Acção: Construção 2011 - Apresentação 05 - KANBIM PT: Sinergias BIM - Lean em Movimento, Prof. Nuno Cachadinha /FCT-UNL
1. ACÇÃO: CONSTRUÇÃO 2011
UM DIA DE VISÃO, PARCERIAS, PROJECTOS, NEGÓCIOS E NETWORKING
16 Fevereiro 2011
FCT/UNL
MONTE DA CAPARICA
KANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTO
Prof. Nuno Cachadinha /FCT-UNL
Organização
2. 08h30 - Recepção e entrega de documentação
09h00 - Sessão de Abertura Director da FCT Universidade Nova
Programa 09h30 - PAINEL OPORTUNIDADES EMERGENTES
CONSTRUÇÃO 2011 - NOVAS OPORTUNIDADES E INOVAÇÃO
Prof. Valadares Tavares
PLANIT VALLEY (PAREDES) SMART & CONNECTED COMMUNITIES
Living PlanIT
INTERNACIONALIZAÇÃO DAS EMPRESAS DE CONSTRUÇÃO PORTUGUESAS ESTRATÉGIAS E DESAFIOS
Eng. Tiago Martins e Miguel Labrincha / FCT-UNL
INOVAÇÃO NA CONSTRUÇÃO
Eng. Ricardo Carvalho / DST
Debate Painel
11h00 - NETWORKING / INTERVALO PARA CAFÉ
11H30 - PAINEL LEAN CONSTRUCTION
KANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTO
Prof. Nuno Cachadinha /FCT-UNL
LEAN JUSTICE - CONSTRUCTION MEDIATION
Dra. Maria da Conceição Oliveira
OPORTUNIDADES E DESAFIOS PARA A LEAN CONSTRUCTION EM PORTUGAL
Eng. João Matias e João Martins / FCT-UNL
CLIP, LAST PLANNFlor ER, KPI
Doutor António / Rumo ao Objectivo
Debate Painel
13h00 - NETWORKING / INTERVALO PARA ALMOÇO (LIVRE)
15h00 - PAINEL BIM BUILDING INFORMATION MODELING
VALOR BIM EM PROJECTO, CONSTRUÇÃO E EXPLORAÇÃO
Eng. Alvaro Sardinha / TECAD
“ARCHITECTUREOR REVOLUTION”
Arq. Levi Dacosta, Arq. Bernardo Vaz Pinto / Lisbon Design Studio
BIM EM AQUECIMENTO, VENTILAÇÃO E AR CONDICIONADO
Eng. Miguel Ferreira / CERTITERM
IMPLEMENTAÇÃO DE BIM NA REALIDADE DA CONSTRUÇÃO NACIONAL
Eng. Tiago Vasconcelos e Pedro Madeira / FCT-UNL
Debate Painel
16h30 - NETWORKING / INTERVALO PARA CAFÉ
17h00 - PAINEL REABILITAÇÃO
REABILITAÇÃO: O FUTURO
Eng. Vitor Cóias / GeCORPA
REABILITAÇÃO E SUSTENTABILIDADE - NOVAS ABORDAGENS
Diogo Pereira e Alexandra Rueff / FCT-UNL
REABILITAÇÃO DE CENTROS HISTÓRICOS
Eng. Catarina Lopes / Eastbanc
RECENTES OBRAS EMBLEMÁTICAS DE REABILITAÇÃO EM PATRIMÓNIO PROTEGIDO
Eng. Ana Melo / Soares da Costa
Debate Painel
18h30 - Encerramento
Subdirectora para a Inovação e Empreendedorismo da UNL FCT
7. KanBIM – Production Control
Start
9 Master Plan End
Construction
Planner Site
10 Look ahead
Construction 8 Engineers
Section / plan
zone Construction 4 Planner Health &
Planner Safety Inspector
managers Section / Section /
Client Section / Detailed zone zone
zone 3 Detailed
Candidate Work managers manager
User Trade Tasks Work
managers Packages User
manager Complete ?
Trade Trade team
managers leader 7
2 Weekly Plan Trade team
User (Control Cards) leader
Construction
Planner Trade
managers
Section /
zone
Trade team
managers leaders 1 Work in
Trade team Process
Health & leader
Safety
Material/
Task Equipment
Work packages
Kanbans
s Tas
Exit ks 5
Tas Logistics
Manager
ks
8. Lintels and ring
beams Basement 1
Framing for false
ceiling Entrance floor
Framing West side Lobby
Basement 1
Complete to
ceiling Basement 1
Partitions
Basement 2
9. Electrical connection
HVAC end unit zone 1
Testing HVAC -
Zone 1
Main ducts –
Ducts 20-31
Secondary ducts –
Ducts 10a-20a
Main ducts –
Ducts 33-42
End Units –
Zone 1
10.
11. Erect columns
Floor 6 Grids E1 to
H4
Erect columns
Floor 6 Grids E5 to
H8
Erect Hollowcore
Floor 5 Grids A5 to D8
Strip and clean Floor
Prepare and pour topping 5 Grids A1 to D8
Floor 5 Grids A1 to D8
Support installation of
hoist South side
Sprinkler pipes facade
Erect Hollowcore
Floor 5 Grids A1 to D4 Floor 4
Main ducts –
Ducts 53-63 Cut HVAC access End Units –
holes Floor 4 Grid B3- Sprinkler pipes Zone 1 Main distribution board –
C4 Floor 3 Wiring Entrance floor
Lintels and ring Main ducts – Lobby
beams Basement 1 Ducts 20-31 Testing HVAC -
Zone 1
Framing for false
Side A West side Secondary ducts –
ceiling Entrance floor
Framing West side Basement 1 Main ducts – Ducts 10a-20a Electrical connection Lobby
Basement 1 Ducts 33-42 HVAC end unit zone 1
Partitions
Complete to Basement 1 Side A East side
ceiling Basement 1 Framing East side Basement 1
Close openings above Basement 1
HVAC Stairwell 2
Pipe installation in drywalls Duct installation in drywalls
Basement 1 West side basement 1 West side Basement 1
Complete to
ceiling Basement 2
Partitions
Lintels and ring Basement 2
beams Basement 2 Fix cracks West
side basement 3
Install main lines W12
Basement 2 Fire fighting
pump room
Partition walls
Storerooms Basement
3
Install main lines
Basement 3 Fire fighting
pump room
12. John Smith
Drywalls Team
Task List
Floor Plan
Side B-
internal
Section 4”
partition
Side A-
internal
1
4” Framing-
partition d internal 4”
partition
GO
Framing-
0
Filters Framing-
internal 4”
internal 4”
partition d Side B-
internal
partition
4”
partition
C
85
% Side A-
internal
50
4”
%
partition
10 Side A-
STOP
% internal
Start 85
%
4”
partition
100
%
1
Complete 70
%
Framing- d
internal 4”
10 partition
%
Stop Control 2d
Card
Control
Card
Exit
13. John Smith
Drywalls Team
Task List Status Type Task Location
Floor Plan Framing Internal 4” partition Apartments 24-26
Side B-
GO Side A Internal 4” partition
internal
Apartments 22-23
Section 4”
partition
Framing
Side A-
1
Internal 4” partition
internal
Apartments 20-21
4” Framing-
partition d internal 4”
partition
GO
1 Side B Internal 4” partition
Framing-
0 Apartments 18-19
Filters d Framing-
internal 4”
internal 4”
partition d internal
Side B-
0 Framing partition Internal 4” partition Apartments 16-17
4”
partition
d C
C Side B 85 Internal 4” partition Apartments 14-15
Side A-
%
internal
50
4”
%
STOP Side A 10 Internal 4” partition Apartments 12-13
Side A-
partition
STOP
% internal
Start 85 4”
1 Side A %
100
Internal 4” partition Apartments 10-11
partition
1
Complete d %
70
d
2d Framing % Internal 4” partition Framing-
Apartments 08-09
internal 4”
10 partition
%
Stop Control 2d
Card
Control
Card
Exit
14. John Smith
Drywalls Team
Task List
Floor Plan
Side B-
internal
Section 4”
partition
Side A-
internal
1
4” Framing-
partition d internal 4”
partition
GO
Framing-
0
Filters Framing-
internal 4”
internal 4”
partition d Side B-
internal
partition
4”
partition
C
85
% Side A-
internal
50
4”
%
partition
10 Side A-
STOP
% internal
Start 85
%
4”
partition
100
%
1
Complete 70
%
Framing- d
internal 4”
10 partition
%
Stop Control 2d
Card
Control
Card
Exit
15. John Smith
Drywalls Team
Side B-
internal
Task List 4”
partition
1
Floor Plan d
You chose to report task: Framing-
Side B – Internal 4” partition at apartment 18-19 internal 4”
Section as complete.
partition
Planned duration: 2 days; Actual duration: 1 day 0
Please report any problems you encountered during execution:
Side A-
internal
d
4”
partition
Filters 1
Preceding activities not finished Lack of materials
d
Workspace was not ready Equipment was not available
Lack of information Framing- Team issues
Framing- internal 4”
internal 4” partition
partition
Start Safety issues Management Instruction
Complete Weather No problems
Stop
Control Complete Cancel
Card
Exit
16. John Smith
Drywalls Team
Task List
Task Location Planned Duration Task Maturity Priority
Floor Plan
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Task name
Section Preceding Last Events
activities
Task name
+ Preceding Activities Task name
Workspac GO
e
• Flooring Apartment 25 was stopped
GO
+ Workspace
Filters Informatio
n Framing
• Apartment 25 is clear
+ Information
Apartment 24-26 Task name
Safety • Changes plan was approved
+ Safety
Materials • Nothing to report Task name
+ Materials STOP
Equipmen
Start t • Rails delivered
• Studs – 30 meters missing
Team + Equipment
Complete Task name
• Nothing to report
+ Team
Stop Close
• Nothing to report
Control
Card
Exit
17. You chose to stop task:
Framing – Internal 4” partition at apartment 16-17
Please provide the reason for stopping this task
Unavailable
Previous work Missing materials
Equipment
Workspace Faulty materials Equipment Fault
Framing-
internal 4”
Missing information Safety issues
partition
Wrong Equipment
A-L-43-R5 Design Errors Team Weather
ID-L-73-1-R2
Management
Instruction
DW-D-6-R1
Select
E-W-23 Stop objects Cancel
completed
Exit
18. John Smith
Drywalls Team
Task List
Task Location Planned Duration Task Maturity Priority
Floor Plan
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Task name
Section Preceding Information Show Details
activities
Task name
Interior design sheet #6 name
Dry GO detail layout Status
wall Description Expecte Reliabili
Name Task Source
Workspac d ty
e
GO
Architectural Approve
A-L-43-R5 HOK
Filters Informatio layout d
n Framing
ID-L-73-1-R2 Interior design Under Barak &
Apartment 24-26 Task name
Thursday 80%
Safety layout revision Partners
DW-D-6- Dry wall detail
Available Arup
Materials R1 sheet #6
Task name
Electrical wiring Waiting Tomorro
E-W-23 90% Mace
STOP
Start Equipmen diagram approval w
t
Team
Complete Task name
Stop Close
A-L-43-R5 ID-L-73-1-R2 DW-D-6-R1 E-W-23
Control
Card
Exit
19. John Smith
Drywalls Team
Task List
Task Location Planned Duration Task Maturity Priority
Floor Plan
Framing internal 4” partition Level 1 Apartment 24-26 1 day 30%
Task name
Section Preceding Safety
activities
Task name Reliabili Responsibl
Safety Preconditions Status nameExpected
Workspac GO Task ty e
e
Safety instruction given GO Eduard
Confirmed
to crew Wise
Filters Informatio
n Framing Eduard
Crew qualified
Apartment 24-26 Confirmed Task nameWise
Safety Personal safety Eduard
Available
equipment available Wise
Materials Work zone cleared of Eduard
Confirmed Task name
hazards Wise
STOP
Equipmen Eduard
Start t Fall protection in place Confirmed
Wise
Team
Complete Task name
Stop Close
Control
Card
Exit
20. Project Server
Planner Smart Board
Data View
Trade 4
Trade 3
Trade 2 Smart Board
Model View
Trade 1
Exit
21. Como podemos fazer isto
acontecer?
Boa tecnologia
Parceiros certos
“Fazer-se ao mar”
22. A melhor forma de termos o
futuro que queremos é criá-lo
Obrigado