Company Profile
ā€¢ Texport Syndicate has strategic global
representation with its corporate headquarters
located in Mumbai, India and manufacturing
facilities located in Bangalore, Mumbai and
Tirupur, India.
ā€¢ Additionally, Texport syndicate is represented in
North America by Key Apprel In New York, USA
In-House Production
ā€¢ Japanese Made Juki, Brother and Singer Machines
with specialized ancillary machines supported with
modern laundry/ finishing embroidery machines.
ā€¢ Factories are designed to produce Shirts, Blouses,
Shorts, Trousers and Outerwear.
ā€¢ Over 300 administrative and Quality Assurance
staffs manage all factories.
ā€¢ Over 9000 skilled workers are permanently
employed with proper welfare facility, observing
Human Rights Issue requirements.
BUYERS
DEPARTMENTS
MERCHANDISING
MERCHANDISER ACTIVITIES
ā€¢ Design / sampling/ Sketch/ Construction/ Pattern/
Sizes/ Season
ā€¢ Fabric/ Quality/ GSM/ EPI/ PPI/ Colour
ā€¢ Trims and Accessories
ā€¢ Testing
ā€¢ Production
ā€¢ Quality check/ Finishing/ Printing / Washing
ā€¢ Documentation
ā€¢ Shipping / forwarding/ Delivery Date / Quantity/
Price
ā€¢ TNA- Time and Action Calendar
SAMPLING
Sampling Department consists of 41 Tailors,4
Pattern Masters, 2 Graders and 4 Marker
Makers. The employees are categorised under:
ā€¢ GM
ā€¢ Technical Manager
ā€¢ Asst. Manager
ā€¢ In charge of CAD Department)
ā€¢ Tailors
Stages of Sample Development
EDP
EDP Department is IT department of the factory which takes
care of hardware and software.
Apart from it, the department does the following work:
ā€¢ Planning of installation of required hardware and software.
ā€¢ Estimation
ā€¢ Budgeting of Software and hardware
ā€¢ Approval from top management
ā€¢ Customisation according to requirement
ā€¢ Purchase
ā€¢ Installation
ā€¢ Implementation
ā€¢ Training of staff about the hardware and software.
ā€¢ Maintenance if required
ā€¢ Accountability of the resources
VGEMS
ā€¢ VGEMS is a Garment Export Management System
developed by Optimal InfoTech System Pvt. Ltd.
Connection from the Citrix software.
ā€¢ VGEMS is an ERP (Enterprise Resource planning)
for the garment manufacturing industries (within
India). This system is being used in Texport units.
ā€¢ The server is located in the Bombay Texport HO. This
software is being used by all the 7 units in the 4
locations: Bangalore, Bombay, Tirupur and Hyderabad.
Production Planning
ā€¢ The PPD is responsible for setting the Targets for the day. This
department plans when and where the production will start, go on and end.
ā€¢ The planning department is responsible for planning how the
production will complete within the delivery date set.
ā€¢ First of all the planning department receives the samplefrom the buyers.
This sample is then sent to the GSD department.
ā€¢ The GSD department analyses all the details and prepare the
Operation Bulletin (OB). This OB is then received here.
ā€¢ Side by side, the PPD also receives the Order Chart and the Fabric
and Trims Status Report from the merchandiser. The order chart has
the delivery date in it.
ā€¢ These 3 reports are necessary for planning and should be received before.
GSD ( GENERAL SEWING DATA)
IED (INDUSTRIAL ENGINEERING)
ā€¢ Method Implementation in the batch.
ā€¢ Works on Kaizen activities.
ā€¢ To maintain the methods of the operation performed in the batch as
implemented by
ā€¢ GSD.
ā€¢ Follow-up on low output operators. Finding out reason for low
efficiency and solving the problem to increase performance and
productivity.
ā€¢ Off-standard & On-standard work details calculation
ā€¢ Calculating non-productive time to estimate loss of cost because of
machine failure.
ā€¢ Maintaining Target stickers for each operation.
ā€¢ Preparation of GSD mode to hang on machine to facilitate the work
of operator.
ā€¢ Monitoring hourly production of line.
ā€¢ To conduct Time study to determine the capacity,
efficiency and to work on critical operation to reduce
the operation cycle time to reduce WIP.
ā€¢ Generating Daily production report and style-wise
efficiency report.
ā€¢ Maintaining incentive report
ā€¢ Maintaining Roll Throughput Yield.
ā€¢ Capacity report generation.
ā€¢ Create and update skill matrix of each operator
& submit the same to personnel department.
ā€¢ Assist in Factory planning.
FABRIC AND TRIMS STORE
Texport Syndicate, Bangalore has a centralised
fabric and trims store in TS-IV Unit which
receives fabric and trims from the suppliers and
issues them to the other unit wherever they are
required. This store has been divided into two
parts i.e.
ā€¢ Fabric Store
ā€¢ Trims and accessories store
CUTTING
MAINTENANCE
ā€¢ Maintenance Department receives tech-pack from the Merchandising department.
ā€¢ They thoroughly go through the construction of garment i.e. Seams and stitches
ā€¢ Based on the analysis, they prepare a list of machines
ā€¢ They check the availability of machine, folders, guides and profile. If certain
machines and folders are not available, they inform about it to the purchase
department and get the purchase order ready and place the order for the machine to
the vendor.
ā€¢ The machines and folders should be in house at least 2 days before the batch setting.
ā€¢ They impart training to the workers regarding the new machines and folders.
ā€¢ They work with Industrial Engineering Department and production department in
batch setting.
ā€¢ For quality, they create template, profile and guide
on demand of Quality Assurance Department.
ā€¢ After the production starts, they keep their eye on
proper functioning of the machines. During the
production if some problem occurs, they repair the
machine to avoid the disturbance in production.
ā€¢ To keep the machine trouble free, they go for
preventing maintenance by cleaning and oiling of
the machine.
SEWING
ā€¢ PP meeting for production planning
ā€¢ Machine layout Implementation on floor
ā€¢ Batch Setting
ā€¢ Individual machine mocks (SPI, Pressure Foot, Feed Dog, and Needle Size)
ā€¢ Quality procedure to be followed by batch checkers and end line checkers.
ā€¢ Quality procedures to be followed by batch QCs. and floor QCs.
ā€¢ Hourly production targets for each operation
ā€¢ Maintaining hourly production defect analysis and corrective report
ā€¢ Supervision of lines by supervisors to get target production with Quality
ā€¢ Batch efficiency for the day
ā€¢ Deployment of operators in case of absenteeism
ā€¢ Incentive paid to operators
ā€¢ Maintaining Batch DHU Report
ā€¢ Issue garments to the finishing and washing section
WASHING AND FINISHING
ā€¢ Garments are checked as per quality mentioned in DC
ā€¢ Garments are stored in washing racks.
ā€¢ ā€œBuyer approved wash standardā€ is received from merchandiser.
ā€¢ First bulk wash of 250 pieces is done.
ā€¢ Rectification of fault and updating of recipe are done on the basis of first wash.
ā€¢ Bulk wash ranges are sent to the buyer along with the comments on wash.
ā€¢ Comments and approval regarding shade ranges and hand feel comes from
buyer.
ā€¢ Bulk washing is done in washing machine.
ā€¢ Hydro-extracting is done to squeeze water from the garments.
ā€¢ Garments are fed into Tumble Dry machine to dry the garments.
ā€¢ Garments are sent to Garment Inspection Room for inspection as per 2.5 AQL.
ā€¢ Grinding (If mentioned by the buyer) is done hourly. Checking of grinding is
done.
ā€¢ Garments are sent to the finishing department for packaging and dispatching.
TIME STUDY SHEETS
ā€¢ Sheet 1
ā€¢ Sheet 2
ā€¢ Sheet 3
ā€¢ Sheet 4
A Throughput Process Flow(TPF)
bulletin using VSM
- Enhance Productivity
Lean manufacturing is a manufacturing strategy that
seeks to produce a high level of throughput with a
minimum of input.
Lean thinking changes the focus of management from
optimizing separate technologies, assets, and vertical
departments to optimizing the flow of products and
services through entire value streams that flow
horizontally across technologies, assets, and departments
to customers.
LEAN TOOLS
ā€¢ 5S
ā€¢ Andon
ā€¢ Bottleneck Analysis
ā€¢ Continuous Flow
ā€¢ Gemba
ā€¢ Heijunka
ā€¢ Hoshin Kanri
ā€¢ Jidoka
ā€¢ JIT
ā€¢ Kaizen
ā€¢ Kanban
ā€¢ KPI
ā€¢ MUDA
ā€¢ OEE
ā€¢ PDCA
ā€¢ Poka-Yoke
ā€¢ Root Cause Analysis
ā€¢ SMED
ā€¢ Six Big Losses
ā€¢ Smart Goals
ā€¢ Standarized Work
ā€¢ TAKT Time
ā€¢ TPM
ā€¢ VSM
ā€¢ Visual Factory
The Goal
To propose a TPF Bulletin for TS4, by using the
Value Stream Mapping method to optimize total
production cost and identify areas of
improvements.
The Approach
Pick and choose a few styles that are representative of most of the
production at TS4, using Pareto Analysis
Study the process, from Fabric Stores to Pack & Dispatch as it happens
ā€¢ Calculate what the throughput will be , using the new set of activities to
maximize value addition.
Identify value added and non-value added activities, understand why things are done
in a certain way, and suggest alternatives
Time and Motion Study, to understand and evaluate the
current methods
PARETO CHART
0
5000
10000
15000
20000
25000
30000
35000
Order Quantity
Order Quantity
The Plan
Review the existing throughput for a chosen style
Operation flow, and information flowā€”identify what are the
true constraints
Analysis of all operational sections: Stores, Fabric-Inspection,
Cutting, Sewing, Washing, Finishing, Packing and Dispatch
Assign value to each of the observed activities, critically analyze
the necessity of these activitiesā€”the value they add, and the
accompanying costs
Optimize the activitiesā€”Simplify, Eliminate, Combine, Redesign
/ Mechanize--Reduce costs while ensuring efficient usage of
resources
The Subject
Style chosen: Zara w14s23c
Product : Kids wearā€”Boys plaid shirt with a single welt
pocket
Plaid Twill, 20 components (w/ pocket bag
Two, differently-sized buttons on each cuff
6 sizes in all
Planned Target: 32,254
Start Date: June 29th,2014
Delivery Date: July 25th, 2014
Shipped Quantity : 31,300
Why ?
Throughput metrics exist for Sewing !
But..
Cutting ?
Washing?
Finishing?
To understand the differences in sectional
(or sub sectional) capacities, and work
towards balancing this throughout the
entire production value chain.
Value Stream Mapping
ā€“ Special type of flow chart that uses symbols
known as "the language of Lean" to depict
and improve the flow of inventory and
information.
ā€“ Value stream mapping & analysis is a tool
that allows you to see waste, and plan to
eliminate it.
What Is Value?
ā€¢ A capability provided to a customer
ā€“ of the highest quality,
ā€“ at the right time,
ā€“ at an appropriate price, as defined by the
customer.
ā€¢ "Value" is what the customer is buying or what
changes the property of the product
Value Stream Analysis
Current State Future State
PUSH SYSYEM PULL SYSTEM
INVENTORY IN THE
FORM OF WIP
SUPERMARKETS
Throughput Time
ā€“ Throughput time is the amount of time required
for a product to pass through a manufacturing
process, thereby being converted from raw
materials into finished goods.
Processing
time
( 3 Hours)
Inspection
time
(0.5 Hours)
Move time
( 1 Hour)
Queue time
(12 Hours)
THROUGHPUT TIME= 16.5 HOURS
PACKAGE TO SHIPMENT
O SHIPMENT
MERCHANDISE
OPERATIONS
ORDER CONFIRMATION TO
RECEIVING PACKAGE
The Study
ā€¢ The processes in each section were analysed with the help of videos.
ā€¢ The data was compiled in the form of a detailed process flow with
chart symbols representing the flow.
ā€¢ It also includes the time per activity, the distance travelled and the
manpower involved.
ā€¢ Each activity was classified into VA and NVA and therefore, waste
elimination methods were suggested, pertaining to their nature.
Data Available
Fabric Stores
Cutting
Sewing
Washing
Finishing
What is Takt Time?
Value Stream Mapping
VSM map as is
Percentage of VA to Total time spent
2.9%
Takt Time
The Maps
ā€¢ The current state vsm map
ā€¢ The future state vsm map
CUTTING MODULE
ā€¢ The production floor has 8 cutting lines on each floor i.e.
16 lines in total.
ā€¢ If each floor is divided into 7 teams and given one table
each then the total number of workers employed would
be 140 excluding the workers involved in fusing.
ā€¢ The production per day is around 1000/line.
ā€¢ Taking 14 working lines, the production will be around
14000.
ā€¢ Comparing to current scenario, the production will
increase with this kind of modular system.
ā€¢ Currently, each floor produces a quantity of 6400, which
gives us a total of 12,800 from both the floors.
Suggestions
ā€¢ After Fabric inspection, the fabric may be rolled onto rods, with just the required
tension such that this makes it easier for the spreading team to work with.
ā€¢ During spreading, the person feeding the fabric onto the table might be replaced with
either just a rod, or the roll of loosely rolled fabric. This performs the same function
and can result in a 33% decrease in manpower requirements of the spreading team.
ā€¢ Having accurate patterns, in multiple sets (due to spreading happening on many
tables at once) will really help cut down on the wait time (close to 30 mins for each
marking cycle) for marking.
ā€¢ Combination trays may be employed, with a certain placement protocol (for eg,
fabric face down always) and each component in its designated space on the tray.
This can eliminate the need for numbering altogether.
ā€¢ Instead of component fusing , entire panels may be fused and then cut with the band
knife. This can decrease the manpower required in the fusing team by about 56%.
ā€¢ Trimming, which is an operation that adds no value to the garment, may be
eliminated, by using under bed trimmers, and trimming at source on the sewing line.
Conclusions
The TPF Bulletin highlights the fact that it takes 5.1 days for the first
finished garment (fabric to pack).
The percentage of VA was only 2.9%. This leaves us with a huge
scope of improvement based on the suggestions.
Evidently, there were certain challenges that this style faced.
The Lean production period provided the buffer space in the
packing section for this, which would have been a major issue had it
been otherwise.
Flexible layout
ABOUT THE PROJECT
ā€¢ TS 4 is a unit of Texport Syndicate produces multi
product styles with varying # of workstations. The
order quantity also varies from 1000 to 3 lakh.
ā€¢ This demands flexible layout in order to ensure on
time responses and optimum use of resources.
ā€¢ This study/project is undertaken to understand the
past patterns of order quantity and related
production to arrive at various layout scenarios on
which layout models can be evolved.
ABOUT THE PROJECT
ā€¢ Creating a flexible layout on the sewing and
finishing floor which caters to the production of
multiple products based on different SAM values
and related workstations.
ā€¢ To optimize/maximize the capacity based on
space availability.
Analysis of Operation Breakdown Sheets for
all the styles produced in the last six month
WORKSHEET 1 (Comparison Worksheet):
Obtained name of the buyer, style, description, no. of
workstations, SAM, no. of critical operations & no. of
machines used for the critical operations, for all the 43
styles.
WORKSHEET 2 (Product Wise Segregation):
All the styles were segregated as per their product type.
To determine Complexity of the Styles
Based on the style description given in the
Operation
Breakdown Sheets:
WORKSHEET 3 (Attribute Wise Segregation):
Various Attributes/Elements of all the styles were defined.
WORKSHEET 4 (Elemental Details):
Elements/Components of the styles were defined in a
more detailed way, to figure out the common/majority of
elements among all the styles respective of their product
types.
WORKSHEET 5 (Process Breakdown):
Operations for all the styles were put together, to
determine the no. of common operations (Helpers,
Ironers & Checkers).
WORKSHEET 6 (Divisional Analysis):
The no. of styles falling in an interval of no. of workstations
and critical operations for a particular range of SAM was
determined.
WORKSHEET 7 (Frequency of styles [Graph]):
The average number of workstations and critical operations
falling under a particular range of SAM was determined.
WORKSHEET 8 (PARETO Analysis [Graph]):
PARETO Graphs for different sets of parameters were
generated.
WORKSHEET 9 (Segregation of ironers, checkers and
helpers):
The operations/processes done by the Helpers, Ironers and
Checkers for main product types were determined.
TAKT Time Calculator:
Determines the no. of lines required to produce the order
quantity in given no. of days (as per shipment details).
WORKSHEET 0 (Basic):
The TAKT Time was calculated and wash/non-wash
property was determined, for all the styles.
RESULT
WORKSHEET 10 (Proposed Layout Scenarios for
Sewing Section):
Various Scenarios for the layout of Sewing Section were
developed, depending on the no. of Workstations and
balancing the Critical Operations.
Sewing Section Layout - Before
ā€¢ 8 lines with 80 no. of
workstations per line.
Sewing Section Layout - After
ā€¢ As 40 is the lowest no. of
workstations with the highest
order quantity, all the 8 lines
are divided into halves
providing a gangway in the
middle.
ā€¢ The study and analysis has given an insight on how to work on the
flexibility and present the various scenarios of workstations to
layout configuration. The snapshot of the finding and model is:
1. Assumption -
ļ‚§ Sewing area has a 80 workstation space -side to side configuration
ļ‚§ Based on the layout multiple sorting (feeding) stations and output
stations needs to be provided which are on wheels or easily movable
like the sewing machines
ļ‚§ There is a direct correlation between SAM and # of workstations
and can be arrived at based on the formula/equation (Equation 1).
2. Layouts have to be made for ten workstation configurations from
minimum 20 to maximum 110 in steps of 10.
3. The top five configurations are based on cumulative quantity of
>100000:
4. 4 different layout scenarios have been worked out based on the
workstation and critical operations. This can be the base model for
implementation at the Gemba.
# of workstations Frequency Cumulative Order
Qty
31-40 8 394585
61-70 9 332274
51-60 4 251182
71-80 6 238586
41-50 6 116210
BIBLIOGRAPH
ā€¢ http://en.wikipedia.org/wiki/Flexible_manufacturing_system
ā€¢ http://www.theseus.fi/bitstream/handle/10024/34405/Paneru_
Naresh.pdf
ā€¢ http://www.engr.uconn.edu/msl/paper/tomastik/ApparelSched
uling96.pdf
ā€¢ http://deepblue.lib.umich.edu/bitstream/handle/2027.42/5690/
ban1329.0001.001.pdf?sequence=5
ā€¢ http://www.nwlean.net/takt_v_cycle.HTM
ā€¢ http://www.leanproduction.com/top-25-lean-tools.html
THANK YOU

More Related Content

What's hot

Sampling .presentration
Sampling .presentrationSampling .presentration
Sampling .presentrationahad003
Ā 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
Ā 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
Ā 
Industrial project
Industrial projectIndustrial project
Industrial projectAsim Barman
Ā 
U 7 total quality management in garment industry
U 7 total quality management in garment industryU 7 total quality management in garment industry
U 7 total quality management in garment industrykibrom G
Ā 
Apparel manufacturing process
Apparel manufacturing processApparel manufacturing process
Apparel manufacturing processPriyambadaKhushboo
Ā 
Internship report BUFT 171 TEM
Internship report BUFT 171 TEM Internship report BUFT 171 TEM
Internship report BUFT 171 TEM mansura1234
Ā 
Internship presentation in knit composite garments
Internship presentation in knit composite garmentsInternship presentation in knit composite garments
Internship presentation in knit composite garmentsNoorul Islam Saiful
Ā 
Buyer manual & measuring of 3 garments
Buyer manual & measuring of 3 garmentsBuyer manual & measuring of 3 garments
Buyer manual & measuring of 3 garmentsVaishali Daksh
Ā 

What's hot (20)

Sampling .presentration
Sampling .presentrationSampling .presentration
Sampling .presentration
Ā 
FINAL REPORT pdf
FINAL REPORT pdfFINAL REPORT pdf
FINAL REPORT pdf
Ā 
Garment costing
Garment costingGarment costing
Garment costing
Ā 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Ā 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
Ā 
Industrial project
Industrial projectIndustrial project
Industrial project
Ā 
Apparel manufacturing process
Apparel manufacturing process Apparel manufacturing process
Apparel manufacturing process
Ā 
Stitches and seam analysis of a polo t shirt
Stitches and seam analysis of a polo t shirtStitches and seam analysis of a polo t shirt
Stitches and seam analysis of a polo t shirt
Ā 
U 7 total quality management in garment industry
U 7 total quality management in garment industryU 7 total quality management in garment industry
U 7 total quality management in garment industry
Ā 
Quality management in garments
Quality management in garmentsQuality management in garments
Quality management in garments
Ā 
Cutting department
Cutting departmentCutting department
Cutting department
Ā 
Work aids of sewing machines
Work aids of sewing machinesWork aids of sewing machines
Work aids of sewing machines
Ā 
KNIT GARMENTS MERSENTISING
KNIT GARMENTS  MERSENTISINGKNIT GARMENTS  MERSENTISING
KNIT GARMENTS MERSENTISING
Ā 
Apparel manufacturing process
Apparel manufacturing processApparel manufacturing process
Apparel manufacturing process
Ā 
Internship report BUFT 171 TEM
Internship report BUFT 171 TEM Internship report BUFT 171 TEM
Internship report BUFT 171 TEM
Ā 
Apparel Industry Analysis
Apparel Industry AnalysisApparel Industry Analysis
Apparel Industry Analysis
Ā 
Internship presentation in knit composite garments
Internship presentation in knit composite garmentsInternship presentation in knit composite garments
Internship presentation in knit composite garments
Ā 
Buyer manual & measuring of 3 garments
Buyer manual & measuring of 3 garmentsBuyer manual & measuring of 3 garments
Buyer manual & measuring of 3 garments
Ā 
Flatlock stitches and its Mechanisms
Flatlock stitches and its MechanismsFlatlock stitches and its Mechanisms
Flatlock stitches and its Mechanisms
Ā 
Fabric spreading
Fabric spreadingFabric spreading
Fabric spreading
Ā 

Viewers also liked

Presentation on washing and garments
Presentation on washing and garmentsPresentation on washing and garments
Presentation on washing and garmentsNuruzzaman Shah
Ā 
Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secretgsdlife
Ā 
Garments washing imran personal
Garments washing imran personalGarments washing imran personal
Garments washing imran personalImran Hasan
Ā 
Apparel internship
Apparel internshipApparel internship
Apparel internshipAnurag Singh
Ā 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsArpan Mahato
Ā 
Internship report by kamran
Internship report by kamranInternship report by kamran
Internship report by kamranstudent
Ā 
B f-tech-course-book-27-07-2010-rev-on-28rev1
B f-tech-course-book-27-07-2010-rev-on-28rev1B f-tech-course-book-27-07-2010-rev-on-28rev1
B f-tech-course-book-27-07-2010-rev-on-28rev1Ravi Shekhar
Ā 
HyperCITY internship Project June 2015
HyperCITY internship Project June 2015HyperCITY internship Project June 2015
HyperCITY internship Project June 2015TambeAnagha
Ā 
Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Ajit gupta
Ā 
Internship Final Report
Internship Final Report Internship Final Report
Internship Final Report Nadia Nahar
Ā 
Internship report
Internship reportInternship report
Internship reportSajjad Ashraf
Ā 

Viewers also liked (20)

Presentation on washing and garments
Presentation on washing and garmentsPresentation on washing and garments
Presentation on washing and garments
Ā 
Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secret
Ā 
Garments washing imran personal
Garments washing imran personalGarments washing imran personal
Garments washing imran personal
Ā 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
Ā 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
Ā 
Apparel internship
Apparel internshipApparel internship
Apparel internship
Ā 
GSD cords
GSD cordsGSD cords
GSD cords
Ā 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
Ā 
Internship report by kamran
Internship report by kamranInternship report by kamran
Internship report by kamran
Ā 
B f-tech-course-book-27-07-2010-rev-on-28rev1
B f-tech-course-book-27-07-2010-rev-on-28rev1B f-tech-course-book-27-07-2010-rev-on-28rev1
B f-tech-course-book-27-07-2010-rev-on-28rev1
Ā 
HyperCITY internship Project June 2015
HyperCITY internship Project June 2015HyperCITY internship Project June 2015
HyperCITY internship Project June 2015
Ā 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
Ā 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
Ā 
Garments washing plant
Garments  washing  plantGarments  washing  plant
Garments washing plant
Ā 
Apparel Internship
Apparel InternshipApparel Internship
Apparel Internship
Ā 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
Ā 
Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...
Ā 
Internship Final Report
Internship Final Report Internship Final Report
Internship Final Report
Ā 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
Ā 
Internship report
Internship reportInternship report
Internship report
Ā 

Similar to A throughput bulletin for Texport Syndicate, post vsm

apparel internship
apparel internshipapparel internship
apparel internshipAnurag Singh
Ā 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11Eric
Ā 
Product design & process analysis at Hirdaramini
Product design & process analysis at HirdaraminiProduct design & process analysis at Hirdaramini
Product design & process analysis at HirdaraminiRashmi Dissanayake
Ā 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
Ā 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxThusharaVinay
Ā 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPCThe Learning Hub
Ā 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control BookLearn With GeekAlign
Ā 
Operation management
Operation managementOperation management
Operation managementMamta Karanji
Ā 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto businessAjit Kumar
Ā 
130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptxNittamallik216
Ā 
Production Planning & Merchandising
Production Planning & MerchandisingProduction Planning & Merchandising
Production Planning & MerchandisingMoiz Khan
Ā 
Planning production year 10 theory 19 may 2011
Planning production year 10 theory 19 may 2011Planning production year 10 theory 19 may 2011
Planning production year 10 theory 19 may 2011Sivabalan Maduramuthu
Ā 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
Ā 
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...Luis Cabrera
Ā 
Tech 149 Unit 1 New.ppt
Tech 149 Unit 1 New.pptTech 149 Unit 1 New.ppt
Tech 149 Unit 1 New.pptssuser3902db
Ā 
Textile Manufacturing Ideas | Charles Boyd Bowman
Textile Manufacturing Ideas | Charles Boyd Bowman Textile Manufacturing Ideas | Charles Boyd Bowman
Textile Manufacturing Ideas | Charles Boyd Bowman Charles Boyd Bowman
Ā 
Syed mohamed ak
Syed mohamed akSyed mohamed ak
Syed mohamed akSyed Mohamed
Ā 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations ManagementMuhammad Talha
Ā 

Similar to A throughput bulletin for Texport Syndicate, post vsm (20)

apparel internship
apparel internshipapparel internship
apparel internship
Ā 
sudath
sudath sudath
sudath
Ā 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
Ā 
Product design & process analysis at Hirdaramini
Product design & process analysis at HirdaraminiProduct design & process analysis at Hirdaramini
Product design & process analysis at Hirdaramini
Ā 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
Ā 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptx
Ā 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPC
Ā 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
Ā 
Operation management
Operation managementOperation management
Operation management
Ā 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
Ā 
130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx130135794-Training-Outline-for-Management-Trainee.pptx
130135794-Training-Outline-for-Management-Trainee.pptx
Ā 
Production Planning & Merchandising
Production Planning & MerchandisingProduction Planning & Merchandising
Production Planning & Merchandising
Ā 
Planning production year 10 theory 19 may 2011
Planning production year 10 theory 19 may 2011Planning production year 10 theory 19 may 2011
Planning production year 10 theory 19 may 2011
Ā 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
Ā 
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Ā 
CIM Technology.ppt
CIM Technology.pptCIM Technology.ppt
CIM Technology.ppt
Ā 
Tech 149 Unit 1 New.ppt
Tech 149 Unit 1 New.pptTech 149 Unit 1 New.ppt
Tech 149 Unit 1 New.ppt
Ā 
Textile Manufacturing Ideas | Charles Boyd Bowman
Textile Manufacturing Ideas | Charles Boyd Bowman Textile Manufacturing Ideas | Charles Boyd Bowman
Textile Manufacturing Ideas | Charles Boyd Bowman
Ā 
Syed mohamed ak
Syed mohamed akSyed mohamed ak
Syed mohamed ak
Ā 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
Ā 

Recently uploaded

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
Ā 
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
Ā 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
Ā 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
Ā 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
Ā 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
Ā 
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort Service
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort ServiceBDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort Service
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort ServiceDelhi Call girls
Ā 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
Ā 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
Ā 
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )Pooja Nehwal
Ā 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
Ā 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
Ā 
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night Enjoy
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night EnjoyCall Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night Enjoy
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night EnjoyPooja Nehwal
Ā 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
Ā 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
Ā 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
Ā 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
Ā 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
Ā 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
Ā 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
Ā 

Recently uploaded (20)

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
Ā 
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
AndrƩs Ramƭrez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Ā 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Ā 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Ā 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
Ā 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
Ā 
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort Service
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort ServiceBDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort Service
BDSMāš”Call Girls in Sector 93 Noida Escorts >ą¼’8448380779 Escort Service
Ā 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Ā 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
Ā 
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )
WhatsApp šŸ“ž 9892124323 āœ…Call Girls In Juhu ( Mumbai )
Ā 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Ā 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
Ā 
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night Enjoy
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night EnjoyCall Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night Enjoy
Call Girl Number in Khar MumbaišŸ“² 9892124323 šŸ’ž Full Night Enjoy
Ā 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
Ā 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Ā 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
Ā 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
Ā 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
Ā 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
Ā 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Ā 

A throughput bulletin for Texport Syndicate, post vsm

  • 1. Apparel Internship At Texport Syndicate India Limited Bangalore Presented By: Mahak Raitani Sourav Kumar Bachelor In Fashion Technology (2011-2015) Department of Fashion Technology National Institute of Fashion Technology
  • 2. Company Profile ā€¢ Texport Syndicate has strategic global representation with its corporate headquarters located in Mumbai, India and manufacturing facilities located in Bangalore, Mumbai and Tirupur, India. ā€¢ Additionally, Texport syndicate is represented in North America by Key Apprel In New York, USA
  • 3. In-House Production ā€¢ Japanese Made Juki, Brother and Singer Machines with specialized ancillary machines supported with modern laundry/ finishing embroidery machines. ā€¢ Factories are designed to produce Shirts, Blouses, Shorts, Trousers and Outerwear. ā€¢ Over 300 administrative and Quality Assurance staffs manage all factories. ā€¢ Over 9000 skilled workers are permanently employed with proper welfare facility, observing Human Rights Issue requirements.
  • 7. MERCHANDISER ACTIVITIES ā€¢ Design / sampling/ Sketch/ Construction/ Pattern/ Sizes/ Season ā€¢ Fabric/ Quality/ GSM/ EPI/ PPI/ Colour ā€¢ Trims and Accessories ā€¢ Testing ā€¢ Production ā€¢ Quality check/ Finishing/ Printing / Washing ā€¢ Documentation ā€¢ Shipping / forwarding/ Delivery Date / Quantity/ Price ā€¢ TNA- Time and Action Calendar
  • 8. SAMPLING Sampling Department consists of 41 Tailors,4 Pattern Masters, 2 Graders and 4 Marker Makers. The employees are categorised under: ā€¢ GM ā€¢ Technical Manager ā€¢ Asst. Manager ā€¢ In charge of CAD Department) ā€¢ Tailors
  • 9. Stages of Sample Development
  • 10. EDP EDP Department is IT department of the factory which takes care of hardware and software. Apart from it, the department does the following work: ā€¢ Planning of installation of required hardware and software. ā€¢ Estimation ā€¢ Budgeting of Software and hardware ā€¢ Approval from top management ā€¢ Customisation according to requirement ā€¢ Purchase ā€¢ Installation ā€¢ Implementation ā€¢ Training of staff about the hardware and software. ā€¢ Maintenance if required ā€¢ Accountability of the resources
  • 11. VGEMS ā€¢ VGEMS is a Garment Export Management System developed by Optimal InfoTech System Pvt. Ltd. Connection from the Citrix software. ā€¢ VGEMS is an ERP (Enterprise Resource planning) for the garment manufacturing industries (within India). This system is being used in Texport units. ā€¢ The server is located in the Bombay Texport HO. This software is being used by all the 7 units in the 4 locations: Bangalore, Bombay, Tirupur and Hyderabad.
  • 12. Production Planning ā€¢ The PPD is responsible for setting the Targets for the day. This department plans when and where the production will start, go on and end. ā€¢ The planning department is responsible for planning how the production will complete within the delivery date set. ā€¢ First of all the planning department receives the samplefrom the buyers. This sample is then sent to the GSD department. ā€¢ The GSD department analyses all the details and prepare the Operation Bulletin (OB). This OB is then received here. ā€¢ Side by side, the PPD also receives the Order Chart and the Fabric and Trims Status Report from the merchandiser. The order chart has the delivery date in it. ā€¢ These 3 reports are necessary for planning and should be received before.
  • 13. GSD ( GENERAL SEWING DATA)
  • 14. IED (INDUSTRIAL ENGINEERING) ā€¢ Method Implementation in the batch. ā€¢ Works on Kaizen activities. ā€¢ To maintain the methods of the operation performed in the batch as implemented by ā€¢ GSD. ā€¢ Follow-up on low output operators. Finding out reason for low efficiency and solving the problem to increase performance and productivity. ā€¢ Off-standard & On-standard work details calculation ā€¢ Calculating non-productive time to estimate loss of cost because of machine failure. ā€¢ Maintaining Target stickers for each operation. ā€¢ Preparation of GSD mode to hang on machine to facilitate the work of operator. ā€¢ Monitoring hourly production of line.
  • 15. ā€¢ To conduct Time study to determine the capacity, efficiency and to work on critical operation to reduce the operation cycle time to reduce WIP. ā€¢ Generating Daily production report and style-wise efficiency report. ā€¢ Maintaining incentive report ā€¢ Maintaining Roll Throughput Yield. ā€¢ Capacity report generation. ā€¢ Create and update skill matrix of each operator & submit the same to personnel department. ā€¢ Assist in Factory planning.
  • 16. FABRIC AND TRIMS STORE Texport Syndicate, Bangalore has a centralised fabric and trims store in TS-IV Unit which receives fabric and trims from the suppliers and issues them to the other unit wherever they are required. This store has been divided into two parts i.e. ā€¢ Fabric Store ā€¢ Trims and accessories store
  • 17.
  • 19. MAINTENANCE ā€¢ Maintenance Department receives tech-pack from the Merchandising department. ā€¢ They thoroughly go through the construction of garment i.e. Seams and stitches ā€¢ Based on the analysis, they prepare a list of machines ā€¢ They check the availability of machine, folders, guides and profile. If certain machines and folders are not available, they inform about it to the purchase department and get the purchase order ready and place the order for the machine to the vendor. ā€¢ The machines and folders should be in house at least 2 days before the batch setting. ā€¢ They impart training to the workers regarding the new machines and folders. ā€¢ They work with Industrial Engineering Department and production department in batch setting.
  • 20. ā€¢ For quality, they create template, profile and guide on demand of Quality Assurance Department. ā€¢ After the production starts, they keep their eye on proper functioning of the machines. During the production if some problem occurs, they repair the machine to avoid the disturbance in production. ā€¢ To keep the machine trouble free, they go for preventing maintenance by cleaning and oiling of the machine.
  • 21. SEWING ā€¢ PP meeting for production planning ā€¢ Machine layout Implementation on floor ā€¢ Batch Setting ā€¢ Individual machine mocks (SPI, Pressure Foot, Feed Dog, and Needle Size) ā€¢ Quality procedure to be followed by batch checkers and end line checkers. ā€¢ Quality procedures to be followed by batch QCs. and floor QCs. ā€¢ Hourly production targets for each operation ā€¢ Maintaining hourly production defect analysis and corrective report ā€¢ Supervision of lines by supervisors to get target production with Quality ā€¢ Batch efficiency for the day ā€¢ Deployment of operators in case of absenteeism ā€¢ Incentive paid to operators ā€¢ Maintaining Batch DHU Report ā€¢ Issue garments to the finishing and washing section
  • 22. WASHING AND FINISHING ā€¢ Garments are checked as per quality mentioned in DC ā€¢ Garments are stored in washing racks. ā€¢ ā€œBuyer approved wash standardā€ is received from merchandiser. ā€¢ First bulk wash of 250 pieces is done. ā€¢ Rectification of fault and updating of recipe are done on the basis of first wash. ā€¢ Bulk wash ranges are sent to the buyer along with the comments on wash. ā€¢ Comments and approval regarding shade ranges and hand feel comes from buyer. ā€¢ Bulk washing is done in washing machine. ā€¢ Hydro-extracting is done to squeeze water from the garments. ā€¢ Garments are fed into Tumble Dry machine to dry the garments. ā€¢ Garments are sent to Garment Inspection Room for inspection as per 2.5 AQL. ā€¢ Grinding (If mentioned by the buyer) is done hourly. Checking of grinding is done. ā€¢ Garments are sent to the finishing department for packaging and dispatching.
  • 23.
  • 24. TIME STUDY SHEETS ā€¢ Sheet 1 ā€¢ Sheet 2 ā€¢ Sheet 3 ā€¢ Sheet 4
  • 25. A Throughput Process Flow(TPF) bulletin using VSM - Enhance Productivity
  • 26. Lean manufacturing is a manufacturing strategy that seeks to produce a high level of throughput with a minimum of input. Lean thinking changes the focus of management from optimizing separate technologies, assets, and vertical departments to optimizing the flow of products and services through entire value streams that flow horizontally across technologies, assets, and departments to customers.
  • 27. LEAN TOOLS ā€¢ 5S ā€¢ Andon ā€¢ Bottleneck Analysis ā€¢ Continuous Flow ā€¢ Gemba ā€¢ Heijunka ā€¢ Hoshin Kanri ā€¢ Jidoka ā€¢ JIT ā€¢ Kaizen ā€¢ Kanban ā€¢ KPI ā€¢ MUDA ā€¢ OEE ā€¢ PDCA ā€¢ Poka-Yoke ā€¢ Root Cause Analysis ā€¢ SMED ā€¢ Six Big Losses ā€¢ Smart Goals ā€¢ Standarized Work ā€¢ TAKT Time ā€¢ TPM ā€¢ VSM ā€¢ Visual Factory
  • 28. The Goal To propose a TPF Bulletin for TS4, by using the Value Stream Mapping method to optimize total production cost and identify areas of improvements.
  • 29. The Approach Pick and choose a few styles that are representative of most of the production at TS4, using Pareto Analysis Study the process, from Fabric Stores to Pack & Dispatch as it happens
  • 30. ā€¢ Calculate what the throughput will be , using the new set of activities to maximize value addition. Identify value added and non-value added activities, understand why things are done in a certain way, and suggest alternatives Time and Motion Study, to understand and evaluate the current methods
  • 32. The Plan Review the existing throughput for a chosen style Operation flow, and information flowā€”identify what are the true constraints Analysis of all operational sections: Stores, Fabric-Inspection, Cutting, Sewing, Washing, Finishing, Packing and Dispatch Assign value to each of the observed activities, critically analyze the necessity of these activitiesā€”the value they add, and the accompanying costs Optimize the activitiesā€”Simplify, Eliminate, Combine, Redesign / Mechanize--Reduce costs while ensuring efficient usage of resources
  • 33. The Subject Style chosen: Zara w14s23c Product : Kids wearā€”Boys plaid shirt with a single welt pocket Plaid Twill, 20 components (w/ pocket bag Two, differently-sized buttons on each cuff 6 sizes in all Planned Target: 32,254 Start Date: June 29th,2014 Delivery Date: July 25th, 2014 Shipped Quantity : 31,300
  • 34. Why ? Throughput metrics exist for Sewing ! But.. Cutting ? Washing? Finishing? To understand the differences in sectional (or sub sectional) capacities, and work towards balancing this throughout the entire production value chain.
  • 35. Value Stream Mapping ā€“ Special type of flow chart that uses symbols known as "the language of Lean" to depict and improve the flow of inventory and information. ā€“ Value stream mapping & analysis is a tool that allows you to see waste, and plan to eliminate it.
  • 36. What Is Value? ā€¢ A capability provided to a customer ā€“ of the highest quality, ā€“ at the right time, ā€“ at an appropriate price, as defined by the customer. ā€¢ "Value" is what the customer is buying or what changes the property of the product
  • 38.
  • 39. Current State Future State PUSH SYSYEM PULL SYSTEM INVENTORY IN THE FORM OF WIP SUPERMARKETS
  • 40. Throughput Time ā€“ Throughput time is the amount of time required for a product to pass through a manufacturing process, thereby being converted from raw materials into finished goods.
  • 41. Processing time ( 3 Hours) Inspection time (0.5 Hours) Move time ( 1 Hour) Queue time (12 Hours) THROUGHPUT TIME= 16.5 HOURS
  • 42. PACKAGE TO SHIPMENT O SHIPMENT MERCHANDISE OPERATIONS ORDER CONFIRMATION TO RECEIVING PACKAGE
  • 43. The Study ā€¢ The processes in each section were analysed with the help of videos. ā€¢ The data was compiled in the form of a detailed process flow with chart symbols representing the flow. ā€¢ It also includes the time per activity, the distance travelled and the manpower involved. ā€¢ Each activity was classified into VA and NVA and therefore, waste elimination methods were suggested, pertaining to their nature.
  • 45. What is Takt Time?
  • 46. Value Stream Mapping VSM map as is Percentage of VA to Total time spent 2.9% Takt Time
  • 47. The Maps ā€¢ The current state vsm map ā€¢ The future state vsm map
  • 48. CUTTING MODULE ā€¢ The production floor has 8 cutting lines on each floor i.e. 16 lines in total. ā€¢ If each floor is divided into 7 teams and given one table each then the total number of workers employed would be 140 excluding the workers involved in fusing. ā€¢ The production per day is around 1000/line. ā€¢ Taking 14 working lines, the production will be around 14000. ā€¢ Comparing to current scenario, the production will increase with this kind of modular system. ā€¢ Currently, each floor produces a quantity of 6400, which gives us a total of 12,800 from both the floors.
  • 49. Suggestions ā€¢ After Fabric inspection, the fabric may be rolled onto rods, with just the required tension such that this makes it easier for the spreading team to work with. ā€¢ During spreading, the person feeding the fabric onto the table might be replaced with either just a rod, or the roll of loosely rolled fabric. This performs the same function and can result in a 33% decrease in manpower requirements of the spreading team. ā€¢ Having accurate patterns, in multiple sets (due to spreading happening on many tables at once) will really help cut down on the wait time (close to 30 mins for each marking cycle) for marking. ā€¢ Combination trays may be employed, with a certain placement protocol (for eg, fabric face down always) and each component in its designated space on the tray. This can eliminate the need for numbering altogether. ā€¢ Instead of component fusing , entire panels may be fused and then cut with the band knife. This can decrease the manpower required in the fusing team by about 56%. ā€¢ Trimming, which is an operation that adds no value to the garment, may be eliminated, by using under bed trimmers, and trimming at source on the sewing line.
  • 50. Conclusions The TPF Bulletin highlights the fact that it takes 5.1 days for the first finished garment (fabric to pack). The percentage of VA was only 2.9%. This leaves us with a huge scope of improvement based on the suggestions. Evidently, there were certain challenges that this style faced. The Lean production period provided the buffer space in the packing section for this, which would have been a major issue had it been otherwise.
  • 52. ABOUT THE PROJECT ā€¢ TS 4 is a unit of Texport Syndicate produces multi product styles with varying # of workstations. The order quantity also varies from 1000 to 3 lakh. ā€¢ This demands flexible layout in order to ensure on time responses and optimum use of resources. ā€¢ This study/project is undertaken to understand the past patterns of order quantity and related production to arrive at various layout scenarios on which layout models can be evolved.
  • 53. ABOUT THE PROJECT ā€¢ Creating a flexible layout on the sewing and finishing floor which caters to the production of multiple products based on different SAM values and related workstations. ā€¢ To optimize/maximize the capacity based on space availability.
  • 54.
  • 55. Analysis of Operation Breakdown Sheets for all the styles produced in the last six month WORKSHEET 1 (Comparison Worksheet): Obtained name of the buyer, style, description, no. of workstations, SAM, no. of critical operations & no. of machines used for the critical operations, for all the 43 styles. WORKSHEET 2 (Product Wise Segregation): All the styles were segregated as per their product type.
  • 56. To determine Complexity of the Styles Based on the style description given in the Operation Breakdown Sheets: WORKSHEET 3 (Attribute Wise Segregation): Various Attributes/Elements of all the styles were defined. WORKSHEET 4 (Elemental Details): Elements/Components of the styles were defined in a more detailed way, to figure out the common/majority of elements among all the styles respective of their product types. WORKSHEET 5 (Process Breakdown): Operations for all the styles were put together, to determine the no. of common operations (Helpers, Ironers & Checkers).
  • 57. WORKSHEET 6 (Divisional Analysis): The no. of styles falling in an interval of no. of workstations and critical operations for a particular range of SAM was determined. WORKSHEET 7 (Frequency of styles [Graph]): The average number of workstations and critical operations falling under a particular range of SAM was determined.
  • 58. WORKSHEET 8 (PARETO Analysis [Graph]): PARETO Graphs for different sets of parameters were generated. WORKSHEET 9 (Segregation of ironers, checkers and helpers): The operations/processes done by the Helpers, Ironers and Checkers for main product types were determined.
  • 59. TAKT Time Calculator: Determines the no. of lines required to produce the order quantity in given no. of days (as per shipment details). WORKSHEET 0 (Basic): The TAKT Time was calculated and wash/non-wash property was determined, for all the styles.
  • 60. RESULT WORKSHEET 10 (Proposed Layout Scenarios for Sewing Section): Various Scenarios for the layout of Sewing Section were developed, depending on the no. of Workstations and balancing the Critical Operations.
  • 61.
  • 62. Sewing Section Layout - Before ā€¢ 8 lines with 80 no. of workstations per line.
  • 63. Sewing Section Layout - After ā€¢ As 40 is the lowest no. of workstations with the highest order quantity, all the 8 lines are divided into halves providing a gangway in the middle.
  • 64. ā€¢ The study and analysis has given an insight on how to work on the flexibility and present the various scenarios of workstations to layout configuration. The snapshot of the finding and model is: 1. Assumption - ļ‚§ Sewing area has a 80 workstation space -side to side configuration ļ‚§ Based on the layout multiple sorting (feeding) stations and output stations needs to be provided which are on wheels or easily movable like the sewing machines ļ‚§ There is a direct correlation between SAM and # of workstations and can be arrived at based on the formula/equation (Equation 1). 2. Layouts have to be made for ten workstation configurations from minimum 20 to maximum 110 in steps of 10.
  • 65. 3. The top five configurations are based on cumulative quantity of >100000: 4. 4 different layout scenarios have been worked out based on the workstation and critical operations. This can be the base model for implementation at the Gemba. # of workstations Frequency Cumulative Order Qty 31-40 8 394585 61-70 9 332274 51-60 4 251182 71-80 6 238586 41-50 6 116210
  • 66. BIBLIOGRAPH ā€¢ http://en.wikipedia.org/wiki/Flexible_manufacturing_system ā€¢ http://www.theseus.fi/bitstream/handle/10024/34405/Paneru_ Naresh.pdf ā€¢ http://www.engr.uconn.edu/msl/paper/tomastik/ApparelSched uling96.pdf ā€¢ http://deepblue.lib.umich.edu/bitstream/handle/2027.42/5690/ ban1329.0001.001.pdf?sequence=5 ā€¢ http://www.nwlean.net/takt_v_cycle.HTM ā€¢ http://www.leanproduction.com/top-25-lean-tools.html