IMPLEMENTATION
EVALUATION AND
MAINTENANCE OF
THE MIS 1
INTRODUCTION
The design of a MIS may seem to :
 management to be an expensive project
 the cost of getting the MIS on line satisfactorily
often be comparable to that of its design.
 the implementation has been accomplished when
outputs of the MIS are continuously utilized by
makers.
2
FOUR BASIC METHODS
FOR IMPLEMENTING
THE MIS
1. Install the system in a new operation or organization.
2. Cut off the old system and install the new.
 This produces a time gap during which no system is in
operation.
 Practically, installation requires one or two days for small
companies or small systems.
3
3. Cut over by segments.
 This method is also referred as” phasing in” the new
system.
 Small parts or subsystems are substituted for the old.
 In the case of upgrading old systems, this may be a very
desirable method.
4. Operate in parallel and cut over.
 The new system is installed and operated in parallel with
the current system until it has been checked out, then only
the current system is cut out.
 This method is expensive because of personal and related
costs.
4
PLAN THE
IMPLEMENTATION
1. Initial installation
2. Test of the system as a whole
3. Evaluation, maintenance and control of the
system
5
PLAN THE
IMPLEMENTATION•The first step in the implementation procedure is to plan the
implementation.
•Some analyst includes the planning of the implementation
with the design of the system, the planning and the action to
implement the plan should be bound closely together.
•Planning is the first step of management, not the last.
•The MIS design and the urgent need for the system at the
time the design is completed will weigh heavily on the plan for
implementation
6
IMPLEMENTATION TASKS
1. Planning the implementation activities
2. Acquiring and laying out facilities and offices
3. Organizing the personnel for implementation
4. Developing procedures for installation and testing
5. Developing the training program for operating personnel
6. Completing the system’s software
7. Acquiring required hardware
8. Generating files
9. Designing forms
10. Testing the entire system
11. Completing cutover to the new system
12. Documenting the system
13. Evaluating the MIS
14. Providing system maintenance (debugging and improving)
7
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Establish Relationships among tasks:
For small projects, the order of performance may
described in text form.
A Gantt chart or network diagram makes visualization
plan and schedule much clearer.
For large projects, many concurrent and sequential
activities are interrelated so that a network diagram
employed in any good plan.
8
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Establish a Schedule:
Schedule is prepared by having the system
estimate the times between the events in the
network.
The critical path (longest time through the network)
be calculated.
After specifying the starting date, the end date is
established.
9
PLANNING THE
IMPLEMENTATION
ACTIVITIES
Cost Schedule to Tasks and Time:
 The cost for completing each task required to
is established as part of the plan.
 Then the rate of expenditures should be
Reporting and control of the work in progress may
obtained by weekly meetings.
•The financial personnel must make certain that
formats allow them to show cost and technical
relationship as well as cost and time. 10
ACQUIRING AND LAYING OUT
FACILITIES AND OFFICES
•For the installation of a new system to replace a current one
may require a major revision of facilities as well as completely
new office, computer room etc.
•The MIS project manager must prepare rough layouts and
estimates of particular floor areas that feel to be needed.
•The manager then prepares cost estimates.
•Space planning must be done by the space to be occupied by
people, the space occupied by equipment and the movement
of people and equipment in the work progress.
•A large investment in good working conditions will repay its
cost many times
11
ORGANIZING THE PERSONNEL
FOR IMPLEMENTATION
•As the implementation tasks have been defined,
management usually assigns a project manager to guide
the implementation.
•The purpose of the MIS is to increase the amount and
quality of their contributions, the system is their system.
•Top management must make the middle managers for
their involvement in implementation, besides these,
systems specialists, computer programmer.
• Top management should make sure that each people who
will operate the system should have active parts in the
implementation.
12
DEVELOPING PROCEDURES FOR
INSTALLATION AND TESTING
•After organizing the personnel for implementation the next
task is to develop or prepare the procedures for
implementation.
•As the project leader has the network plan for proceeding with
the implementation, this leader calls the key people in the
project to prepare more detailed procedures for system
installation.
•Procedures for evaluating and selecting hardware must be
spelled out.
•Procedures for phasing in parts of the MIS or operating the
MIS in parallel must be developed.
•The major part of implementing the MIS is the testing of each
segment of total system as it is installed. 13
DEVELOPING THE TRAINING
PROGRAM FOR OPERATING
PERSONNEL
•A program is developed keeping in mind to impress
management and support.
•After that , it is necessary to train operating personnel in their
new duties.
•They must have a thorough understanding of what the new
MIS is like and what it is supposed to do.
•They must learn how it will operate.
•They are faced with many changes in their work and have to
obtain acceptance of changes.
14
THANK YOU
15

Weitere ähnliche Inhalte

Was ist angesagt?

Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing systemJayson Jueco
 
System vulnerability and abuse
System vulnerability and abuseSystem vulnerability and abuse
System vulnerability and abusePrakash Raval
 
MIS 15 Application of MIS (Manufacturing Sector)
MIS 15 Application of MIS (Manufacturing Sector)MIS 15 Application of MIS (Manufacturing Sector)
MIS 15 Application of MIS (Manufacturing Sector)Tushar B Kute
 
Enterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPEnterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPGanesha Pandian
 
Multiple Approaches & Synthesis of MIS Structure
Multiple Approaches & Synthesis of MIS StructureMultiple Approaches & Synthesis of MIS Structure
Multiple Approaches & Synthesis of MIS StructureMohammed Jasir PV
 
Enterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesEnterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesGanesha Pandian
 
Industry framework of e commerce
Industry framework of e commerceIndustry framework of e commerce
Industry framework of e commerceANOOPA NARAYANAN
 
SELECTION OF HARDWARE AND SOFTWARE IN MIS
SELECTION OF HARDWARE AND SOFTWARE IN MISSELECTION OF HARDWARE AND SOFTWARE IN MIS
SELECTION OF HARDWARE AND SOFTWARE IN MISbit allahabad
 
Operations Management: Production System
Operations Management: Production SystemOperations Management: Production System
Operations Management: Production SystemSarabjeet Singh
 
Application of MIS in manufacturing sector
Application of MIS in manufacturing sectorApplication of MIS in manufacturing sector
Application of MIS in manufacturing sectorArpan Mahato
 

Was ist angesagt? (20)

Evolution of ERP Systems
Evolution of ERP SystemsEvolution of ERP Systems
Evolution of ERP Systems
 
Mis planning
Mis planningMis planning
Mis planning
 
Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing system
 
System vulnerability and abuse
System vulnerability and abuseSystem vulnerability and abuse
System vulnerability and abuse
 
Plant location
Plant locationPlant location
Plant location
 
System concept in MIS
System concept in MISSystem concept in MIS
System concept in MIS
 
MIS 15 Application of MIS (Manufacturing Sector)
MIS 15 Application of MIS (Manufacturing Sector)MIS 15 Application of MIS (Manufacturing Sector)
MIS 15 Application of MIS (Manufacturing Sector)
 
Chapter 14 enterprise and global management of it
Chapter 14  enterprise and global management of itChapter 14  enterprise and global management of it
Chapter 14 enterprise and global management of it
 
Executive Information System
Executive Information SystemExecutive Information System
Executive Information System
 
Structure of MIS
Structure of MISStructure of MIS
Structure of MIS
 
Enterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPEnterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERP
 
E-Commerce Security
E-Commerce SecurityE-Commerce Security
E-Commerce Security
 
Erp implementation life cycle
Erp implementation life cycleErp implementation life cycle
Erp implementation life cycle
 
Multiple Approaches & Synthesis of MIS Structure
Multiple Approaches & Synthesis of MIS StructureMultiple Approaches & Synthesis of MIS Structure
Multiple Approaches & Synthesis of MIS Structure
 
Enterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesEnterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modules
 
Industry framework of e commerce
Industry framework of e commerceIndustry framework of e commerce
Industry framework of e commerce
 
SELECTION OF HARDWARE AND SOFTWARE IN MIS
SELECTION OF HARDWARE AND SOFTWARE IN MISSELECTION OF HARDWARE AND SOFTWARE IN MIS
SELECTION OF HARDWARE AND SOFTWARE IN MIS
 
System Modelling
System ModellingSystem Modelling
System Modelling
 
Operations Management: Production System
Operations Management: Production SystemOperations Management: Production System
Operations Management: Production System
 
Application of MIS in manufacturing sector
Application of MIS in manufacturing sectorApplication of MIS in manufacturing sector
Application of MIS in manufacturing sector
 

Andere mochten auch

System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development MethodologiesDevon Ravihansa
 
Chapter18 maintaining information systems
Chapter18 maintaining information systemsChapter18 maintaining information systems
Chapter18 maintaining information systemsDhani Ahmad
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system developmentcymark09
 
History of Management Information System
History of Management Information SystemHistory of Management Information System
History of Management Information SystemEmil Mesina
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation systemGagan Preet
 
Decision Support System
Decision Support SystemDecision Support System
Decision Support Systemparamalways
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information SystemNijaz N
 
MIS Presentation
MIS PresentationMIS Presentation
MIS PresentationDhiren Gala
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)Sayantan Sur
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information SystemsManuel Ardales
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and DesignAamir Abbas
 
Management Information System (Full Notes)
Management Information System (Full Notes)Management Information System (Full Notes)
Management Information System (Full Notes)Harish Chand
 
Management information system
Management information systemManagement information system
Management information systemSikander Saini
 

Andere mochten auch (17)

Evolution of mis
Evolution of misEvolution of mis
Evolution of mis
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
 
Chapter18 maintaining information systems
Chapter18 maintaining information systemsChapter18 maintaining information systems
Chapter18 maintaining information systems
 
Mis introduction
Mis introductionMis introduction
Mis introduction
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system development
 
History of Management Information System
History of Management Information SystemHistory of Management Information System
History of Management Information System
 
Component level design
Component   level designComponent   level design
Component level design
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation system
 
Mis ppt
Mis pptMis ppt
Mis ppt
 
Decision Support System
Decision Support SystemDecision Support System
Decision Support System
 
Decision Support System - Management Information System
Decision Support System - Management Information SystemDecision Support System - Management Information System
Decision Support System - Management Information System
 
MIS Presentation
MIS PresentationMIS Presentation
MIS Presentation
 
Decision Support System(DSS)
Decision Support System(DSS)Decision Support System(DSS)
Decision Support System(DSS)
 
Types Of Information Systems
Types Of Information SystemsTypes Of Information Systems
Types Of Information Systems
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
 
Management Information System (Full Notes)
Management Information System (Full Notes)Management Information System (Full Notes)
Management Information System (Full Notes)
 
Management information system
Management information systemManagement information system
Management information system
 

Ähnlich wie Implementation evaluation and maintenance of the mis

L10 system implementation
L10 system implementationL10 system implementation
L10 system implementationOMWOMA JACKSON
 
Slide management project
Slide management projectSlide management project
Slide management projecttheogrouptech
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2Media-Mosaic
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycleOneil Powers
 
ERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, ImplementationERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, Implementationwww.SMARTvt.org
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systemsOnline
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback systemmsandbhor
 
Mc leod9e ch07 systems development
Mc leod9e ch07 systems developmentMc leod9e ch07 systems development
Mc leod9e ch07 systems developmentsellyhood
 
How to implement an enterprise system
How to implement an enterprise systemHow to implement an enterprise system
How to implement an enterprise systemMiki Lumnitz
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMRebekahSamuel2
 

Ähnlich wie Implementation evaluation and maintenance of the mis (20)

L10 system implementation
L10 system implementationL10 system implementation
L10 system implementation
 
Slide management project
Slide management projectSlide management project
Slide management project
 
Proposal dms for dwf v2
Proposal   dms for dwf v2Proposal   dms for dwf v2
Proposal dms for dwf v2
 
Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
 
Project scheduler doc
Project scheduler docProject scheduler doc
Project scheduler doc
 
ERP Unit iii
ERP  Unit   iii ERP  Unit   iii
ERP Unit iii
 
ERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, ImplementationERP / MRP - Selection, Qualifying, Implementation
ERP / MRP - Selection, Qualifying, Implementation
 
Management project
Management projectManagement project
Management project
 
System development methodologies
System development methodologiesSystem development methodologies
System development methodologies
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
 
Presentation2
Presentation2Presentation2
Presentation2
 
Student feedback system
Student feedback systemStudent feedback system
Student feedback system
 
Proposal DMS
Proposal   DMS Proposal   DMS
Proposal DMS
 
Mc leod9e ch07 systems development
Mc leod9e ch07 systems developmentMc leod9e ch07 systems development
Mc leod9e ch07 systems development
 
SDLC
SDLCSDLC
SDLC
 
How to implement an enterprise system
How to implement an enterprise systemHow to implement an enterprise system
How to implement an enterprise system
 
Proj Mgmt.ppt
Proj Mgmt.pptProj Mgmt.ppt
Proj Mgmt.ppt
 
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEMHOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
HOW TO PHYSICALLY DESIGN A COMPUTER BASED INFORMATION SYSTEM
 
Chapter-1.ppt
Chapter-1.pptChapter-1.ppt
Chapter-1.ppt
 

Kürzlich hochgeladen

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 

Kürzlich hochgeladen (20)

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 

Implementation evaluation and maintenance of the mis

  • 2. INTRODUCTION The design of a MIS may seem to :  management to be an expensive project  the cost of getting the MIS on line satisfactorily often be comparable to that of its design.  the implementation has been accomplished when outputs of the MIS are continuously utilized by makers. 2
  • 3. FOUR BASIC METHODS FOR IMPLEMENTING THE MIS 1. Install the system in a new operation or organization. 2. Cut off the old system and install the new.  This produces a time gap during which no system is in operation.  Practically, installation requires one or two days for small companies or small systems. 3
  • 4. 3. Cut over by segments.  This method is also referred as” phasing in” the new system.  Small parts or subsystems are substituted for the old.  In the case of upgrading old systems, this may be a very desirable method. 4. Operate in parallel and cut over.  The new system is installed and operated in parallel with the current system until it has been checked out, then only the current system is cut out.  This method is expensive because of personal and related costs. 4
  • 5. PLAN THE IMPLEMENTATION 1. Initial installation 2. Test of the system as a whole 3. Evaluation, maintenance and control of the system 5
  • 6. PLAN THE IMPLEMENTATION•The first step in the implementation procedure is to plan the implementation. •Some analyst includes the planning of the implementation with the design of the system, the planning and the action to implement the plan should be bound closely together. •Planning is the first step of management, not the last. •The MIS design and the urgent need for the system at the time the design is completed will weigh heavily on the plan for implementation 6
  • 7. IMPLEMENTATION TASKS 1. Planning the implementation activities 2. Acquiring and laying out facilities and offices 3. Organizing the personnel for implementation 4. Developing procedures for installation and testing 5. Developing the training program for operating personnel 6. Completing the system’s software 7. Acquiring required hardware 8. Generating files 9. Designing forms 10. Testing the entire system 11. Completing cutover to the new system 12. Documenting the system 13. Evaluating the MIS 14. Providing system maintenance (debugging and improving) 7
  • 8. PLANNING THE IMPLEMENTATION ACTIVITIES Establish Relationships among tasks: For small projects, the order of performance may described in text form. A Gantt chart or network diagram makes visualization plan and schedule much clearer. For large projects, many concurrent and sequential activities are interrelated so that a network diagram employed in any good plan. 8
  • 9. PLANNING THE IMPLEMENTATION ACTIVITIES Establish a Schedule: Schedule is prepared by having the system estimate the times between the events in the network. The critical path (longest time through the network) be calculated. After specifying the starting date, the end date is established. 9
  • 10. PLANNING THE IMPLEMENTATION ACTIVITIES Cost Schedule to Tasks and Time:  The cost for completing each task required to is established as part of the plan.  Then the rate of expenditures should be Reporting and control of the work in progress may obtained by weekly meetings. •The financial personnel must make certain that formats allow them to show cost and technical relationship as well as cost and time. 10
  • 11. ACQUIRING AND LAYING OUT FACILITIES AND OFFICES •For the installation of a new system to replace a current one may require a major revision of facilities as well as completely new office, computer room etc. •The MIS project manager must prepare rough layouts and estimates of particular floor areas that feel to be needed. •The manager then prepares cost estimates. •Space planning must be done by the space to be occupied by people, the space occupied by equipment and the movement of people and equipment in the work progress. •A large investment in good working conditions will repay its cost many times 11
  • 12. ORGANIZING THE PERSONNEL FOR IMPLEMENTATION •As the implementation tasks have been defined, management usually assigns a project manager to guide the implementation. •The purpose of the MIS is to increase the amount and quality of their contributions, the system is their system. •Top management must make the middle managers for their involvement in implementation, besides these, systems specialists, computer programmer. • Top management should make sure that each people who will operate the system should have active parts in the implementation. 12
  • 13. DEVELOPING PROCEDURES FOR INSTALLATION AND TESTING •After organizing the personnel for implementation the next task is to develop or prepare the procedures for implementation. •As the project leader has the network plan for proceeding with the implementation, this leader calls the key people in the project to prepare more detailed procedures for system installation. •Procedures for evaluating and selecting hardware must be spelled out. •Procedures for phasing in parts of the MIS or operating the MIS in parallel must be developed. •The major part of implementing the MIS is the testing of each segment of total system as it is installed. 13
  • 14. DEVELOPING THE TRAINING PROGRAM FOR OPERATING PERSONNEL •A program is developed keeping in mind to impress management and support. •After that , it is necessary to train operating personnel in their new duties. •They must have a thorough understanding of what the new MIS is like and what it is supposed to do. •They must learn how it will operate. •They are faced with many changes in their work and have to obtain acceptance of changes. 14