STEP 1:
Identification Of Problem
6
A
• Failure of injection moulding nozzle
• Accidents during maintenance of Grinding
machine
B
• Leakage of Hydraulic oil
• Live circuit in contact with equipment body
C
• Equipment damage due to voltage fluctuations
• Suspended particulate matter and flyaway
• Accidents during machine maintenance
• Injuries during mould transport and storage
• Accidents during hopper loading
• Burns due to handling of hot products
A- Can be solved by themselves
B- Can be solved with help of other departments
C- Requires management support
7
8
STEP 2:
Selection Of Problem
9
Problems Pre determined criteria weightage rank
fatigue quality safety environment production
Equipment damage due to voltage fluctuations 1 1 1 3 1
Live circuit in contact with equipment body 1 1 1 3 1
Suspended particulate matter and flyaway 1 1 1 3 1
Accidents during mould maintenance 1 1 1 3 1
Accidents during EOT crane maintenance 1 1 2 2
Failure of injection moulding nozzle 1 1 1 3 1
Injuries during mould transport and storage 1 1 2 2
Slippage of mould due to improper maintenance of
Platens
1 1 1 1 3
Leakage of Hydraulic oil 1 1 1 3 1
Accidents during hopper loading 1 3
Accidents during maintenance of Grinding machine 1 1 1 3
Burns due to handling of hot products 1 1 3
Absence of appropriate lighting conditions 1 1 2 2
Fire hazards 1 1 1 3 1
10
0 1 2 3 4 5 6 7 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Number of accidents
Problemnumber
11
Sl. No Problems Frequency Percentage
1
Injuries during mould
handling
8 34.78
2
Accidents during
machine maintenance
5 21.74
3
Suspended particulate
matter and flyaway
4 17.39
4
Equipment damage due
to voltage fluctuations
4 17.39
5
Live circuit in contact
with equipment body
1 4.35
6 Leakage of Hydraulic oil 1 4.35
7 Fire hazards 0 0
TOTAL 23 100
12
0
10
20
30
40
50
60
70
80
90
100
0
1
2
3
4
5
6
7
8
Injuries during
mould transport
and storage
Accidents during
mould
maintainence
Suspended
particulate
matter and
flyaway
Equipment
damage due to
voltage
fluctuations
Live circuit in
contact with
equipment body
Leakage of
Hydrolic oil
Fire hazards
Frequency Cum Freq
13
STEP 3:
Defining The Problems
14
Problem 1
• Injuries during mould handling– EOT break
failure, Loose parts falling off during transport of mould by
EOT crane, mould falling on an operator’s feet
Mould
mounted on
machine
Mould
carried
from
workshop to
machine
Mould taken
to Workshop
Mould
carried by
EOT crane
Mould
Dismounted
15
Production
is carried
out
Maintenance
is carried
out
Control
panel is
opened up
Machine is
turned off
Cutting
machine is
restarted
Machine
cover is
opened and
blades are
cleaned
Cutout
plastics are
emptied
Main power
switched off
Cutting
machine is
switched off
Problem 2
• Accidents during machine maintenance–
control panel maintenance of injection machine, grinding
machine maintenance.
16
The plastic
granules
are stored
The plastic is
converted to
smaller
granules
Scrap plastic
is inserted
into the
machine
Grinding
machine is
started
Problem 3
• Suspended particulate matter and
flyaway – while operating the grinding machine
17
Production
is carried
out
Machine is
operated
Electrical
supply is
switched
on
Problem 4
• Equipment damage due to voltage
fluctuations – Spikes in voltage may damage the
machine
18
S.no Activity Responsibility Oct’
16
Nov’1
6
Dec’1
7
1 Defining the problem All members
2 Analysis of problem All members
3 Identification of
causes
All members
4 Finding out root
causes
All members
5 Data analysis Ashish Rakshit
6 Developing solution All members
7 Foreseeing resistance All members
8 Trial Implementation Swapan Mondal
9 Regular
implementation
All members
10 Follow up and review All members
19
STEP 4:
Analyze The Problem
20
What is the problem?
Injuries during mould
handling
Where is the problem?
Production area
When is the problem
observed?
During transportation of
mould
Who noticed the
problem?
The operators at
production line
How did the problem occur?
1) EOT brake failure
2) Falling of loose parts
during mould handling
21
What is the problem?
Accidents during machine
maintenance
Where is the problem?
Production zone
(machines)
When is the problem
observed?
During machine
maintenance
Who noticed the
problem?
Maintenance department
operators
How did the problem occur?
1)Sparks during machine
control panel maintenance
2) Accidentally turning the
power supply on during
maintenance
22
What is the problem?
Suspended Particulate
Matter and Flyaway
Where is the problem?
Production zone
When is the problem
observed?
During machine
operation
Who noticed the
problem?
Operators at
production zone
How did the problem
occur?
1) Absence of
protective eyewear
What is the problem?
Equipment damage due to
voltage fluctuations
Where is the problem?
Production area
When is the problem
observed?
During production
Who noticed the
problem?
Operators at
production zone
How did the problem
occur?
1) Voltage fluctuations in
power supply
24
STEP 5:
Identification Of Causes
25
Injuries during
Mould Handling
Protective
gear not used
Loose parts falling
off from moulds
EOT crane
break failure
Protective gear
not provided
26
Injuries during
Machine
Maintenance
Protective
gear not used
LOTO not
implemented
Human error during
machine maintenance
Protective gear
not provided
Failure of
Limit Switch
27
Suspended
Particulate Matters
and Flyaway
Protective gear
not provided
Protective
gear not used
28
Equipment Damage
due to voltage
fluctuations
Voltage stabilizer
not provided
29
STEP 6:
Finding Out Root Causes
30
EOT crane
failure
Irregular
maintenance
Loose parts
falling from
mould
Checks on
mould not
performed
before
transport
31
Power supply
switched on
accidentally
Lack of attention
of
Operators/Human
error
32
Injuries due to
Suspended
particulate
matter
Protective eye
gear and
gloves not
used
Absence of
safety
measures
33
Fluctuations in
power supply
Absence of
Power stabilizer
34
STEP 7:
Data Analysis
35
0
10
20
30
40
50
60
70
80
90
100
0
1
2
3
4
5
6
7
8
Injuries during
mould transport
and storage
Accidents during
mould
maintainence
Suspended
particulate
matter and
flyaway
Equipment
damage due to
voltage
fluctuations
Live circuit in
contact with
equipment body
Leakage of
Hydrolic oil
Fire hazards
Frequency Cum Freq
36
• Brain storming
• Data Collection
• PDCA
STEP 8:
Developing Solutions
37
Provide workers
with Safety
helmets,
Industrial boots
and safety
harness
Making sure
that the mould
to be
transported has
no loose parts
Routine EOT
Crane
maintenance
Problem 1
38
Implementation
of LOTO
Providing
Rubber mats
and gloves to
prevent
electrical
shocks
Providing safety
eye gear during
machine
maintenance
Problem 2
39
Provide
workers
with
protective
eye gear
Take the
cutting
machine
outdoors
Problem 3
40
Using a
servo for
stabilizing
power
supply
Problem 4
41
STEP 9:
Foreseeing Problems Of
Resistance
Fund allocation from management
Periodic training and safety drill
implementation
Providing SOP's for machine operation
Enforcing strict safety measures and providing
incentives
42
STEP 10:
Trial Implementation
And Check
43
Regular checks are conducted to
ensure compliance with safety
regulations.
Periodic drills conducted and
attendance of employees is
monitored.
Routine maintenance checks for
machinery and components.
44
• To provide a zero accident work
environment
• To eliminate all potential risks associated
• To provide enhanced job satisfaction and
sense of security to employees
• To involve all employees in constant
improvement and implementation of
safety regulations
45
STEP 11:
Regular Implementation
46
0
1
2
3
4
5
6
7
8
Problem 1 Problem 2 Problem 3 Problem 4
47
• Minimized Property Damage
• Reduction of machine downtime
• Increased financial savings
• Efficient use of available man-power
• Increased employee morale
• Safer working environment
• Job satisfaction for employees
48
STEP 12:
Follow Up And Review
49
Step No. Activity Responsibilities Oct'16 Nov'16 Dec'16
3 Defining the Problem All Members
Target
Achieved
4 Analysis of the problem All Members
Target
Achieved
5 Identifying the causes All Members
Target
Achieved
6 Finding out the root causes All Members
Target
Achieved
7 Data Analysis A.Rakshit & S.Mondal
Target
Achieved
8 Developing Solution All Members
Target
Achieved
9 Foreseeing Resistance All Members
Target
Achieved
10 Trial Implementation S.Mondal & C.Das
Target
Achieved
11 Regular Implementation All Members
Target
Achieved
12 Follow up/Review S.Mondal & C.Das
Target
50
But,
We do have
one more
thing!
f
f
51
52
53
Increased
water tank
capacity
Automatic
sprinkler
system
Fire
extinguishers
Assembly
point
marking
Temperature
sensors
54
For the next project
we will be working
on:
55
56

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (12)

Línea de tiempo semiotica
Línea de tiempo semioticaLínea de tiempo semiotica
Línea de tiempo semiotica
 
Fundamentos Legales que regulan el Registro Sanitario de Medicamentos y Produ...
Fundamentos Legales que regulan el Registro Sanitario de Medicamentos y Produ...Fundamentos Legales que regulan el Registro Sanitario de Medicamentos y Produ...
Fundamentos Legales que regulan el Registro Sanitario de Medicamentos y Produ...
 
Cómo usarías la red social en el aula de clases
Cómo usarías la red social en el aula de clasesCómo usarías la red social en el aula de clases
Cómo usarías la red social en el aula de clases
 
Ggonzalez taller 1 (1)
Ggonzalez taller 1 (1)Ggonzalez taller 1 (1)
Ggonzalez taller 1 (1)
 
Gestion inventarios con demanda independiente
Gestion inventarios con demanda independienteGestion inventarios con demanda independiente
Gestion inventarios con demanda independiente
 
Preparo para mercado de trabalho
Preparo para mercado de trabalhoPreparo para mercado de trabalho
Preparo para mercado de trabalho
 
Ifhibh
IfhibhIfhibh
Ifhibh
 
imagen
imagenimagen
imagen
 
Achilles Tendon Presentation2013
Achilles Tendon Presentation2013Achilles Tendon Presentation2013
Achilles Tendon Presentation2013
 
Juego del aparato locomotor
Juego del aparato locomotor Juego del aparato locomotor
Juego del aparato locomotor
 
Perang padri sejarah wajib
Perang padri sejarah wajibPerang padri sejarah wajib
Perang padri sejarah wajib
 
Q5
Q5Q5
Q5
 

Final2017