2-1
EXAMPLE OF STATEMENT OF DESIGN OR SPECIFICATIONS
FOR CIVIL, ELECTRICAL AND MECHANICAL
WORKS:CASE OF ENGINEERING
LABORATORY COMPLEX
By
Eng. Prof. S. K. Makhanu, B. Sc. (UoN), M. Sc. (UoN), Ph. D (Kyoto), MIEK, P. Eng.
AEQ Consultants, P. O. Box 37-50100, Kakamega, KENYA
Contact E-mail; ksmakhanu@yahoo.com/aeqconsultants@yahoo.com
Part 1: Architecture
(State the basis of design, scope and reference to relevant clauses)
1、Basis of Design
This design shall be designed according to Kenyan standards but conforming to related BS
standards.
1.1 Code for Design of Civil Buildings
1.2 Code of Design on Building Fire Protection and Prevention
1.3 Code for Design of Science Laboratory Building
2、The main design Principle
The building is designed on the basis of the reconnaissance survey and on information from
similar works in Kenya and elsewhere. Reference made to specifications for similar works
already constructed in Kenya.
3、 Building Design
(discuss the scope of building, the size, functional layout, elevations etc)
3.1 Overview
Unit A-- Mechanical laboratory (single-floor building)
Unit B-- Comprehensive laboratory building consisiting of civil, electrical and computer labs
(three-floor building)
Unit C-- Power generating room (single-floor building)
3.2 Overview of Building Characteristics
a.This building has a total building area of 6502.8 m
2
, wherein the Mechanical Laboratory
covers 2689.70 m
2
, the Comprehensive Laboratory building 3772.8 m
2
and the Power
generating room 90.5 m
2
.
b.This building adopts frame structure; the building structure is of Category C; the service life
is 50 years; the seismic intensity is 5-6 degree.
c. The fire-proof level of this building is level 2.
d. Water-proof level: roof water-proof level is level 2.
3.3 Plan Function Layout
Unit A:The plan form of the mechanical laboratory is “T” shaped.
11 laboratories are arranged inside the Mechanical laboratory. The head of “T" is arranged in
the CNC Lathe training Room, CNC Milling Machine and Machining Center training Room,
General Lathe training Room, Fitter Training Room, Machining Training Room, five
2-2
laboratories in total. Other parts are hydraulic laboratory, Mechanics Laboratory, Surveying
and Drawing Room, Tolerance Laboratory, Basic Mechanical Designing Room and Rapid
Prototyping Manufacturing (RPM)Laboratory, 6 laboratories in total.
Unit B: Comprehensive laboratory building (three-floor building)
6 laboratories are arranged in the ground floor: Concrete Performance Testing Laboratory,
Asphalt mixture Laboratory, Mechanical Laboratory, Asphalt Laboratory, Aggregate
Laboratory, Mortar and Maintenance Laboratory.
7 laboratories are arranged in the first floor: Electric Device Laboratory, Electric Control
Laboratory, Motor Disassembly Laboratory, Electronic Assembling Laboratory, Electronic
Laboratory, Electrical Laboratory and Decoration Materials Laboratory of civil engineering
laboratory.
6 laboratories of Medical Training and 1 laboratory of machnical laboratory are ranged in the
second floor: Hematology and detection technology laboratory, Basic clinical detection,
Molecular biology and detection technology, Biochemistry and detection technology,
Microorganism and parasite detection technology, Immunology and detection technology and
AutoCAD computer room.
Unit C: Standby Generator sets Room. In addition to the adaptation of generator sets, there
are diesel storage room, duty & tools room as well as repairing room is included.
3.4 Profile Design
The mechanical laboratory is one-floor building, with floor height of 4.2m. The comprehensive
laboratory building is a three-floor building, with floor height of 4.2m. The height gap of inside
and outside is 0.60m.
3.5 Elevation Design
The sloping roof:
Integrated with the local climate and environmental characteristics, the sloping roof, that is a
simple and neat, but also echoes with the local architectural style design, adopts red tile roof
and red and white walls to realize both economical and practical.
3.6 Vertical Transportation Design
The vertical transportation of this building mainly adopts 2 stairs, one ramp and 1 vertical
elevator.
3.7 Building Fire Fighting Design
There are three floors in the laboratory building, each of which provided with a fire-proof zone,
which is less than 2500m
2
and is provided with 2 evacuation stairs.
3.8 The main functions of Building and size of allocation table:
Building Floor Lab Quantity
of labs
Name Area(m2)
Unit A 1 floor
Machanical
Laboratory
1 Surveying and Drawing Room 100
2 RPM Laboratory 153
3 Basic Mechanical Designing Room 100
4 Mechanics Laboratory 100
5 Fitter Training Room 130
2-3
6 Tolerance Laboratory 100
7 General Lathe training Room 230
8 Machining Training Room 500
9 CNC Lathe training Room 260
10
CNC Milling Machine and Machining
Center training Room
320
11 Hydraulic Laboratory 100
12 Switch Board Room 50
Unit B
Ground
Floor
Civil
Engineering
Laboratory
1 Mortar and Maintenance Laboratory 160
2
Concrete Performance Testing
Laboratory
100
3 Mechanical Laboratory 126
4 Aggregate Laboratory 152
5 Asphalt Laboratory 152
6 Asphalt mixture Laboratory 152
7 Switch Board Room 33.6
8
Fire Fighting, weak electricity
room and duty office 25.2
The
First
Floor
Electric and
Electronics
Laboratory
1 Electrical Laboratory 100
2 Electronic Laboratory 100
3 Electric Control Laboratory 100
4 Electric Device Laboratory 100
5
Electrical and Electronic Automation
Laboratory
100
6 Electronic Assembling Laboratory 100
7 Motor Disassembly Laboratory 100
8 Decoration Materials Laboratory 160
9 Office 25.2
10 Storage Room 33.6
The
second
Floor
Medical
Training
Laboratory
1 Basic clinical detection 100
2 Hematology and detection technology 100
3 Biochemistry and detection technology 100
4
Microorganism and parasite detection
technology
100
5 Immunology and detection technology 100
6
Molecular biology and detection
technology
100
7 Medical Experiment Room 100
8 AutoCAD Computer Room 160
9 Office 24.9
10 Storage Room 33.6
2-4
Unit C 1 floor
Generator
Set Room
Generator Sets, Storage Room and
1
Duty Office
90.5
3.9 Building Decoration
a. External decoration
E
x
t
e
r
n
a
l
d
e
c
o
r
a
t
i
o
n
External wall surface Wall surface of
main body
Building coating or concrete brick or
natural stone(partly)
External thread
picking foot
Building coating
Outdoor stage Primary entrance
and special path of
disabled
Granite stage
Secondary
entrance
Cement cutting hair stage
Water scattering Concrete water scattering
External window Aluminum windows, ordinary
single-glass,
With screens
b. Materials for the walls
As a result of the reinforced concrete frame structure, so all the walls are non load-bearing walls.
Wall materials: use of lightweight partition walls, 150mm thick and light steel keel fiber cement
board or gypsum wall pressure can be used. 150mm thin stone can be used on external walls of
concrete block or cement blocks or local commonly used cutted stone.
Infill material: brick for internal walls 150mm thick plastered both sides. But for external wall
infill is either concrete block 150 mm plastered both sides or dressed stone 150mm thick plastered
on internal surface.
c. Water-proof design
The roof water-proof level is level 2. The water-proof material adopts the combination of one
layer of SBS modified bitumen water-proof coiled material and one layer of SBS modified bitumen
coating. The coiled material is 4mm thick and the coating is 3mm.
The floor of toilet and clean room adopts 2 thick polymer cement water-proof coating.
d. Door and Window Design on External Wall
The external window adopts Aluminum ordinary single-layer glass window. Safe glass is adopted for
window with unit area larger than 1.5m
2
. For the air tightness of door and window, the external
window ≥ level four. Please refer to the table below for other physical property index:
Physical property Unit Index Physical Unit Index
2-5
property
Air-pressure
resistance
Pa ≥3000 Coefficient
of heat
transmission
w/m
2
.k ≤2.7
Air penetration
property
m
3
/m.h ≤1.5 Sound
insulation
property
dB ≥25
Rain water
penetration
property
Pa ≥250
e.Internal Decoration
Item
Room name Ground (floor) Wall surface Ceiling
Laboratory and corridor
Slip resistant
floor tile
Fire-proof
emulsion paint
Fire-proof
emulsion paint
Toilet
Slip resistant
floor tile
Ashlars brick
PVC plate
ceiling
Distribution room Cement floor White wash White wash
Part 2(Two) : The Structure
This design of building structure is made according to KEBS standards but conforming to related BS
standards applicable in the republic of Kenya.
1. Basis of Design
1.1 Load Code for the Design of Building Structures
1.2 Code for Design of Concrete Structures
1.3 Code for Design of Masonry Structures
1.4 Code for Seismic Design of Buildings
1.5 Code for Design of Building Foundation
1.6 Technical Code for Ground Treatment of Buildings
1.7 Code for Investigation of Geotechnical Engineering
1.8 Regulations to Compile the Documents of Architectural Engineering Design
2. Basic Conditions of Structure
2.1 The plan is to build three buildings: Unit A is a single floor building for Machnical laboratory;
Unit B is a comprehesnsive laboratory building with 3 floors above ground; The above
building adopts steel frame structure. Unit C is a single floor generator set building for
which the structure adopts Brick-concrete structure constructed plus column, or reinforced
concrete frame structure frame.
2.2 Foundation type: independent foundation
2.3 Service life of structure: 50 years
2.4 Safety level of structure: level 1.
2.5 Seismic intensity: 5-6 degree. The basic seismic acceleration value is 0.2.
2.6 Seismic category: B.
2-6
2.7 Foundation design level: A.
Part 3(Three): Water Supply and Drainage (mechanical laboratory and Comprehensive laboratory
building)
1.1 Water supply system: water is supplied directly by means of urban water supply pipeline
network with putting the water tank on the roof for Increasing pressure on water supplies.
The water supply pressure is no less than 0.2MPa. The water supply pipe material adopts
steel plastic composite pipe.
1.2 Water drainage system: sewage water and waste water of this building are discharged
together. The drainage vertical pipe adopts hard polyethylene inner spiral PVC-U pipe. The
domestic drainage water is discharged into the municipal water drainage pipeline network
through the central processing made by septic tank.
1.3 Rain water system: rain water is collected and drained through organized system. The rain
water on the roof is discharged to the water gutter and then drained to water collecting
tank( 60 m3), and after settling for greening buildings sanitary use.
1.4 Fire fighting system: The fire hydrant system is set for indoor rooms and fire hydrant box
adopts local common practice of fire hose. The fire-fighting water source shall be provided
uniformly by fire-fighting pump room inside the campus.
Part 4(Four) : Ventilation and Insulation
1.1 The Machanical Laboratory
1.1.1 Ventilation: natural ventilation is adopted in the workshop and the toilet is provided
with mechanical air exhausting (air exhausting fan).
1.1.2 Insulation: To place aluminum foil for the insulation to the under of roof tiles for the hot
areas building. In addition, to put dormer windows(with hopper windows) on the
sloping roof in order to increase ventilation in the roof layer to achieve the purpose of
insulation.
1.2 Comprehensive Laboratory building:
1.2.1 Ventilation: natural ventilation is adopted in the room and the toilet is provided with
mechanical air exhausting (air exhausting fan). Mechanical air exhausting is adopted in
asphalt composite material laboratory practical training room, asphalt laboratory
practical training room and microorganism and parasite inspection technology room.
The fan is arranged on the ceiling.
1.2.2 Insulation: To place aluminum foil for insulation to the under of roof tiles for the hot
areas building. In addition, to put dormer windows(with hopper windows) on the
sloping roof in order to increase ventilation in the roof layer to achieve the purpose of
insulation.
1.2.3 Smoke extraction. The mechanical smoke extraction system shall be arranged when
the length of path exceeds 60m. The fan is arranged on the ceiling.
Part 5(Five) : Electrical Specifications
1. design basis
Technical conditons provided by the Owner and known locally in Kenya
The local design standard and norms
"Architectural design code for fire protection"
"Building Lightning Protection Design Code"
"Automatic fire alarm system design specification"
"Power distribution system design specification"
"Low-voltage power distribution system design specification"
"Architectural Lighting Design Standards"
"Electrical Design of civil norms"
2. design scope
Low-voltage distribution systems and power distribution; standby generator sets; general
2-7
lighting and emergency lighting; Lightning Protection and grounding system; telephone
communications and network systems; broadcast system; Fire Sprinkler, and Smoke
systems.
2.1 Electricity transformation and distribution system:
Load rating:
The building is the ordinary multi-floor and single-floor building equipped with fire
fighting electrical equipment, fire control center, network and communications
equipment, accident and evacuation lighting. The sophisticated, important equipment
is equipped with high load of power supply. The general distribution, lighting and
general equipment are equipped with electric power load by ordinary load of power
supply.
Load Capacity
This power of the building is supplied by the power transformation and distribution
station of the Campus.
Load capacity of Lighting electricity: The sophisticated, important Laboratory:
18W/M
2
, The ordinary Laboratory: 11W/M
2
;
Load capacity of Equipments: Mechanical Laboratory: 645.7KW; Electricial and
electronics Laboratory: 169KW; Civil Engineering Laboraroty is : 243KW; Medical
training laborotory: 16KW; Rapid prototyping Manufacturing Laboratory is about:
50KW; part of the equipments inside of the Laboratories is equipped with high load
of power supply.
Lighting Load: 68KW +30 KW = 98KW
Estimated load: 1222KW
Total installed capacity: 1600KVA.
2.2 emergency power supply system
Diesel generator set is configurated as the emergency power supply for the Building,
with a single generator room (C Building) which consists of one unit of 600KW
generator set for the fire load and emergency load use.
Part 6(Six) Power distribution and lighting
1. Low-voltage distribution voltage is 415V/240V volts using a combination of trunk-type and
radial distribution type. The high load equipment such as fire fighting equipments adopts
double-loop power distribution and terminal switch approach. The normal lighting adopts
energy-saving fluorescent lighting. The main principle of illumination degree of the laboratories
are as follows:
Common laboratory 300Lx
Precision Laboratory 500Lx
Doors and Halls 100Lx
Office 300Lx
2. Lighting Source: Adopting highly efficient fluorescent lamps, in order to improve the power
factor and energy-saving, fluorescent lamp electronic ballasts are configured.
3. The general lighting and emergency lighting are configured. Exact Lighting will be based
on different characteristics of various architectural space and configuration, and energy-saving
fluorescent lamps and metal halide lamp etc will be installed for normal lighting, And in the
important places and public place, the emergency lighting and evacuation instructions lighting
will be configured.
2-8
Part 7(Seven): Lightning Potection and Gounding
The building is with the second level lightning, and the grounding system adopts TN-S system.
The joint grounding menthod is adopted and the grounding resistance requirement is less than 1
ohm. To prevent lightning electromagnetic pulse caused by over-current and over-voltage, the
Surge Protection Device (SPD) is installed in the corresponding part.
Part 8(eight): Control System
1. To meet the requirements of local norms and standards of fire fighting in Kenya, the building is
equipped with automatic fire sprinkler system and smoke detectors system.
2. Power supply of fire fighting and lighting system
Fire electrical equipment distribution adopts double-loop power supply with terminal switch
approach and equipped with emergency lighting and evacuation instructions.
Part 9(nine): Weak Electricity systems
1. Design scope: telephone systems, network system.
Broadband network and telephone system
2. The building is equipped with broadband network and telephone systems. The local call and
broadband network are put into from outside the building by the introduction of fiber optic cable,
and then laying to the electronic equipment room by wearing pipe, The patch panel and other
equipment will be set up in the equipment room.
Part 10(TEN): Specification for Equipment
equipment shpld be described in sufficient detail to enable the ordering from suppliers. The
standard from is to describe the equipment technical details including a drawing / picture.
1. Specification for a Computer
Item (NO.3) Computer & 19” Monitor
Picture
2-9
1.1.1.Specification
 OS : Vista home basic
 CPU : Core2Quad Q9400
 HDD : 250 GB
 RAM : 2(DDR2) GB
 CACHE MEMORY : 2 MB
 ODD : Super-multi
 GRAPIC : nVidia Geforce 7100
 SOUND : High definition audio
 KEYBOARD : PS/2
 POWER : AC 220V
 SIZE : 173×365×388mm(WHD)
 SLOT : 2×PCI, PCI-E(16X) 1, PCI-E(1X) 1
2. Specification for Microphone
Item (NO.9) Microphone
Picture
3-10
2.1.1.Specification Features
• Provides natural, full-range vocal reproduction
• Silent on-off operation thanks to MagnaLock™ switch design
• Hi-ENERGY® neodymium magnet for improved output and transient
response
• Two-stage ball-type screen reduces wind noise and “popping” during close
use
• Corrosion-resistant contacts from gold-plated XLRM-type connectors
• Superior internal shock mounting reduces handling noise
• Rugged design and construction for reliable performance
• Cardioid polar pattern reduces pickup of sounds from the sides and rear,
improving isolation of desired sound source
SPECIFICATIONS
• ELEMENT: Dynamic
• POLAR PATTERN: Cardioid
• FREQUENCY RESPONSE: 90-16,000 Hz
• OPEN CIRCUIT SENSITIVITY: –55 dB (1.7 mV) re 1V at 1 Pa*
• IMPEDANCE: 300 ohms
• SWITCH: MagnaLock™ on/off
• WEIGHT: (less cable and accessories) 10.7 oz (304 g)
• DIMENSIONS: 7.28" (185.0 mm) long, 2.09" (53.1 mm) head diameter
• OUTPUT CONNECTOR: Integral 3-pin XLRM-type
• CABLE: 15.0' (4.5 m) cable with XLRF-type connector at microphone end,
XLRM-type connector at equipment End
3. E-learing solution
Item
(No.20 ) e-learning solution : Authoring tool
3-11
Picture
3.1.1.Specification
Editing tool to record all contents of lecture while writing on the screen
with electronic board function and teacher’s lecturing voice and
appearance simultaneously into one video
1. Electronic board function
- Support pen, highlighter, eraser and magnifier
- Support various kinds of colors and thickness
- Open Power point file
- Support viewing of all page lists and transferring to the designated
page
- Support detection of pen pressure sensitivity
2. Recording function
- Automatic creation of the table of contents in the unit of lecture
document page
- Manual creation of the table of contents
- Pause recording
- Cancel recording and re-start recording
- Support conversion to windows screen
- Camera preview
- Screen/camera/microphone setting
- Manual creation of the table of contents during recording session
- Reduce audio noise
3. Editing function
- Edit video contents in the unit of table of contents (Drag & Drop
mode)
- Support timeline editing interface for manual indexing
- Function to modify information on the table of contents
- 2-stage (chapter/section) of hierarchical structure for table of
contents
- Trash bin function
4. Playback function
- Display the table of contents
- Change the location of screen/camera window
- Full screen playback
5-12
4. Master table
Item
(No.23 ) Master Table : Made-to-order
Picture
4.1.1.Specification • Material: Inside-Chipboard, Outside-HM film coated
• Holes for connection
• Size: 1800x750x750mm(WxDxH)
5. Student Desk
Item
(No.26 ) Student Desk : For 2 Users
Picture
5.1.1.Specification • Material: Inside-Chipboard, Outside-HM film coated
• Size: 1600x600x750mm(WxDxH)

More Related Content

What's hot

MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESSelva Prakash
 
Concrete and steel bridges
Concrete and steel bridgesConcrete and steel bridges
Concrete and steel bridgesMadujith Sagara
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniquessunilighare
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering EthicsDon W. Lewis
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2saibabu48
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
5 reasons to study mechanical engineering
5 reasons to study mechanical engineering5 reasons to study mechanical engineering
5 reasons to study mechanical engineeringRohanDavid3
 
Unit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsUnit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsKunal Kacholiya
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Engineering Professional Practice Pokhara University
Engineering Professional Practice Pokhara UniversityEngineering Professional Practice Pokhara University
Engineering Professional Practice Pokhara UniversityHari Krishna Shrestha
 

What's hot (20)

MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIES
 
Etendering
EtenderingEtendering
Etendering
 
Concrete and steel bridges
Concrete and steel bridgesConcrete and steel bridges
Concrete and steel bridges
 
Construction techniques
Construction techniquesConstruction techniques
Construction techniques
 
Civil engineering
Civil engineeringCivil engineering
Civil engineering
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering Ethics
 
Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2Iii design-of-steel-structures-unit-2
Iii design-of-steel-structures-unit-2
 
Unit 3.pptx
Unit 3.pptxUnit 3.pptx
Unit 3.pptx
 
BOLTED CONNECTION
BOLTED CONNECTIONBOLTED CONNECTION
BOLTED CONNECTION
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
5 reasons to study mechanical engineering
5 reasons to study mechanical engineering5 reasons to study mechanical engineering
5 reasons to study mechanical engineering
 
Unit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsUnit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & Byelaws
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Engineering Professional Practice Pokhara University
Engineering Professional Practice Pokhara UniversityEngineering Professional Practice Pokhara University
Engineering Professional Practice Pokhara University
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Construction Failure
Construction FailureConstruction Failure
Construction Failure
 

Viewers also liked

Презентация вчителя
Презентация вчителяПрезентация вчителя
Презентация вчителяmissisnazarenko2012
 
Broadcast journalism
Broadcast journalismBroadcast journalism
Broadcast journalismRia priya
 
الادب و النصوص للصف الرابع العلمي
الادب و النصوص للصف الرابع العلميالادب و النصوص للصف الرابع العلمي
الادب و النصوص للصف الرابع العلميAyad Haris Beden
 
Phantom 3 professional_user_manual_v1.4_en
Phantom 3 professional_user_manual_v1.4_enPhantom 3 professional_user_manual_v1.4_en
Phantom 3 professional_user_manual_v1.4_enChristin Neumann
 
كتاب الكيمياء للصف الثالث متوسط
كتاب الكيمياء للصف الثالث متوسطكتاب الكيمياء للصف الثالث متوسط
كتاب الكيمياء للصف الثالث متوسطAyad Haris Beden
 
Ch3 1 powerpoint Tort Law
Ch3 1 powerpoint Tort LawCh3 1 powerpoint Tort Law
Ch3 1 powerpoint Tort Lawgellenberger
 
Beginner Guide - How to fly a DJI Phantom Drone Camera
Beginner Guide - How to fly a DJI Phantom Drone CameraBeginner Guide - How to fly a DJI Phantom Drone Camera
Beginner Guide - How to fly a DJI Phantom Drone CameraMedia Designs
 

Viewers also liked (8)

Презентация вчителя
Презентация вчителяПрезентация вчителя
Презентация вчителя
 
Broadcast journalism
Broadcast journalismBroadcast journalism
Broadcast journalism
 
الادب و النصوص للصف الرابع العلمي
الادب و النصوص للصف الرابع العلميالادب و النصوص للصف الرابع العلمي
الادب و النصوص للصف الرابع العلمي
 
Jurnal len
Jurnal lenJurnal len
Jurnal len
 
Phantom 3 professional_user_manual_v1.4_en
Phantom 3 professional_user_manual_v1.4_enPhantom 3 professional_user_manual_v1.4_en
Phantom 3 professional_user_manual_v1.4_en
 
كتاب الكيمياء للصف الثالث متوسط
كتاب الكيمياء للصف الثالث متوسطكتاب الكيمياء للصف الثالث متوسط
كتاب الكيمياء للصف الثالث متوسط
 
Ch3 1 powerpoint Tort Law
Ch3 1 powerpoint Tort LawCh3 1 powerpoint Tort Law
Ch3 1 powerpoint Tort Law
 
Beginner Guide - How to fly a DJI Phantom Drone Camera
Beginner Guide - How to fly a DJI Phantom Drone CameraBeginner Guide - How to fly a DJI Phantom Drone Camera
Beginner Guide - How to fly a DJI Phantom Drone Camera
 

Similar to Example of engineering specification for an engineering laboratory complex

CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Final project presentation
Final project presentationFinal project presentation
Final project presentationYahya Jundi
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roofMELVIN tan
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline KH
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 newRamez Nasr
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйЦ. Алтангэрэл
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyQuinn Liew
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 ReportBolin Loong
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Habibie Razak
 
Park turquoise presentation
Park turquoise presentationPark turquoise presentation
Park turquoise presentationDastagir bhatare
 

Similar to Example of engineering specification for an engineering laboratory complex (20)

5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Final project presentation
Final project presentationFinal project presentation
Final project presentation
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roof
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
 
Park xpress presentation
Park xpress presentationPark xpress presentation
Park xpress presentation
 
Park xpress presentation
Park xpress presentationPark xpress presentation
Park xpress presentation
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
Btech report
Btech reportBtech report
Btech report
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Presentation
PresentationPresentation
Presentation
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
 
Park turquoise presentation
Park turquoise presentationPark turquoise presentation
Park turquoise presentation
 
Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
 

Recently uploaded

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Recently uploaded (20)

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 

Example of engineering specification for an engineering laboratory complex

  • 1. 2-1 EXAMPLE OF STATEMENT OF DESIGN OR SPECIFICATIONS FOR CIVIL, ELECTRICAL AND MECHANICAL WORKS:CASE OF ENGINEERING LABORATORY COMPLEX By Eng. Prof. S. K. Makhanu, B. Sc. (UoN), M. Sc. (UoN), Ph. D (Kyoto), MIEK, P. Eng. AEQ Consultants, P. O. Box 37-50100, Kakamega, KENYA Contact E-mail; ksmakhanu@yahoo.com/aeqconsultants@yahoo.com Part 1: Architecture (State the basis of design, scope and reference to relevant clauses) 1、Basis of Design This design shall be designed according to Kenyan standards but conforming to related BS standards. 1.1 Code for Design of Civil Buildings 1.2 Code of Design on Building Fire Protection and Prevention 1.3 Code for Design of Science Laboratory Building 2、The main design Principle The building is designed on the basis of the reconnaissance survey and on information from similar works in Kenya and elsewhere. Reference made to specifications for similar works already constructed in Kenya. 3、 Building Design (discuss the scope of building, the size, functional layout, elevations etc) 3.1 Overview Unit A-- Mechanical laboratory (single-floor building) Unit B-- Comprehensive laboratory building consisiting of civil, electrical and computer labs (three-floor building) Unit C-- Power generating room (single-floor building) 3.2 Overview of Building Characteristics a.This building has a total building area of 6502.8 m 2 , wherein the Mechanical Laboratory covers 2689.70 m 2 , the Comprehensive Laboratory building 3772.8 m 2 and the Power generating room 90.5 m 2 . b.This building adopts frame structure; the building structure is of Category C; the service life is 50 years; the seismic intensity is 5-6 degree. c. The fire-proof level of this building is level 2. d. Water-proof level: roof water-proof level is level 2. 3.3 Plan Function Layout Unit A:The plan form of the mechanical laboratory is “T” shaped. 11 laboratories are arranged inside the Mechanical laboratory. The head of “T" is arranged in the CNC Lathe training Room, CNC Milling Machine and Machining Center training Room, General Lathe training Room, Fitter Training Room, Machining Training Room, five
  • 2. 2-2 laboratories in total. Other parts are hydraulic laboratory, Mechanics Laboratory, Surveying and Drawing Room, Tolerance Laboratory, Basic Mechanical Designing Room and Rapid Prototyping Manufacturing (RPM)Laboratory, 6 laboratories in total. Unit B: Comprehensive laboratory building (three-floor building) 6 laboratories are arranged in the ground floor: Concrete Performance Testing Laboratory, Asphalt mixture Laboratory, Mechanical Laboratory, Asphalt Laboratory, Aggregate Laboratory, Mortar and Maintenance Laboratory. 7 laboratories are arranged in the first floor: Electric Device Laboratory, Electric Control Laboratory, Motor Disassembly Laboratory, Electronic Assembling Laboratory, Electronic Laboratory, Electrical Laboratory and Decoration Materials Laboratory of civil engineering laboratory. 6 laboratories of Medical Training and 1 laboratory of machnical laboratory are ranged in the second floor: Hematology and detection technology laboratory, Basic clinical detection, Molecular biology and detection technology, Biochemistry and detection technology, Microorganism and parasite detection technology, Immunology and detection technology and AutoCAD computer room. Unit C: Standby Generator sets Room. In addition to the adaptation of generator sets, there are diesel storage room, duty & tools room as well as repairing room is included. 3.4 Profile Design The mechanical laboratory is one-floor building, with floor height of 4.2m. The comprehensive laboratory building is a three-floor building, with floor height of 4.2m. The height gap of inside and outside is 0.60m. 3.5 Elevation Design The sloping roof: Integrated with the local climate and environmental characteristics, the sloping roof, that is a simple and neat, but also echoes with the local architectural style design, adopts red tile roof and red and white walls to realize both economical and practical. 3.6 Vertical Transportation Design The vertical transportation of this building mainly adopts 2 stairs, one ramp and 1 vertical elevator. 3.7 Building Fire Fighting Design There are three floors in the laboratory building, each of which provided with a fire-proof zone, which is less than 2500m 2 and is provided with 2 evacuation stairs. 3.8 The main functions of Building and size of allocation table: Building Floor Lab Quantity of labs Name Area(m2) Unit A 1 floor Machanical Laboratory 1 Surveying and Drawing Room 100 2 RPM Laboratory 153 3 Basic Mechanical Designing Room 100 4 Mechanics Laboratory 100 5 Fitter Training Room 130
  • 3. 2-3 6 Tolerance Laboratory 100 7 General Lathe training Room 230 8 Machining Training Room 500 9 CNC Lathe training Room 260 10 CNC Milling Machine and Machining Center training Room 320 11 Hydraulic Laboratory 100 12 Switch Board Room 50 Unit B Ground Floor Civil Engineering Laboratory 1 Mortar and Maintenance Laboratory 160 2 Concrete Performance Testing Laboratory 100 3 Mechanical Laboratory 126 4 Aggregate Laboratory 152 5 Asphalt Laboratory 152 6 Asphalt mixture Laboratory 152 7 Switch Board Room 33.6 8 Fire Fighting, weak electricity room and duty office 25.2 The First Floor Electric and Electronics Laboratory 1 Electrical Laboratory 100 2 Electronic Laboratory 100 3 Electric Control Laboratory 100 4 Electric Device Laboratory 100 5 Electrical and Electronic Automation Laboratory 100 6 Electronic Assembling Laboratory 100 7 Motor Disassembly Laboratory 100 8 Decoration Materials Laboratory 160 9 Office 25.2 10 Storage Room 33.6 The second Floor Medical Training Laboratory 1 Basic clinical detection 100 2 Hematology and detection technology 100 3 Biochemistry and detection technology 100 4 Microorganism and parasite detection technology 100 5 Immunology and detection technology 100 6 Molecular biology and detection technology 100 7 Medical Experiment Room 100 8 AutoCAD Computer Room 160 9 Office 24.9 10 Storage Room 33.6
  • 4. 2-4 Unit C 1 floor Generator Set Room Generator Sets, Storage Room and 1 Duty Office 90.5 3.9 Building Decoration a. External decoration E x t e r n a l d e c o r a t i o n External wall surface Wall surface of main body Building coating or concrete brick or natural stone(partly) External thread picking foot Building coating Outdoor stage Primary entrance and special path of disabled Granite stage Secondary entrance Cement cutting hair stage Water scattering Concrete water scattering External window Aluminum windows, ordinary single-glass, With screens b. Materials for the walls As a result of the reinforced concrete frame structure, so all the walls are non load-bearing walls. Wall materials: use of lightweight partition walls, 150mm thick and light steel keel fiber cement board or gypsum wall pressure can be used. 150mm thin stone can be used on external walls of concrete block or cement blocks or local commonly used cutted stone. Infill material: brick for internal walls 150mm thick plastered both sides. But for external wall infill is either concrete block 150 mm plastered both sides or dressed stone 150mm thick plastered on internal surface. c. Water-proof design The roof water-proof level is level 2. The water-proof material adopts the combination of one layer of SBS modified bitumen water-proof coiled material and one layer of SBS modified bitumen coating. The coiled material is 4mm thick and the coating is 3mm. The floor of toilet and clean room adopts 2 thick polymer cement water-proof coating. d. Door and Window Design on External Wall The external window adopts Aluminum ordinary single-layer glass window. Safe glass is adopted for window with unit area larger than 1.5m 2 . For the air tightness of door and window, the external window ≥ level four. Please refer to the table below for other physical property index: Physical property Unit Index Physical Unit Index
  • 5. 2-5 property Air-pressure resistance Pa ≥3000 Coefficient of heat transmission w/m 2 .k ≤2.7 Air penetration property m 3 /m.h ≤1.5 Sound insulation property dB ≥25 Rain water penetration property Pa ≥250 e.Internal Decoration Item Room name Ground (floor) Wall surface Ceiling Laboratory and corridor Slip resistant floor tile Fire-proof emulsion paint Fire-proof emulsion paint Toilet Slip resistant floor tile Ashlars brick PVC plate ceiling Distribution room Cement floor White wash White wash Part 2(Two) : The Structure This design of building structure is made according to KEBS standards but conforming to related BS standards applicable in the republic of Kenya. 1. Basis of Design 1.1 Load Code for the Design of Building Structures 1.2 Code for Design of Concrete Structures 1.3 Code for Design of Masonry Structures 1.4 Code for Seismic Design of Buildings 1.5 Code for Design of Building Foundation 1.6 Technical Code for Ground Treatment of Buildings 1.7 Code for Investigation of Geotechnical Engineering 1.8 Regulations to Compile the Documents of Architectural Engineering Design 2. Basic Conditions of Structure 2.1 The plan is to build three buildings: Unit A is a single floor building for Machnical laboratory; Unit B is a comprehesnsive laboratory building with 3 floors above ground; The above building adopts steel frame structure. Unit C is a single floor generator set building for which the structure adopts Brick-concrete structure constructed plus column, or reinforced concrete frame structure frame. 2.2 Foundation type: independent foundation 2.3 Service life of structure: 50 years 2.4 Safety level of structure: level 1. 2.5 Seismic intensity: 5-6 degree. The basic seismic acceleration value is 0.2. 2.6 Seismic category: B.
  • 6. 2-6 2.7 Foundation design level: A. Part 3(Three): Water Supply and Drainage (mechanical laboratory and Comprehensive laboratory building) 1.1 Water supply system: water is supplied directly by means of urban water supply pipeline network with putting the water tank on the roof for Increasing pressure on water supplies. The water supply pressure is no less than 0.2MPa. The water supply pipe material adopts steel plastic composite pipe. 1.2 Water drainage system: sewage water and waste water of this building are discharged together. The drainage vertical pipe adopts hard polyethylene inner spiral PVC-U pipe. The domestic drainage water is discharged into the municipal water drainage pipeline network through the central processing made by septic tank. 1.3 Rain water system: rain water is collected and drained through organized system. The rain water on the roof is discharged to the water gutter and then drained to water collecting tank( 60 m3), and after settling for greening buildings sanitary use. 1.4 Fire fighting system: The fire hydrant system is set for indoor rooms and fire hydrant box adopts local common practice of fire hose. The fire-fighting water source shall be provided uniformly by fire-fighting pump room inside the campus. Part 4(Four) : Ventilation and Insulation 1.1 The Machanical Laboratory 1.1.1 Ventilation: natural ventilation is adopted in the workshop and the toilet is provided with mechanical air exhausting (air exhausting fan). 1.1.2 Insulation: To place aluminum foil for the insulation to the under of roof tiles for the hot areas building. In addition, to put dormer windows(with hopper windows) on the sloping roof in order to increase ventilation in the roof layer to achieve the purpose of insulation. 1.2 Comprehensive Laboratory building: 1.2.1 Ventilation: natural ventilation is adopted in the room and the toilet is provided with mechanical air exhausting (air exhausting fan). Mechanical air exhausting is adopted in asphalt composite material laboratory practical training room, asphalt laboratory practical training room and microorganism and parasite inspection technology room. The fan is arranged on the ceiling. 1.2.2 Insulation: To place aluminum foil for insulation to the under of roof tiles for the hot areas building. In addition, to put dormer windows(with hopper windows) on the sloping roof in order to increase ventilation in the roof layer to achieve the purpose of insulation. 1.2.3 Smoke extraction. The mechanical smoke extraction system shall be arranged when the length of path exceeds 60m. The fan is arranged on the ceiling. Part 5(Five) : Electrical Specifications 1. design basis Technical conditons provided by the Owner and known locally in Kenya The local design standard and norms "Architectural design code for fire protection" "Building Lightning Protection Design Code" "Automatic fire alarm system design specification" "Power distribution system design specification" "Low-voltage power distribution system design specification" "Architectural Lighting Design Standards" "Electrical Design of civil norms" 2. design scope Low-voltage distribution systems and power distribution; standby generator sets; general
  • 7. 2-7 lighting and emergency lighting; Lightning Protection and grounding system; telephone communications and network systems; broadcast system; Fire Sprinkler, and Smoke systems. 2.1 Electricity transformation and distribution system: Load rating: The building is the ordinary multi-floor and single-floor building equipped with fire fighting electrical equipment, fire control center, network and communications equipment, accident and evacuation lighting. The sophisticated, important equipment is equipped with high load of power supply. The general distribution, lighting and general equipment are equipped with electric power load by ordinary load of power supply. Load Capacity This power of the building is supplied by the power transformation and distribution station of the Campus. Load capacity of Lighting electricity: The sophisticated, important Laboratory: 18W/M 2 , The ordinary Laboratory: 11W/M 2 ; Load capacity of Equipments: Mechanical Laboratory: 645.7KW; Electricial and electronics Laboratory: 169KW; Civil Engineering Laboraroty is : 243KW; Medical training laborotory: 16KW; Rapid prototyping Manufacturing Laboratory is about: 50KW; part of the equipments inside of the Laboratories is equipped with high load of power supply. Lighting Load: 68KW +30 KW = 98KW Estimated load: 1222KW Total installed capacity: 1600KVA. 2.2 emergency power supply system Diesel generator set is configurated as the emergency power supply for the Building, with a single generator room (C Building) which consists of one unit of 600KW generator set for the fire load and emergency load use. Part 6(Six) Power distribution and lighting 1. Low-voltage distribution voltage is 415V/240V volts using a combination of trunk-type and radial distribution type. The high load equipment such as fire fighting equipments adopts double-loop power distribution and terminal switch approach. The normal lighting adopts energy-saving fluorescent lighting. The main principle of illumination degree of the laboratories are as follows: Common laboratory 300Lx Precision Laboratory 500Lx Doors and Halls 100Lx Office 300Lx 2. Lighting Source: Adopting highly efficient fluorescent lamps, in order to improve the power factor and energy-saving, fluorescent lamp electronic ballasts are configured. 3. The general lighting and emergency lighting are configured. Exact Lighting will be based on different characteristics of various architectural space and configuration, and energy-saving fluorescent lamps and metal halide lamp etc will be installed for normal lighting, And in the important places and public place, the emergency lighting and evacuation instructions lighting will be configured.
  • 8. 2-8 Part 7(Seven): Lightning Potection and Gounding The building is with the second level lightning, and the grounding system adopts TN-S system. The joint grounding menthod is adopted and the grounding resistance requirement is less than 1 ohm. To prevent lightning electromagnetic pulse caused by over-current and over-voltage, the Surge Protection Device (SPD) is installed in the corresponding part. Part 8(eight): Control System 1. To meet the requirements of local norms and standards of fire fighting in Kenya, the building is equipped with automatic fire sprinkler system and smoke detectors system. 2. Power supply of fire fighting and lighting system Fire electrical equipment distribution adopts double-loop power supply with terminal switch approach and equipped with emergency lighting and evacuation instructions. Part 9(nine): Weak Electricity systems 1. Design scope: telephone systems, network system. Broadband network and telephone system 2. The building is equipped with broadband network and telephone systems. The local call and broadband network are put into from outside the building by the introduction of fiber optic cable, and then laying to the electronic equipment room by wearing pipe, The patch panel and other equipment will be set up in the equipment room. Part 10(TEN): Specification for Equipment equipment shpld be described in sufficient detail to enable the ordering from suppliers. The standard from is to describe the equipment technical details including a drawing / picture. 1. Specification for a Computer Item (NO.3) Computer & 19” Monitor Picture
  • 9. 2-9 1.1.1.Specification  OS : Vista home basic  CPU : Core2Quad Q9400  HDD : 250 GB  RAM : 2(DDR2) GB  CACHE MEMORY : 2 MB  ODD : Super-multi  GRAPIC : nVidia Geforce 7100  SOUND : High definition audio  KEYBOARD : PS/2  POWER : AC 220V  SIZE : 173×365×388mm(WHD)  SLOT : 2×PCI, PCI-E(16X) 1, PCI-E(1X) 1 2. Specification for Microphone Item (NO.9) Microphone Picture
  • 10. 3-10 2.1.1.Specification Features • Provides natural, full-range vocal reproduction • Silent on-off operation thanks to MagnaLock™ switch design • Hi-ENERGY® neodymium magnet for improved output and transient response • Two-stage ball-type screen reduces wind noise and “popping” during close use • Corrosion-resistant contacts from gold-plated XLRM-type connectors • Superior internal shock mounting reduces handling noise • Rugged design and construction for reliable performance • Cardioid polar pattern reduces pickup of sounds from the sides and rear, improving isolation of desired sound source SPECIFICATIONS • ELEMENT: Dynamic • POLAR PATTERN: Cardioid • FREQUENCY RESPONSE: 90-16,000 Hz • OPEN CIRCUIT SENSITIVITY: –55 dB (1.7 mV) re 1V at 1 Pa* • IMPEDANCE: 300 ohms • SWITCH: MagnaLock™ on/off • WEIGHT: (less cable and accessories) 10.7 oz (304 g) • DIMENSIONS: 7.28" (185.0 mm) long, 2.09" (53.1 mm) head diameter • OUTPUT CONNECTOR: Integral 3-pin XLRM-type • CABLE: 15.0' (4.5 m) cable with XLRF-type connector at microphone end, XLRM-type connector at equipment End 3. E-learing solution Item (No.20 ) e-learning solution : Authoring tool
  • 11. 3-11 Picture 3.1.1.Specification Editing tool to record all contents of lecture while writing on the screen with electronic board function and teacher’s lecturing voice and appearance simultaneously into one video 1. Electronic board function - Support pen, highlighter, eraser and magnifier - Support various kinds of colors and thickness - Open Power point file - Support viewing of all page lists and transferring to the designated page - Support detection of pen pressure sensitivity 2. Recording function - Automatic creation of the table of contents in the unit of lecture document page - Manual creation of the table of contents - Pause recording - Cancel recording and re-start recording - Support conversion to windows screen - Camera preview - Screen/camera/microphone setting - Manual creation of the table of contents during recording session - Reduce audio noise 3. Editing function - Edit video contents in the unit of table of contents (Drag & Drop mode) - Support timeline editing interface for manual indexing - Function to modify information on the table of contents - 2-stage (chapter/section) of hierarchical structure for table of contents - Trash bin function 4. Playback function - Display the table of contents - Change the location of screen/camera window - Full screen playback
  • 12. 5-12 4. Master table Item (No.23 ) Master Table : Made-to-order Picture 4.1.1.Specification • Material: Inside-Chipboard, Outside-HM film coated • Holes for connection • Size: 1800x750x750mm(WxDxH) 5. Student Desk Item (No.26 ) Student Desk : For 2 Users Picture 5.1.1.Specification • Material: Inside-Chipboard, Outside-HM film coated • Size: 1600x600x750mm(WxDxH)