SlideShare a Scribd company logo
1 of 20
SUDHIR REDDY S.V.R
(09311D0412)
ASSEMBLY SYSTEMS:
There are various methods used in industry to accomplish
the assembly processes. Major methods can be classified:
1. Manual single-station assembly.
2. Manual assembly lines.
3. Automated assembly system.
1. Manual Single-Station1. Manual Single-Station
Assembly:Assembly:
*Consist of a single workplace to accomplish the product or
some major subassembly of the product.
*Generally used on a product that is complex and produced
in small quantities, one or more workers depending on
the size of the product and the production rate.
*Such as machine tools, industrial equipment, aircraft, ships
and complex consumer products (appliances, car,...).
Manual Single-Station Assembly:
2. Manual Assembly Lines:
*Consist of multiple workstations in which the
assembly work is accomplished as the product
(subassembly) is passed from station to station along
the line.
*At each workstation one or more human workers
perform a portion of the total assembly work on the
product, by adding one or more components to the
existing subassembly.
Manual Assembly Lines:
3. Automated Assembly System:
*Use of automated methods at the workstations rather than*Use of automated methods at the workstations rather than
human beings.human beings.
Automated Assembly System:
REASONS FOR MANUAL
ASSEMBLY:
1.Demands for the product is high or medium.
2.The products made on the line are identical or similar.
3.The total work required to assemble the product can be
divided into small work elements.
4.It is technologically impossible or economically infeasible
to automate the assembly operations.
THE LINE BALANCING PROBLEM:
*The line balancing problem is to arrange the individual
processing and assembly tasks at the workstations so
that the total time required at each workstation is
approximately the same.
*If the work elements can be grouped so that all the station
times are exactly equal, we have perfect balance
on the line and we can expect the production to flow
smoothly.
*In most practical situations it is very difficult to achieve
perfect balance. When workstation times are
unequal, the slowest station determines the overall
production rate of the line.
Method of Line Balancing:
1.Largest-Candidate Rule(LCR).
2.Kilbridge and Wester's Method (KWM).
3.Ranked Positional Weights Method (RPW).
Largest-Candidate Rule(LCR):
Procedure:
Step 1:-List all elements in descending order of Te value,
largest Te at the top of the list.
Step 2:-To assign elements to the first workstation, start at
the top of the list and work done, selecting the first
feasible element for placement at the station. A feasible
element is one that satisfies the precedence requirements
and does not cause the sum of the Tej value at station to
exceed the cycle time Tc.
Step 3:- Repeat step 2.
Kilbridge & Wester's Method
(KWM):
*It is a heuristic procedure which selects work elements for
assignment to stations according to their position
in the precedence diagram.
*This overcomes one of the difficulties with the largest
candidate rule (LCR), with which elements at the end
of the precedence diagram might be the first candidates to be
considered, simply because their values are
large.
Procedure:
Step 1:- Construct the precedence diagram so those nodes
representing work elements of identical precedence
are arranged vertically in columns.
Step 2:-List the elements in order of their columns, column I
at the top of the list. If an element can be located
in more than one column, list all columns by the element to
show the transferability of the element.
Step 3:-To assign elements to workstations, start with the
column I elements. Continue the assignment
procedure in order of column number until the cycle time is
reached (Tc).
Ranked Positional Weights
Method (RPW):
*Introduced by Helgeson and Birnie in 1961.
*Combined the LCR and K-W methods.
*The RPW takes account of both the Te value of the
element and its position in the precedence diagram.
Then, the elements are assigned to workstations in the
general order of their RPW values.
Procedure:
Step 1:-Calculate the RPW for each element by summing
the elements Te together with the Te values for all
the elements that follow it in the arrow chain of the
precedence diagram.
Step 2:-List the elements in the order of their RPW, largest
RPW at the top of the list. For convenience,
include the Te value and immediate predecessors for each
element.
Step 3:-Assign elements to stations according to RPW,
avoiding precedence constraint and time cycle
violations.
Compare LCR, K-W, and RPW:
*The RPW solution represents a more efficient assignment
of work elements to station than either of the two
preceding solutions.
*However, this result is accordingly by the acceptance of
cycle time Tc = 1 and make those methods
different.
*If the problem were reworked with Tc = 0.92 minute, it
might be possible to duplicate the efficiency.
Ways to Improve the Line Balance:
Dividing work elements:-A minimum rational work
element was defined as the smallest practical indivisible task.
Advantages- eliminates the bottleneck and increases
the tool life.
Changing work lead speeds at automatic stations:-
Through a process increasing the speed/feed combinations at
the stations with long process time, and reducing the
speed/feed combinations at stations with idle time.
Method analysis:-The study of human work activity may
result in better workplace layout, redesigned tooling and
fixturing or improved hand and body motions.
Pre-assembly of components:-Reduce the total amount of
work done on the regular assembly line by another assembly
cell or by purchasing.
a. Required process may be difficult to implement on the
regular assembly lines
b. Variations in process times (adjustments or fitting)
Inventory buffers between stations.
Parallel stations.
Assembly systems & line balance

More Related Content

What's hot

ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGEANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGEManoj Gowda K
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process PlanningAsha A
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION) TAMILMECHKIT
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
Group technology
Group technologyGroup technology
Group technologyjntuhcej
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGjntuhcej
 
Chapter 2 line_balancing no pics
Chapter 2 line_balancing no picsChapter 2 line_balancing no pics
Chapter 2 line_balancing no picsNirav Jadav
 
Manufacturing systems
Manufacturing systemsManufacturing systems
Manufacturing systemsAbu Bashar
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyMd Abu Bakar Siddique
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Dr.Muftooh Ur Rehman Siddiqi
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systemsVibhas Purushu
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Vishal Shinde
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line BalancingAlan Wei Teck
 

What's hot (20)

ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGEANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process Planning
 
Line balancing
Line balancingLine balancing
Line balancing
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
Line balancing
Line balancingLine balancing
Line balancing
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Group technology
Group technologyGroup technology
Group technology
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
Chapter 2 line_balancing no pics
Chapter 2 line_balancing no picsChapter 2 line_balancing no pics
Chapter 2 line_balancing no pics
 
Manufacturing systems
Manufacturing systemsManufacturing systems
Manufacturing systems
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case Study
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Method study
Method studyMethod study
Method study
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 

Similar to Assembly systems & line balance

final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.pptxicohos114
 
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemIRJET Journal
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer linesKunal mane
 
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...Compensator Design for Speed Control of DC Motor by Root Locus Approach using...
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...IRJET Journal
 
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKING
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKINGPHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKING
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKINGIRJET Journal
 
Reliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmReliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmIRJET Journal
 
LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxssuser574918
 
DigSILENT PF - 03 loadflow theory
DigSILENT PF - 03 loadflow theoryDigSILENT PF - 03 loadflow theory
DigSILENT PF - 03 loadflow theoryHimmelstern
 
DigSILENT PF - 04 (es) loadflow theory
DigSILENT PF - 04 (es) loadflow theoryDigSILENT PF - 04 (es) loadflow theory
DigSILENT PF - 04 (es) loadflow theoryHimmelstern
 
Concepts of Real time Systems (RTS)
Concepts of Real time Systems (RTS)Concepts of Real time Systems (RTS)
Concepts of Real time Systems (RTS)EngKarrarSMuttair
 
A Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy ManagementA Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy ManagementIRJET Journal
 
Benchmark methods to analyze embedded processors and systems
Benchmark methods to analyze embedded processors and systemsBenchmark methods to analyze embedded processors and systems
Benchmark methods to analyze embedded processors and systemsXMOS
 
Proposed pricing model for cloud computing
Proposed pricing model for cloud computingProposed pricing model for cloud computing
Proposed pricing model for cloud computingAdeel Javaid
 
Automated Tuning and Controller Design for DC-DC Boost Converter
Automated Tuning and Controller Design  for DC-DC Boost ConverterAutomated Tuning and Controller Design  for DC-DC Boost Converter
Automated Tuning and Controller Design for DC-DC Boost ConverterIRJET Journal
 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyeSAT Journals
 
Battery Aware Dynamic Scheduling for Periodic Task Graphs
Battery Aware Dynamic Scheduling for Periodic Task GraphsBattery Aware Dynamic Scheduling for Periodic Task Graphs
Battery Aware Dynamic Scheduling for Periodic Task GraphsNicolas Navet
 
IRJET- Wireless Active Vibration Control for Structural Vibrations using Emb...
IRJET-	 Wireless Active Vibration Control for Structural Vibrations using Emb...IRJET-	 Wireless Active Vibration Control for Structural Vibrations using Emb...
IRJET- Wireless Active Vibration Control for Structural Vibrations using Emb...IRJET Journal
 
Instrumentation limited kota
Instrumentation limited kotaInstrumentation limited kota
Instrumentation limited kotaMohit Nainwaya
 

Similar to Assembly systems & line balance (20)

final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
 
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control System
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer lines
 
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...Compensator Design for Speed Control of DC Motor by Root Locus Approach using...
Compensator Design for Speed Control of DC Motor by Root Locus Approach using...
 
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKING
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKINGPHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKING
PHOTOVOLTAIC BASED ELECTRIC VEHICLE USING MAXIMUM POWER POINT TRACKING
 
Mid Year Review
Mid Year ReviewMid Year Review
Mid Year Review
 
Reliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmReliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel Algorithm
 
LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptx
 
SEM 6th final 1
SEM 6th final 1SEM 6th final 1
SEM 6th final 1
 
DigSILENT PF - 03 loadflow theory
DigSILENT PF - 03 loadflow theoryDigSILENT PF - 03 loadflow theory
DigSILENT PF - 03 loadflow theory
 
DigSILENT PF - 04 (es) loadflow theory
DigSILENT PF - 04 (es) loadflow theoryDigSILENT PF - 04 (es) loadflow theory
DigSILENT PF - 04 (es) loadflow theory
 
Concepts of Real time Systems (RTS)
Concepts of Real time Systems (RTS)Concepts of Real time Systems (RTS)
Concepts of Real time Systems (RTS)
 
A Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy ManagementA Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy Management
 
Benchmark methods to analyze embedded processors and systems
Benchmark methods to analyze embedded processors and systemsBenchmark methods to analyze embedded processors and systems
Benchmark methods to analyze embedded processors and systems
 
Proposed pricing model for cloud computing
Proposed pricing model for cloud computingProposed pricing model for cloud computing
Proposed pricing model for cloud computing
 
Automated Tuning and Controller Design for DC-DC Boost Converter
Automated Tuning and Controller Design  for DC-DC Boost ConverterAutomated Tuning and Controller Design  for DC-DC Boost Converter
Automated Tuning and Controller Design for DC-DC Boost Converter
 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case study
 
Battery Aware Dynamic Scheduling for Periodic Task Graphs
Battery Aware Dynamic Scheduling for Periodic Task GraphsBattery Aware Dynamic Scheduling for Periodic Task Graphs
Battery Aware Dynamic Scheduling for Periodic Task Graphs
 
IRJET- Wireless Active Vibration Control for Structural Vibrations using Emb...
IRJET-	 Wireless Active Vibration Control for Structural Vibrations using Emb...IRJET-	 Wireless Active Vibration Control for Structural Vibrations using Emb...
IRJET- Wireless Active Vibration Control for Structural Vibrations using Emb...
 
Instrumentation limited kota
Instrumentation limited kotaInstrumentation limited kota
Instrumentation limited kota
 

More from Sudhir Reddy

Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbolsSudhir Reddy
 
Seminor on air motors
Seminor on air motorsSeminor on air motors
Seminor on air motorsSudhir Reddy
 
Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systemsSudhir Reddy
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)Sudhir Reddy
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematicsSudhir Reddy
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systemsSudhir Reddy
 
Introduction to microprocessor
Introduction to microprocessorIntroduction to microprocessor
Introduction to microprocessorSudhir Reddy
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsSudhir Reddy
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fmsSudhir Reddy
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’sSudhir Reddy
 

More from Sudhir Reddy (15)

Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbols
 
Seminor on air motors
Seminor on air motorsSeminor on air motors
Seminor on air motors
 
Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systems
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematics
 
L20
L20L20
L20
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systems
 
Introduction to microprocessor
Introduction to microprocessorIntroduction to microprocessor
Introduction to microprocessor
 
Gear pump
Gear pumpGear pump
Gear pump
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fms
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’s
 
Accumulators
AccumulatorsAccumulators
Accumulators
 
10 mech seminars
10 mech seminars10 mech seminars
10 mech seminars
 
Nc programming
Nc programmingNc programming
Nc programming
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 

Recently uploaded (20)

Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Assembly systems & line balance

  • 2. ASSEMBLY SYSTEMS: There are various methods used in industry to accomplish the assembly processes. Major methods can be classified: 1. Manual single-station assembly. 2. Manual assembly lines. 3. Automated assembly system.
  • 3. 1. Manual Single-Station1. Manual Single-Station Assembly:Assembly: *Consist of a single workplace to accomplish the product or some major subassembly of the product. *Generally used on a product that is complex and produced in small quantities, one or more workers depending on the size of the product and the production rate. *Such as machine tools, industrial equipment, aircraft, ships and complex consumer products (appliances, car,...).
  • 5. 2. Manual Assembly Lines: *Consist of multiple workstations in which the assembly work is accomplished as the product (subassembly) is passed from station to station along the line. *At each workstation one or more human workers perform a portion of the total assembly work on the product, by adding one or more components to the existing subassembly.
  • 7. 3. Automated Assembly System: *Use of automated methods at the workstations rather than*Use of automated methods at the workstations rather than human beings.human beings.
  • 9. REASONS FOR MANUAL ASSEMBLY: 1.Demands for the product is high or medium. 2.The products made on the line are identical or similar. 3.The total work required to assemble the product can be divided into small work elements. 4.It is technologically impossible or economically infeasible to automate the assembly operations.
  • 10. THE LINE BALANCING PROBLEM: *The line balancing problem is to arrange the individual processing and assembly tasks at the workstations so that the total time required at each workstation is approximately the same. *If the work elements can be grouped so that all the station times are exactly equal, we have perfect balance on the line and we can expect the production to flow smoothly. *In most practical situations it is very difficult to achieve perfect balance. When workstation times are unequal, the slowest station determines the overall production rate of the line.
  • 11. Method of Line Balancing: 1.Largest-Candidate Rule(LCR). 2.Kilbridge and Wester's Method (KWM). 3.Ranked Positional Weights Method (RPW).
  • 12. Largest-Candidate Rule(LCR): Procedure: Step 1:-List all elements in descending order of Te value, largest Te at the top of the list. Step 2:-To assign elements to the first workstation, start at the top of the list and work done, selecting the first feasible element for placement at the station. A feasible element is one that satisfies the precedence requirements and does not cause the sum of the Tej value at station to exceed the cycle time Tc. Step 3:- Repeat step 2.
  • 13. Kilbridge & Wester's Method (KWM): *It is a heuristic procedure which selects work elements for assignment to stations according to their position in the precedence diagram. *This overcomes one of the difficulties with the largest candidate rule (LCR), with which elements at the end of the precedence diagram might be the first candidates to be considered, simply because their values are large.
  • 14. Procedure: Step 1:- Construct the precedence diagram so those nodes representing work elements of identical precedence are arranged vertically in columns. Step 2:-List the elements in order of their columns, column I at the top of the list. If an element can be located in more than one column, list all columns by the element to show the transferability of the element. Step 3:-To assign elements to workstations, start with the column I elements. Continue the assignment procedure in order of column number until the cycle time is reached (Tc).
  • 15. Ranked Positional Weights Method (RPW): *Introduced by Helgeson and Birnie in 1961. *Combined the LCR and K-W methods. *The RPW takes account of both the Te value of the element and its position in the precedence diagram. Then, the elements are assigned to workstations in the general order of their RPW values.
  • 16. Procedure: Step 1:-Calculate the RPW for each element by summing the elements Te together with the Te values for all the elements that follow it in the arrow chain of the precedence diagram. Step 2:-List the elements in the order of their RPW, largest RPW at the top of the list. For convenience, include the Te value and immediate predecessors for each element. Step 3:-Assign elements to stations according to RPW, avoiding precedence constraint and time cycle violations.
  • 17. Compare LCR, K-W, and RPW: *The RPW solution represents a more efficient assignment of work elements to station than either of the two preceding solutions. *However, this result is accordingly by the acceptance of cycle time Tc = 1 and make those methods different. *If the problem were reworked with Tc = 0.92 minute, it might be possible to duplicate the efficiency.
  • 18. Ways to Improve the Line Balance: Dividing work elements:-A minimum rational work element was defined as the smallest practical indivisible task. Advantages- eliminates the bottleneck and increases the tool life. Changing work lead speeds at automatic stations:- Through a process increasing the speed/feed combinations at the stations with long process time, and reducing the speed/feed combinations at stations with idle time.
  • 19. Method analysis:-The study of human work activity may result in better workplace layout, redesigned tooling and fixturing or improved hand and body motions. Pre-assembly of components:-Reduce the total amount of work done on the regular assembly line by another assembly cell or by purchasing. a. Required process may be difficult to implement on the regular assembly lines b. Variations in process times (adjustments or fitting) Inventory buffers between stations. Parallel stations.