Descon provides cost-effective solutions that address unique project challenges. In every task we look at projects holistically to find the optimal solution. Our projects are completed in a timely manner and in line with local regulations.
1. B U I L D I N G
I N F O R M A T I O N
M O D E L I N G
UAB “Descon”
+370 686 15499
info@descon.lt
www.descon.work
ONE OF THE LEADING BIM ENGINEERS IN NORDIC COUNTRIES
Descon provides cost-effective solutions that address unique project challenges. In every
task we look at projects holistically to find the optimal solution. Our projects are
completed in a timely manner and in line with local regulations.
OUR SOFTWARE OUR PARTNERS
-Free - thermal bridge calculation
-Energy efficiency calculation
-Passive House design.
Passive house design and
energy calculation
-Tender (conceptual) model
calculation.
-Concrete structures design/ detailing.
-Precast structures design/ detailing.
-Steel structure design/ detailing.
-Stability calculation.
Structural Engineering and
BIM management
WE DO
Architectural
integration
Structural engineering
-Finding optimal
solutions
-3D TEKLA modelling
Fabrication integration
-Production automation
-CNC data files
Conceptual design
-Preliminary drawings
-Basic structure sizes & positions.
Sales & bidding
-Cost estimating
-Alternative solutions
Erection scheduling
-Erection planing &
follow up
-Sequencing & lotting
-Project managment
Detailing
-Shop drawings
-Detailed connections
Erection drawings
-General arrangement
drawings
-Sections & elevations
WE OFFER
20%
20%
25%
30%
80%
80%
Lower construction costs
Increase your profit
Shorter construction time
Improved conditions for building
maintenance
Less errors and rework
Better quality projects
OUR TEAM
13 Highly skilled professionals
4 - Leading
engineers
4 - Junior
engineers
1 - Architect3 - Engineers
1 - “Passive House“ design expert
2. NAME: Ikea’s Headquarters ”Hubhult”
TYPE: Structural engineering
ARCHITECT: Dorte Mandrup
CLIENT: IKEA Fastigheter AB
LOCATION: Malmø, Sweden
COMPLETED: 2014
NAME: VALLASTADEN School
TYPE: Structural engineering
ARCHITECT: M5 Arkitektur
CLIENT: SKANSKA
LOCATION: Linkoping, Sweden
COMPLETED: 2016
NAME: Library building
TYPE: Structural engineering
CLIENT: PEAB
LOCATION: Jonstorp, Sweden
COMPLETED: 2012
NAME: Residential buildings and parking
TYPE: Structural engineering
ARCHITECT: Gisteråsjöstrand Arkitektur AB
CLIENT: PEAB, Marsalis Bygg
LOCATION: Østersund, Sweden
COMPLETED: 2014
22,000 m2 surface area building is made from
Steel composit columns, concrete collumns,
DeltaBeam, HDf slab, steel frame roof.
This project was nominated for Tekla BIM
Awards 2014 as one of the finalists together
with leeding companies from Sweedan
Precast-steel concrete structures.
Precast concrete detailing.
School was designed using BIM in order to
optimize building costs, and reduce erection
time. It also helped to prevent errors due high
precision.
Building is designed using Open BIM modeling.
It contains - all precast concrete structure.
Precast concrete detailing.
3. NAME: Imlitex office building
TYPE: Structural engineering
ARCHITECT: G. Natkevicius ir partneriai
CLIENT: YIT Kausta
LOCATION:Kaunas, Lithuania
COMPLETED: 2017
NAME: Office building Mikrovisata
TYPE: Structural engineering
ARCHITECT: G. Natkevicius ir partneriai
CLIENT: “Mikrovisata valda”
LOCATION:Kaunas, Lithuania
COMPLETED: 2017
NAME: Maxima office building
TYPE: Structural engineering
ARCHITECT: Gediminas Jurevicius
CLIENT: Maxima
LOCATION: Vilnius, Lithuania
COMPLETED: 2016
NAME: Braxen office building
TYPE: Structural engineering
ARCHITECT: White Architects
CLIENT: PEAB
LOCATION: Linkoping, Sweden
COMPLETED: 2014
Post - tensioned concrete structure.
Building meets A+ class energy efficiency
regulations. It has unique expressive
architecture.
It was first BIM project for Maxima. It allowed client to reduce ex-
plotation costs and prevent errors. This project was nominated for
Tekla BIM Awards 2016 as one of the finalists together with leeding
companies from Sweedan
BuildingismadefromIn-Situconcretestructure.
It meets A class energy efficiency regulations.
Building was used during entire renovation
procedure. BIM allowed us to reduce the
cost due the error prevention and precise
estimation.