steel beams
Reliability based selection of standard steel beamseSAT Journals
 
IRJET- An Efficient Techniques in Digital Image Processing to Detect Glau...
IRJET-  	  An Efficient Techniques in Digital Image Processing to Detect Glau...IRJET-  	  An Efficient Techniques in Digital Image Processing to Detect Glau...
IRJET- An Efficient Techniques in Digital Image Processing to Detect Glau...IRJET Journal
 
Guidelines to Understanding Design of Experiment and Reliability Prediction
Guidelines to Understanding Design of Experiment and Reliability PredictionGuidelines to Understanding Design of Experiment and Reliability Prediction
Guidelines to Understanding Design of Experiment and Reliability Predictionijsrd.com
 
4 Super Lightweight Tank - Risk Management
4 Super Lightweight Tank - Risk Management4 Super Lightweight Tank - Risk Management
4 Super Lightweight Tank - Risk Managementpmb25
 
Assembly Root Cause Analysis A Way To Reduce Dimensional Variation In Assemb...
Assembly Root Cause Analysis  A Way To Reduce Dimensional Variation In Assemb...Assembly Root Cause Analysis  A Way To Reduce Dimensional Variation In Assemb...
Assembly Root Cause Analysis A Way To Reduce Dimensional Variation In Assemb...Stephen Faucher
 
Iris Recognition Using Active Contours
Iris Recognition Using Active ContoursIris Recognition Using Active Contours
Iris Recognition Using Active ContoursIJARIDEA Journal
 
IRJET- Effectiveness of Constructivist Instructional Approach on Achievem...
IRJET-  	  Effectiveness of Constructivist Instructional Approach on Achievem...IRJET-  	  Effectiveness of Constructivist Instructional Approach on Achievem...
IRJET- Effectiveness of Constructivist Instructional Approach on Achievem...IRJET Journal
 
Prosthodontics Journal Club: Altered cast impression techniques
Prosthodontics Journal Club: Altered cast impression techniquesProsthodontics Journal Club: Altered cast impression techniques
Prosthodontics Journal Club: Altered cast impression techniquesNeerajaMenon4
 
Bone Age Estimation for Investigational Analysis
Bone Age Estimation for Investigational AnalysisBone Age Estimation for Investigational Analysis
Bone Age Estimation for Investigational AnalysisIRJET Journal
 
REVIEW OF TRUE BENDING STRESS IN SPUR GEAR
REVIEW OF TRUE BENDING STRESS IN SPUR GEARREVIEW OF TRUE BENDING STRESS IN SPUR GEAR
REVIEW OF TRUE BENDING STRESS IN SPUR GEARIRJET Journal
 
Reliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodReliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodIJERA Editor
 
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice Guideline
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice GuidelineVenous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice Guideline
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice GuidelineYasser Sami Abdel Dayem Amer
 
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...Application of Analytic Hierarchy Process to Retaining wall maintenance prior...
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...IRJET Journal
 

Ähnlich wie "Reliability-based inspection planning in view of both crack initiation and propagation" presented at ESREL2017 by Guang Zou (20)

Trends in Computer Science and Information Technology
Trends in Computer Science and Information TechnologyTrends in Computer Science and Information Technology
Trends in Computer Science and Information Technology
 
Risk based inspection planning for for steel structures
Risk based inspection planning for for steel structuresRisk based inspection planning for for steel structures
Risk based inspection planning for for steel structures
 
Study on Structural Optimization of truss members using Meta- heuristic Algor...
Study on Structural Optimization of truss members using Meta- heuristic Algor...Study on Structural Optimization of truss members using Meta- heuristic Algor...
Study on Structural Optimization of truss members using Meta- heuristic Algor...
 
stouffl_hyo13rapport
stouffl_hyo13rapportstouffl_hyo13rapport
stouffl_hyo13rapport
 
Is robustness really robust? how different definitions of robustness impact d...
Is robustness really robust? how different definitions of robustness impact d...Is robustness really robust? how different definitions of robustness impact d...
Is robustness really robust? how different definitions of robustness impact d...
 
Reliability based selection of standard steel beams
Reliability based selection of standard steel beamsReliability based selection of standard steel beams
Reliability based selection of standard steel beams
 
IRJET- An Efficient Techniques in Digital Image Processing to Detect Glau...
IRJET-  	  An Efficient Techniques in Digital Image Processing to Detect Glau...IRJET-  	  An Efficient Techniques in Digital Image Processing to Detect Glau...
IRJET- An Efficient Techniques in Digital Image Processing to Detect Glau...
 
Guidelines to Understanding Design of Experiment and Reliability Prediction
Guidelines to Understanding Design of Experiment and Reliability PredictionGuidelines to Understanding Design of Experiment and Reliability Prediction
Guidelines to Understanding Design of Experiment and Reliability Prediction
 
4 Super Lightweight Tank - Risk Management
4 Super Lightweight Tank - Risk Management4 Super Lightweight Tank - Risk Management
4 Super Lightweight Tank - Risk Management
 
Assembly Root Cause Analysis A Way To Reduce Dimensional Variation In Assemb...
Assembly Root Cause Analysis  A Way To Reduce Dimensional Variation In Assemb...Assembly Root Cause Analysis  A Way To Reduce Dimensional Variation In Assemb...
Assembly Root Cause Analysis A Way To Reduce Dimensional Variation In Assemb...
 
Iris Recognition Using Active Contours
Iris Recognition Using Active ContoursIris Recognition Using Active Contours
Iris Recognition Using Active Contours
 
IRJET- Effectiveness of Constructivist Instructional Approach on Achievem...
IRJET-  	  Effectiveness of Constructivist Instructional Approach on Achievem...IRJET-  	  Effectiveness of Constructivist Instructional Approach on Achievem...
IRJET- Effectiveness of Constructivist Instructional Approach on Achievem...
 
Prosthodontics Journal Club: Altered cast impression techniques
Prosthodontics Journal Club: Altered cast impression techniquesProsthodontics Journal Club: Altered cast impression techniques
Prosthodontics Journal Club: Altered cast impression techniques
 
Bone Age Estimation for Investigational Analysis
Bone Age Estimation for Investigational AnalysisBone Age Estimation for Investigational Analysis
Bone Age Estimation for Investigational Analysis
 
REVIEW OF TRUE BENDING STRESS IN SPUR GEAR
REVIEW OF TRUE BENDING STRESS IN SPUR GEARREVIEW OF TRUE BENDING STRESS IN SPUR GEAR
REVIEW OF TRUE BENDING STRESS IN SPUR GEAR
 
Reliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point MethodReliability Analysis of Slope Stability by Central Point Method
Reliability Analysis of Slope Stability by Central Point Method
 
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice Guideline
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice GuidelineVenous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice Guideline
Venous Thromboembolism Prophylaxis CPG: an ADAPTE Clinical Practice Guideline
 
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...Application of Analytic Hierarchy Process to Retaining wall maintenance prior...
Application of Analytic Hierarchy Process to Retaining wall maintenance prior...
 
ppt_mm.pptx
ppt_mm.pptxppt_mm.pptx
ppt_mm.pptx
 
CSC-1986.original
CSC-1986.originalCSC-1986.original
CSC-1986.original
 

Mehr von TRUSS ITN

"On the bonding performance of distributed optical fiber sensors (DOFS) in st...
"On the bonding performance of distributed optical fiber sensors (DOFS) in st..."On the bonding performance of distributed optical fiber sensors (DOFS) in st...
"On the bonding performance of distributed optical fiber sensors (DOFS) in st...TRUSS ITN
 
"Mechanical characterisation of braided BFRP rebars for internal concrete rei...
"Mechanical characterisation of braided BFRP rebars for internal concrete rei..."Mechanical characterisation of braided BFRP rebars for internal concrete rei...
"Mechanical characterisation of braided BFRP rebars for internal concrete rei...TRUSS ITN
 
"Structural health monitoring of bridges: a Bayesian network approach" presen...
"Structural health monitoring of bridges: a Bayesian network approach" presen..."Structural health monitoring of bridges: a Bayesian network approach" presen...
"Structural health monitoring of bridges: a Bayesian network approach" presen...TRUSS ITN
 
"Using step-by-step Bayesian updating to better estimate the reinforcement lo...
"Using step-by-step Bayesian updating to better estimate the reinforcement lo..."Using step-by-step Bayesian updating to better estimate the reinforcement lo...
"Using step-by-step Bayesian updating to better estimate the reinforcement lo...TRUSS ITN
 
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ...
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ..."Bridge condition evaluation using LDVs installed on a vehicle" presented at ...
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ...TRUSS ITN
 
"Surrogate infill criteria for operational fatigue reliability analysis" pres...
"Surrogate infill criteria for operational fatigue reliability analysis" pres..."Surrogate infill criteria for operational fatigue reliability analysis" pres...
"Surrogate infill criteria for operational fatigue reliability analysis" pres...TRUSS ITN
 
"Outlier detection of point clouds generating from low-cost UAVs for bridge i...
"Outlier detection of point clouds generating from low-cost UAVs for bridge i..."Outlier detection of point clouds generating from low-cost UAVs for bridge i...
"Outlier detection of point clouds generating from low-cost UAVs for bridge i...TRUSS ITN
 
"A machine learning approach for the estimation of fuel consumption related t...
"A machine learning approach for the estimation of fuel consumption related t..."A machine learning approach for the estimation of fuel consumption related t...
"A machine learning approach for the estimation of fuel consumption related t...TRUSS ITN
 
"Characterization of hoisting operations on the dynamic response of the lifti...
"Characterization of hoisting operations on the dynamic response of the lifti..."Characterization of hoisting operations on the dynamic response of the lifti...
"Characterization of hoisting operations on the dynamic response of the lifti...TRUSS ITN
 
"Probabilistic decision basis and objectives for inspection planning and opti...
"Probabilistic decision basis and objectives for inspection planning and opti..."Probabilistic decision basis and objectives for inspection planning and opti...
"Probabilistic decision basis and objectives for inspection planning and opti...TRUSS ITN
 
"Impact of input variables on the seismic response of free-standing spent fue...
"Impact of input variables on the seismic response of free-standing spent fue..."Impact of input variables on the seismic response of free-standing spent fue...
"Impact of input variables on the seismic response of free-standing spent fue...TRUSS ITN
 
"Fatigue testing of reinforced concrete beam instrumented with distributed op...
"Fatigue testing of reinforced concrete beam instrumented with distributed op..."Fatigue testing of reinforced concrete beam instrumented with distributed op...
"Fatigue testing of reinforced concrete beam instrumented with distributed op...TRUSS ITN
 
"Nothing on the road axle detection system using direct strain measurements –...
"Nothing on the road axle detection system using direct strain measurements –..."Nothing on the road axle detection system using direct strain measurements –...
"Nothing on the road axle detection system using direct strain measurements –...TRUSS ITN
 
"Vibration-based, output-only damage identification of bridge under vehicle i...
"Vibration-based, output-only damage identification of bridge under vehicle i..."Vibration-based, output-only damage identification of bridge under vehicle i...
"Vibration-based, output-only damage identification of bridge under vehicle i...TRUSS ITN
 
"Finding the influence line for a bridge based on random traffic and field me...
"Finding the influence line for a bridge based on random traffic and field me..."Finding the influence line for a bridge based on random traffic and field me...
"Finding the influence line for a bridge based on random traffic and field me...TRUSS ITN
 
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan..."Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...TRUSS ITN
 
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo..."Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo...TRUSS ITN
 
"A comparative study on different BFRP rebar design methodologies" presented ...
"A comparative study on different BFRP rebar design methodologies" presented ..."A comparative study on different BFRP rebar design methodologies" presented ...
"A comparative study on different BFRP rebar design methodologies" presented ...TRUSS ITN
 
"A big data approach for investigating the performance of road infrastructure...
"A big data approach for investigating the performance of road infrastructure..."A big data approach for investigating the performance of road infrastructure...
"A big data approach for investigating the performance of road infrastructure...TRUSS ITN
 
"Statistical reliability of the screw pullout test in the assessment of in-si...
"Statistical reliability of the screw pullout test in the assessment of in-si..."Statistical reliability of the screw pullout test in the assessment of in-si...
"Statistical reliability of the screw pullout test in the assessment of in-si...TRUSS ITN
 

Mehr von TRUSS ITN (20)

"On the bonding performance of distributed optical fiber sensors (DOFS) in st...
"On the bonding performance of distributed optical fiber sensors (DOFS) in st..."On the bonding performance of distributed optical fiber sensors (DOFS) in st...
"On the bonding performance of distributed optical fiber sensors (DOFS) in st...
 
"Mechanical characterisation of braided BFRP rebars for internal concrete rei...
"Mechanical characterisation of braided BFRP rebars for internal concrete rei..."Mechanical characterisation of braided BFRP rebars for internal concrete rei...
"Mechanical characterisation of braided BFRP rebars for internal concrete rei...
 
"Structural health monitoring of bridges: a Bayesian network approach" presen...
"Structural health monitoring of bridges: a Bayesian network approach" presen..."Structural health monitoring of bridges: a Bayesian network approach" presen...
"Structural health monitoring of bridges: a Bayesian network approach" presen...
 
"Using step-by-step Bayesian updating to better estimate the reinforcement lo...
"Using step-by-step Bayesian updating to better estimate the reinforcement lo..."Using step-by-step Bayesian updating to better estimate the reinforcement lo...
"Using step-by-step Bayesian updating to better estimate the reinforcement lo...
 
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ...
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ..."Bridge condition evaluation using LDVs installed on a vehicle" presented at ...
"Bridge condition evaluation using LDVs installed on a vehicle" presented at ...
 
"Surrogate infill criteria for operational fatigue reliability analysis" pres...
"Surrogate infill criteria for operational fatigue reliability analysis" pres..."Surrogate infill criteria for operational fatigue reliability analysis" pres...
"Surrogate infill criteria for operational fatigue reliability analysis" pres...
 
"Outlier detection of point clouds generating from low-cost UAVs for bridge i...
"Outlier detection of point clouds generating from low-cost UAVs for bridge i..."Outlier detection of point clouds generating from low-cost UAVs for bridge i...
"Outlier detection of point clouds generating from low-cost UAVs for bridge i...
 
"A machine learning approach for the estimation of fuel consumption related t...
"A machine learning approach for the estimation of fuel consumption related t..."A machine learning approach for the estimation of fuel consumption related t...
"A machine learning approach for the estimation of fuel consumption related t...
 
"Characterization of hoisting operations on the dynamic response of the lifti...
"Characterization of hoisting operations on the dynamic response of the lifti..."Characterization of hoisting operations on the dynamic response of the lifti...
"Characterization of hoisting operations on the dynamic response of the lifti...
 
"Probabilistic decision basis and objectives for inspection planning and opti...
"Probabilistic decision basis and objectives for inspection planning and opti..."Probabilistic decision basis and objectives for inspection planning and opti...
"Probabilistic decision basis and objectives for inspection planning and opti...
 
"Impact of input variables on the seismic response of free-standing spent fue...
"Impact of input variables on the seismic response of free-standing spent fue..."Impact of input variables on the seismic response of free-standing spent fue...
"Impact of input variables on the seismic response of free-standing spent fue...
 
"Fatigue testing of reinforced concrete beam instrumented with distributed op...
"Fatigue testing of reinforced concrete beam instrumented with distributed op..."Fatigue testing of reinforced concrete beam instrumented with distributed op...
"Fatigue testing of reinforced concrete beam instrumented with distributed op...
 
"Nothing on the road axle detection system using direct strain measurements –...
"Nothing on the road axle detection system using direct strain measurements –..."Nothing on the road axle detection system using direct strain measurements –...
"Nothing on the road axle detection system using direct strain measurements –...
 
"Vibration-based, output-only damage identification of bridge under vehicle i...
"Vibration-based, output-only damage identification of bridge under vehicle i..."Vibration-based, output-only damage identification of bridge under vehicle i...
"Vibration-based, output-only damage identification of bridge under vehicle i...
 
"Finding the influence line for a bridge based on random traffic and field me...
"Finding the influence line for a bridge based on random traffic and field me..."Finding the influence line for a bridge based on random traffic and field me...
"Finding the influence line for a bridge based on random traffic and field me...
 
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan..."Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...
"Sensitivity of SHM sensors to bridge stiffness" presented at CERI2018 by Dan...
 
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo..."Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
 
"A comparative study on different BFRP rebar design methodologies" presented ...
"A comparative study on different BFRP rebar design methodologies" presented ..."A comparative study on different BFRP rebar design methodologies" presented ...
"A comparative study on different BFRP rebar design methodologies" presented ...
 
"A big data approach for investigating the performance of road infrastructure...
"A big data approach for investigating the performance of road infrastructure..."A big data approach for investigating the performance of road infrastructure...
"A big data approach for investigating the performance of road infrastructure...
 
"Statistical reliability of the screw pullout test in the assessment of in-si...
"Statistical reliability of the screw pullout test in the assessment of in-si..."Statistical reliability of the screw pullout test in the assessment of in-si...
"Statistical reliability of the screw pullout test in the assessment of in-si...
 

Kürzlich hochgeladen

Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 

Kürzlich hochgeladen (20)

Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 

"Reliability-based inspection planning in view of both crack initiation and propagation" presented at ESREL2017 by Guang Zou

  • 1. Reliability-based inspection planning in view of both crack initiation and propagation · Presenter Guang Zou (research fellow, PhD student) · Authors Guang Zou (Lloyd’s Register, UK) Dr Kian Banisoleiman (Lloyd’s Register, UK) Dr Arturo González (University College Dublin, IR) The funding from the EU’s Horizon 2020 programme under the Marie Sklodowska-Curie grant agreement No. 642453 is greatly appreciated. ESREL, 20 Jun, 2017
  • 2.  Serious consequences of fatigue and fracture failure  Significant uncertainties associated with wave loads and fatigue degradation  Design assumptions cannot be fully satisfied during operation.  Inspection/monitoring results can be utilized to support optimal decisions on operation and maintenance. Motivation(Structural integrity management) Structural Integrity management (SIM) for ships ESREL, 20 Jun, 2017
  • 3. Fatigue design & S-N model One and two-segment characteristic S-N curve Miner’s Rule Limit-state function Long-term stress range Equivalent stress range 𝑔 = 𝑁 − 𝑁𝑆<0 ∆, 𝐴, 𝐵 are variables: ∆ reflect the uncrtainty in damage accumulation 𝐴 reflect the uncrtainty in fatigue capacity 𝐵 reflect the uncrtainty in stress calculation Limitations: too general, no link with inspection results ESREL, 20 Jun, 2017
  • 4. Inspection planning & FM model Crack propagation (Paris’s law) Limit-state function Strengths: 1. detailed information 2. comparable with inspections Limitations: 1. 𝑎0 is hard to obtain 2. 𝑇0 is not accounted for Three stages of crack development ESREL, 20 Jun, 2017
  • 5. Time-To-Crack-Initiation (𝑁𝐼)  For critical components, 𝑎0 may be smaller than 𝑎 𝑑, and hard to measure  𝑁𝐼 may account for a large part of fatigue life of critical components  Crack size under 𝑎 𝑑 is not important, but 𝑁𝐼 is important for inspection planning  Obtain info. on 𝑁𝐼 by specimen test (e.g. Lassen and Sørensen (2002a)) 𝑁𝐹 = 𝑁𝐼 + 𝑁 𝑃 𝑁𝐹 = 𝑁𝐼 + 1 𝜋 𝑚 2 𝐶∆𝜎 𝑚 𝑎 𝑑 𝑎 𝑐 𝑑𝑎 𝑎 𝑚 2 𝑌 𝑎 𝑚 𝑎 𝑡 𝑎 𝑑 𝑁𝐼 𝑎0 N ESREL, 20 Jun, 2017
  • 6. Inspection strategies  Inspection timing fixed inspection interval approach vs. target reliability approach  Inspection method close visual inspection (CVI) vs. magnetic particle inspection (MPI) 𝑡 𝛽𝑡 𝑡 𝛽𝑡 𝛽 𝛽 𝑇𝑆𝐿 ∆𝑇 ∆𝑇 ∆𝑇 𝑇𝑆𝐿𝑇𝑖𝑛𝑠𝑝 1 𝑇𝑖𝑛𝑠𝑝 2 𝑃𝑜𝐷 = 𝐹 𝑎 𝑑 = 1 − exp − 𝑎 𝑑 𝜈 𝑑 Probability of detection curves for CVI & MPI ESREL, 20 Jun, 2017
  • 7. Illustrative example  Fatigue-prone welded T joints  Inspection plans allowing for 𝑁𝐼  Reliability based & time based inspection  Visual inspection & MPI ESREL, 20 Jun, 2017
  • 8. Results(reliability-based plans) βt = 2.5, CVI βt = 2.5, MPI βt = 3.5, CVI βt = 3.5, MPI ESREL, 20 Jun, 2017
  • 9. Results(time-based plans) ICI, CVI ICI, MPI NCI, CVI NCI, MPI ESREL, 20 Jun, 2017
  • 10. Discussions(reliability-based plans)  𝑛𝑖𝑛𝑠𝑝 may be decreased while allowing for 𝑁𝐼. But if 𝛽𝑡 is high, regular inspections are necessary. ESREL, 20 Jun, 2017
  • 11. Discussions(reliability-based plans)  ∆𝑇𝑖𝑛𝑠𝑝1 can be prolonged while allowing for 𝑁𝐼. Fail to take this into account may result in waste of inspection resources.  There isn’t much difference in the following inspection intervals ∆𝑇𝑖𝑛𝑠𝑝2, ∆𝑇𝑖𝑛𝑠𝑝3, …, whether considering 𝑁𝐼 or not.  No indication from MPI supports longer inspection interval, compared with no indication from CVI. ESREL, 20 Jun, 2017
  • 12. Discussions(time-based plans)  Fixed inspection interval is preferred from the point of logistics. The fixed interval is also be determined based on reliability analysis.  Reliability-based plans are able to keep safety margin above a certain level more even than time-based plans. ESREL, 20 Jun, 2017
  • 13. Conclusions  𝑁𝐼 may account for a significant part of 𝑁𝐹 for some critical joints, and should be taken into account in inspection planning.  𝑁𝐼 can be obtained based on specimen tests, and be added to 𝑁 𝑃, so that crack initiation life is included, without having to know statistical information on 𝑎0.  Allowing for 𝑁𝐼, ∆𝑇𝑖𝑛𝑠𝑝 1 can be prolonged, but there isn’t much difference in ∆𝑇𝑖𝑛𝑠𝑝2, ∆𝑇𝑖𝑛𝑠𝑝3, …, .  Allowing for 𝑁𝐼, 𝑛𝑖𝑛𝑠𝑝 may be decreased, depending on 𝛽𝑡. ESREL, 20 Jun, 2017
  • 14. Thank you for your attention! · Presenter Guang Zou (Lloyd’s Register, research fellow) guang.zou@lr.org The funding from the EU’s Horizon 2020 programme under the Marie Sklodowska-Curie grant agreement No. 642453 is greatly appreciated. ESREL, 20 Jun, 2017