SlideShare a Scribd company logo
1 of 3
RESUME
TRILOK SHARMA Email: tirloksharma45@gmail.com
B-698, Ved Bhawan, Gali No.-5, Mob: +91 8882662159
Old Shiv Mandir, Shiv Colony
Vill: Sahibabad.
Ghaziabad ( U.P)
Looking for a post of Foreman in Metro, Underground Rail, Road projects etc.
CAREER OBJECTIVE
Intend to build a career with an organization Hi –Tech environment with committed & Dedicated people,
which will help to explore fully and realize my potential willing to work with as a key player in challenging &
creative environment.
Professional Synopsis
Having 7+ year experience in Tunneling.
Presently associated with Continental Engineering Corporation as a Tunnel Supervisor in Delhi Metro Rail
Project
Having good knowledge of launching TBM, Key allocation, Initial drive and cutter head intervention on
TBM.
Having knowledge in VMT guidance system for TBM driving.
Experience in executing all types of Grouting and Shotcrete works for Tunnels.
A good team player with good communication and interpersonal skills.
Flexible and Versatile to adapt to any new environment and work on any projects
EDUCATIONAL QUALIFICATION
 B.A in Rajasthan University
 Intermediate From Uttar Pradesh Board in 2007
Previous Organization
EMPLOYER: M/S CEC–CICI (JV)
CLIENT: Delhi Metro Rail Corporation DMRC
DESIGNATION: Supervisor – Tunnel
Employment Details: MAY 2013 to till date
Project Details:-Design and Construction of Tunnels by shield TBM EPB (Earth Pressure Balance),
Tunnel by Cut & Cover, Cross passages with Sump by NATM, Underground Station at Azadpur by Cut &
Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on Mukundpur -
Yamuna Vihar Corridor of Phase III of Delhi MRTS.
Tunnel: 2.145 kms. Twin Bored Tunnels with internal finished Dia - 5.80 meters (using 2 Shield)
Responsibility:-
Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation
of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling)
Supervision and execution of Primary and secondary grouting by segment grouting method.
Optimum utilization of resources.
Supervision and execution of jet grouting in Azadpur site.
Construction of stone columns at Mukundpur ramp for soil liquefaction.
Having good knowledge about Ring selection.
Proper utilization of Equipments and Machinery
Making of Daily Progress report.
EMPLOYER: ITD-ITD CEM. J.V in KOLKATA Metro Rail
CLIENT: Kolkata Metro Rail Corporation KMRC
DESIGNATION: Tunnel Supervisor
Employment Details: Feb 2011 to April 2013
Project Details: - Construction of Tunnels by shield TBM EPB (Earth Pressure Balance), Tunnel by
Cut & Cover
Responsibility:-
Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation
of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling)
Preparation and Execution of Primary and secondary grouting in tunnel
Proper utilization of Equipments and Machinery
Making of Daily Progress report
EMPLOYER: - ITD CEM. J.V in Delhi Metro Rail
CLIENT: - Delhi Metro Rail Corporation DMRC
DESIGNATION: - Supervisor – Tunnel
Employment Details: - Feb 2008 to Jan 2011
Responsibility:-
Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation
of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling)
Preparation and execution activities for tunnel breakthrough & dismantling of TBM works.
Execution and supervision of tunnel invert concrete and permanent walkway work.
Execution of grouting work in tunnel
Proper utilization of Equipments and Machinery
Making of Daily Progress report
EMPLOYER: - MTG (METRO TUNNELING GROUP)
CLIENT: - Delhi Metro Rail Corporation DMRC
DESIGNATION: - Surface supervisor
Employment Details: - Dec-2007 to Jan-2008
Responsibility:-
Responsible for all surface activities for tunnel
Preparation and construction of Gantry foundation and muck pit.
Preparation and construction of service line Trench
Preparation of Segment stocking yard
Arranging material for tunnel requirement
Quick responding in Emergency situations
Proper utilization of Equipments and Machinery
Making of Daily Progress report
PERSONAL PROFILE:-
FATHER’S NAME Mr. Kanti Kumar Sharma
DATE OF BIRTH 5 Sep 1987
NATIONALITY INDIAN
MARITIAL STATUS MARRIED
CORRESPONDENCE AS ABOVE
PASSPORT NO. H6131589
STRENGTH AREAS Good Communication Skills.
Declaration:
I hereby declare that the given information is true to the best of my knowledge
(TRILOK SHARMA)

More Related Content

What's hot

CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)zeeshan Ali
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CVIbrar Hussain
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed Shahzad
 
Jeevan: Site Supervisor
Jeevan: Site SupervisorJeevan: Site Supervisor
Jeevan: Site SupervisorJeevan Banal
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)muhammadmasood75
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)ALI RZA
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15muhammed ishfaq
 
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012Mohammad Solaiman
 

What's hot (20)

A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
K{15 Revised}
K{15 Revised}K{15 Revised}
K{15 Revised}
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
Land Surveyor Updated CV
Land Surveyor Updated CVLand Surveyor Updated CV
Land Surveyor Updated CV
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Jeevan: Site Supervisor
Jeevan: Site SupervisorJeevan: Site Supervisor
Jeevan: Site Supervisor
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
 
C.V. small size
C.V. small sizeC.V. small size
C.V. small size
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
Cv of siddique feb 2016
Cv of siddique feb 2016Cv of siddique feb 2016
Cv of siddique feb 2016
 
Pamgopal Pramanick Presentation
Pamgopal Pramanick PresentationPamgopal Pramanick Presentation
Pamgopal Pramanick Presentation
 
Curriculam vitae
Curriculam vitaeCurriculam vitae
Curriculam vitae
 

Similar to Tirlok (20)

MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Resume
ResumeResume
Resume
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
balu UG
balu UGbalu UG
balu UG
 
Peeyush Resume
Peeyush ResumePeeyush Resume
Peeyush Resume
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
NPS resume
NPS resumeNPS resume
NPS resume
 
abhi_cv
abhi_cvabhi_cv
abhi_cv
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
jainco
jaincojainco
jainco
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
HM SIAL
HM SIALHM SIAL
HM SIAL
 

Tirlok

  • 1. RESUME TRILOK SHARMA Email: tirloksharma45@gmail.com B-698, Ved Bhawan, Gali No.-5, Mob: +91 8882662159 Old Shiv Mandir, Shiv Colony Vill: Sahibabad. Ghaziabad ( U.P) Looking for a post of Foreman in Metro, Underground Rail, Road projects etc. CAREER OBJECTIVE Intend to build a career with an organization Hi –Tech environment with committed & Dedicated people, which will help to explore fully and realize my potential willing to work with as a key player in challenging & creative environment. Professional Synopsis Having 7+ year experience in Tunneling. Presently associated with Continental Engineering Corporation as a Tunnel Supervisor in Delhi Metro Rail Project Having good knowledge of launching TBM, Key allocation, Initial drive and cutter head intervention on TBM. Having knowledge in VMT guidance system for TBM driving. Experience in executing all types of Grouting and Shotcrete works for Tunnels. A good team player with good communication and interpersonal skills. Flexible and Versatile to adapt to any new environment and work on any projects EDUCATIONAL QUALIFICATION  B.A in Rajasthan University  Intermediate From Uttar Pradesh Board in 2007 Previous Organization EMPLOYER: M/S CEC–CICI (JV) CLIENT: Delhi Metro Rail Corporation DMRC DESIGNATION: Supervisor – Tunnel Employment Details: MAY 2013 to till date Project Details:-Design and Construction of Tunnels by shield TBM EPB (Earth Pressure Balance), Tunnel by Cut & Cover, Cross passages with Sump by NATM, Underground Station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on Mukundpur - Yamuna Vihar Corridor of Phase III of Delhi MRTS. Tunnel: 2.145 kms. Twin Bored Tunnels with internal finished Dia - 5.80 meters (using 2 Shield)
  • 2. Responsibility:- Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling) Supervision and execution of Primary and secondary grouting by segment grouting method. Optimum utilization of resources. Supervision and execution of jet grouting in Azadpur site. Construction of stone columns at Mukundpur ramp for soil liquefaction. Having good knowledge about Ring selection. Proper utilization of Equipments and Machinery Making of Daily Progress report. EMPLOYER: ITD-ITD CEM. J.V in KOLKATA Metro Rail CLIENT: Kolkata Metro Rail Corporation KMRC DESIGNATION: Tunnel Supervisor Employment Details: Feb 2011 to April 2013 Project Details: - Construction of Tunnels by shield TBM EPB (Earth Pressure Balance), Tunnel by Cut & Cover Responsibility:- Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling) Preparation and Execution of Primary and secondary grouting in tunnel Proper utilization of Equipments and Machinery Making of Daily Progress report EMPLOYER: - ITD CEM. J.V in Delhi Metro Rail CLIENT: - Delhi Metro Rail Corporation DMRC DESIGNATION: - Supervisor – Tunnel Employment Details: - Feb 2008 to Jan 2011 Responsibility:- Responsible for construction and supervision of all tunnel activities for initial and main drive (as instillation of Tunnel Eye, T.B.M Cradle fixing, Head Wall Construction, TBM lowering & assembling) Preparation and execution activities for tunnel breakthrough & dismantling of TBM works. Execution and supervision of tunnel invert concrete and permanent walkway work. Execution of grouting work in tunnel Proper utilization of Equipments and Machinery Making of Daily Progress report
  • 3. EMPLOYER: - MTG (METRO TUNNELING GROUP) CLIENT: - Delhi Metro Rail Corporation DMRC DESIGNATION: - Surface supervisor Employment Details: - Dec-2007 to Jan-2008 Responsibility:- Responsible for all surface activities for tunnel Preparation and construction of Gantry foundation and muck pit. Preparation and construction of service line Trench Preparation of Segment stocking yard Arranging material for tunnel requirement Quick responding in Emergency situations Proper utilization of Equipments and Machinery Making of Daily Progress report PERSONAL PROFILE:- FATHER’S NAME Mr. Kanti Kumar Sharma DATE OF BIRTH 5 Sep 1987 NATIONALITY INDIAN MARITIAL STATUS MARRIED CORRESPONDENCE AS ABOVE PASSPORT NO. H6131589 STRENGTH AREAS Good Communication Skills. Declaration: I hereby declare that the given information is true to the best of my knowledge (TRILOK SHARMA)