Theunis bridge
Antwerp - Belgium
2
The client The engineering offices The architects
Albert Canal
PROJECT INTRODUCTION:
In the context of removing the capacity limits for the Albert canal it has been issued
that all bridges must beredesigned in order to have a minimum vertical clearance of 9,10m.
In the beginning of 2014, 28 bridges of 61 were already executed, 33 other bridges were
in progress of design.The ambition is to finish the bridges by 2020.
“Theunis” bridge was built around 1960 and is located on the N129 route.It is situated northeast of the cityof Antwerp, in the district
“Merksem” and it represents the link between Antwerp-North and Deurne.
This urban bridgeis surrounded by industrial and residential areas.
3
GENERAL INTRODUCTION:
The Albert canal is the main canal in Belgium.
Each year, there are more then 40 million tons of
goods transported. The canal connects the port of
Antwerp with the industrial area of Liège.
4
The surrounding bridges
5
Architectural context
Connection with the district Merksem
Transformation of the urban environment
Connection with the district Deurne north
Connection with the highway and city centre
Renewal quay walls Albert canal
Connection with the existing bicycle routes
Relocation ofthe Theunis bridge
Integration existing industrial environment
6
Bridge design
Functional program:
- Tramway with connection to the subway.
- Road design 2x2 lanes, speed: 50km/h.
- 2 Bicycle - and pedestrian lanes.
Dimensions:
- Canal widening until approx. 90m.
- Bridge span of +/-110 meters.
- Bridge width of 50 meters.
- Multiple bridges easier to build in phases.
7
Environment
Impression under the bridge:
Transform the old bridge area into
an urban social environment.
Impression near the bridge:
Create an experience for traffic and residents.
8
VISUAL PROGRAMMING
Theunis Bridge
Visual Programming For Bridges
After analyzing the complexity of the model and the software tools possibilities, Dynamo and Grasshopper (as a
visual programming tools) were chosen in order to generate the bridge in a parametric manner.
A collaborative design process was set in place that would ease the process and increase the efficiency
Interdisciplinary
2016
01 The Architect. Cinema4D / Civil 3D
03 The visual programmers.
02 The Engineers.Nemetscheck SCIA
Engineering
04 The 3d Modellers
9
10
Top View
{ Concept}
The bridges are curved in
longitudinal projection, having
also different elevations on
bridge ends
Longitudinal
{ Concept }
Bridge Architecture Design – Concept Stage
The bridges are curved in horizontal
projection, the paths of the transversal
beams follow a radial distribution
between axis 12 and 14, and a parallel
distribution towards the ends
Sections
{ Concept}
Middle Bridge - Tram Bridge
Typical section
East And West Bridges
Typical Section
Sections
{ Concept }
Structural Design
STRUCTURAL ENGINEERING
Structuralanalysis hasbeen performedby the mixBelgian-Romanianteam andthe design software of choicewas SCIA.The physical
structures and their componentshavebeendesignedto withstand allnecessaryloadsto ensuresafety, reliabilityand integrity.
SCIAcross-section files haverepresentedalsoan entry pointfor the Dynamo generationalgorithm. Cross-section outlineshavebeen made
by injectingSCIAcross-sectionfibers valuesdirectly intoDynamo,
SCIACrossSection
11
Civil3D
ROAD ENGINEERING
Bridge architecture was made in Cinema4D and Civil3D. The provided 3d model was accurate in terms of road outline
and bridge main design shape. From Civil 3d we extracted 3d-polylines that were exported as a set of points in CSV.
We injected these points in Dynamo to have our main guidelines.
CIVIL3DGuideLines
Dynamo – XYZ Values
12
Severalstage wereidentifiedat the beginningof the designprocess anda logicaldesignschema was setin place.
The design was intendedto bea multi-disciplinary,multi-user developmentprocess.
01
STEP
02
STEP
03
STEP
05
STEP
04
STEP
Externaldata has been read from CSV /
EXCEL / TEXT FILES.
Generic definitionshave been adapted or
newly created to meetparticular conditions
Generic definitionshave been placed to
adapt to allbridges as a general rule
READING INPUT
LONGITUDINAL BEAMS
AND AXIS
CONFIGURING EACH BRIDGE
EXPORTING TO REVIT / SAT
QUANTITIES
13
06
STEP
DRAWINGS
APPO 3.0 Powerpoint Template.14
VPL – HOW?
APPO 3.0 Powerpoint Template.
Project Structure
[Civil exports]
[Dyn]
[PlatingGeometry]
[SciaSectionExport]
[xmlgeometry]
A python script was written to read the section files (the scope is to fast adopt it to other
projects)
Cross-Section Dimensions - SCIA
READING INPUT
All existing data were read and not
remade. This kept up certainty with input
values
Small configuration data and
implementing the script in Dynamo and
we have the local coordinates of our
cross-section.
The data for Longitudinal Beams and
diagonals were read using these files.
Data for Transversal Beams were
manually written in the definition
15
Plating Geometry - Thicknesses
Civil 3d - Coordinates
ADDING GENERIC FEATURES
Longitudinal Beams and Axis
Project Structure
[Civil exports]
[Dyn]
[PlatingGeometry]
[SciaSectionExport]
[xmlgeometry]
A. Skeleton– Creating the longitudinalbeamslayoutof the bridge and preparing the basisfor the next features.
Dyn
A. Skeleton
B. Diagonals
C. Diagonal and Beams Surfaces (With Fillets)
D. Transversal Beams
E. Bicycle Lane
F. Stiffeners
Using geometric formulasto reach the accuracyrequired (example – using vector
cross productto obtaina Z-invariantworking planefor cross-sections)
16
a
ADDING GENERIC FEATURES
The Diagonals
B. Diagonals– Creating the longitudinal beamslayoutof the bridge and preparingthe basisfor the next features.
Optionto change the degree of diagonals,the height, the start / middle / end segment position
17
b
ADDING GENERIC FEATURES
Plating and the fillets
C. Collecting– Getting datafor longitudinalbeams, diagonalsand fillets.Exportingto Revit
18
c
ADDING GENERICFEATURES
Deck,transversalbeams.
D. Transversalbeams – Generating transversalbeams, concrete deck andconcrete between beams
Transversalbeam data:
19
d
ADDING GENERIC FEATURES
Bicyclelane.
E. Bicycle Lane – Generating bicycle lane components (beams, concrete / steel deck plate, longitudinal U-shapestiffeners)
20
e
ADDING GENERICFEATURES
Adding longitudinalstiffeners.
F. Stiffeners – Adding some longitudinalstiffeners– and testing several outcome possibilities
21
f
Local libraryfiles – designed tobe used project independent.These functionsare made to be reused
CONFIGURINGEACH BRIDGE
Genericdefinitionshavebeen adaptedto particularsituations
Externalpythonscriptshave been made tobe used withoutstructure change
Using dynamicgeneric programming, dynamo fileshave been used for all3 bridges successfullyafter copying the files to
the right folders, changing the folder inputdata pathsand making some particularchanges for the bridges.
To change the entry datawe just change the pathto where the datais stored:
22
EXPORTING TO REVIT
Bridge componentshave been exported from Dynamo to Revit andlinkedtogether withother components made in Revit
(foundationelements).
23
APPO 3.0 Powerpoint Template.24
EXPORTING TO EXCEL
QUANTITY ESTIMATION
a
a) Export to excel, data is grouped according to plate position within the overall geometry
color coded for faster error check, visual understanding of the thickness distribution
APPO 3.0 Powerpoint Template.25
EXPORTING TO EXCEL
QUANTITY ESTIMATION
b
b) Rhino Grasshopper – area calculation and separation depending on plate thickness
APPO 3.0 Powerpoint Template.
EXPORTING TO AUTOCAD
26
27
How is collaborating on this project:
Project Manager: Luc Huysmans BL infrastructure Belgium
Project leader: Bart van Zegbroeck & engineers BL infrastructure Belgium
BIM engineer & Dynamo specialist: Rami HamatiGEC Romania
Civilengineer: Bogdan Gentimir and his team GEC Romania
BIMcoordinator: Stefan Verhoeven BL infrastructure Belgium

More Related Content

What's hot

Bim projects portfolio
Bim projects  portfolioBim projects  portfolio
Bim projects portfolio
Amr-Saad
 
Revit 2014 api_presentation_slides
Revit 2014 api_presentation_slidesRevit 2014 api_presentation_slides
Revit 2014 api_presentation_slides
ali lemssefer
 
CV- Matt Dowie-extended
CV- Matt Dowie-extendedCV- Matt Dowie-extended
CV- Matt Dowie-extended
Matthew Dowie
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV
Paula Davison
 
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
Nidhi Sompura
 

What's hot (19)

BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel Almenares
 
BIM ppt
BIM pptBIM ppt
BIM ppt
 
Bim projects portfolio
Bim projects  portfolioBim projects  portfolio
Bim projects portfolio
 
My BIM Profesional Portafolio English version
My BIM Profesional Portafolio English versionMy BIM Profesional Portafolio English version
My BIM Profesional Portafolio English version
 
BIM Portfolio
BIM PortfolioBIM Portfolio
BIM Portfolio
 
Revit Projects 1
Revit Projects 1Revit Projects 1
Revit Projects 1
 
Profesional portafolio 2020
Profesional portafolio 2020Profesional portafolio 2020
Profesional portafolio 2020
 
Revit 2014 api_presentation_slides
Revit 2014 api_presentation_slidesRevit 2014 api_presentation_slides
Revit 2014 api_presentation_slides
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
Turn Revit data into useful information with visualization techniques and wor...
Turn Revit data into useful information with visualization techniques and wor...Turn Revit data into useful information with visualization techniques and wor...
Turn Revit data into useful information with visualization techniques and wor...
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies
 
Profesional portafolio 05 2017
Profesional portafolio 05 2017Profesional portafolio 05 2017
Profesional portafolio 05 2017
 
MTECH BIM project case study
MTECH BIM project case studyMTECH BIM project case study
MTECH BIM project case study
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
CV- Matt Dowie-extended
CV- Matt Dowie-extendedCV- Matt Dowie-extended
CV- Matt Dowie-extended
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV
 
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
 
Advanced Road Design with InfraWorks
Advanced Road Design with InfraWorksAdvanced Road Design with InfraWorks
Advanced Road Design with InfraWorks
 
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
What's in Your Structural Model? Understanding Detail-Level Requirements Usin...
 

Viewers also liked

Dynamo 100107092845-phpapp02
Dynamo 100107092845-phpapp02Dynamo 100107092845-phpapp02
Dynamo 100107092845-phpapp02
Takefumi MIYOSHI
 
S1.3_PRES_Centre_of_Gravity_BMcCallum
S1.3_PRES_Centre_of_Gravity_BMcCallumS1.3_PRES_Centre_of_Gravity_BMcCallum
S1.3_PRES_Centre_of_Gravity_BMcCallum
Bruce McCallum
 

Viewers also liked (14)

Dynamo visual programming for design
Dynamo visual programming for designDynamo visual programming for design
Dynamo visual programming for design
 
Dynamo for Revit – Bill Knittle, Synergis
Dynamo for Revit – Bill Knittle, SynergisDynamo for Revit – Bill Knittle, Synergis
Dynamo for Revit – Bill Knittle, Synergis
 
Dynamo 100107092845-phpapp02
Dynamo 100107092845-phpapp02Dynamo 100107092845-phpapp02
Dynamo 100107092845-phpapp02
 
May 2016 spring_arch754_final_shinyikwan
May 2016 spring_arch754_final_shinyikwanMay 2016 spring_arch754_final_shinyikwan
May 2016 spring_arch754_final_shinyikwan
 
S1.3_PRES_Centre_of_Gravity_BMcCallum
S1.3_PRES_Centre_of_Gravity_BMcCallumS1.3_PRES_Centre_of_Gravity_BMcCallum
S1.3_PRES_Centre_of_Gravity_BMcCallum
 
Work Summary
Work SummaryWork Summary
Work Summary
 
WorkCollection_v3
WorkCollection_v3WorkCollection_v3
WorkCollection_v3
 
Разработка проекта в Revit
Разработка проекта в RevitРазработка проекта в Revit
Разработка проекта в Revit
 
Justin Burton, Revit BIM Modeler / Revit Programmer
Justin Burton, Revit BIM Modeler / Revit Programmer Justin Burton, Revit BIM Modeler / Revit Programmer
Justin Burton, Revit BIM Modeler / Revit Programmer
 
Revit 2018 API News
Revit 2018 API NewsRevit 2018 API News
Revit 2018 API News
 
Trình bày công trình
Trình bày công trìnhTrình bày công trình
Trình bày công trình
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to Presentation - Theunis Bridge - Dynamo BIM

Industrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USAIndustrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USA
Brian Cherry
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
Consultrans, S.A.
 
BIM Summit Preseantation
BIM Summit PreseantationBIM Summit Preseantation
BIM Summit Preseantation
Russell Bunn
 
summer practice report(CVE 400)
summer practice report(CVE 400)summer practice report(CVE 400)
summer practice report(CVE 400)
Ali Can OKUR
 

Similar to Presentation - Theunis Bridge - Dynamo BIM (20)

2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions
 
ANALYSIS AND DESIGN OF BRIDGE FOUNDATION
ANALYSIS AND DESIGN OF BRIDGE FOUNDATIONANALYSIS AND DESIGN OF BRIDGE FOUNDATION
ANALYSIS AND DESIGN OF BRIDGE FOUNDATION
 
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
 
Auto CAD Civil 3D
Auto CAD Civil 3DAuto CAD Civil 3D
Auto CAD Civil 3D
 
Excellence in infrastructure 2014 - Overview
Excellence in infrastructure 2014 - OverviewExcellence in infrastructure 2014 - Overview
Excellence in infrastructure 2014 - Overview
 
2012-04-12_Cad-Q Revit Superbrukerdag_Visualisering som del av Designprosessen
2012-04-12_Cad-Q Revit Superbrukerdag_Visualisering som del av Designprosessen2012-04-12_Cad-Q Revit Superbrukerdag_Visualisering som del av Designprosessen
2012-04-12_Cad-Q Revit Superbrukerdag_Visualisering som del av Designprosessen
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Industrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USAIndustrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USA
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
Rail infrastructures with BIM, more than 50 solutions to improve the quality ...
Rail infrastructures with BIM, more than 50 solutions to improve the quality ...Rail infrastructures with BIM, more than 50 solutions to improve the quality ...
Rail infrastructures with BIM, more than 50 solutions to improve the quality ...
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear project
 
BIM Summit Preseantation
BIM Summit PreseantationBIM Summit Preseantation
BIM Summit Preseantation
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
Central Station Reference Concept Design Online Consultation
Central Station Reference Concept Design Online ConsultationCentral Station Reference Concept Design Online Consultation
Central Station Reference Concept Design Online Consultation
 
Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
summer practice report(CVE 400)
summer practice report(CVE 400)summer practice report(CVE 400)
summer practice report(CVE 400)
 
CV_subandhu dutta
CV_subandhu duttaCV_subandhu dutta
CV_subandhu dutta
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and Modelling
 

Recently uploaded

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Presentation - Theunis Bridge - Dynamo BIM

  • 2. 2 The client The engineering offices The architects
  • 3. Albert Canal PROJECT INTRODUCTION: In the context of removing the capacity limits for the Albert canal it has been issued that all bridges must beredesigned in order to have a minimum vertical clearance of 9,10m. In the beginning of 2014, 28 bridges of 61 were already executed, 33 other bridges were in progress of design.The ambition is to finish the bridges by 2020. “Theunis” bridge was built around 1960 and is located on the N129 route.It is situated northeast of the cityof Antwerp, in the district “Merksem” and it represents the link between Antwerp-North and Deurne. This urban bridgeis surrounded by industrial and residential areas. 3 GENERAL INTRODUCTION: The Albert canal is the main canal in Belgium. Each year, there are more then 40 million tons of goods transported. The canal connects the port of Antwerp with the industrial area of Liège.
  • 5. 5 Architectural context Connection with the district Merksem Transformation of the urban environment Connection with the district Deurne north Connection with the highway and city centre Renewal quay walls Albert canal Connection with the existing bicycle routes Relocation ofthe Theunis bridge Integration existing industrial environment
  • 6. 6 Bridge design Functional program: - Tramway with connection to the subway. - Road design 2x2 lanes, speed: 50km/h. - 2 Bicycle - and pedestrian lanes. Dimensions: - Canal widening until approx. 90m. - Bridge span of +/-110 meters. - Bridge width of 50 meters. - Multiple bridges easier to build in phases.
  • 7. 7 Environment Impression under the bridge: Transform the old bridge area into an urban social environment. Impression near the bridge: Create an experience for traffic and residents.
  • 8. 8 VISUAL PROGRAMMING Theunis Bridge Visual Programming For Bridges After analyzing the complexity of the model and the software tools possibilities, Dynamo and Grasshopper (as a visual programming tools) were chosen in order to generate the bridge in a parametric manner. A collaborative design process was set in place that would ease the process and increase the efficiency
  • 9. Interdisciplinary 2016 01 The Architect. Cinema4D / Civil 3D 03 The visual programmers. 02 The Engineers.Nemetscheck SCIA Engineering 04 The 3d Modellers 9
  • 10. 10 Top View { Concept} The bridges are curved in longitudinal projection, having also different elevations on bridge ends Longitudinal { Concept } Bridge Architecture Design – Concept Stage The bridges are curved in horizontal projection, the paths of the transversal beams follow a radial distribution between axis 12 and 14, and a parallel distribution towards the ends Sections { Concept} Middle Bridge - Tram Bridge Typical section East And West Bridges Typical Section Sections { Concept }
  • 11. Structural Design STRUCTURAL ENGINEERING Structuralanalysis hasbeen performedby the mixBelgian-Romanianteam andthe design software of choicewas SCIA.The physical structures and their componentshavebeendesignedto withstand allnecessaryloadsto ensuresafety, reliabilityand integrity. SCIAcross-section files haverepresentedalsoan entry pointfor the Dynamo generationalgorithm. Cross-section outlineshavebeen made by injectingSCIAcross-sectionfibers valuesdirectly intoDynamo, SCIACrossSection 11
  • 12. Civil3D ROAD ENGINEERING Bridge architecture was made in Cinema4D and Civil3D. The provided 3d model was accurate in terms of road outline and bridge main design shape. From Civil 3d we extracted 3d-polylines that were exported as a set of points in CSV. We injected these points in Dynamo to have our main guidelines. CIVIL3DGuideLines Dynamo – XYZ Values 12
  • 13. Severalstage wereidentifiedat the beginningof the designprocess anda logicaldesignschema was setin place. The design was intendedto bea multi-disciplinary,multi-user developmentprocess. 01 STEP 02 STEP 03 STEP 05 STEP 04 STEP Externaldata has been read from CSV / EXCEL / TEXT FILES. Generic definitionshave been adapted or newly created to meetparticular conditions Generic definitionshave been placed to adapt to allbridges as a general rule READING INPUT LONGITUDINAL BEAMS AND AXIS CONFIGURING EACH BRIDGE EXPORTING TO REVIT / SAT QUANTITIES 13 06 STEP DRAWINGS
  • 14. APPO 3.0 Powerpoint Template.14 VPL – HOW?
  • 15. APPO 3.0 Powerpoint Template. Project Structure [Civil exports] [Dyn] [PlatingGeometry] [SciaSectionExport] [xmlgeometry] A python script was written to read the section files (the scope is to fast adopt it to other projects) Cross-Section Dimensions - SCIA READING INPUT All existing data were read and not remade. This kept up certainty with input values Small configuration data and implementing the script in Dynamo and we have the local coordinates of our cross-section. The data for Longitudinal Beams and diagonals were read using these files. Data for Transversal Beams were manually written in the definition 15 Plating Geometry - Thicknesses Civil 3d - Coordinates
  • 16. ADDING GENERIC FEATURES Longitudinal Beams and Axis Project Structure [Civil exports] [Dyn] [PlatingGeometry] [SciaSectionExport] [xmlgeometry] A. Skeleton– Creating the longitudinalbeamslayoutof the bridge and preparing the basisfor the next features. Dyn A. Skeleton B. Diagonals C. Diagonal and Beams Surfaces (With Fillets) D. Transversal Beams E. Bicycle Lane F. Stiffeners Using geometric formulasto reach the accuracyrequired (example – using vector cross productto obtaina Z-invariantworking planefor cross-sections) 16 a
  • 17. ADDING GENERIC FEATURES The Diagonals B. Diagonals– Creating the longitudinal beamslayoutof the bridge and preparingthe basisfor the next features. Optionto change the degree of diagonals,the height, the start / middle / end segment position 17 b
  • 18. ADDING GENERIC FEATURES Plating and the fillets C. Collecting– Getting datafor longitudinalbeams, diagonalsand fillets.Exportingto Revit 18 c
  • 19. ADDING GENERICFEATURES Deck,transversalbeams. D. Transversalbeams – Generating transversalbeams, concrete deck andconcrete between beams Transversalbeam data: 19 d
  • 20. ADDING GENERIC FEATURES Bicyclelane. E. Bicycle Lane – Generating bicycle lane components (beams, concrete / steel deck plate, longitudinal U-shapestiffeners) 20 e
  • 21. ADDING GENERICFEATURES Adding longitudinalstiffeners. F. Stiffeners – Adding some longitudinalstiffeners– and testing several outcome possibilities 21 f
  • 22. Local libraryfiles – designed tobe used project independent.These functionsare made to be reused CONFIGURINGEACH BRIDGE Genericdefinitionshavebeen adaptedto particularsituations Externalpythonscriptshave been made tobe used withoutstructure change Using dynamicgeneric programming, dynamo fileshave been used for all3 bridges successfullyafter copying the files to the right folders, changing the folder inputdata pathsand making some particularchanges for the bridges. To change the entry datawe just change the pathto where the datais stored: 22
  • 23. EXPORTING TO REVIT Bridge componentshave been exported from Dynamo to Revit andlinkedtogether withother components made in Revit (foundationelements). 23
  • 24. APPO 3.0 Powerpoint Template.24 EXPORTING TO EXCEL QUANTITY ESTIMATION a a) Export to excel, data is grouped according to plate position within the overall geometry color coded for faster error check, visual understanding of the thickness distribution
  • 25. APPO 3.0 Powerpoint Template.25 EXPORTING TO EXCEL QUANTITY ESTIMATION b b) Rhino Grasshopper – area calculation and separation depending on plate thickness
  • 26. APPO 3.0 Powerpoint Template. EXPORTING TO AUTOCAD 26
  • 27. 27 How is collaborating on this project: Project Manager: Luc Huysmans BL infrastructure Belgium Project leader: Bart van Zegbroeck & engineers BL infrastructure Belgium BIM engineer & Dynamo specialist: Rami HamatiGEC Romania Civilengineer: Bogdan Gentimir and his team GEC Romania BIMcoordinator: Stefan Verhoeven BL infrastructure Belgium