SlideShare a Scribd company logo
1 of 7
Hardin Consulting LLC Page 1
Stephen G. Hardin
Resume
Name: Stephen G. Hardin
275 E. Old Lockhart Rd.
West Point, TX 78963
Email: shardinconsulting@gmail.com
Home: 979-242-5400
Cell: 979-250-1199
Qualifications:
Summary of Key Experience and Responsibilities
Senior Project Professional with over forty (40) years of domestic and
international experience in the oil and gas industry, with a broad variety of roles
in project services, material management, contract administration, construction
management and project management. Proven ability to manage and motivate
effectively. Strong and effective interpersonal skills promoting team atmosphere
with focus on delivery. Self motivated, team contributor. Demonstrated ability
to deal quickly with problems, while keeping focus on project drivers and
objectives.
Skills and competencies include the following:
• Led and managed teams in support of projects through all stages of
development.
• Flexible and innovative in establishing organizations to support different
strategies and meet project objectives and drivers.
• Extensive knowledge of project development and execution processes,
e.g., CVP, CII, etc.
• Experience with many different Project Controls systems with a proven
ability to utilize appropriate methods to meet project requirements.
• Demonstrated ability to maximize performance utilizing limited
resources.
• Extensive experience in material management, both in operations and
projects.
• Successfully established necessary infrastructure requirements to
support numerous project teams, during both engineering and
construction.
• Multiple opportunities to work internationally and gain an understanding
and appreciation for cultures outside the United States leading to a
proven ability to be effective in these environments.
• End to End Project Management
• Project Planning/Execution
• Cross-Functional Project Team Leadership
Hardin Consulting LLC Page 2
Stephen G. Hardin
Resume
Experience:
2007 – 2016
• Materials Management
• Project Administration
• Infrastructure Requirements
• Construction Site Requirements
• Logistics
• Project Controls
o Cost
o Schedule coordination
o Resource management
o Budget preparation / analysis
o Risk assessments
o Contract administration
o Change management
o Reporting
Education
BBA Texas Tech University 1975
ConocoPhillips
Eagle Ford – Kenedy, Texas July 2011 – January 2016
Fort Worth Basin – Weatherford, Texas February 2010 – April 2011
Chittum Field – Carrizzo Springs, Texas October 2009 – December 2009
Bossier Field - Franklin, Texas March 2007 – October 2009
Project Lead
Provide daily on site supervision in the construction of various production
facilities and the installation of high pressure pipelines. Responsibilities included
safety leadership, cost/schedule management, logistics, material procurement,
contractor coordination, and overall project quality. Participated in site
evaluations and kick-off meetings prior to beginning each facility, liaison
between contractors and QA/QC personnel, and lead the Pre-Start up Safety
Review (PSSR) prior to turning facility over to operations. Participated in the
construction of over 450 facilities/pipelines.
Hardin Consulting LLC Page 3
Stephen G. Hardin
Resume
1975 – 2006 BP/AMOCO
Various Projects and Locations
Cooper River Boiler Replacement Project 2003-2006
Project Services Manager
Led the project services team in Cooper River PTA # 2 for the Boiler
Replacement Project through the Appraise, Select, Define, and Execute stages.
Responsibilities included management of the project controls, resource
planning, budget preparation, estimate reviews, development and
implementation of contract strategy, procurement strategy, contract preparation
and administration, and interface with Plant accounting personnel. Participated
in constructability reviews, HAZOPS, risk assessments (estimate & schedule),
and external benchmarking. (Project received “Best in Class” ranking from
Independent Project Analysis, IPA). Also supported the plant capital works
group for Project Controls Functional Discipline.
GoM Deepwater Development 2002
Site Shared Services Manager
Seconded to Houma, Louisiana to coordinate multiple Deepwater projects for
BP. Responsibilities included cross project consistency and “Program”
perspective in relationships, processes, and procedures with J. Ray McDermott,
resource management and coordination, development of Project Incentive
Targets, yard asset planning, contract administration, cost/schedule control,
material management/preservation, and interface with Business Unit Project
Services Team, Deepwater Development Commercial Team, and Supply Chain
Management Team.
BP Amoco Chemical Company TMA 2 Project 2001
Project Services Manager/Procurement Manager
Provided Project Controls functional discipline support to the TMA 2 project, a
next generation trimellitic anhydride (TMA) facility to be located in Southeast
Asia. In addition to the normal project controls responsibilities, was also fulfilling
the role of procurement manager in the development, sourcing, and bidding the
major equipment. This plant was to be constructed in Malaysia, but subsequent
to the attacks of September 11, 2001, the project was cancelled.
Prairie Rose LAO Project 1998-2001
Project Services/Site Services Manager
Provided project services in support of the Joffre LAO Plant Project through the
appraise and select stages. Areas of responsibility were management of project
controls, budget preparation, estimate reviews, resource planning, and
development of projects contract strategy. Coordinated the issuance of the EPC
Hardin Consulting LLC Page 4
Stephen G. Hardin
Resume
Request for Proposal (RFP) as the project moved into the define/execute stage.
As the project moved into the construction phase, was mobilized to site as the
Site Services Manager to establish the necessary infrastructure, site policies and
procedures, locate housing for project team, and to liaison with Nova Chemicals,
upon whose site this facility was to be constructed. Due to changes to personnel
assigned to the project, provided direct supervision for the construction of the
permanent plant administration building, maintenance building, warehouse,
compressor building, cooling tower pump house, and process control room
facilities. Additionally, was responsible for the cost, schedule, and specification
compliance for the facilities IT infrastructure design and installation.
Cooper River No. 2 PTA Project 1995-1997
Project Administrative Manager
Selected to support the Cooper River No. 2 PTA project team which required
establishing, implementing, and managing all the projects administrative
policies and procedures, budgets, cost control, and infrastructure requirements
necessary to support both the engineering efforts being performed in Rome,
Italy and the construction efforts in Wando, South Carolina. Additionally,
provided monthly interface with South Carolina Revenue to resolve taxation
issues, provided logistics and customs support, developed and implemented a
scheduled audit plan, implemented SAP in the middle of the project, disposed of
surplus material and equipment, and settled outstanding claims with
subcontractors and vendors at project completion.
Amoco PT&S (Construction) 1993-1995
Sr. Staff Administrative Supervisor
Assigned to Amoco’s Worldwide Engineering and Construction organization to
provide functional discipline and leadership to the project controls team.
Supported 23 cost engineering personnel assigned to capital project teams,
located at various project sites around Amoco’s global business units. Directly
managed the Houston based administrative team which provided support to
several domestic projects as well as the Houston based PT&S organization.
Investment Recovery Team - Business Process Reengineering 1992-
1993
Sr. Staff Administrative Supervisor/Team Leader
Selected to lead a team charged with evaluating, defining, and restructuring the
business processes utilized by Amoco Production Company in the management
of surplus material and equipment and to develop and recommend the
appropriate organization to implement the improved processes in accordance
with the current restructuring to a Houston based organization.
Hardin Consulting LLC Page 5
Stephen G. Hardin
Resume
Amoco PT&S (General Office) 1989-1992
Sr. Staff Administrative Supervisor
Directed the efforts of Amoco Production Company’s General Office material
group whose primary responsibility was to provide oversight and direction in the
management of APC’s material assets worldwide. Co-chaired the steering
committee responsible for the development and implementation of the Material
Asset Control System which made the material transfer and pricing system an
electronic process, served as Amoco Production Company’s representative to
the Corporate committee responsible for developing the electronic material
catalog system, served as APC’s representative to the Council of Petroleum
Accountants Society (COPUS) on all joint interest material issues, and provided
material pricing support to all APC’s domestic operations. Additionally, managed
the Central Inventory Team responsible for inventorying and reconciling all
APC’s domestic company operated properties. This was completed to coincide
with the rollout of the electronic Material Asset Control System (MACS).
Houston Region – North Operations 1987-1989
Sr. Staff Administrative Supervisor
Responsible for developing the staffing requirements to provide material and
administrative support the Houston based North Operations Group and the six
associated operations centers which resulted from the restructuring of the
Houston Region to a Houston based organization. Implemented the plan and
supervised the group for the first year of operation.
Houston Region – Hobbs District Office 1885-1987
District Administrative Supervisor
Provide leadership and direction to the district administrative staff in the areas
of financial records, revenue & production, materials, automation, and
personnel. These groups were responsible for providing support to the
engineering and operations personnel of the Hobbs District which operated over
1500 wells, one plant, and several compression facilities located in the eastern
half of New Mexico.
Houston Region – West Texas Eastern New Mexico Division 1984-1985
Staff Administrative Supervisor
Direct the efforts of the Joint Interest group responsible for the preparation and
control of all joint interest AFE’s and the disposition of all outside audits for the
WT-ENM Division. Additionally, provided assistance in the preparation of the
annual control budget and provided backup for the Division Administrative
Manager.
Hardin Consulting LLC Page 6
Stephen G. Hardin
Resume
Hobbs District – Bravo Dome Operations Center 1981-1984
Administrative Supervisor
Provide supervision and leadership to the administrative staff responsible for
supporting the drilling, operations, construction, and engineering personnel
assigned to the Bravo Dome operation. During this period Amoco drilled 197
wells, constructed the Phase I compression facility, and installed 50 miles of
collection system.
Houston Region-Levelland & Hobbs District Offices 1975-1980
Administrative Analyst
Various administrative roles in the areas of financial records, revenue &
production, material transfers, field material coordination, warehousing, drilling
contracts, and budget preparation.
Safety Training
• Waste Management
• Hazardous Energy LOTO & Try
• Hazard Communication
• First Aid/CPR/AED
• HAZWOPER First Responder
• Hydrogen Sulphide
• Defensive Driving
• Confined Space Entry
• Excavation and Trenching
• Speed Shore
• Fall Protection
• Scaffolding
• Ladder Safety
• Heat Stress Safety
• Hot Work
• Mechanical Lifting and Rigging
• Hearing Conservation
• Respiratory Protection
Hardin Consulting LLC Page 7
Stephen G. Hardin
Resume
• Hazard Communication Standard Globally Harmonized System
• Line Finding
• Accident Prevention, Signs & Tags
• Hazardous Materials Transportation
• Incident Reporting & Investigation
• Portable Fire Extinguishers
• Fire Protection
• Risk Management
• Steel Pipeline Construction
• Hydro Testing
• Purging Operations
• Smith Commentary Driving
• Personal Protective Equipment
• Naturally Occurring Radioactive Materials (NORM)
• Exposure Control Plan (Bloodborne Pathogens)
• Asbestos
• Benzene
References:
Projects Supervisor
Laddie Carlos
985-498-9529
Laddie.P.Carlos@conocophillips.com
Projects Foreman
Daniel (Mac) Mayers
601-209-8960
Daniel.M.Mayers@conocophillips.com
Other references upon request.

More Related Content

What's hot

Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks
 
Tracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4Joe Ungvarsky
 
Craig_Thomas_Armes 072215
Craig_Thomas_Armes 072215Craig_Thomas_Armes 072215
Craig_Thomas_Armes 072215Craig Armes
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Abdulkader Sayed
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov DetailedAndrei Sannikov
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10Jackie Ha
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Marcel Boutin
 

What's hot (20)

Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical Engineer
 
Tracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing Engineer
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
Craig_Thomas_Armes 072215
Craig_Thomas_Armes 072215Craig_Thomas_Armes 072215
Craig_Thomas_Armes 072215
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
Fred_Resume Jun 2015
Fred_Resume Jun 2015Fred_Resume Jun 2015
Fred_Resume Jun 2015
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 
Topside
TopsideTopside
Topside
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov Detailed
 
RESUME
RESUMERESUME
RESUME
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 

Viewers also liked

Definitivo_TESI TRIENNALE
Definitivo_TESI TRIENNALEDefinitivo_TESI TRIENNALE
Definitivo_TESI TRIENNALEAndrea Lo Dolce
 
29 jhon rodriguez 10°c insertar hipervinculos
29 jhon rodriguez 10°c insertar hipervinculos29 jhon rodriguez 10°c insertar hipervinculos
29 jhon rodriguez 10°c insertar hipervinculosalexander rodriguez
 
abdul_qureshi_resume
abdul_qureshi_resumeabdul_qureshi_resume
abdul_qureshi_resumeAbdul Qureshi
 
CV الماظ إنجليزى من 3 ورقات ...
CV الماظ إنجليزى من 3 ورقات ...CV الماظ إنجليزى من 3 ورقات ...
CV الماظ إنجليزى من 3 ورقات ...???? ?????
 
Cv of mahmoud mohamed doudah dwh developer-
Cv of mahmoud mohamed doudah  dwh developer-Cv of mahmoud mohamed doudah  dwh developer-
Cv of mahmoud mohamed doudah dwh developer-Mahmoud M. Doudah
 
¿ Qué es pacie
¿ Qué es pacie ¿ Qué es pacie
¿ Qué es pacie Dieguess
 
Cv mohammed magdy elbahnasawi
Cv mohammed magdy elbahnasawiCv mohammed magdy elbahnasawi
Cv mohammed magdy elbahnasawimohammed magdy
 
CV Capt.Ahmad Sary
CV Capt.Ahmad SaryCV Capt.Ahmad Sary
CV Capt.Ahmad SaryAHMAD SARY
 
Learn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionLearn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionIn a Rocket
 
How to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanHow to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanPost Planner
 
SEO: Getting Personal
SEO: Getting PersonalSEO: Getting Personal
SEO: Getting PersonalKirsty Hulse
 
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika AldabaLightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldabaux singapore
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvFarhan Awan
 
Civilsdaily digest june 2015
Civilsdaily digest june 2015Civilsdaily digest june 2015
Civilsdaily digest june 2015Civilsdaily
 
"Do You Know?" Pitch
"Do You Know?" Pitch"Do You Know?" Pitch
"Do You Know?" Pitchseanrdhughes
 

Viewers also liked (18)

Definitivo_TESI TRIENNALE
Definitivo_TESI TRIENNALEDefinitivo_TESI TRIENNALE
Definitivo_TESI TRIENNALE
 
29 jhon rodriguez 10°c insertar hipervinculos
29 jhon rodriguez 10°c insertar hipervinculos29 jhon rodriguez 10°c insertar hipervinculos
29 jhon rodriguez 10°c insertar hipervinculos
 
abdul_qureshi_resume
abdul_qureshi_resumeabdul_qureshi_resume
abdul_qureshi_resume
 
xxx CV ABOZAID NEW
xxx  CV ABOZAID NEWxxx  CV ABOZAID NEW
xxx CV ABOZAID NEW
 
CV الماظ إنجليزى من 3 ورقات ...
CV الماظ إنجليزى من 3 ورقات ...CV الماظ إنجليزى من 3 ورقات ...
CV الماظ إنجليزى من 3 ورقات ...
 
Cv of mahmoud mohamed doudah dwh developer-
Cv of mahmoud mohamed doudah  dwh developer-Cv of mahmoud mohamed doudah  dwh developer-
Cv of mahmoud mohamed doudah dwh developer-
 
¿ Qué es pacie
¿ Qué es pacie ¿ Qué es pacie
¿ Qué es pacie
 
Cv mohammed magdy elbahnasawi
Cv mohammed magdy elbahnasawiCv mohammed magdy elbahnasawi
Cv mohammed magdy elbahnasawi
 
CV Capt.Ahmad Sary
CV Capt.Ahmad SaryCV Capt.Ahmad Sary
CV Capt.Ahmad Sary
 
Learn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionLearn BEM: CSS Naming Convention
Learn BEM: CSS Naming Convention
 
How to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanHow to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media Plan
 
SEO: Getting Personal
SEO: Getting PersonalSEO: Getting Personal
SEO: Getting Personal
 
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika AldabaLightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
 
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job? Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
 
Singapore Property Outlook 2014
Singapore Property Outlook 2014Singapore Property Outlook 2014
Singapore Property Outlook 2014
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
Civilsdaily digest june 2015
Civilsdaily digest june 2015Civilsdaily digest june 2015
Civilsdaily digest june 2015
 
"Do You Know?" Pitch
"Do You Know?" Pitch"Do You Know?" Pitch
"Do You Know?" Pitch
 

Similar to Resume - Stephen G. Hardin 4 [14405]

Similar to Resume - Stephen G. Hardin 4 [14405] (20)

Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01
 
Ben-Coleman II
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
 
Michael E Soukup Resume 6-25-15
Michael E  Soukup Resume 6-25-15Michael E  Soukup Resume 6-25-15
Michael E Soukup Resume 6-25-15
 
Murray_Michaelene-150718
Murray_Michaelene-150718Murray_Michaelene-150718
Murray_Michaelene-150718
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
 
James L Harris CV
James L Harris CVJames L Harris CV
James L Harris CV
 
Resume 12. 2017
Resume 12. 2017 Resume 12. 2017
Resume 12. 2017
 
Resume 4-14-2015
Resume 4-14-2015Resume 4-14-2015
Resume 4-14-2015
 
Peter Leal Resume 2015
Peter Leal Resume 2015Peter Leal Resume 2015
Peter Leal Resume 2015
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
Bwk pipeline resume_0716
Bwk pipeline resume_0716Bwk pipeline resume_0716
Bwk pipeline resume_0716
 

Resume - Stephen G. Hardin 4 [14405]

  • 1. Hardin Consulting LLC Page 1 Stephen G. Hardin Resume Name: Stephen G. Hardin 275 E. Old Lockhart Rd. West Point, TX 78963 Email: shardinconsulting@gmail.com Home: 979-242-5400 Cell: 979-250-1199 Qualifications: Summary of Key Experience and Responsibilities Senior Project Professional with over forty (40) years of domestic and international experience in the oil and gas industry, with a broad variety of roles in project services, material management, contract administration, construction management and project management. Proven ability to manage and motivate effectively. Strong and effective interpersonal skills promoting team atmosphere with focus on delivery. Self motivated, team contributor. Demonstrated ability to deal quickly with problems, while keeping focus on project drivers and objectives. Skills and competencies include the following: • Led and managed teams in support of projects through all stages of development. • Flexible and innovative in establishing organizations to support different strategies and meet project objectives and drivers. • Extensive knowledge of project development and execution processes, e.g., CVP, CII, etc. • Experience with many different Project Controls systems with a proven ability to utilize appropriate methods to meet project requirements. • Demonstrated ability to maximize performance utilizing limited resources. • Extensive experience in material management, both in operations and projects. • Successfully established necessary infrastructure requirements to support numerous project teams, during both engineering and construction. • Multiple opportunities to work internationally and gain an understanding and appreciation for cultures outside the United States leading to a proven ability to be effective in these environments. • End to End Project Management • Project Planning/Execution • Cross-Functional Project Team Leadership
  • 2. Hardin Consulting LLC Page 2 Stephen G. Hardin Resume Experience: 2007 – 2016 • Materials Management • Project Administration • Infrastructure Requirements • Construction Site Requirements • Logistics • Project Controls o Cost o Schedule coordination o Resource management o Budget preparation / analysis o Risk assessments o Contract administration o Change management o Reporting Education BBA Texas Tech University 1975 ConocoPhillips Eagle Ford – Kenedy, Texas July 2011 – January 2016 Fort Worth Basin – Weatherford, Texas February 2010 – April 2011 Chittum Field – Carrizzo Springs, Texas October 2009 – December 2009 Bossier Field - Franklin, Texas March 2007 – October 2009 Project Lead Provide daily on site supervision in the construction of various production facilities and the installation of high pressure pipelines. Responsibilities included safety leadership, cost/schedule management, logistics, material procurement, contractor coordination, and overall project quality. Participated in site evaluations and kick-off meetings prior to beginning each facility, liaison between contractors and QA/QC personnel, and lead the Pre-Start up Safety Review (PSSR) prior to turning facility over to operations. Participated in the construction of over 450 facilities/pipelines.
  • 3. Hardin Consulting LLC Page 3 Stephen G. Hardin Resume 1975 – 2006 BP/AMOCO Various Projects and Locations Cooper River Boiler Replacement Project 2003-2006 Project Services Manager Led the project services team in Cooper River PTA # 2 for the Boiler Replacement Project through the Appraise, Select, Define, and Execute stages. Responsibilities included management of the project controls, resource planning, budget preparation, estimate reviews, development and implementation of contract strategy, procurement strategy, contract preparation and administration, and interface with Plant accounting personnel. Participated in constructability reviews, HAZOPS, risk assessments (estimate & schedule), and external benchmarking. (Project received “Best in Class” ranking from Independent Project Analysis, IPA). Also supported the plant capital works group for Project Controls Functional Discipline. GoM Deepwater Development 2002 Site Shared Services Manager Seconded to Houma, Louisiana to coordinate multiple Deepwater projects for BP. Responsibilities included cross project consistency and “Program” perspective in relationships, processes, and procedures with J. Ray McDermott, resource management and coordination, development of Project Incentive Targets, yard asset planning, contract administration, cost/schedule control, material management/preservation, and interface with Business Unit Project Services Team, Deepwater Development Commercial Team, and Supply Chain Management Team. BP Amoco Chemical Company TMA 2 Project 2001 Project Services Manager/Procurement Manager Provided Project Controls functional discipline support to the TMA 2 project, a next generation trimellitic anhydride (TMA) facility to be located in Southeast Asia. In addition to the normal project controls responsibilities, was also fulfilling the role of procurement manager in the development, sourcing, and bidding the major equipment. This plant was to be constructed in Malaysia, but subsequent to the attacks of September 11, 2001, the project was cancelled. Prairie Rose LAO Project 1998-2001 Project Services/Site Services Manager Provided project services in support of the Joffre LAO Plant Project through the appraise and select stages. Areas of responsibility were management of project controls, budget preparation, estimate reviews, resource planning, and development of projects contract strategy. Coordinated the issuance of the EPC
  • 4. Hardin Consulting LLC Page 4 Stephen G. Hardin Resume Request for Proposal (RFP) as the project moved into the define/execute stage. As the project moved into the construction phase, was mobilized to site as the Site Services Manager to establish the necessary infrastructure, site policies and procedures, locate housing for project team, and to liaison with Nova Chemicals, upon whose site this facility was to be constructed. Due to changes to personnel assigned to the project, provided direct supervision for the construction of the permanent plant administration building, maintenance building, warehouse, compressor building, cooling tower pump house, and process control room facilities. Additionally, was responsible for the cost, schedule, and specification compliance for the facilities IT infrastructure design and installation. Cooper River No. 2 PTA Project 1995-1997 Project Administrative Manager Selected to support the Cooper River No. 2 PTA project team which required establishing, implementing, and managing all the projects administrative policies and procedures, budgets, cost control, and infrastructure requirements necessary to support both the engineering efforts being performed in Rome, Italy and the construction efforts in Wando, South Carolina. Additionally, provided monthly interface with South Carolina Revenue to resolve taxation issues, provided logistics and customs support, developed and implemented a scheduled audit plan, implemented SAP in the middle of the project, disposed of surplus material and equipment, and settled outstanding claims with subcontractors and vendors at project completion. Amoco PT&S (Construction) 1993-1995 Sr. Staff Administrative Supervisor Assigned to Amoco’s Worldwide Engineering and Construction organization to provide functional discipline and leadership to the project controls team. Supported 23 cost engineering personnel assigned to capital project teams, located at various project sites around Amoco’s global business units. Directly managed the Houston based administrative team which provided support to several domestic projects as well as the Houston based PT&S organization. Investment Recovery Team - Business Process Reengineering 1992- 1993 Sr. Staff Administrative Supervisor/Team Leader Selected to lead a team charged with evaluating, defining, and restructuring the business processes utilized by Amoco Production Company in the management of surplus material and equipment and to develop and recommend the appropriate organization to implement the improved processes in accordance with the current restructuring to a Houston based organization.
  • 5. Hardin Consulting LLC Page 5 Stephen G. Hardin Resume Amoco PT&S (General Office) 1989-1992 Sr. Staff Administrative Supervisor Directed the efforts of Amoco Production Company’s General Office material group whose primary responsibility was to provide oversight and direction in the management of APC’s material assets worldwide. Co-chaired the steering committee responsible for the development and implementation of the Material Asset Control System which made the material transfer and pricing system an electronic process, served as Amoco Production Company’s representative to the Corporate committee responsible for developing the electronic material catalog system, served as APC’s representative to the Council of Petroleum Accountants Society (COPUS) on all joint interest material issues, and provided material pricing support to all APC’s domestic operations. Additionally, managed the Central Inventory Team responsible for inventorying and reconciling all APC’s domestic company operated properties. This was completed to coincide with the rollout of the electronic Material Asset Control System (MACS). Houston Region – North Operations 1987-1989 Sr. Staff Administrative Supervisor Responsible for developing the staffing requirements to provide material and administrative support the Houston based North Operations Group and the six associated operations centers which resulted from the restructuring of the Houston Region to a Houston based organization. Implemented the plan and supervised the group for the first year of operation. Houston Region – Hobbs District Office 1885-1987 District Administrative Supervisor Provide leadership and direction to the district administrative staff in the areas of financial records, revenue & production, materials, automation, and personnel. These groups were responsible for providing support to the engineering and operations personnel of the Hobbs District which operated over 1500 wells, one plant, and several compression facilities located in the eastern half of New Mexico. Houston Region – West Texas Eastern New Mexico Division 1984-1985 Staff Administrative Supervisor Direct the efforts of the Joint Interest group responsible for the preparation and control of all joint interest AFE’s and the disposition of all outside audits for the WT-ENM Division. Additionally, provided assistance in the preparation of the annual control budget and provided backup for the Division Administrative Manager.
  • 6. Hardin Consulting LLC Page 6 Stephen G. Hardin Resume Hobbs District – Bravo Dome Operations Center 1981-1984 Administrative Supervisor Provide supervision and leadership to the administrative staff responsible for supporting the drilling, operations, construction, and engineering personnel assigned to the Bravo Dome operation. During this period Amoco drilled 197 wells, constructed the Phase I compression facility, and installed 50 miles of collection system. Houston Region-Levelland & Hobbs District Offices 1975-1980 Administrative Analyst Various administrative roles in the areas of financial records, revenue & production, material transfers, field material coordination, warehousing, drilling contracts, and budget preparation. Safety Training • Waste Management • Hazardous Energy LOTO & Try • Hazard Communication • First Aid/CPR/AED • HAZWOPER First Responder • Hydrogen Sulphide • Defensive Driving • Confined Space Entry • Excavation and Trenching • Speed Shore • Fall Protection • Scaffolding • Ladder Safety • Heat Stress Safety • Hot Work • Mechanical Lifting and Rigging • Hearing Conservation • Respiratory Protection
  • 7. Hardin Consulting LLC Page 7 Stephen G. Hardin Resume • Hazard Communication Standard Globally Harmonized System • Line Finding • Accident Prevention, Signs & Tags • Hazardous Materials Transportation • Incident Reporting & Investigation • Portable Fire Extinguishers • Fire Protection • Risk Management • Steel Pipeline Construction • Hydro Testing • Purging Operations • Smith Commentary Driving • Personal Protective Equipment • Naturally Occurring Radioactive Materials (NORM) • Exposure Control Plan (Bloodborne Pathogens) • Asbestos • Benzene References: Projects Supervisor Laddie Carlos 985-498-9529 Laddie.P.Carlos@conocophillips.com Projects Foreman Daniel (Mac) Mayers 601-209-8960 Daniel.M.Mayers@conocophillips.com Other references upon request.