Building Information
Modeling (B.I.M.)
Building Information Services
SEC Courtyard
• BIM knows what a wall is, what it is made out of, what color it is, how big it is and where it
is. All of the intelligent parameters of a BIM model can be defined by the owner. Things
like model, size and color are just a few examples.
• With BIM, we no longer think in a horizontal environment, we begin thinking vertically.
In our current space management process, we can track space and space types in
AutoCAD, but with Revit, we can track and define every existing condition within a
building.
• With BIM, our drawings are more than flat lines, they become a virtual building.
• The BIM can quickly track and report the space, occupancy, department, occupant, area
and volume. Within BIM, our drawings and spreadsheets are one. The cross walk of data
from one program to the other no longer needed. If data within the drawing changes, the
spreadsheet within the BIM is updated instantly.
B.I.M. is more than just 3D design, it’s intelligent!
Bryant-Denny Stadium – in development
Smart Drawings
Once the BIM is created, there is virtually nothing that can’t be viewed or stored within the drawings.
No more going to the plan room to find information, things can be viewed in a virtual, real time
environment, from anywhere at any time. Links can be placed within the drawing to take you directly
to information provided in the building repository.
• View elevations and change vantage points on the fly
• View sections and change cut planes on the fly
• Shade and color fill rooms instantly, by room or department, complete with legends
• Generate walkthroughs for any area in the building as needed
• View current real time schedules
• 3D renderings from any vantage point, both inside and outside the building
Adams Hall - completed
B.I.M. for
Space/Facilities Management
• Archival and Retrieval of Material & Vendor Data
• Material or Equipment Inventories
• Space and Asset Management
• Building Security
• Emergency Preparedness & Evacuation Plans
• Energy Analysis
• Renovation Planning, Design, Construction
• Maintenance & Replacement Scheduling
• Life Cycle Analysis
At this point we have incorporated mostly room/space data in to our models. We will continue to add
data to our models as needed. Our models are a living virtual building and will be modified as changes
are made to the buildings.
Ferguson Center - completed
The following slides are samples of our B.I.M. files and this will be available on Estus for use
throughout campus.
By using a cut away floor plan (like the building below) we are able to more accurately
show building features that can benefit UAPD, EHS and improve wayfinding within a
building.
Numbe
r Name Level FICM Capacity Occupancy Area College Department Org. Name Org. Number HazardousMaterials
1301 Research Laboratory Level 1 250 - Research/Non Class Lab. 597.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1302 Research Service Level 1 255 - Research/Non Class Lab. Service 152.13 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1303 Research Laboratory Level 1 250 - Research/Non Class Lab. 899.05 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1304 Research Service Level 1 255 - Research/Non Class Lab. Service 150.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1305 Office Level 1 310 - Office 620.20 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1306 Research Laboratory Level 1 250 - Research/Non Class Lab. 887.59 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials
1307 Research Laboratory Level 1 250 - Research/Non Class Lab. 104.46 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1308 Research Laboratory Level 1 250 - Research/Non Class Lab. 97.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1309 Research Laboratory Level 1 250 - Research/Non Class Lab. 99.63 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1310 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.33 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1311 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.87 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1312 Research Laboratory Level 1 250 - Research/Non Class Lab. 117.79 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1313 Research Service Level 1 255 - Research/Non Class Lab. Service 137.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1314 Office Level 1 310 - Office 171.54 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1315 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1316 Office Level 1 310 - Office 169.56 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1317 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
1318 Office Level 1 310 - Office 166.57 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411
Below is a sample of the spreadsheet that is generated from our BIM model. The difference
between our BIM spreadsheet and normal space data sheets is that ours is directly linked to
our BIM model and changes as the drawing changes, therefore eliminating the crosswalk
between two different programs.
The amount of data that we can track within our model is limitless. We can also create links
within our data to link to Estus documents (such as warranty information, specifications
etc).
These are two aerial views of the SEC area of campus
showing Shelby Hall, SEC, SERC, HM Comer and Bevill.
As we complete buildings, we will have the ability to
view existing conditions of any zone on campus.
Who will benefit from the use of BIM?
• Construction and Planning
• Facilities Administration
• Building Information Services
• Furnishings and Design
• Public Safety
• University Planning
• EHS
• Athletics
• Housing
• Logistics and Support Services
• Academic Affairs
We are developing the most critical buildings first, in the same manner we did when developing the CAD floor plans in 2008.
BIS anticipates having all buildings located on the main campus modeled by early 2014.
Ridgecrest South Entry

Weitere ähnliche Inhalte

Ähnlich wie Building-Information-Modeling.ppt

Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningRICHBUTKUS
 
An Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyAn Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyRita Yi Man Li
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practicesEwa Ostrowska
 
lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017Dale Ritchie
 
Digital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionDigital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionRemedy Geotechnics Ltd
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptxshaik saifulla
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014Graham H Stewart
 
Doing more with less
Doing more with lessDoing more with less
Doing more with lessmnico
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424Anshad cp
 
Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenNiels van de Ven
 
Research Sruti
Research SrutiResearch Sruti
Research Srutisrutin
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REVPaula Davison
 

Ähnlich wie Building-Information-Modeling.ppt (20)

Bimarabia6en
Bimarabia6enBimarabia6en
Bimarabia6en
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
An Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction SafetyAn Economic Analysis on Automated Construction Safety
An Economic Analysis on Automated Construction Safety
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices20150915CPD EOA BIM for small practices
20150915CPD EOA BIM for small practices
 
lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017lifecycle-bim-gis-user-group-april-2017
lifecycle-bim-gis-user-group-april-2017
 
Building information modeling services new zealand
Building information modeling services new zealand  Building information modeling services new zealand
Building information modeling services new zealand
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Bi marabia7en
Bi marabia7enBi marabia7en
Bi marabia7en
 
Digital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & constructionDigital data & its use in geotechnical design & construction
Digital data & its use in geotechnical design & construction
 
Bim overview
Bim overviewBim overview
Bim overview
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Doing more with less
Doing more with lessDoing more with less
Doing more with less
 
BIM and the Lighting Industry
 BIM and the Lighting Industry BIM and the Lighting Industry
BIM and the Lighting Industry
 
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 16120111142420161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
20161111whatisbimwhatareitsbenefitstotheconstructionindustry 161201111424
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de Ven
 
Research Sruti
Research SrutiResearch Sruti
Research Sruti
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV
 

Kürzlich hochgeladen

Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 

Kürzlich hochgeladen (20)

Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 

Building-Information-Modeling.ppt

  • 1. Building Information Modeling (B.I.M.) Building Information Services SEC Courtyard
  • 2. • BIM knows what a wall is, what it is made out of, what color it is, how big it is and where it is. All of the intelligent parameters of a BIM model can be defined by the owner. Things like model, size and color are just a few examples. • With BIM, we no longer think in a horizontal environment, we begin thinking vertically. In our current space management process, we can track space and space types in AutoCAD, but with Revit, we can track and define every existing condition within a building. • With BIM, our drawings are more than flat lines, they become a virtual building. • The BIM can quickly track and report the space, occupancy, department, occupant, area and volume. Within BIM, our drawings and spreadsheets are one. The cross walk of data from one program to the other no longer needed. If data within the drawing changes, the spreadsheet within the BIM is updated instantly. B.I.M. is more than just 3D design, it’s intelligent! Bryant-Denny Stadium – in development
  • 3. Smart Drawings Once the BIM is created, there is virtually nothing that can’t be viewed or stored within the drawings. No more going to the plan room to find information, things can be viewed in a virtual, real time environment, from anywhere at any time. Links can be placed within the drawing to take you directly to information provided in the building repository. • View elevations and change vantage points on the fly • View sections and change cut planes on the fly • Shade and color fill rooms instantly, by room or department, complete with legends • Generate walkthroughs for any area in the building as needed • View current real time schedules • 3D renderings from any vantage point, both inside and outside the building Adams Hall - completed
  • 4. B.I.M. for Space/Facilities Management • Archival and Retrieval of Material & Vendor Data • Material or Equipment Inventories • Space and Asset Management • Building Security • Emergency Preparedness & Evacuation Plans • Energy Analysis • Renovation Planning, Design, Construction • Maintenance & Replacement Scheduling • Life Cycle Analysis At this point we have incorporated mostly room/space data in to our models. We will continue to add data to our models as needed. Our models are a living virtual building and will be modified as changes are made to the buildings. Ferguson Center - completed
  • 5. The following slides are samples of our B.I.M. files and this will be available on Estus for use throughout campus.
  • 6.
  • 7.
  • 8.
  • 9. By using a cut away floor plan (like the building below) we are able to more accurately show building features that can benefit UAPD, EHS and improve wayfinding within a building.
  • 10. Numbe r Name Level FICM Capacity Occupancy Area College Department Org. Name Org. Number HazardousMaterials 1301 Research Laboratory Level 1 250 - Research/Non Class Lab. 597.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1302 Research Service Level 1 255 - Research/Non Class Lab. Service 152.13 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1303 Research Laboratory Level 1 250 - Research/Non Class Lab. 899.05 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1304 Research Service Level 1 255 - Research/Non Class Lab. Service 150.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1305 Office Level 1 310 - Office 620.20 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1306 Research Laboratory Level 1 250 - Research/Non Class Lab. 887.59 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Contains Hazardous Materials 1307 Research Laboratory Level 1 250 - Research/Non Class Lab. 104.46 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1308 Research Laboratory Level 1 250 - Research/Non Class Lab. 97.14 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1309 Research Laboratory Level 1 250 - Research/Non Class Lab. 99.63 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1310 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.33 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1311 Research Laboratory Level 1 250 - Research/Non Class Lab. 110.87 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1312 Research Laboratory Level 1 250 - Research/Non Class Lab. 117.79 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1313 Research Service Level 1 255 - Research/Non Class Lab. Service 137.72 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1314 Office Level 1 310 - Office 171.54 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1315 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1316 Office Level 1 310 - Office 169.56 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1317 Office Level 1 310 - Office 173.61 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 1318 Office Level 1 310 - Office 166.57 SF College of Arts and Sciences Natural Sciences BiologicalSciences 204411 Below is a sample of the spreadsheet that is generated from our BIM model. The difference between our BIM spreadsheet and normal space data sheets is that ours is directly linked to our BIM model and changes as the drawing changes, therefore eliminating the crosswalk between two different programs. The amount of data that we can track within our model is limitless. We can also create links within our data to link to Estus documents (such as warranty information, specifications etc).
  • 11. These are two aerial views of the SEC area of campus showing Shelby Hall, SEC, SERC, HM Comer and Bevill. As we complete buildings, we will have the ability to view existing conditions of any zone on campus.
  • 12. Who will benefit from the use of BIM? • Construction and Planning • Facilities Administration • Building Information Services • Furnishings and Design • Public Safety • University Planning • EHS • Athletics • Housing • Logistics and Support Services • Academic Affairs We are developing the most critical buildings first, in the same manner we did when developing the CAD floor plans in 2008. BIS anticipates having all buildings located on the main campus modeled by early 2014. Ridgecrest South Entry