SlideShare ist ein Scribd-Unternehmen logo
1 von 12
1
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
RESUME IMCA AIR DIVING SUPERVISOR
A) Personal Data
NAME : Sherif Mohamed Abdel Kader
Nationality : Egyptian
Date of Birth : 31/08/1978
Certificate : 7018
Email : shrief78mohamed@gmail.com
Mobile : 00201280729950 – 00201003454220
Seaman
Passport : 178780
Passport : A06918019
B) Education & Professional Affiliation
Education : Faculty of Commerce 2001
C)Training :
* Diver Certificate of Part I – Naval Forces .
* Commercial diver course class ΙΙ & III at
commercial diving school - South Africa .
* Chamber operator .
* Medical Emergency Basic Training .
* Fire Prevention Fighting .
* Personal Survival Techniques Search And Rescue.
* Trainee Offshore Air Diving Supervisor .
* IMCA Air Diving Supervisor .
* H2S – OPITO T-BOSIET
* Microsoft Word – Excel – Movie Maker
2
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
D)Highlights of Experience
 Working as Trainee Air Diving Supervisor since
2010 with (EBGDCO LPG - Petrobel – Valentine -
AlKhafji KJO – GUPCO- suco ) .
 Working as IMCA Supervisor With ( Maridive off
shore projects - GPC – SUCO – EBGDCO bahraneia –
Petrobel )
E)List of Project Reference
** PETROBEL - Diving supervisor offshore on board MD
232 DSV ( DP 2 ) 2015 – portsaid until now
- Scope of work included
- Installed 20 bledco and 5 smith clamps at location gas p/l 12”
- Water jet
- Air left
- Sand plast
- U.T
- V.R
** PETROBEL - Diving supervisor offshore on board MD
232 DSV ( DP 2 ) 2015 – Red sea
- Scope of work included
- INSTALLED LEG & PRESS & VDM CLAMP ANODES
- SAND BLAST
- WOTER JET
- Remve WTER INJECTION RISER BY NEW ONE 26”
- SPLASH INTER ZONE 101 COATING
- GVI FOR P / FORMS
- C.P
- U.T
- MPI
- V.R
3
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
** SUCO - supervisor offshore on board barge MD 300 Red SEA
2015
- Scope of work included
- Sea bed survey
- Maintenance for Gas P/L
- Cleaning at locations
- Installing clamps
** Petrobel - supervisor offshore on board maridive 87 port
Said 2014 - 2015
- Scope of work included
- Maintenance for platforms & Gas P / L
- Install Clamps on the P / L
- Remove concrete on location using disk and hand tools
- Using air left & sand blast
** SUCO - supervisor on shore tender No – op/02/2015
- Repair P/L 8” oil injection splash zone area .
- Scope of work included :-
- Visual Inspection
- Remove old wrapping
- Cleaning using sand blaster
- Installing pvc mesh
- Applying inter zone 101 coating
** SUCO - supervisor on board barge . 2013 –
2014 – contract NO – op/47/2011
- Scope of work included:-
- Installing concrete mattress
- Take measurements for 8 spool pieces and connect it with the p /
l
- Free Span Correction
- Until now
** supervisor working from offshore at EBGDCO LPG sea berth
# 4 bahraneia plem 2014 .
- Scope of work included:-
* GVI for flange hoses , anodes , plem with overview with marine
4
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
Growth , hoses , bolts on clamps , leakage , corrosion .
* V recording
** SUCO - supervisor on board barge MD 300. 2013 –
2014 – contract NO – op/47/2011
- Scope of work included:-
* Laying for 3 new new pipelines from shore to platforms
* Install 3 spool pieces
* Bottom survey
* Install sand bags at free span location
* V / R
* Install 3 risers and riser clamps
* spools connection for risers and P / L
** GPC - supervisor on board barge MD 300 contract no
923. 2013
- Scope of work included:-
- Maintenance for platforms.
- remove cable
- laying new one
- Free Span Correction
** Trainee Diving Supervisor on board Barge ( valentine
company ) DLB-1600 working on HILAL-B jacket & deck
offshore installation Project – Installation of a new PL/F
Hilal-B to be located approximately 300 meters north to
damaged Hilal PL/F, Gulf of suez petroleum company
(GUPCO) (Contract NO.: GUP-EC-13-003), May 2012 -
November 2012 .
- Connect vent valves to the structure legs at the top side of
the jacket above the water level.
- Connect the flooding hoses to the structure legs at the top
side of the jacket.
- Open the flooding valves (4 Valves) installed on the platform
legs under the water level to make the jacket start
automatically sinking due to flooding.
- Boat landing installation on a stabbing guide from under
water side and by clamps & flanges from the top side above
the water line.
- Installation of six barge bumpers, the flange on the shock
cell of the barge bumper and on the jacket legs was
5
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
installed-bolted and galvanized chain was run between the
past on the barge bumper and the jacket leg.
U/W Video Recording & Still Photos for the boat landing and
barge bumpers after installation
** Petrobel – Trainee supervisor on board M/D
Maridive 232 DP 2.Belayiem Oil Field – May
2012
- Scope of work included:-
* UT inspection for pipelines & risers.
* Maintenance for platforms.
* Boat landing installation.
* Splash zone coating.
* Marine growth removal.
* Underwater cutting.
* Visual inspection and video recording
** Al Khafji KJO Field – Trainee supervisor. on
board barge lan jiong – 2012.
- Scope of work included:-
* Install 2 P/F
* Survey after & before & V . recording
* Take measurement with C.P
** Al Khafji KJO Field – Trainee supervisor. on
board Maridive MD 43 during the project for
laying 8" marine power cables 2012.
- Scope of work included:-
* U/W survey for trenching of new marine power cable.
*Shifting the existing power cable using M/V MARIDIVE43.
*Putting sandbags and arrange it around the existing
power cable.
* Still photos and v. recording
** Al Khafji KJO Field – Trainee supervisor. on board
MD 32 – 2012 .
- Scope of work included :-
6
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
* GVI for P/F & video recording
* Take measurement with C.P & U.T
* Installing anodes
* Remove riser 8" & install new one
** Petrobel Marine diving Services – Trainee
supervisor on board barge MD 300 Repair &
Maintenance pipe line 2011
- Scope of work included:-
* U/W survey for the pipe line & video recording
* Installing grouting bags at free span spaces
* Take measurement with C.P & U.T
 Working as diver since 2006 WITH MARIDIVE OFF
SHORE PROJECTS COMPANY - GPC – SUCO – EBGDCO
bahraneia - Petrobel – Valentine - AlKhafji KJO –
GUPCO – lang yang ) .
- K.O.C. - Contract No 31225 . Maintenance for S.P.M
system 2006 .
- K.O.C. - Contract No. 25760 – Repair of 48" & 20"
Submarine Pipelines 2006 .
- K.O.C. 2007 Maintenance for offshore platform sea
island .
- Saudi Aramco –– Contract No. 6600015254 – on board
diving support vessel Enad for the project of free span
correction for pipelines at Saudi Aramco Oil 2007 .
- Petrobel – Contract No. CT 4600000930 – Marine diving
Services 2007 - General Maintenance for offshore
platforms .
- Petrobel – General Maintenance for offshore platforms
2008 .
7
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
- Iran–Contract No. 3220-82-2FG - Kharg Island Gas
Gathering 2008 - 24” & 26 “ pipeline 72 km starting
from Kharg shore by beach pull in pre trenched corridor
to Aboozar field .
- Dubai – diver on board barge Ocean Mentinar - clamps
& Risers – 2008 .
- Al Khafji joint operation Co. KJO –Khafji Field – 2008
Diver on board the barge Maridive Offshore Base for 12
J-tube installation on platforms and clamps J-tube .
- Iranian Offshore Oil Co. IOOC – Abu Zar and Nourooz
oil field –2009 Diver on board M/v.Maridive VI for
jacket face survey for AA & A9 platform , Sea bed
survey and dim.check for the existing 24" riser.
Install 12 Nos. of repair clamps for the 18" main oil line
from Nowrooz oil field to Bahregan District – North part
of the perisian gulf.
- INDIA Reliance Jamnagar Export Refinery Project CONT.
(25194-MLD-HC3-LL0L01) 2010 - S.P.M system
installation from NRPE to Plem (including Tie-in to PLEM’s
of SPM #3 and riser at NRP E - Testing and
precommissioning - Installation of 2 Nos. 48” pipelines -
Installation of PLEM.
- North Sanai Petroleum Company (NOSPOCO) –
Port Said - 2010 M/V Maridive 300 Installation of
the anti-trawler and guard cage for mechanical
connector .
- Egyptian liquefied natural gas (ELNG) – 2010.
Inspection Offshore faculties M/V Maridive 94 - Marine
growth survey and removal - Sea bed survey - General
/ Close visual inspection - Wall thickness measurements
- Anode inspection and measurements .
- INDIA – Mumbai – diver on board barge Ocean
Mentinar Installation Clamps Riser guard 2011 .
8
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
- General petroleum company (GPC) Subcontractor
for laying cables FOA No.CFT/244/2011/PM Diver
on board Geebo El-Emlak - Cable laying .
- INDIA – Mondra - Installation of SPM system &
associated marine pipe line – C0904.– 2011 - barge
Regina 250 for Installation of SPM system and
Associated Marine pipeline 48 " - Installation PLEM .
- Abourdies pier Inspection of M/V Gulf Fleet No. 54 -
2011 - M/V Maridive 4 Maintenance .
- Agiba MPA platform Inspection and repairing 4.5' Oil
Pipeline accident contract #:208/2011 - El-Emlak barge -
riser and pipeline survey - Cutting and removing the
damage section of oil riser and spool piece - Installing the
new section .
- Al Khafji KJO Field Maridive 43 during the project for
laying 8" marine power cable 2012 - U/W survey –
Laying 13 cables .
- Petrobel – Belayiem Oil Field –2013 - supervisor on
board M/V Maridive 232 DP 2.
- GPC - barge MD 300. 2013- Maintenance for platforms -
remove cables -laying new .
F)Brief Employment History
Name of Employer
Sherif Mohamed Abd Elkader
Position
IMCA AIR DIV. SUPERVISOR
9
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
10
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
11
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER
12
IMCA AIR DIVING SUPERVISOR
SHRIEF MOHAMED ABDELKADER

Weitere ähnliche Inhalte

Was ist angesagt?

MOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMINMOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMINHafizi Amin
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspectorWael Mahmoud alkilany
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
 
Barry Colin CV @ Resume
Barry Colin CV @ ResumeBarry Colin CV @ Resume
Barry Colin CV @ ResumeBarry Colin
 
NEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI MNEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI MAndi Muliyadi
 
Vipin V Nair(CV)-Asst Driller
Vipin V Nair(CV)-Asst DrillerVipin V Nair(CV)-Asst Driller
Vipin V Nair(CV)-Asst DrillerVIPIN V NAIR
 

Was ist angesagt? (11)

MOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMINMOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMIN
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
Barry Colin CV @ Resume
Barry Colin CV @ ResumeBarry Colin CV @ Resume
Barry Colin CV @ Resume
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Sanoop CV 2016
Sanoop CV 2016Sanoop CV 2016
Sanoop CV 2016
 
NEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI MNEW CURRICULUM VITAE ANDI M
NEW CURRICULUM VITAE ANDI M
 
Vipin V Nair(CV)-Asst Driller
Vipin V Nair(CV)-Asst DrillerVipin V Nair(CV)-Asst Driller
Vipin V Nair(CV)-Asst Driller
 
RESUME-3
RESUME-3RESUME-3
RESUME-3
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 

Ähnlich wie RESUME IMCA AIR DIVING SUPERVISOR

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 
Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
SOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanSOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanJan Homan
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016SON LO XUAN
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016siam sayed
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eandreastzortzis
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymohamed saad
 
C.V- 2015 Last
C.V- 2015 LastC.V- 2015 Last
C.V- 2015 LastAli Saleh
 
William Ho Resume Wizar1
William Ho Resume Wizar1William Ho Resume Wizar1
William Ho Resume Wizar1William Ho
 

Ähnlich wie RESUME IMCA AIR DIVING SUPERVISOR (20)

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
Keith Youngs Resume 2015
Keith Youngs Resume 2015Keith Youngs Resume 2015
Keith Youngs Resume 2015
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
Rogers cv feb 2016
Rogers cv feb 2016Rogers cv feb 2016
Rogers cv feb 2016
 
SOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanSOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan Homan
 
KHALED_cv_V1_2015
KHALED_cv_V1_2015KHALED_cv_V1_2015
KHALED_cv_V1_2015
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
New CV Amended
New CV Amended New CV Amended
New CV Amended
 
Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.e
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copy
 
C.V- 2015 Last
C.V- 2015 LastC.V- 2015 Last
C.V- 2015 Last
 
William Ho Resume Wizar1
William Ho Resume Wizar1William Ho Resume Wizar1
William Ho Resume Wizar1
 
CV OT
CV OTCV OT
CV OT
 
OT Resume
OT ResumeOT Resume
OT Resume
 

RESUME IMCA AIR DIVING SUPERVISOR

  • 1. 1 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER RESUME IMCA AIR DIVING SUPERVISOR A) Personal Data NAME : Sherif Mohamed Abdel Kader Nationality : Egyptian Date of Birth : 31/08/1978 Certificate : 7018 Email : shrief78mohamed@gmail.com Mobile : 00201280729950 – 00201003454220 Seaman Passport : 178780 Passport : A06918019 B) Education & Professional Affiliation Education : Faculty of Commerce 2001 C)Training : * Diver Certificate of Part I – Naval Forces . * Commercial diver course class ΙΙ & III at commercial diving school - South Africa . * Chamber operator . * Medical Emergency Basic Training . * Fire Prevention Fighting . * Personal Survival Techniques Search And Rescue. * Trainee Offshore Air Diving Supervisor . * IMCA Air Diving Supervisor . * H2S – OPITO T-BOSIET * Microsoft Word – Excel – Movie Maker
  • 2. 2 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER D)Highlights of Experience  Working as Trainee Air Diving Supervisor since 2010 with (EBGDCO LPG - Petrobel – Valentine - AlKhafji KJO – GUPCO- suco ) .  Working as IMCA Supervisor With ( Maridive off shore projects - GPC – SUCO – EBGDCO bahraneia – Petrobel ) E)List of Project Reference ** PETROBEL - Diving supervisor offshore on board MD 232 DSV ( DP 2 ) 2015 – portsaid until now - Scope of work included - Installed 20 bledco and 5 smith clamps at location gas p/l 12” - Water jet - Air left - Sand plast - U.T - V.R ** PETROBEL - Diving supervisor offshore on board MD 232 DSV ( DP 2 ) 2015 – Red sea - Scope of work included - INSTALLED LEG & PRESS & VDM CLAMP ANODES - SAND BLAST - WOTER JET - Remve WTER INJECTION RISER BY NEW ONE 26” - SPLASH INTER ZONE 101 COATING - GVI FOR P / FORMS - C.P - U.T - MPI - V.R
  • 3. 3 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER ** SUCO - supervisor offshore on board barge MD 300 Red SEA 2015 - Scope of work included - Sea bed survey - Maintenance for Gas P/L - Cleaning at locations - Installing clamps ** Petrobel - supervisor offshore on board maridive 87 port Said 2014 - 2015 - Scope of work included - Maintenance for platforms & Gas P / L - Install Clamps on the P / L - Remove concrete on location using disk and hand tools - Using air left & sand blast ** SUCO - supervisor on shore tender No – op/02/2015 - Repair P/L 8” oil injection splash zone area . - Scope of work included :- - Visual Inspection - Remove old wrapping - Cleaning using sand blaster - Installing pvc mesh - Applying inter zone 101 coating ** SUCO - supervisor on board barge . 2013 – 2014 – contract NO – op/47/2011 - Scope of work included:- - Installing concrete mattress - Take measurements for 8 spool pieces and connect it with the p / l - Free Span Correction - Until now ** supervisor working from offshore at EBGDCO LPG sea berth # 4 bahraneia plem 2014 . - Scope of work included:- * GVI for flange hoses , anodes , plem with overview with marine
  • 4. 4 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER Growth , hoses , bolts on clamps , leakage , corrosion . * V recording ** SUCO - supervisor on board barge MD 300. 2013 – 2014 – contract NO – op/47/2011 - Scope of work included:- * Laying for 3 new new pipelines from shore to platforms * Install 3 spool pieces * Bottom survey * Install sand bags at free span location * V / R * Install 3 risers and riser clamps * spools connection for risers and P / L ** GPC - supervisor on board barge MD 300 contract no 923. 2013 - Scope of work included:- - Maintenance for platforms. - remove cable - laying new one - Free Span Correction ** Trainee Diving Supervisor on board Barge ( valentine company ) DLB-1600 working on HILAL-B jacket & deck offshore installation Project – Installation of a new PL/F Hilal-B to be located approximately 300 meters north to damaged Hilal PL/F, Gulf of suez petroleum company (GUPCO) (Contract NO.: GUP-EC-13-003), May 2012 - November 2012 . - Connect vent valves to the structure legs at the top side of the jacket above the water level. - Connect the flooding hoses to the structure legs at the top side of the jacket. - Open the flooding valves (4 Valves) installed on the platform legs under the water level to make the jacket start automatically sinking due to flooding. - Boat landing installation on a stabbing guide from under water side and by clamps & flanges from the top side above the water line. - Installation of six barge bumpers, the flange on the shock cell of the barge bumper and on the jacket legs was
  • 5. 5 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER installed-bolted and galvanized chain was run between the past on the barge bumper and the jacket leg. U/W Video Recording & Still Photos for the boat landing and barge bumpers after installation ** Petrobel – Trainee supervisor on board M/D Maridive 232 DP 2.Belayiem Oil Field – May 2012 - Scope of work included:- * UT inspection for pipelines & risers. * Maintenance for platforms. * Boat landing installation. * Splash zone coating. * Marine growth removal. * Underwater cutting. * Visual inspection and video recording ** Al Khafji KJO Field – Trainee supervisor. on board barge lan jiong – 2012. - Scope of work included:- * Install 2 P/F * Survey after & before & V . recording * Take measurement with C.P ** Al Khafji KJO Field – Trainee supervisor. on board Maridive MD 43 during the project for laying 8" marine power cables 2012. - Scope of work included:- * U/W survey for trenching of new marine power cable. *Shifting the existing power cable using M/V MARIDIVE43. *Putting sandbags and arrange it around the existing power cable. * Still photos and v. recording ** Al Khafji KJO Field – Trainee supervisor. on board MD 32 – 2012 . - Scope of work included :-
  • 6. 6 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER * GVI for P/F & video recording * Take measurement with C.P & U.T * Installing anodes * Remove riser 8" & install new one ** Petrobel Marine diving Services – Trainee supervisor on board barge MD 300 Repair & Maintenance pipe line 2011 - Scope of work included:- * U/W survey for the pipe line & video recording * Installing grouting bags at free span spaces * Take measurement with C.P & U.T  Working as diver since 2006 WITH MARIDIVE OFF SHORE PROJECTS COMPANY - GPC – SUCO – EBGDCO bahraneia - Petrobel – Valentine - AlKhafji KJO – GUPCO – lang yang ) . - K.O.C. - Contract No 31225 . Maintenance for S.P.M system 2006 . - K.O.C. - Contract No. 25760 – Repair of 48" & 20" Submarine Pipelines 2006 . - K.O.C. 2007 Maintenance for offshore platform sea island . - Saudi Aramco –– Contract No. 6600015254 – on board diving support vessel Enad for the project of free span correction for pipelines at Saudi Aramco Oil 2007 . - Petrobel – Contract No. CT 4600000930 – Marine diving Services 2007 - General Maintenance for offshore platforms . - Petrobel – General Maintenance for offshore platforms 2008 .
  • 7. 7 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER - Iran–Contract No. 3220-82-2FG - Kharg Island Gas Gathering 2008 - 24” & 26 “ pipeline 72 km starting from Kharg shore by beach pull in pre trenched corridor to Aboozar field . - Dubai – diver on board barge Ocean Mentinar - clamps & Risers – 2008 . - Al Khafji joint operation Co. KJO –Khafji Field – 2008 Diver on board the barge Maridive Offshore Base for 12 J-tube installation on platforms and clamps J-tube . - Iranian Offshore Oil Co. IOOC – Abu Zar and Nourooz oil field –2009 Diver on board M/v.Maridive VI for jacket face survey for AA & A9 platform , Sea bed survey and dim.check for the existing 24" riser. Install 12 Nos. of repair clamps for the 18" main oil line from Nowrooz oil field to Bahregan District – North part of the perisian gulf. - INDIA Reliance Jamnagar Export Refinery Project CONT. (25194-MLD-HC3-LL0L01) 2010 - S.P.M system installation from NRPE to Plem (including Tie-in to PLEM’s of SPM #3 and riser at NRP E - Testing and precommissioning - Installation of 2 Nos. 48” pipelines - Installation of PLEM. - North Sanai Petroleum Company (NOSPOCO) – Port Said - 2010 M/V Maridive 300 Installation of the anti-trawler and guard cage for mechanical connector . - Egyptian liquefied natural gas (ELNG) – 2010. Inspection Offshore faculties M/V Maridive 94 - Marine growth survey and removal - Sea bed survey - General / Close visual inspection - Wall thickness measurements - Anode inspection and measurements . - INDIA – Mumbai – diver on board barge Ocean Mentinar Installation Clamps Riser guard 2011 .
  • 8. 8 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER - General petroleum company (GPC) Subcontractor for laying cables FOA No.CFT/244/2011/PM Diver on board Geebo El-Emlak - Cable laying . - INDIA – Mondra - Installation of SPM system & associated marine pipe line – C0904.– 2011 - barge Regina 250 for Installation of SPM system and Associated Marine pipeline 48 " - Installation PLEM . - Abourdies pier Inspection of M/V Gulf Fleet No. 54 - 2011 - M/V Maridive 4 Maintenance . - Agiba MPA platform Inspection and repairing 4.5' Oil Pipeline accident contract #:208/2011 - El-Emlak barge - riser and pipeline survey - Cutting and removing the damage section of oil riser and spool piece - Installing the new section . - Al Khafji KJO Field Maridive 43 during the project for laying 8" marine power cable 2012 - U/W survey – Laying 13 cables . - Petrobel – Belayiem Oil Field –2013 - supervisor on board M/V Maridive 232 DP 2. - GPC - barge MD 300. 2013- Maintenance for platforms - remove cables -laying new . F)Brief Employment History Name of Employer Sherif Mohamed Abd Elkader Position IMCA AIR DIV. SUPERVISOR
  • 9. 9 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER
  • 10. 10 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER
  • 11. 11 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER
  • 12. 12 IMCA AIR DIVING SUPERVISOR SHRIEF MOHAMED ABDELKADER