Prepared by:-
Er. Simarpreet Singh
A.P, Civil Engg.
ACET, Amritsar
TABLE OF CONTENTS
 One Room Building
 Concrete work in foundation (Center line and
separate wall method)
 Brickwork in footing (Center line and separate wall
method)
 Brickwork in walls (Center line and separate wall
method)
 Two Rooms Building
 Concrete work in foundation (Center line and
separate wall method)
5m
4m
0.3m
0.3m
0.5m
0.6m
0.9m
0.4m
0.6m
3.5m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
A
A’
B B’
Plan
0.9 m
5.3m
4.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.9 m Total Qty of concrete in foundation= (19.2×0.9×0.3) cum
Center Line Method
0.9 m
5.3m
6.2m
4.3 m
3.4 m
Separate Wall Method
Width = 0.9 m Total Qty of concrete in fdn= (2×6.2×0.9×0.3) + (2×3.4×0.9×0.3)cum
Long Wall = 5.3+0.9=6.2 m Short Wall = 4.3-0.9=3.4 m
0.6 m
5.3m
4.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.6 m Total Qty of brickwork in Ist footing= (19.2×0.6×0.3) cum
Center Line Method
0.6 m
5.3m
5.9 m
4.3 m
3.7 m
Width = 0.6 m
Separate Wall Method
Long Wall = 5.3+0.6=5.9 m Short Wall = 4.3-0.6=3.7 m
Total Qty of brickwork in Ist footing= (2×5.9×0.6×0.3) + (2×3.7×0.6×0.3)cum
5.3m
4.3 m
0.3 m
Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.3 m Total Qty of brickwork in walls= (19.2×0.3×3.5) cum
Center Line Method
5.6 m
5.3m
4.3 m
4 m
0.3 m
Width = 0.3 m
Separate Wall Method
Long Wall = 5.3+0.3=5.6 m Short Wall = 4.3-0.3=4.0 m
Total Qty of brickwork in walls= (2×5.6×0.3×3.5) + (2×4.0×0.3×3.5)cum
5m
4m
0.3m
0.3m
0.5m
0.6m
0.9m
0.4m
0.6m
3.5m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
A
A’
B B’
Plan
Center Line Method
Total Center line = 5.3+5.3+5.3+5.3+4.3+4.3+4.3=34.1 m
Width = 0.9 m Total Qty of concrete in fdn= (34.1×0.9×0.3)
5.3m 5.3m
4.3 m
0.9 m
Intermediate wall
– (2×0.9×(0.9/2) ×0.3)cum
Separate Wall Method
Long Wall = 5.3+5.3+0.9=11.5 m Short Wall = 4.3-0.9=3.4 m
Width = 0.9 m Total Qty of concrete in fdn= (2×11.5×0.9×0.3)
5.3m 5.3m
4.3 m
0.9 m
11.5 m
3.4m
Intermediate wall
+ (3×3.4×0.9×0.3)cum
Building estimation methods

More Related Content

What's hot

Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Tests of aggregates
Tests of aggregatesTests of aggregates
Tests of aggregatesKaran Patel
 
5#rate analysis problems
5#rate analysis   problems5#rate analysis   problems
5#rate analysis problemsLIJI A
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingTarun kumar
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & propertieslalitha moorthy
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction pptBeing Deepak
 
footing
footingfooting
footingillpa
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of buildingARUN KUMAR
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye lawsCul Aditi
 

What's hot (20)

Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Tests of aggregates
Tests of aggregatesTests of aggregates
Tests of aggregates
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 
5#rate analysis problems
5#rate analysis   problems5#rate analysis   problems
5#rate analysis problems
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied building
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Foundation ppt
Foundation pptFoundation ppt
Foundation ppt
 
Estimation
EstimationEstimation
Estimation
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
footing
footingfooting
footing
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye laws
 
Foundations
FoundationsFoundations
Foundations
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 

Viewers also liked

Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar HussainAnwar Hussain
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Harsh Gupta
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07Ptpg Stuc
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential buildingVardhaman Sethia
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
RESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGRESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGHafizah Hajimia
 

Viewers also liked (12)

Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works  By S.Anwar HussainNrega Technical Aspects Of Execution Of Works  By S.Anwar Hussain
Nrega Technical Aspects Of Execution Of Works By S.Anwar Hussain
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Enlistment rules2014 07
Enlistment rules2014 07Enlistment rules2014 07
Enlistment rules2014 07
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential building
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
RESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLINGRESEARCH METHOD - SAMPLING
RESEARCH METHOD - SAMPLING
 

Similar to Building estimation methods

E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodYusuf Challawala
 
Long wall and short wall method 2
Long wall and short wall method 2Long wall and short wall method 2
Long wall and short wall method 2Saiyyed Akbar
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentationAnthonyward
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdfAnuPriya323
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project reportPraba Haran
 

Similar to Building estimation methods (10)

E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
 
LONG WALL AND SHORT WALL METHOD-6
LONG WALL AND SHORT WALL METHOD-6LONG WALL AND SHORT WALL METHOD-6
LONG WALL AND SHORT WALL METHOD-6
 
Long wall and short wall method 4
Long wall and short wall method 4Long wall and short wall method 4
Long wall and short wall method 4
 
Long wall and short wall method 5
Long wall and short wall method 5Long wall and short wall method 5
Long wall and short wall method 5
 
Long wall and short wall method 2
Long wall and short wall method 2Long wall and short wall method 2
Long wall and short wall method 2
 
tpp3k
tpp3ktpp3k
tpp3k
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentation
 
Long wall and short wall method 3
Long wall and short wall method 3Long wall and short wall method 3
Long wall and short wall method 3
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
 
Design example of a six storey building project report
Design example of a six storey building project reportDesign example of a six storey building project report
Design example of a six storey building project report
 

More from Simarpreet Singh

More from Simarpreet Singh (6)

Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Foundation Engineering Introduction
Foundation Engineering IntroductionFoundation Engineering Introduction
Foundation Engineering Introduction
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Strength of materials
Strength of materialsStrength of materials
Strength of materials
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Professional practice
Professional practiceProfessional practice
Professional practice
 

Recently uploaded

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 

Recently uploaded (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

Building estimation methods

  • 1. Prepared by:- Er. Simarpreet Singh A.P, Civil Engg. ACET, Amritsar
  • 2. TABLE OF CONTENTS  One Room Building  Concrete work in foundation (Center line and separate wall method)  Brickwork in footing (Center line and separate wall method)  Brickwork in walls (Center line and separate wall method)  Two Rooms Building  Concrete work in foundation (Center line and separate wall method)
  • 3.
  • 4. 5m 4m 0.3m 0.3m 0.5m 0.6m 0.9m 0.4m 0.6m 3.5m Section at A-A’ and B-B’ Thickness of footing and foundation is 30 cm each A A’ B B’ Plan
  • 5. 0.9 m 5.3m 4.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.9 m Total Qty of concrete in foundation= (19.2×0.9×0.3) cum Center Line Method
  • 6. 0.9 m 5.3m 6.2m 4.3 m 3.4 m Separate Wall Method Width = 0.9 m Total Qty of concrete in fdn= (2×6.2×0.9×0.3) + (2×3.4×0.9×0.3)cum Long Wall = 5.3+0.9=6.2 m Short Wall = 4.3-0.9=3.4 m
  • 7. 0.6 m 5.3m 4.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.6 m Total Qty of brickwork in Ist footing= (19.2×0.6×0.3) cum Center Line Method
  • 8. 0.6 m 5.3m 5.9 m 4.3 m 3.7 m Width = 0.6 m Separate Wall Method Long Wall = 5.3+0.6=5.9 m Short Wall = 4.3-0.6=3.7 m Total Qty of brickwork in Ist footing= (2×5.9×0.6×0.3) + (2×3.7×0.6×0.3)cum
  • 9. 5.3m 4.3 m 0.3 m Total Center line = 5.3+5.3+4.3+4.3=19.2 m Width = 0.3 m Total Qty of brickwork in walls= (19.2×0.3×3.5) cum Center Line Method
  • 10. 5.6 m 5.3m 4.3 m 4 m 0.3 m Width = 0.3 m Separate Wall Method Long Wall = 5.3+0.3=5.6 m Short Wall = 4.3-0.3=4.0 m Total Qty of brickwork in walls= (2×5.6×0.3×3.5) + (2×4.0×0.3×3.5)cum
  • 11.
  • 12. 5m 4m 0.3m 0.3m 0.5m 0.6m 0.9m 0.4m 0.6m 3.5m Section at A-A’ and B-B’ Thickness of footing and foundation is 30 cm each A A’ B B’ Plan
  • 13. Center Line Method Total Center line = 5.3+5.3+5.3+5.3+4.3+4.3+4.3=34.1 m Width = 0.9 m Total Qty of concrete in fdn= (34.1×0.9×0.3) 5.3m 5.3m 4.3 m 0.9 m Intermediate wall – (2×0.9×(0.9/2) ×0.3)cum
  • 14. Separate Wall Method Long Wall = 5.3+5.3+0.9=11.5 m Short Wall = 4.3-0.9=3.4 m Width = 0.9 m Total Qty of concrete in fdn= (2×11.5×0.9×0.3) 5.3m 5.3m 4.3 m 0.9 m 11.5 m 3.4m Intermediate wall + (3×3.4×0.9×0.3)cum