1. 1
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
RESUME IMCA AIR DIVING SUPERVISOR
A) Personal Data
NAME : Sherif Mohamed Abdel Kader
Nationality : Egyptian
Date of Birth : 31/08/1978
Certificate : 7018
Email : shrief78mohamed@gmail.com
Mobile : 00201280729950 – 00201003454220
Seaman
Passport : 178780
Passport : A06918019
B) Education & Professional Affiliation
Education : Faculty of Commerce 2001
C)Training :
* Diver Certificate of Part I – Naval Forces .
* Commercial diver course class ΙΙ & III at
commercial diving school - South Africa .
* Chamber operator .
* Medical Emergency Basic Training .
* Fire Prevention Fighting .
* Personal Survival Techniques Search And Rescue.
* Trainee Offshore Air Diving Supervisor .
* IMCA Air Diving Supervisor .
* H2S – OPITO T-BOSIET
* Microsoft Word – Excel – Movie Maker
2. 2
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
D)Highlights of Experience
Working as Trainee Air Diving Supervisor since
2010 with (EBGDCO LPG - Petrobel – Valentine -
AlKhafji KJO – GUPCO- suco ) .
Working as IMCA Supervisor With ( Maridive off
shore projects - GPC – SUCO – EBGDCO bahraneia –
Petrobel )
E)List of Project Reference
** PETROBEL - Diving supervisor offshore on board MD
232 DSV ( DP 2 ) 2015 – portsaid until now
- Scope of work included
- Installed 20 bledco and 5 smith clamps at location gas p/l 12”
- Water jet
- Air left
- Sand plast
- U.T
- V.R
** PETROBEL - Diving supervisor offshore on board MD
232 DSV ( DP 2 ) 2015 – Red sea
- Scope of work included
- INSTALLED LEG & PRESS & VDM CLAMP ANODES
- SAND BLAST
- WOTER JET
- Remve WTER INJECTION RISER BY NEW ONE 26”
- SPLASH INTER ZONE 101 COATING
- GVI FOR P / FORMS
- C.P
- U.T
- MPI
- V.R
3. 3
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
** SUCO - supervisor offshore on board barge MD 300 Red SEA
2015
- Scope of work included
- Sea bed survey
- Maintenance for Gas P/L
- Cleaning at locations
- Installing clamps
** Petrobel - supervisor offshore on board maridive 87 port
Said 2014 - 2015
- Scope of work included
- Maintenance for platforms & Gas P / L
- Install Clamps on the P / L
- Remove concrete on location using disk and hand tools
- Using air left & sand blast
** SUCO - supervisor on shore tender No – op/02/2015
- Repair P/L 8” oil injection splash zone area .
- Scope of work included :-
- Visual Inspection
- Remove old wrapping
- Cleaning using sand blaster
- Installing pvc mesh
- Applying inter zone 101 coating
** SUCO - supervisor on board barge . 2013 –
2014 – contract NO – op/47/2011
- Scope of work included:-
- Installing concrete mattress
- Take measurements for 8 spool pieces and connect it with the p /
l
- Free Span Correction
- Until now
** supervisor working from offshore at EBGDCO LPG sea berth
# 4 bahraneia plem 2014 .
- Scope of work included:-
* GVI for flange hoses , anodes , plem with overview with marine
4. 4
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
Growth , hoses , bolts on clamps , leakage , corrosion .
* V recording
** SUCO - supervisor on board barge MD 300. 2013 –
2014 – contract NO – op/47/2011
- Scope of work included:-
* Laying for 3 new new pipelines from shore to platforms
* Install 3 spool pieces
* Bottom survey
* Install sand bags at free span location
* V / R
* Install 3 risers and riser clamps
* spools connection for risers and P / L
** GPC - supervisor on board barge MD 300 contract no
923. 2013
- Scope of work included:-
- Maintenance for platforms.
- remove cable
- laying new one
- Free Span Correction
** Trainee Diving Supervisor on board Barge ( valentine
company ) DLB-1600 working on HILAL-B jacket & deck
offshore installation Project – Installation of a new PL/F
Hilal-B to be located approximately 300 meters north to
damaged Hilal PL/F, Gulf of suez petroleum company
(GUPCO) (Contract NO.: GUP-EC-13-003), May 2012 -
November 2012 .
- Connect vent valves to the structure legs at the top side of
the jacket above the water level.
- Connect the flooding hoses to the structure legs at the top
side of the jacket.
- Open the flooding valves (4 Valves) installed on the platform
legs under the water level to make the jacket start
automatically sinking due to flooding.
- Boat landing installation on a stabbing guide from under
water side and by clamps & flanges from the top side above
the water line.
- Installation of six barge bumpers, the flange on the shock
cell of the barge bumper and on the jacket legs was
5. 5
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
installed-bolted and galvanized chain was run between the
past on the barge bumper and the jacket leg.
U/W Video Recording & Still Photos for the boat landing and
barge bumpers after installation
** Petrobel – Trainee supervisor on board M/D
Maridive 232 DP 2.Belayiem Oil Field – May
2012
- Scope of work included:-
* UT inspection for pipelines & risers.
* Maintenance for platforms.
* Boat landing installation.
* Splash zone coating.
* Marine growth removal.
* Underwater cutting.
* Visual inspection and video recording
** Al Khafji KJO Field – Trainee supervisor. on
board barge lan jiong – 2012.
- Scope of work included:-
* Install 2 P/F
* Survey after & before & V . recording
* Take measurement with C.P
** Al Khafji KJO Field – Trainee supervisor. on
board Maridive MD 43 during the project for
laying 8" marine power cables 2012.
- Scope of work included:-
* U/W survey for trenching of new marine power cable.
*Shifting the existing power cable using M/V MARIDIVE43.
*Putting sandbags and arrange it around the existing
power cable.
* Still photos and v. recording
** Al Khafji KJO Field – Trainee supervisor. on board
MD 32 – 2012 .
- Scope of work included :-
6. 6
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
* GVI for P/F & video recording
* Take measurement with C.P & U.T
* Installing anodes
* Remove riser 8" & install new one
** Petrobel Marine diving Services – Trainee
supervisor on board barge MD 300 Repair &
Maintenance pipe line 2011
- Scope of work included:-
* U/W survey for the pipe line & video recording
* Installing grouting bags at free span spaces
* Take measurement with C.P & U.T
Working as diver since 2006 WITH MARIDIVE OFF
SHORE PROJECTS COMPANY - GPC – SUCO – EBGDCO
bahraneia - Petrobel – Valentine - AlKhafji KJO –
GUPCO – lang yang ) .
- K.O.C. - Contract No 31225 . Maintenance for S.P.M
system 2006 .
- K.O.C. - Contract No. 25760 – Repair of 48" & 20"
Submarine Pipelines 2006 .
- K.O.C. 2007 Maintenance for offshore platform sea
island .
- Saudi Aramco –– Contract No. 6600015254 – on board
diving support vessel Enad for the project of free span
correction for pipelines at Saudi Aramco Oil 2007 .
- Petrobel – Contract No. CT 4600000930 – Marine diving
Services 2007 - General Maintenance for offshore
platforms .
- Petrobel – General Maintenance for offshore platforms
2008 .
7. 7
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
- Iran–Contract No. 3220-82-2FG - Kharg Island Gas
Gathering 2008 - 24” & 26 “ pipeline 72 km starting
from Kharg shore by beach pull in pre trenched corridor
to Aboozar field .
- Dubai – diver on board barge Ocean Mentinar - clamps
& Risers – 2008 .
- Al Khafji joint operation Co. KJO –Khafji Field – 2008
Diver on board the barge Maridive Offshore Base for 12
J-tube installation on platforms and clamps J-tube .
- Iranian Offshore Oil Co. IOOC – Abu Zar and Nourooz
oil field –2009 Diver on board M/v.Maridive VI for
jacket face survey for AA & A9 platform , Sea bed
survey and dim.check for the existing 24" riser.
Install 12 Nos. of repair clamps for the 18" main oil line
from Nowrooz oil field to Bahregan District – North part
of the perisian gulf.
- INDIA Reliance Jamnagar Export Refinery Project CONT.
(25194-MLD-HC3-LL0L01) 2010 - S.P.M system
installation from NRPE to Plem (including Tie-in to PLEM’s
of SPM #3 and riser at NRP E - Testing and
precommissioning - Installation of 2 Nos. 48” pipelines -
Installation of PLEM.
- North Sanai Petroleum Company (NOSPOCO) –
Port Said - 2010 M/V Maridive 300 Installation of
the anti-trawler and guard cage for mechanical
connector .
- Egyptian liquefied natural gas (ELNG) – 2010.
Inspection Offshore faculties M/V Maridive 94 - Marine
growth survey and removal - Sea bed survey - General
/ Close visual inspection - Wall thickness measurements
- Anode inspection and measurements .
- INDIA – Mumbai – diver on board barge Ocean
Mentinar Installation Clamps Riser guard 2011 .
8. 8
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
- General petroleum company (GPC) Subcontractor
for laying cables FOA No.CFT/244/2011/PM Diver
on board Geebo El-Emlak - Cable laying .
- INDIA – Mondra - Installation of SPM system &
associated marine pipe line – C0904.– 2011 - barge
Regina 250 for Installation of SPM system and
Associated Marine pipeline 48 " - Installation PLEM .
- Abourdies pier Inspection of M/V Gulf Fleet No. 54 -
2011 - M/V Maridive 4 Maintenance .
- Agiba MPA platform Inspection and repairing 4.5' Oil
Pipeline accident contract #:208/2011 - El-Emlak barge -
riser and pipeline survey - Cutting and removing the
damage section of oil riser and spool piece - Installing the
new section .
- Al Khafji KJO Field Maridive 43 during the project for
laying 8" marine power cable 2012 - U/W survey –
Laying 13 cables .
- Petrobel – Belayiem Oil Field –2013 - supervisor on
board M/V Maridive 232 DP 2.
- GPC - barge MD 300. 2013- Maintenance for platforms -
remove cables -laying new .
F)Brief Employment History
Name of Employer
Sherif Mohamed Abd Elkader
Position
IMCA AIR DIV. SUPERVISOR