CONTENTS
 SUBMERGED FLOATING TUNNEL
 TRANSATLANTIC TUNNEL
 REASON FOR FLOATING
 CONSTRUCTION OF TUNNEL
 COMPONENTS OF TUNNEL
 PROBLEMS TO BE FACED
 CONCLUSION
 REFERANCES
The Submerged Floating
Tunnel
 The Submerged floating Tunnel is a tube like
structure of Steel or Concrete made to through
buoyancy and supported on columns or held in
place by tethers attached to the sea floor or by
pontoons floating on the surface.
 The Submerged floating tunnel utilizes lakes
and waterways to carry traffic under water and
on to the other side, where it can be
conveniently linked to the rural network or to
the underground infrastructure of modern cities.
 In recent times, the needs of society for
regional growth and the protection of the
environment have assumed increased
importance. In this wider context the
submerged floating tunnel offers new
opportunities.
 The submerged floating tunnel is an
innovative concept for crossing waterways,
utilizing the law of buoyancy to support the
structure at a moderate and convenient
depth.
 The beauty of the bridge is that it takes over
to the other side. The beauty of the bridge
is also the aesthetic impression.
 Sometimes it might be best if the bridge
was not there, because of the
environmental impact a bridge may have,
such as noise, pollution and disruption to
the scenery. But then you cannot get across
– to the other side.
Attached to
the sea floor
Suspended
from the
Pontoons
TRANSATLANTIC TUNNEL
 A Transatlantic tunnel is a theoretical
tunnel which would span the Atlantic
Ocean between North America and
Europe and would carry some sort of
mass transit—trains are envisioned in
most proposals. Using advanced
technologies, speeds of 300 to 5,000 mph
(500 to 800 km/h) are envisioned.
Yellow - New York -
Greenland, Great
Britain & Norway
Red -
direct to
London.
 Plans for such a tunnel have not progressed
beyond the conceptual stage, and no one is
actively pursuing such a project.
 The main barriers to constructing such a
tunnel are cost—as much as $12 trillion and
the limits of current materials science.
 A Transatlantic Tunnel is 215 times longer
than the longest current tunnel and would
cost perhaps 3000 times as much.
REASON FOR FLOATING
 Floating tunnel is the totally new concept
and never before use even for very small
length.
 It can be observed that depth from place to
place on a great extent. The max depth is
up to 8 km. also at certain sections. (avg.
Depth 3.3 km)
 The two more alternatives are available for
constructions are bridge above water level
or tunnel below ground level.
But as we seen,
the depth is up to 8 km it is impossible to
construct concrete columns of such height.
Secondly,
If we go for 2nd option,
the pressure below 8km from sea surface is
nearly about 500 times than atmospheric
pressure so one can not survive in such a
high pressure zone.
 Therefore, floating tunnel is finalised which is
at a depth 30m from sea level At which there
is no problem of high pressure. This is
sufficient to go any big ship to pass over it
without any obstruction.
RUBBER CAP
SEAL
COMPONENTS OF
TUNNEL
Following are the main components of this
Tunnel
 Gasket/shell
 Sea anchors
 Utility conduits and service port
 Vacuum pumps
 Maglev train
 Guide ways
GASKET/SHELL
 As the tunnel is situated at a depth of 30m, it
should be perfectly water tight and secondly it
should resist the salty sea water and thirdly it
should be withstand against hydrostatic forces
coming on it.
 Therefore it is made of 4 layers. Outermost
layer is constructed of aluminium to resist the
salty sea water. Second and third layer is
made of the foam to float the tunnel easily in
water. Fourth layer is of concrete which gives
strength to the tunnel.
 As the length of tunnel is very large, it is not
possible to construct the tunnel at situ.
Therefore it is made up of 54000 precast
units. These units are casted on shore and
transported to place where they have to fix
the units with two large floating platforms.
SEA ANCHORS
 As the tunnel is in the Atlantic Ocean, it
should have to face high current velocity
in Atlantic Ocean.
 The tunnel should not deflect much with
water current. Therefore it anchored to
the sea bed with the help of steel
anchors.
The procedure is as follows
 First, ropes are attached to a block and
this block is inserted in sea bed water
come out from top and forms a
hydrostatics seal which holds the block
firmly in sea bed.
VACUUM PUMP
 The train is running with such a thrilling speed
of 5000 mph in the tunnel. The air resistance is
too high on such a high speed. Therefore to
reduce it and increase the speed of train,
vacuum is created in tunnel.
 But creating vacuum in such a long tunnel is
very difficult task. With available equipments,
100 propellers of most powerful boing jet are
require to evacuate the air continuously for 15
days. The vacuum pumps are installed
throughout the length of tunnel to maintain the
vacuum in it.
SERVICE PORT
 The tunnel is powered by electrically which
should be available for entire length of tunnel.
These electrical wires are carried out through
utility conduits.
 The two service ports are provided in tunnel,
one above and other below the track conduit.
These are provided for communication and
access for repair works.
MAGLEV TRAIN
 These are magnetically elevated trains. These
trains do not run over the track but floats
slightly above the track.
 Thus we can achieve practically zero tractive
resistance between train and track.
 Further this train will pass though vacuum,
which increase the speed of train.
 The sensation of flying at 400mph with no
engine noise or vibration will make the journey
through the tunnel a unique experience.
 Special rotating and pivoting seats are provided
to further reduce the effect of gravitational force.
CHALLENGES TO BE
FACED
 Cost: - Due to lots of material and
machinery involved in project,
estimated cost is nearly 1.2
Thousand crore dollars.
 Fire: - It is difficult to rescue people if
fire will break out in train and
also to face the problems due to
the smoke of fire.
 Collision: - If in case of collision of two
trains took place , it is very
difficult to rescue the people.
 No Stoppage: - It is very difficult to stop
the train travelling on
such a high speed.
“TITANIC AGAIN?”
“SHIP HITS THE TRANS-ATLANTIC
TUNNEL ENDED UP IN GREAT
TRADEGY”
CONCLUSION
 The tunnel will set new trends in
transportation engineering and which shows
with the advances in technology we can
reduce the time required for travelling and
make the transportation more effective.
 By hiding the traffic under water, the beauty
of landscape is maintained and valuable land
is available for other purposes. Benefits can
be obtained with respect to energy
consumption, air pollution and reduced noise
emission.
 For wide and deep crossings the
submerged floating tunnel may be the only
feasible fix link , replacing present days
ferries and providing local communities with
new opportunities for improved
communication and regional development.
REFERANCES
 http://dsc.discovery.com/convergence/e
ngineering/transatlantictunnel/interactive
/interactive.html
 www.wikipedia.org
 www.google.com
 www.youtube.com
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx

More Related Content

Similar to TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx

Similar to TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx (20)

Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel ppt
 
409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnel
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Floating tunnel
Floating tunnelFloating tunnel
Floating tunnel
 
Seikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail TunnelSeikan tunnel - The Longest Underwater Rail Tunnel
Seikan tunnel - The Longest Underwater Rail Tunnel
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam project
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating Tunnel
 
multi swing bridges
multi swing bridgesmulti swing bridges
multi swing bridges
 
TUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdfTUNNEL ENGINEERING basics of tunnel types .pdf
TUNNEL ENGINEERING basics of tunnel types .pdf
 
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridge
 
On the road
On the roadOn the road
On the road
 
Seminar report on Vactrain
Seminar report on VactrainSeminar report on Vactrain
Seminar report on Vactrain
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
 
Ce(hs)401 model 2 & 3 all
Ce(hs)401  model 2 & 3 allCe(hs)401  model 2 & 3 all
Ce(hs)401 model 2 & 3 all
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx

  • 1. TRANSATLANTIC TUNNEL (FLOATING TUNNEL) STRUCTURAL DESIGN DEPARTMENT, CEPT UNIVERSITY, AHMEDABAD.
  • 2. CONTENTS  SUBMERGED FLOATING TUNNEL  TRANSATLANTIC TUNNEL  REASON FOR FLOATING  CONSTRUCTION OF TUNNEL  COMPONENTS OF TUNNEL  PROBLEMS TO BE FACED  CONCLUSION  REFERANCES
  • 3. The Submerged Floating Tunnel  The Submerged floating Tunnel is a tube like structure of Steel or Concrete made to through buoyancy and supported on columns or held in place by tethers attached to the sea floor or by pontoons floating on the surface.  The Submerged floating tunnel utilizes lakes and waterways to carry traffic under water and on to the other side, where it can be conveniently linked to the rural network or to the underground infrastructure of modern cities.
  • 4.  In recent times, the needs of society for regional growth and the protection of the environment have assumed increased importance. In this wider context the submerged floating tunnel offers new opportunities.  The submerged floating tunnel is an innovative concept for crossing waterways, utilizing the law of buoyancy to support the structure at a moderate and convenient depth.
  • 5.  The beauty of the bridge is that it takes over to the other side. The beauty of the bridge is also the aesthetic impression.  Sometimes it might be best if the bridge was not there, because of the environmental impact a bridge may have, such as noise, pollution and disruption to the scenery. But then you cannot get across – to the other side.
  • 6.
  • 7. Attached to the sea floor Suspended from the Pontoons
  • 8.
  • 9. TRANSATLANTIC TUNNEL  A Transatlantic tunnel is a theoretical tunnel which would span the Atlantic Ocean between North America and Europe and would carry some sort of mass transit—trains are envisioned in most proposals. Using advanced technologies, speeds of 300 to 5,000 mph (500 to 800 km/h) are envisioned.
  • 10. Yellow - New York - Greenland, Great Britain & Norway Red - direct to London.
  • 11.  Plans for such a tunnel have not progressed beyond the conceptual stage, and no one is actively pursuing such a project.  The main barriers to constructing such a tunnel are cost—as much as $12 trillion and the limits of current materials science.  A Transatlantic Tunnel is 215 times longer than the longest current tunnel and would cost perhaps 3000 times as much.
  • 12. REASON FOR FLOATING  Floating tunnel is the totally new concept and never before use even for very small length.  It can be observed that depth from place to place on a great extent. The max depth is up to 8 km. also at certain sections. (avg. Depth 3.3 km)  The two more alternatives are available for constructions are bridge above water level or tunnel below ground level.
  • 13. But as we seen, the depth is up to 8 km it is impossible to construct concrete columns of such height. Secondly, If we go for 2nd option, the pressure below 8km from sea surface is nearly about 500 times than atmospheric pressure so one can not survive in such a high pressure zone.
  • 14.  Therefore, floating tunnel is finalised which is at a depth 30m from sea level At which there is no problem of high pressure. This is sufficient to go any big ship to pass over it without any obstruction.
  • 15.
  • 16.
  • 18.
  • 19.
  • 20. COMPONENTS OF TUNNEL Following are the main components of this Tunnel  Gasket/shell  Sea anchors  Utility conduits and service port  Vacuum pumps  Maglev train  Guide ways
  • 21. GASKET/SHELL  As the tunnel is situated at a depth of 30m, it should be perfectly water tight and secondly it should resist the salty sea water and thirdly it should be withstand against hydrostatic forces coming on it.  Therefore it is made of 4 layers. Outermost layer is constructed of aluminium to resist the salty sea water. Second and third layer is made of the foam to float the tunnel easily in water. Fourth layer is of concrete which gives strength to the tunnel.
  • 22.  As the length of tunnel is very large, it is not possible to construct the tunnel at situ. Therefore it is made up of 54000 precast units. These units are casted on shore and transported to place where they have to fix the units with two large floating platforms.
  • 23. SEA ANCHORS  As the tunnel is in the Atlantic Ocean, it should have to face high current velocity in Atlantic Ocean.  The tunnel should not deflect much with water current. Therefore it anchored to the sea bed with the help of steel anchors.
  • 24. The procedure is as follows  First, ropes are attached to a block and this block is inserted in sea bed water come out from top and forms a hydrostatics seal which holds the block firmly in sea bed.
  • 25. VACUUM PUMP  The train is running with such a thrilling speed of 5000 mph in the tunnel. The air resistance is too high on such a high speed. Therefore to reduce it and increase the speed of train, vacuum is created in tunnel.  But creating vacuum in such a long tunnel is very difficult task. With available equipments, 100 propellers of most powerful boing jet are require to evacuate the air continuously for 15 days. The vacuum pumps are installed throughout the length of tunnel to maintain the vacuum in it.
  • 26. SERVICE PORT  The tunnel is powered by electrically which should be available for entire length of tunnel. These electrical wires are carried out through utility conduits.  The two service ports are provided in tunnel, one above and other below the track conduit. These are provided for communication and access for repair works.
  • 27.
  • 28. MAGLEV TRAIN  These are magnetically elevated trains. These trains do not run over the track but floats slightly above the track.  Thus we can achieve practically zero tractive resistance between train and track.  Further this train will pass though vacuum, which increase the speed of train.  The sensation of flying at 400mph with no engine noise or vibration will make the journey through the tunnel a unique experience.  Special rotating and pivoting seats are provided to further reduce the effect of gravitational force.
  • 29.
  • 30.
  • 31. CHALLENGES TO BE FACED  Cost: - Due to lots of material and machinery involved in project, estimated cost is nearly 1.2 Thousand crore dollars.  Fire: - It is difficult to rescue people if fire will break out in train and also to face the problems due to the smoke of fire.
  • 32.  Collision: - If in case of collision of two trains took place , it is very difficult to rescue the people.  No Stoppage: - It is very difficult to stop the train travelling on such a high speed.
  • 33. “TITANIC AGAIN?” “SHIP HITS THE TRANS-ATLANTIC TUNNEL ENDED UP IN GREAT TRADEGY”
  • 34. CONCLUSION  The tunnel will set new trends in transportation engineering and which shows with the advances in technology we can reduce the time required for travelling and make the transportation more effective.  By hiding the traffic under water, the beauty of landscape is maintained and valuable land is available for other purposes. Benefits can be obtained with respect to energy consumption, air pollution and reduced noise emission.
  • 35.  For wide and deep crossings the submerged floating tunnel may be the only feasible fix link , replacing present days ferries and providing local communities with new opportunities for improved communication and regional development.