This complete deck can be used to present to your team. It has PPT slides on various topics highlighting all the core areas of your business needs. This complete deck focuses on Construction Management PowerPoint Presentation Slides and has professionally designed templates with suitable visuals and appropriate content. This deck consists of total of sixty three slides. All the slides are completely customizable for your convenience. You can change the colour, text and font size of these templates. You can add or delete the content if needed. Get access to this professionally designed complete presentation by clicking the download button below. https://bit.ly/3dzMg9t
2. Agenda of Construction Management
Understand project scope and analyzing client requirement
Analyze the understand all the phases of construction
management and develop a plan for its efficient delivery
Add text here
Add text here
Add text here
2
3. Table of Content
Introduction
Project Analysis
Regulatory Requirement
Construction Phases
Risk Analysis
Quality Assurance Plan
Construction Waste Management
Measuring our Efforts
3
4. Table of Content
4
Introduction
âș Construction Project requirement and Deliverables
âș Client Requirement for Construction Project
âș Construction Project Scope & Description
5. The purpose of the following slide is to analyze the project based on its requirements and deliverables. The requirement can be construction of residential complex for 5000 people with parking of 2500 cars .
The deliverable can be a 5 phased project plan.
Construction Project Requirements and Deliverables
Project Requirements
âș Residential complex for 5000 people
âș Parking complex for 2500 cars
âș 20 commercial complex for shops
âș Add text here
âș Add text here
âș Add text here
Construction of residential project having
the following facilities
Project Deliverables
âș Design
âș Pre-construction phase
âș Procurement
âș Construction phase
âș Post construction
âș Add text here
The project can be completed within 5-year
span by ABC Corp in 5 project phases
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
5
6. The purpose of the following slide is to provide an overview of the construction project that is undertaken by the company, this slide analyses the description of the project, its location, the duration and cost.
Construction Project Scope and Description
Project Description
âș Construction of residential buildings & parking
lots for 5,000 people
âș Parking space for 250 vehicles
âș Construction contract for of 5 years
âș Add text here
âș Add text here
Chicago, Illinois Add location here
Project Location
Project Duration
âș Expected date of beginning- 6 March 2020
âș Expected end date- 6 March 2023
Project Cost
USD â 3.5 MM
Add Text Here
âș Add Text Here
âș Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
6
7. The following slide analyses the multiple requirements of client such as speed cost and time. The provided table highlights various client needs such as on-time procurement, Low cost of construction and on
time project completion.
Requirements that are Specified by Clients
Client Needs Description Comments
On-Time Possession
âș Fast & on time possession of the property
âș Add text here
âș Procurement of the residential complex within 2
year of initial investment
âș Add text here
Low Cost of Construction
âș Low cost of the project
âș Low material cost
âș Low cost of construction equipment
âș Low cost of the procuring the material for
construction
âș Add text here
On-Time Project Completion
âș Timely & effective completion & delivery of the
project
âș Add text here
âș Add text here
âș Add text here
Add Text Here
âș Add text here
âș Add text here
âș Add text here
âș Add text here
Add Text Here
âș Add text here
âș Add text here
âș Add text here
âș Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
8. Table of Content
8
Project Analysis
âș Construction Project Cost Analysis
âș Power & Electricity Requirement
âș Structural Details of Construction Project
âș Electricity Provider Rate Comparison
9. The following slide displays the various cost that are associated with the construction project these cost can be divided into two major parts such as sales price breakdown and construction cost breakdown.
Construction Project Cost Analysis (1/2)
Sales Price Breakdown Average
Finished Lot Cost (incl. financing cost) $67,551
Total Construction Cost $184,125
Financing Cost $6,669
Overhead & General Expenses $16,306
Marketing Cost $4,645
Construction Cost Breakdown Average
Building Permit Fees $3,107
Impact Fee $2,850
Excavation, Foundation & Backfill $2,952
Steel $17,034
Framing & Trusses $1,012
Sheathing $24,904
Windows $2,142
Exterior Doors $6,148
Interior Doors & Hardware $2,150
Stairs $2,883
Roof Shingles $1,052
Siding $5,256
Gutters & Downspouts $8,739
Plumbing $870
Electrical Wiring $10,990
Lighting Fixtures $8,034
HVAC $2,193
Insulation $8,760
Drywall $3,399
Other $19,487
Total XXXXXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
9
10. The following slide displays the various cost that are associated with the construction project. Various components of the cost can be labor ,construction equipment , procurement cost and travel cost.
Construction Project Cost Analysis (2/2)
ITEM Mth-1 Mth-2 Mth-3 Mth-4 Mth-5 Mth-6 Mth-7 Mth-8 Mth-9 Mth-10 Mth-11 Mth-12
Labor 0 0 0 0 0 0 0 0 0 0 0 0
Equipment for
Construction
0 0 0 0 0 0 0 0 0 0 0 0
Procurement Cost 0 0 0 0 0 0 0 0 0 0 0 0
Travel 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0
Total Cost 0 0 0 0 0 0 0 0 0 0 0 0
Accumulated Cost 0 0 0 0 0 0 0 0 0 0 0 0
Project: ABC Site Construction
Date: 06-march-2020
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
10
11. The purpose of the following slide is to provide structural detail of the construction project. These project details include per square feet area of the construction complex, its description etc.
Structural Details of Construction Project
Area Description Area Per Sq. Ft Comments
Residential Complex Residential 2bhk & 3bhk flats 25000 Add comments here
Parking Space Parking space for 2500 cars 12000 Add comments here
Commercial Complex Commercial Complex for 20 shops 3000 Add comments here
Add text here Add text here XXXX Add comments here
Add text here Add text here XXXX Add comments here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
11
12. The following slide displays the power and electricity requirement of the project. The provided table displays multiple sources from which electricity can be generated. These sources can be solar panels,
Geothermal power or wind energy.
Power and Electricity Requirement for Construction Project
Energy Generation Mode Initial Cost of Procurement USD Maintenance Cost USD Comments
Solar Panels 45,000 10,000
âș Long Battery life
âș High Durability
âș Add text Here
Natural Gas 50,000 24,000
âș High Durability
âș Can be Hazardous
âș Add Text Here
Add Text Here 60,000 15,000
âș High cost of procurement and
implementation
âș Low Durability
Add Text Here XXXX XXXXX
âș Add Text Here
âș Add Text Here
Requirement
âș Number of Household - 300
âș Commercial Stores - 45
âș Light Poles - 120
âș Add Text Here - XXX
âș Add Text Here - XXX
âș Add Text Here - XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
12
13. The purpose of the following slide is to compare multiple electricity provider in the area based on the IR cost per kilowatt , their rate flexibility and the minimum usage fee.
Electricity Provider Rate Comparison for Construction Management
Electricity Providers in State Cost Per Kilowatt Hour Fixed Rate of Variable Rate Minimum Usage Fees Add Parameter Here
Electricity Provider 1 14 cent Fixed rate Yes Add text here
Electricity Provider 2 20 cent Variable and fixed rate Yes Add text here
Electricity Provider 3 12 cent Variable rates No Add text here
Add Provider Here XXXX Add text here XX Add text here
Add Provider Here XXXX Add text here XX Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
13
15. The Purpose of this slide is to show the regulatory requirements that the organization needs to meet in order to initiate the project, the following table shows multiple regulations and whether the organization
has them or not.
Certificate Checklist for Construction Project
Regulations & Permit Yes or No
ABC Permit Yes
Engineering & Architect License Yes
General Contract Licensee Yes
Trade Contract Licensee No
US Federal Construction Project Yes
Installation of:
âș Alarms
âș Fall Protection
âș Ad Text Here
Yes
No
Yes
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
Add Text Here XXX
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
15
16. The following slide displays the application for construction permit and the entire application process. The following slide also highlights the stage in which the process is right now.
Construction Permit Application Process
Submit Permit Application
Plans Reviewed
for Code
Compliance
Non Compliant Compliant
Correction &
Comment Provided
Plans Stamped as Approved
& Construction may Begin
Revise & Resubmit drawings
& Specifications
Inspection
Process
Begins
Does not Pass
Inspection(s)
Pass Inspection(s)
Corrections Made in
Field & Re-Inspected
Certificate of
Occupancy Issued
Application Submitted on 31 Oct 2019
If Inspection not approved
Corrections to be made &
re-inspection of the site is to be done
Expected date of
Application Approval
07 January 2020
Current Application Status Construction Map Approved,
Site Inspection Pending
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
16
19. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Total Complex Overview and Plan (1/2)
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
19
20. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Total Complex Overview and Plan with Video Holder (2/2)
Overview
25000 square feet of residential space
Residential space with 2BHK, 3bhk and penthouses
Parking for 2500 vehicles
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
20
21. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
Building Layout and Plan (1/3)
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
21
22. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan same.
Building Layout and Plan (2/3)
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
22
23. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Building Layout and Plan with Video Holder (3/3)
Overview
3 BHK Layout
3 Galleries
2 Washrooms
Add text here
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
23
24. The purpose of this slide is to display the layout and planning of the parking space of the new construction site. The slides also provides an overview of the plan of the same.
Parking Layout and Plan (1/2)
Overview
Parking of 2500 vehicles
3 Parking spots per house occupants
Open space parking for 1500 vehicles
Underground parking for 1000 vehicles
Underground vehicles parking height 7 Ft
Add text here
24
25. The purpose of this slide is to display the layout and planning of the apartment of the new construction site. The slides also provides an overview of the plan provided.
Parking Layout and Plan with Video Holder (2/2)
Overview
Parking of 2500 vehicles
3 Parking spots per house occupants
Open space parking for 1500 vehicles
Underground parking for 1000 vehicles
Underground vehicles parking height 7 Ft
Add text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
25
26. The following slide displays a storage plan for the construction site. The provided table highlights that material that needs to be stored, whether they will be stored On-Site or Off-Site.
Storage Plan for Construction Management
Material Onsite Offsite
Storage Unit 1 Storage Unit 2 Warehouse Location
Cement Bags Yes No No NA
Wooden Logs Yes Yes No NA
Steel Rods No Yes No NA
Glass Panels No No Soft Storage Warehouse Chicago XYZ Avenue
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
Add Text Here Add Text Here Add Text Here Add Text Here Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
26
28. The following slide displays material required for the construction project along with the quantity required.
Material Required for Construction Project
12.3% Sand
22.8% Fittings
âș Window- 3.0%
âș Doors- 3.4%
âș Plumbing- 5.5%
âș Electrical- 6.6%
âș CP+ Sanitary- 4.1%
7.4% Aggregated
Gravels
16.5% Finishers
âș Paint- 4.1%
âș Tiles- 8.0%
âș Bricks- 4.4%
24.6% Steel
16.4% Cement
$ 731,700
1000 Sq. Ft
(Build up area)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
28
29. The following slide compares multiple vendors through which the organization can procure its material. The provided table highlights multiple criteria such as the quality required and per piece cost.
Vendor Selection for Construction Material
Quantity
Required
Vendor 1 USD
per piece
Vendor 2 USD
per piece
Vendor 3 USD
per piece
Selected
Vendor
Comments
10,000 Bags 18 17 16 Vendor 3
âș Add comments here
âș Add comments here
20,000 Bags 11 10 15 Vendor 2
âș Add comments here
âș Add comments here
5000 Bags 22 25 20 Vendor 3
âș Add comments here
âș Add comments here
2,000 Beams 45 40 41 Vendor 2
âș Add comments here
âș Add comments here
50 Ltrs. 40 35 38 Vendor 2
âș Add comments here
âș Add comments here
Na XX XX XX Add text here
âș Add comments here
âș Add comments here
Cement
Material
Required
Sand
Aggregates
Gravels
Steel
Finishing Material
(Paint polisher)
Fittings
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
29
30. The following slide displays machinery required for the construction project. These machineries can be earth moving equipment, Construction Vehicles, Material Handling Equipment etc.
Machinery Required for Construction Work
Earth Moving Equipment
âș Excavators
âș Graders
âș Loaders
âș Skid Loader
âș Backhoe
âș Bulldozer Trenchers
âș Scrapers Wheeled
âș Loading Shovel
Construction Vehicles
âș Lorry
âș Dumber
âș Trailers
âș Tanker
âș Add Text Here
Construction Equipment
âș Concrete Mixtures
âș Compactors
âș Paver
âș Road Roller
âș Add Text Here
âș Add Text Here
âș Add Text Here
Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
Material Handling Equipment
âș Crane
âș Conveyors
âș Hoists
âș Forklift
âș Add Text Here
Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
âș Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
30
31. The purpose of this slide is to analyze the equipment procurement plan of the organization. The provided table analyzes the rates offered by multiple vendors the quantity required by the organization and the
name of equipment's.
Vendor Selection for Construction Equipment
Equipment Quantity Owned Purchase Vendor 1 Pricing PP $ Vendor 2 Pricing PP $ Vendor 3 Pricing PP $ Comments
Excavators 3 2 1 7,000 8,000 9,000 Purchase from Vendor 1
Backhoe 1 0 1
7,000
9,000 8,000 Purchase from Vendor 1
Bulldozer 5 2 3 9,000 8,000
7,000
Purchase from Vendor 3
Wheel Tractor 5 3 2 8,000 9,000
7,000
Purchase from Vendor 3
Tower Crane 2 2 0 XX XX XX XX
Dump Trucks 8 7 1
7,000
8,000 9,000 Purchase from Vendor 1
Add Text Here XX XX XX XXXX XXXX XXXX Add Text here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
31
32. The purpose of the following slide is to show the type of insurance that is required by the company. These insurance can be of three type: People insurance, Asset- insurance and liability insurance.
Our Insurance Requirement for Construction Management
People
âș Life Insurance
âș Disability Insurance
âș Partnership Insurance
âș Medical Insurance
âș Key Personal Insurance
Assets
âș Property Insurance
âș Content Insurance
âș Business Interruption Insurance
âș Vehicle Insurance
âș Account Receivable Insurance
Liability
âș General Liability Insurance
âș Product Liability Insurance
âș Professional Liability Insurance
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
32
33. The following slide compares multiple vendors through which the organization can purchase insurance . The provided table highlights multiple criteria based on which the organization can choose their
insurance provider.
Vendor Selection for Construction Management
Our Requirement
âș People insurance for 400 employees
âș Asset insurance for major machineries
âș Liability insurance
âș Add text here
âș Add text here
âș Add text here
Insurance Types 1 2 3 4 Comments
People Insurance Yes No Yes Yes
âș Add comments here
âș Add comments here
Asset Insurance No No Yes Yes
âș Add comments here
âș Add comments here
Lability Insurance Yes Yes Yes No
âș Add comments here
âș Add comments here
100% Reimbursement No Yes Yes No
âș Add comments here
âș Add comments here
Cost Per Year $7,500 $5,000 $6,000 $4,000 Purchase from Insurance Provider 3
Insurance Provider
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
33
34. 60%
51%
71%
75%
42%
51%
Text Here
Labor
Force
Equipment
Oprator
Human
Resourse
Architect
Engineer
67%
31%
73%
50%
38%
62%
412
Men
34
The purpose of this slide is to analyze the workforce requirement of the construction project, the provided slide analyses the diversity of workforce along with the salary and working hours per day.
Workforce Requirement
971
Full Time People
932.23
Full Time
Equivalent Staff
6Working
Days per week
127
Part-Time Staff
Median Salary for
Men
Women
Text here
Text here
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select âEdit Dataâ.
519
Women
35. OurRequirements
The following slide analysis multiple platforms for recruitment by highlighting the various forms of recruitment such as Internal recruitment, external recruitment, social and web recruitment and print
advertisement.
Hiring Plan for Construction Project
Recruitment Platforms
âș Outsourcing the employment
âș Hiring through school college
and universities
âș Add text here
âș Add text here
Internal Recruitment
âș Promote current employees
âș Offer temporary employee
permanent contract
âș Hire retired employee as
freelancer
âș Add text here
External Recruitment Social & Web Recruitment
âș E-mail
âș Social media platform:
Facebook, Twitter & LinkedIn
âș Online Recruitment Portals
âș Company Website
âș Add text here
Print Advertisement
âș News Paper
âș Magazines
âș Pamphlets
âș Add text here
âș Add text here
âș On-site Engineers : 15
âș Machinery Operators : 25
âș Accountants : 5
âș Human Resource Personal : 2
âș Add Text Here : XX
âș Construction Workers : 200
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
35
37. The following slide displays a map of the entire construction site shows various areas such as entry point, the office space, excavation ground etc to ensure the smooth and safe functioning of the project.
Construction Site Access and Layout
Details
House Foundation- 25,000 Sq. ft
Steel Depot- 1,000 sq. ft
Office Space- 3*500 Sq. ft
Add Text Here
Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
37
38. The following slide displays the construction process of the organization along with a timeline.
Construction Process for Construction Management
Selecting a Contractor Financing
Windows &
Exterior Doors
HVAC
Plans
Site Preparation
Permits & Insurance
Foundation
Framing
Roof & Siding
Interior
Exterior Paint
Landscaping
Punch List
Finished Project
Warranty Period
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
20 Feb
2020
2021
2022
Inspection
Utilities
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
38
39. The purpose of the following slide is to display the process of commissioning during after the completion of construction project.
Post Construction Commissioning
Pre- Design Design Construction Commissioning
Turnover/
Re-Commissioning
Execute Level 1,2,3
Commissioning
Develop Level 4 & 5
Commissioning Script
Execute Level 4 & 5
Commissioning
Rest to Normal
Configuration
Final Site
Clean Up
Verify IT Equipment
Dual Corded
Develop
Commissioning Script
Execute
Commissioning Activities
Build
Commissioning Team
OPR+ BOD
Development
Commissioning by Project Phase
Develop Overall
Commissioning Plan
Develop Level 1,2,3
Commissioning Documents
Review Design for
Commissioning Readiness
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
39
40. The purpose of the following slide is to show the entire construction project team . The team members can be C Level individual, Architects Designers and Contractors.
Construction Project Team
Champions
Project Manager/
Client Representative
Project Sponsor
Project Board
Contractor
Sub- Contractor Suppliers
User Panels
Lead Consultant
Other Consultants Lead Designer
âș Cost Consultant
âș CDM Co- Ordinator
âș Specialist Consultants
âș Architect
âș Services Engineer
âș Structural Engineer
âș Specialist Designers
Design Team
Board of Directors
Independent
Client Advisers
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
40
41. Table of Content
41
Risk Analysis
âș Risk Identification
âș Risk Mitigation Strategies
âș Risk Impact and Likelihood Matrix
42. The purpose of the following slide is to identify the various risks that are associated with the construction project. The risk can financial, socio Political, Environmental and construction related.
Risk Identification for Construction Management
Environmental Risk
âș Natural Disasters
âș Recession
âș War
âș Add Text Here
Construction Related Risk
âș Material Shortage
âș Labor Union Strike
âș Unwanted Delay in Construction Work
âș Add Text Here
Financial Risk
âș Shortfall of Investment
âș Poor Performance of Economy
âș Budget Deficit
âș Low Sale of Project
âș Add Text Here
âș Add Text Here
Socio Political Risk
âș Regulatory Compliances
âș Change in Rules & Regulations
âș Taxes
âș Add Text Here
âș Add Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
42
43. The purpose of the following slide is to analyze the impact and likelihood of multiple risks that may effect organization.
Construction Risk Impact and Likelihood Matrix
Insignificant Minor Moderate Major Catastrophic
Almost certain Add text here Add text here
Unwanted delay in
construction work
Labor union strike Material shortage
Likely Add text here Add text here Add text here Add text here Add text here
Possible Add text here Financial shortfall Budget deficit Add text here Add text here
Unlikely Add text here Add text here Add text here Add text here Add text here
Rare Recession Regulatory compliances War Add text here Add text here
Impact/ Consequences
Likelihood
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
43
44. The purpose of this slide is to show various mitigation strategies for multiple risks such as investment shortfall, labor force strike etc.
Risk Mitigation Strategies for Construction Management
Risk Mitigation Strategy Comments
Investment Shortfall
âș Reserves for financial deficit
âș Fund raising through selling apartments & providing
possession upon full construction
âș Add comments here
âș Add comment here
Labor Force Strike
âș Strike insurance to prevent losses that might be incurred
during strike
âș Setting up a negotiation committee for negotiations with the
labor union
âș Add comments here
âș Add comment here
Budget Deficit
âș Reduction in miscellaneous expenses
âș Reconsideration of budgetary policy
âș Add comments here
âș Add comment here
Damages due to Natural Disaster
âș Insurance with vendor who provides human machinery &
liability insurance
âș Add text here
âș Add comments here
âș Add comment here
Add Text Here
âș Add text here
âș Add text here
âș Add comments here
âș Add comment here
Add Text Here
âș Add text here
âș Add text here
âș Add comments here
âș Add comment here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
44
45. Table of Content
45
Quality Assurance Plan
âș Quality Assurance of Sale Process
âș Quality Assurance Process
46. The purpose of the following slide is to show the entire process quality assurance in sales. The provided flowchart shows a 4 steps of ensuring quality.
Quality Assurance Plan in Sales
Quality Control Flowchart
Step 1 Step 2 Step 3 Step 4
Customer Satisfaction
Survey & Management
Customer Complaint
Management
Design Quality Control
Process Point
Assessment
Revision
Of Design
Revision
Management
After- sales
Quality Control
Supply Chain Quality Control
Supplier
Quality Control
Incoming Material
Quality Control
Staff Training
& Assessment
Inspection
& Approval
Press Quality Control
Production
Preparation Inspection
Production Flow
Revision Management
Process
Quality Control
Quality Maintenance along the Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
46
47. The purpose of the following slide is to show the entire process quality assurance in construction process . The provided process shows the construction quality plan and material inspection and test plan.
Quality Assurance Process for Construction Management
Construction Quality Control Plans
Inspection & Test Plan
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
47
48. Table of Content
48
Construction Waste Management
âș Identifying the Type of Waste in
Construction Management
âș Construction Waste Management Plan
49. The purpose of the following slide is to Categorize different types of wate that can be generated during the construction project. These waste can be wood,glass and plastic.
Identifying the type of Waste in Construction Management
âș Concrete: Non-Hazardous
âș Bricks: Non-Hazardous
âș Tiles & Ceramics: Non-Hazardous
âș Add text here
âș Add text here
âș Add text here
âș Add text here
âș Add text here
âș Add text here
âș Untreated Woods: Non-Hazardous
âș Uncontaminated Glass: Non-hazardous
âș Treated Woods: Hazardous Waste
âș Treated Glass: Hazardous Waste
âș Add text here
âș Add text here
âș Add text here
âș Add text here
âș Add text here
Construction Waste
Wood, Glass & Plastic
Add Text Here
Add Text Here
Types of Construction Waste
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
49
50. The purpose of the following slide is to display a waste management plan for the construction project. The provided table highlights the 3 categories of waste that are Inert, Non- Hazard and Hazard.
Construction Waste Management Plan
Waste Description Re-Use Onsite Off-site Recycle On Site Off-Site Dispose On Site Off-Site
Bricks Yes Yes Yes
Add Text Here Yes Yes Yes
Add Text Here Yes Yes Yes
Plastic Pipes Yes Yes Yes
Plastic Wirings Yes Yes Yes
Add Text Here Yes Yes Yes
Bio-Chemical Yes Yes Yes
Lead Yes Yes Yes
Add Text Here Yes Yes
Inert
Non- Hazard
Hazard
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
50
52. 52
The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget.
Project Management Dashboard
CompletedPlanning
CompletedDesign
Projected Launch Date
107 Days
Friday,15th December
Overdue Task Deadline Employee
1 Day Add text here 2017-08-15 Paula
4 Days Add text here 2017-08-06 Kate
10 Days Add text here 2017-08-01 Nancy
24 Days Add text here 2017-07-18 George
Employee Task Deadline Workload
Kate Add text here 2017-08-15
George Add text here 2017-08-06
Nancy Add text here 2017-08-01
Paula Add text here 2017-07-18
WaitingCommissioning
Pre-
Construction
67% In Progress
67%
55%
48% 45%
30%
George Nancy Richard Kate Paula
$0K
$20K
$40K
$60K
Total Budget Budget Amont Used Target Amount Used
Total Budget- $52,000
Remaining- $87,70
Currently- 8.1% (Over Target)
Overdue Task
Upcoming Deadlines
Project Budget
Workload
34%
56%
15%
11%
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select âEdit Dataâ.
55. 55
Clustered Column
80
50
60
30
45
78
59
40
$0
$20
$40
$60
$80
$100
2016 2018 2019 2020
Sales(inUSDMillion)
Years
Product 01
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select âEdit Dataâ.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select âEdit Dataâ.
Product01
Product02
56. 56
Stacked Column
Product 01
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select âEdit Dataâ.
Product 02
This graph/chart is linked to excel, and
changes automatically based on data. Just left
click on it and select âEdit Dataâ.
4.3
2.5
-3.5
-4.5
2.4
4.4
-1.8
-0.8
-6
-4
-2
0
2
4
6
8
Product 02
Product 01
Sales
57. 57
Magnifying Glass
01
02
03
04
05
06
07
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
58. 58
Timeline
20202016 2017 2018 2019
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
59. Our Mission
59
Mission
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
60. 60
Post It Notes
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
61. Our Financial
61
23% This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Minimum
82% This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Maximum
62. 62
Venn
25%
75%
35%
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here