SlideShare ist ein Scribd-Unternehmen logo
1 von 15
P R E P A R E D B Y
S H A H A D A T H O S S A I N S H A K I L
( U S A I D / B A N G L A D E S H ) ,
S . M . L A B I B
( D E P T . O F U R B A N A N D R E G I O N A L P L A N N I N G , B A N G L A D E S H U N I V E R S I T Y
O F E N G I N E E R I N G A N D T E C H N O L O G Y ) ,
M D . S H A K I L K H A N
( D E P T . O F U R B A N A N D R E G I O N A L P L A N N I N G , K H U L N A U N I V E R S I T Y O F
E N G I N E E R I N G A N D T E C H N O L O G Y , K H U L N A )
Stakeholder Debate in Policy Implementation:
An Evaluation of Bangladesh Leather
Processing Industry Relocation Policy
Annual Conference on Recent Research on Urbanization in Bangladesh 2015
The 43rd Anniversary of the Centre for Urban Studies (CUS), Dhaka
Introduction
• Hazaribagh tannery area has been ranked within
world’s top ten worst place for toxic threat
•This leather processing industry is surrounded by
some of the prestigious residential area of Dhaka
city
•Liquid effluent and solid waste eventually find its
way to Dhaka’s main river Buriganga and
destroying the aquatic life of the river
•This area has disastrous impact on surface and
ground water of the city and health of exposed
population
•This tannery has been a major polluter for Dhaka
city environment and ecology as well as the urban
structure
Bangladesh Leather Processing Industry Relocation
Policy
• In response to the criticisms from local
community, scientific group and international
and local environmental watchdogs, government
began to think about the relocation of this
industry from city center towards outskirts since
the 1991
•Tannery industry supposed to be relocated to
Savar (outskirt of Dhaka and more upstream)
for ensuring planned development through
establishment of Common Effluent Treatment
Plant (CETP) within a “Tannery Industry
Town”.
•Total 205 plot has been developed over 200
acres of land and distributed among 155
tanneries
Present
Proposed
Year Event
Pre-liberation
1940 Establishment of first tannery
Post-liberation
1972 Government formed Bangladesh Tanneries Corporation (BTC)
1982 Failing to make profit, government transferred the ownership to private body
1986 Government ordered 903 polluting factories (including the Hazaribagh tanneries) to adopt measures to control their
pollution within three years
1991 The question of relocation began to be discussed among policy makers
1993 It was decided that tanneries will shift to Savar
2001 High Court of Bangladesh ordered polluting factories (including the Hazaribagh tanneries) to adopt adequate measures
to control pollution within one year
2002 Relocation policy announced by that time prime minister of Bangladesh Nationalist Party (BNP)
2003
(Oct, 23rd)
- Government and tannery owners signed an agreement
- Government (BNP) pledged to provide financial assistance of 40%
- “Tannery Industry Town-Savar, Dhaka” Project was initiated to be completed by December, 2005
2005 The project was revised to be completed within May, 2009
2006
- Government allocated 205 plots.
- No firm participated in the first tender for CETP (Common Effluent Treatment Plant )
- Second tender for CETP, only one firm responded
2007 - Two firms responded to the third bid call,
2008 - all the tanneries shall shift within February, 2010
2009
- The government in that time (Bangladesh Awami League) said it would not bear the cost of CETP, the owners
will have to pay for it
- High Court ruled government to ensure relocation by February, 2010, “failing of which [they] shall be shut down”
2010 - The tender of CETP was floated for the fourth time
2012 Chinese joint venture JLEPCL-DCL was awarded the contract of CETP
2013
- European Union (chief buyer of Bangladeshi leather exports) threatened to boycott the country's products
- Government targeted to complete the project by June, 2016
- It will now bear 80 percent of the core project cost
- The relocation of the tanneries, however, still remains uncertain
Ruling
(BNP)
(BAL)
Caretaker
Government
Relocation Policy (Cont..)
Stakeholder Debate in Policy Implementation
“Environmental problems are typically complex, uncertain, multi-scale and affect
multiple actors and agencies. This demands transparent decision-making that is flexible
to changing circumstances, and embraces a diversity of knowledge and values. To
achieve this, stakeholder participation is increasingly being sought and embedded
into environmental decision making processes, from local to international
scales”(Reed, 2008)
•Relocation policy yet not been implemented
•The main factor played behind this lengthy policy implementation procedure is
extreme stakeholder debate and negotiation considering various economic and
socio-political issues
•Who are the stakeholder s? And their stakes?
Stakeholder Debate in Policy Implementation (Cont..)
•Area of the Rectangle Represents the Operational Scale or Number of the Actors
•Red Color Characterizes Negative Consent towards the Policy Tool and Green Color Symbolize the Opposite
•Width of the Arrow (Blue) Denotes Influence upon the Policy Measure (i.e. thick arrow = higher influence)
•Arrows in Black Represents the Relationship Between the Actors : Direction Represents the Orientation and Width
Symbolizes the Significance
Stakeholder Debate in Policy Implementation (Cont..)
Issue/Policy: Bangladesh Leather Processing Industry Relocation
Stakeholders Aspect of Involvement Goal/Interest
European Union Implementation Threatened to boycott for early implementation of the policy to
ensure a neat image worldwide of their supply chain
Human Rights Watch Implementation Protect the basic right of the exposed community through awareness
building
United Nations Industrial
Development Organization (UNIDO)
Implementation Provided an on-site solution and against the relocation because of
further risk of pollution via relocation in the upstream (Savar)
Bangladesh Small and Cottage
Industries Corporation (BSCIC)
Formulation &
Implementation
Relocation initiative under local and national pressure and to ensure
environmental compliance
Bangladesh Environmental Lawyers
Association (BELA)
Formulation Immediate relocation to protect the local environment specially the
adjacent Buriganga river
Asociación Cluster de Industrias de
MedioAmbiente de Euskadi
(ACLIMA) & Khulna University
Formulation Analyzed the present pollution scenario and proposed an extensive
and resource consumptive remediation plan for redevelopment in
present location; against the relocation in terms of research findings
Bangladesh Tanners Association
(BTA)
Formulation &
Implementation
Core opposition for relocation; negotiating for years regarding
compensation and other aids
Bangladesh Finished Leather,
Leather Goods & Footwear
Exporters’ Association (BFLLFEA)
Formulation &
Implementation
Co-core opposition for relocation; negotiating for years regarding
compensation and other aids
Workers Effect Tannery as the principal livelihood; physically victim for the delay in
policy implementation; will be also effected economically during and
after relocation
Exposed People Effect Wants early relocation to get rid of the severe health threat
Local Political Leaders Implementation Against the relocation; works for the interest of government as well
as tannery owners
Real Estate Developers Effect Hidden actor of the scenario; wants early relocation for the sake of
profit making through re-development
Evaluation of relocation process
Economic loss and benefit
•Played a vital role behind this extreme negotiation between the three key stakeholders - BSCIC, BTA
and BFLLFEA
•2003 government approved to bear 40 percent of the total cost (TK175.75 crore)whereas tanners had
to bear the rest
•The new target of relocation was set for June, 2016 resulting project cost spiraled near about 100
percent (TK1078.71 crore) in comparison to the starting point
•Now government is willing to bear 80 percent
•Tanners from the beginning negotiating about the compensation package as well as running business
in the current location considering further risk of pollution in Savar, cost-effectiveness of providing
CETP in Hazaribagh, production loss during relocation and other ‘pull factors’ of the current location
(i.e. transportation, utilities etc.)
Politically biased perspective
•First agreement reached about relocation (2003) the ruling government party was Bangladesh
Nationalist Party (BNP), who agreed to bear the cost of CETP
•2009 when Bangladesh Awami League (BAL) came into the power they refuse to bear the substantial
cost of CETP
•Tanners are divided among themselves according to political belief
Evaluation of relocation process (Cont…)
Lobbying
•Lobbying strongly by tanners due to their favorable economic, social and political position affected
the implementation of the policy further
•Due to their financial position they got strong linkages within government and negotiated with top
level of the country throughout these years without suffering any penalties
•Tanners continuously extended the time of relocation along with government in the face of several
ruling from High Court between this time periods
•‘lawyer’ “who represented the tannery associations in one petition to the High Court in February 2010
for an extension was ‘a member of the government’.
Regulatory Issues
•Regulatory chill and glacier pace of the government bureaucracy has been observed for the tanneries
which has been extrapolated during the study of Human Rights Watch (2012) and others.
•According to a Department of Environment official “there is a de facto policy not to monitor or
enforce environmental laws because the Ministry of Industries is preparing a site in Savar for
relocation of the tanneries. In the words of one official who requested anonymity, since the plan to
shift, the Department of Environment has been inactive”
Evaluation of relocation process (Cont…)
Disregard of alternatives
•EU put high pressure for relocation
•ACLIMA (2007) along with Khulna University Bangladesh conducted an extensive research on the
pollution of Hazaribagh and recommended to install CETP within it other than relocation
•UNIDO proposed an initiative to install CETP in Hazaribagh, but government opposed it with the
help of local political leaders
•Shifting is simple revenue earning for governments side and profit making for EU, as at new location
they (tanners) can expand their existing production scale, which in turn will result more cost-effective
supply for EU and more revenue for government
•The tanners also but they are concerned about their huge investment in Hazaribagh and production
loss during transition period
Top-down approach
•Failure of top-down approach, in other countries during tannery relocation due to owner’s strong
unwillingness should be also taken into consideration while judging this policy
•Stakeholder’s unwillingness and debate resulted failure of the policy measure (Case studies)
Evaluation of relocation process (Cont…)
Country India Egypt Mexico
City Tamil Nadu Cairo Leon
Number of Tanneries 577 320 675
The River Polluted Palar Nile Gomez
Causes of Failure of
Relocation Projects
Appeals from social
communities including
tannery owners
Unwillingness of the
tannery owners to assist
the government
in ownership and transfer
issues
No progress because
of the unwillingness of
the tannery owners
Reference Kennedy (1999) Bartone and Benavides
(1997)
Blackman (2000)
Source: Adopted and Reproduced from Bhowmik (2013, p.115)
Conclusion
• Hazaribagh tannery relocation Policy is an imposed decision on relevant stakeholders
(especially on tannery owners).
•It is necessary taking consent from the community affected before undertaking any project
for the sake of its success
•Government had taken the decision to ensure environmental decision which is also crucial
but selected the policy options without considering other alternatives and proper research
about further risk and sustainability
•Recent agreement about the relocation within June, 2016 is questionable by the concerned
people of this industry (Human Rights Watch, 2012) due to new debate about the increased
allotment cost and failure of similar attempt in other countries.
Thank You
ACLIMA. (2007). Site Remediation and Management Guidelines for Hazaribagh. Asociación Cluster de Industrias de Medio Ambiente
de Euskadi. Retrieved from
http://www.aclima.net/aclima/Web.nsf/vwPaginasPlanasWEB/9EA57521011F2A8EC1257457002DDFEA?Opendocument
Al-Muti, S. A., & Ahmad, N. (2013, November 13). Relocation a Boon for Bangladeshi Leather Sector. Retrieved December 6, 2013, from
http://asiafoundation.org/in-asia/2013/11/13/relocation-a-boon-for-bangladeshi-leather-sector/
Asaduzzaman, A. T. M., Nury, S. N., Hoque, S., & Sultana, S. (2004). Water and Soil Contamination from Tannery Waste: Potential
Impact on Public Health in Hazaribagh and Surroundings, Dhaka, Bangladesh. In The Ground Beneath Our Feet : A Factor in Urban
Planning (Vol. 14, pp. 415–443). New York, USA: United Nations, Economic and Social Commission for Asia and the Pacific.
Banglapedia. (2012). Dhaka. In National Encyclopedia of Bangladesh (2nd ed.). Dhaka, Bangladesh: Asiatic Society of Bangladesh.
Retrieved from http://www.banglapedia.org/HT/D_0171.htm
Bartone, C. R., & Benavides, L. (1997). Local Management of Hazardous Wastes from Small-Scale and Cottage Industries. Waste
Management & Research, 15(1), 3–21. http://doi.org/10.1177/0734242X9701500102
Bhowmik, A. K. (2012). Environmental Sustainability vs. Political Decision: A Review of the Bangladesh Leather Processing Industry
Relocation Plan (p. 26). Presented at the 2nd World Sustainability Forum, Basel, Switzerland: MDPI.
Bhowmik, A. K. (2013). Industries’ Location as Jeopardy for Sustainable Urban Development in Asia: A Review of the Bangladesh Leather
Processing Industry Relocation Plan. Environment and Urbanization Asia, 4(1), 93–119. http://doi.org/10.1177/0975425313477749
Bhowmik, A. K., & Islam, M. S. (2009). Relocation of Hazaribagh Tannery: Myth or Reality? (Bachelor Thesis). Department of Urban &
Regional Planning, Bangladesh University of Engineering & Technology, Dhaka.
Biswas, B., & Hamada, T. (2013). Relation Between Hazaribagh Tannery Industry Development and Buriganga River Pollution in
Bangladesh. International Journal of Environment, 2(2), 117–127.
Blackman, A. (2000). Making Small Beautiful - Lessons from Mexican Leather Tanneries and Brick Kilns. Small Enterprise Development,
11(2), 4–14. http://doi.org/10.3362/0957-1329.2000.016
Blacksmith Institute, & Green Cross Switzerland. (2013). The World’s Worst Polluted Places - Top Ten Toxic Threats in 2013: Cleanup,
Progress, and Ongoing Challenges (p. 35). New York: Blacksmith Institute & Green Cross Switzerland. Retrieved from
http://www.worstpolluted.org/docs/TopTenThreats2013.pdf
ELAW. (2012). Bangladesh - BELA v. Government of Bangladesh and Others (WP of 2003) (Tannery Case) (Original Petition). Retrieved
December 5, 2013, from http://www.elaw.org/node/2561
Goodland, R. (1995). The Concept of Environmental Sustainability. Annual Review of Ecology and Systematics, 26, 1–24.
Goodland, R. (2004). Free, Prior and Informed Consent and the World Bank Group. Sustainable Development Law & Policy, 4, 66–75.
Hasnain, S. A., Jawahar, S., & Porst, J. (1999). Assistance in Pollution Control in the Tanning Industry in South-East Asia
(US/RAS/92/120). United Nations Industrial Development Organization. Retrieved from
http://www.unido.org/fileadmin/import/43186_FINAL_EVAL_REPORT_19991007_USRAS92120.pdf
Hoque, A., & Clarke, A. (2013). Greening of Industries in Bangladesh: Pollution Prevention Practices. Journal of Cleaner Production, 51,
47–56. http://doi.org/10.1016/j.jclepro.2012.09.008
Hossain, B. (2012). Tannery. In National Encyclopedia of Bangladesh (2nd ed.). Dhaka, Bangladesh: Asiatic Society of Bangladesh.
Retrieved from http://www.banglapedia.org/HT/T_0055.htm
References
Hossain, S. (2008). Rapid Urban Growth and Poverty in Dhaka City. Bangladesh E-Journal of Sociology, 5(1), 1–24.
Human Rights Watch. (2012). Toxic Tanneries: The Health Repercussions of Bangladesh’s Hazaribagh Leather. United States of America: Human Rights Watch.
Human Rights Watch. (2013, March 4). Italy: Leather Buyers Beware. Retrieved October 10, 2013, from http://www.trust.org/item/?map=italy-leather-buyers-beware
IEDS. (2008). Tannery Shifting Stalled and Stuck in Court. Retrieved December 5, 2013, from http://www.iedsbd.org/tannery.html
Jibon, S. I. (2013, August 13). Tannery Relocation Project - Cost to be Doubled - Delay in Implementation, Govt. Move to Benefit Tannery Owners Blamed [Online
Newspaper]. Retrieved October 10, 2013, from http://newagebd.com/detail.php?date=2013-08-13&nid=60729#.UlagRVOGPSQ
Karim, M. R., Manshoven, S., Islam, M. R., Gascon, J. A., Ibarra, M., Diels, L., & Rahman, M. M. (2013). Assessment of an Urban Contaminated Site from Tannery
Industries in Dhaka City, Bangladesh. Journal of Hazardous, Toxic, and Radioactive Waste, 17(1), 52–61. http://doi.org/10.1061/(ASCE)HZ.2153-5515.0000139
Kennedy, L. (1999). Cooperating for Survival: Tannery Pollution and Joint Action in the Palar Valley (India). World Development, 27(9), 1673–1691.
http://doi.org/10.1016/S0305-750X(99)00080-7
Lanteigne, D. (2010, December 5). Colours of Water: Bangladesh’s Leather Tanneries. Retrieved December 5, 2013, from http://ourworld.unu.edu/en/colours-of-
water-bangladesh%E2%80%99s-leather-tanneries
Leather International. (2013, February 9). When Will It End? Reviewing the Dhaka Tannery Impasse. Leather International. UK. Retrieved from
http://www.leathermag.com/features/featurewhen-will-it-end-reviewing-the-dhakar-tannery-impasse/
MoEF. (1995). National Environment Management Action Plan (NEMAP) - 1995. Dhaka, Bangladesh: Ministry of Environment and Forests, Government of the
People’s Republic of Bangladesh.
MoEF. (2013). Bangladesh National Environmental Policy 2013 (Draft). Dhaka, Bangladesh: Ministry of Environment, Government of the Peoples Republic of
Bangladesh.
MoEF, GoB. (2010). Pollution Abatement Strategies for Rivers and Wetlands in and Around Dhaka City (Parliamentary Standing Committee Report on Ministry of
Environment & Forests). Dhaka: UNDP. Retrieved from
http://ext.bd.undp.org/CCED/bgdp/BGDP%20Materials/Review%20Documents/Pollution%20abatement%20strategies%20for%20river%20and%20wetland.pdf
Motlagh, J. (2013, March 9). Hell for Leather: Bangladesh’s Toxic Tanneries Ravage Lives and Environment.Time. Retrieved from
http://world.time.com/2013/09/03/hell-for-leather-bangladeshs-toxic-tanneries-ravage-lives-and-environment/
Paul, H. L., Antunes, A. P. M., Covington, A. D., Evans, P., & Phillips, P. S. (2013). Bangladeshi Leather Industry: An Overview of Recent Sustainable Developments.
Journal of the Society of Leather Technologists and Chemists, 97(1), 25–32.
Rabbani, M. G. (2009). Environmental Risks in Dhaka: Present Initiatives and the Future Improvements. In R. Shaw, H.Srinivas, & A. Sharma (Eds.), Community,
Environment and Disaster Risk Management (Vol. 1, pp. 319–338). Emerald Group Publishing Limited. Retrieved from
http://www.emeraldinsight.com/10.1108/S2040-7262(2009)0000001020
Reed, M. S. (2008). Stakeholder Participation for Environmental Management: A Literature Review. Biological Conservation, 141(10), 2417–2431.
http://doi.org/10.1016/j.biocon.2008.07.014
Saha, S. (2013, August 19). Tannery Relocation by 2016 [Online Newspaper]. Retrieved October 10, 2013, from http://www.thedailystar.net/beta2/news/tannery-
relocation-by-2016-barua-says/
Sarker, P. K., & Siddique, A. B. (2013, June 5). Hazardous Hazaribagh. Dhaka Tribune. Dhaka. Retrieved from
http://www.dhakatribune.com/environment/2013/jun/05/hazardous-hazaribagh
Sheltech. (2009). Preparation of Detailed Area Plan (DAP) for Location-1, 2, 20 of Dhaka Metropolitan Development Plan (DMDP) of RAJUK (Capital Development
Authority, Dhaka). Dhaka, Bangladesh: Sheltech Consultants Pvt. Ltd.
Sunny, F. A., Karimanzira, T., & Huang, Z. (2012). Environment Security: An Empirical Study of Industrialization and the Impact on Environment in the Dhaka
Division, Bangladesh. Environment, Development and Sustainability, 14(6), 885–900. http://doi.org/10.1007/s10668-012-9357-5
References

Weitere ähnliche Inhalte

Was ist angesagt?

Waste Manag Res-2016-Lakhan-0734242X16659923 (1)
Waste Manag Res-2016-Lakhan-0734242X16659923 (1)Waste Manag Res-2016-Lakhan-0734242X16659923 (1)
Waste Manag Res-2016-Lakhan-0734242X16659923 (1)Calvin Lakhan, Ph.D
 
IJCER (www.ijceronline.com) International Journal of computational Engineeri...
 IJCER (www.ijceronline.com) International Journal of computational Engineeri... IJCER (www.ijceronline.com) International Journal of computational Engineeri...
IJCER (www.ijceronline.com) International Journal of computational Engineeri...ijceronline
 
Carbon Impacts of paper manufacture literature review by RMIT
Carbon Impacts of paper manufacture literature review by RMITCarbon Impacts of paper manufacture literature review by RMIT
Carbon Impacts of paper manufacture literature review by RMITChristopher Sewell
 
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghana
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghanaFactors influencing-green-supply-chain-in-the-mining-sector-in-ghana
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghanakofi adu peprah
 
Item 7d. y.yamaguchi japan ver2
Item 7d. y.yamaguchi japan ver2Item 7d. y.yamaguchi japan ver2
Item 7d. y.yamaguchi japan ver2OECD Environment
 
Circular Economy: Where we stand and how we account for progress?
Circular Economy: Where we stand and how we account for progress?Circular Economy: Where we stand and how we account for progress?
Circular Economy: Where we stand and how we account for progress?OECD CFE
 
Sustainability and gren manufacturing presentation
Sustainability and gren manufacturing presentationSustainability and gren manufacturing presentation
Sustainability and gren manufacturing presentationsalman jafar
 
Will social media advertising be a sustainable development marketing strategy...
Will social media advertising be a sustainable development marketing strategy...Will social media advertising be a sustainable development marketing strategy...
Will social media advertising be a sustainable development marketing strategy...Christopher Sewell
 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...sbgjbritishcouncil
 
OECD Modelling Plastics Use Projections Workshop - IIASA
OECD Modelling Plastics Use Projections Workshop - IIASAOECD Modelling Plastics Use Projections Workshop - IIASA
OECD Modelling Plastics Use Projections Workshop - IIASAJack McNeill
 
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...ijiert bestjournal
 
OECD Modelling Plastics Use Projections Workshop - Shardul Agrawala
OECD Modelling Plastics Use Projections Workshop - Shardul AgrawalaOECD Modelling Plastics Use Projections Workshop - Shardul Agrawala
OECD Modelling Plastics Use Projections Workshop - Shardul AgrawalaJack McNeill
 
IRJET-Construction & Demolition Waste Management Practices in Construction in...
IRJET-Construction & Demolition Waste Management Practices in Construction in...IRJET-Construction & Demolition Waste Management Practices in Construction in...
IRJET-Construction & Demolition Waste Management Practices in Construction in...IRJET Journal
 
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar MuniyasamyHall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy7391456
 
OECD Modelling Plastics Use Projections Workshop - Roland Geyer
OECD Modelling Plastics Use Projections Workshop - Roland GeyerOECD Modelling Plastics Use Projections Workshop - Roland Geyer
OECD Modelling Plastics Use Projections Workshop - Roland GeyerJack McNeill
 
Recycling the waste materials to produce carbon fiber for reducing environmen...
Recycling the waste materials to produce carbon fiber for reducing environmen...Recycling the waste materials to produce carbon fiber for reducing environmen...
Recycling the waste materials to produce carbon fiber for reducing environmen...Saifuddin Rakib
 

Was ist angesagt? (19)

Waste Manag Res-2016-Lakhan-0734242X16659923 (1)
Waste Manag Res-2016-Lakhan-0734242X16659923 (1)Waste Manag Res-2016-Lakhan-0734242X16659923 (1)
Waste Manag Res-2016-Lakhan-0734242X16659923 (1)
 
Green textile production
Green textile productionGreen textile production
Green textile production
 
IJCER (www.ijceronline.com) International Journal of computational Engineeri...
 IJCER (www.ijceronline.com) International Journal of computational Engineeri... IJCER (www.ijceronline.com) International Journal of computational Engineeri...
IJCER (www.ijceronline.com) International Journal of computational Engineeri...
 
Carbon Impacts of paper manufacture literature review by RMIT
Carbon Impacts of paper manufacture literature review by RMITCarbon Impacts of paper manufacture literature review by RMIT
Carbon Impacts of paper manufacture literature review by RMIT
 
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghana
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghanaFactors influencing-green-supply-chain-in-the-mining-sector-in-ghana
Factors influencing-green-supply-chain-in-the-mining-sector-in-ghana
 
Item 7d. y.yamaguchi japan ver2
Item 7d. y.yamaguchi japan ver2Item 7d. y.yamaguchi japan ver2
Item 7d. y.yamaguchi japan ver2
 
Circular Economy: Where we stand and how we account for progress?
Circular Economy: Where we stand and how we account for progress?Circular Economy: Where we stand and how we account for progress?
Circular Economy: Where we stand and how we account for progress?
 
Sustainability and gren manufacturing presentation
Sustainability and gren manufacturing presentationSustainability and gren manufacturing presentation
Sustainability and gren manufacturing presentation
 
Will social media advertising be a sustainable development marketing strategy...
Will social media advertising be a sustainable development marketing strategy...Will social media advertising be a sustainable development marketing strategy...
Will social media advertising be a sustainable development marketing strategy...
 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
 
OECD Modelling Plastics Use Projections Workshop - IIASA
OECD Modelling Plastics Use Projections Workshop - IIASAOECD Modelling Plastics Use Projections Workshop - IIASA
OECD Modelling Plastics Use Projections Workshop - IIASA
 
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
 
OECD Modelling Plastics Use Projections Workshop - Shardul Agrawala
OECD Modelling Plastics Use Projections Workshop - Shardul AgrawalaOECD Modelling Plastics Use Projections Workshop - Shardul Agrawala
OECD Modelling Plastics Use Projections Workshop - Shardul Agrawala
 
IRJET-Construction & Demolition Waste Management Practices in Construction in...
IRJET-Construction & Demolition Waste Management Practices in Construction in...IRJET-Construction & Demolition Waste Management Practices in Construction in...
IRJET-Construction & Demolition Waste Management Practices in Construction in...
 
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar MuniyasamyHall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
 
OECD Modelling Plastics Use Projections Workshop - Roland Geyer
OECD Modelling Plastics Use Projections Workshop - Roland GeyerOECD Modelling Plastics Use Projections Workshop - Roland Geyer
OECD Modelling Plastics Use Projections Workshop - Roland Geyer
 
A012250107
A012250107A012250107
A012250107
 
C382135.pdf
C382135.pdfC382135.pdf
C382135.pdf
 
Recycling the waste materials to produce carbon fiber for reducing environmen...
Recycling the waste materials to produce carbon fiber for reducing environmen...Recycling the waste materials to produce carbon fiber for reducing environmen...
Recycling the waste materials to produce carbon fiber for reducing environmen...
 

Andere mochten auch

Study report on tannery industry in Bangladesh
Study report on tannery industry in BangladeshStudy report on tannery industry in Bangladesh
Study report on tannery industry in BangladeshPicard Bangladesh Limited
 
Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development  Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development Shahadat Hossain Shakil
 
Policy implementation: the influence of frontline staff, the nature and meani...
Policy implementation: the influence of frontline staff, the nature and meani...Policy implementation: the influence of frontline staff, the nature and meani...
Policy implementation: the influence of frontline staff, the nature and meani...CREHS
 
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaAssessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaShahadat Hossain Shakil
 
Ecological Footprint as a Sustainability Indicator
Ecological Footprint as a Sustainability IndicatorEcological Footprint as a Sustainability Indicator
Ecological Footprint as a Sustainability IndicatorShahadat Hossain Shakil
 
Cuda基本介绍
Cuda基本介绍Cuda基本介绍
Cuda基本介绍caolejun
 
Image of Chawk Bazar an Analysis from Physical and Socio Economic Perspectives
Image of Chawk Bazar an Analysis from Physical and Socio Economic PerspectivesImage of Chawk Bazar an Analysis from Physical and Socio Economic Perspectives
Image of Chawk Bazar an Analysis from Physical and Socio Economic PerspectivesShahadat Hossain Shakil
 
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Shahadat Hossain Shakil
 
Foursquare per sales i clubs
Foursquare per sales i clubsFoursquare per sales i clubs
Foursquare per sales i clubsSem Pons Puig
 
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Shahadat Hossain Shakil
 
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Shahadat Hossain Shakil
 
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...Shahadat Hossain Shakil
 
Topographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsTopographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsShahadat Hossain Shakil
 
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Shahadat Hossain Shakil
 
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Shahadat Hossain Shakil
 
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Shahadat Hossain Shakil
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh PerspectiveShahadat Hossain Shakil
 
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Shahadat Hossain Shakil
 

Andere mochten auch (20)

Study report on tannery industry in Bangladesh
Study report on tannery industry in BangladeshStudy report on tannery industry in Bangladesh
Study report on tannery industry in Bangladesh
 
Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development  Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development
 
Policy implementation: the influence of frontline staff, the nature and meani...
Policy implementation: the influence of frontline staff, the nature and meani...Policy implementation: the influence of frontline staff, the nature and meani...
Policy implementation: the influence of frontline staff, the nature and meani...
 
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaAssessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
 
Policy Implementation
Policy Implementation Policy Implementation
Policy Implementation
 
Ecological Footprint as a Sustainability Indicator
Ecological Footprint as a Sustainability IndicatorEcological Footprint as a Sustainability Indicator
Ecological Footprint as a Sustainability Indicator
 
Ua nmp session1
Ua nmp session1Ua nmp session1
Ua nmp session1
 
Cuda基本介绍
Cuda基本介绍Cuda基本介绍
Cuda基本介绍
 
Image of Chawk Bazar an Analysis from Physical and Socio Economic Perspectives
Image of Chawk Bazar an Analysis from Physical and Socio Economic PerspectivesImage of Chawk Bazar an Analysis from Physical and Socio Economic Perspectives
Image of Chawk Bazar an Analysis from Physical and Socio Economic Perspectives
 
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
 
Foursquare per sales i clubs
Foursquare per sales i clubsFoursquare per sales i clubs
Foursquare per sales i clubs
 
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
 
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
 
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...
Exploration of Pipeline Water System in Doldoli Tea Garden and Its Feasibilit...
 
Topographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsTopographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and Tectonics
 
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
 
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
 
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
 
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
Sustainable City Design: Developing Conceptual Planning Proposal for Eastern ...
 

Ähnlich wie Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leather Processing Industry Relocation Policy

Green rating of industries
Green rating of industriesGreen rating of industries
Green rating of industriesPallavi Kaul
 
EIA Report Preparation and its Challenges.pptx
 EIA Report Preparation and its Challenges.pptx EIA Report Preparation and its Challenges.pptx
EIA Report Preparation and its Challenges.pptxAmit Chaudhary
 
impact assesment .pptx
impact assesment .pptximpact assesment .pptx
impact assesment .pptxSaikumar281375
 
Strategicv5
Strategicv5Strategicv5
Strategicv5zurasco
 
REDD+ social safeguards in Indonesia: Opportunities and challenges
REDD+ social safeguards in Indonesia:  Opportunities and challengesREDD+ social safeguards in Indonesia:  Opportunities and challenges
REDD+ social safeguards in Indonesia: Opportunities and challengesCIFOR-ICRAF
 
Capstone Project_2013-15
Capstone Project_2013-15Capstone Project_2013-15
Capstone Project_2013-15Priyankur Dhar
 
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...Hari Shrestha
 
Global Comparative Study on REDD+: Inputs for ASEAN region
Global Comparative Study on REDD+: Inputs for ASEAN regionGlobal Comparative Study on REDD+: Inputs for ASEAN region
Global Comparative Study on REDD+: Inputs for ASEAN regionCIFOR-ICRAF
 
National & International Trends in CSR
National & International Trends in CSRNational & International Trends in CSR
National & International Trends in CSRIshan Parekh
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11shivram21957
 
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...OECD Environment
 
Sustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxSustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxTantish QS, UTM
 
1 transparency mechanism (english)
1 transparency mechanism (english)1 transparency mechanism (english)
1 transparency mechanism (english)Article33
 
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...Shahadat Hossain Shakil
 

Ähnlich wie Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leather Processing Industry Relocation Policy (20)

cdm-india.pdf
cdm-india.pdfcdm-india.pdf
cdm-india.pdf
 
cdm-india.pdf
cdm-india.pdfcdm-india.pdf
cdm-india.pdf
 
cdm-india.pdf
cdm-india.pdfcdm-india.pdf
cdm-india.pdf
 
Green rating of industries
Green rating of industriesGreen rating of industries
Green rating of industries
 
EIA Report Preparation and its Challenges.pptx
 EIA Report Preparation and its Challenges.pptx EIA Report Preparation and its Challenges.pptx
EIA Report Preparation and its Challenges.pptx
 
impact assesment .pptx
impact assesment .pptximpact assesment .pptx
impact assesment .pptx
 
Strategicv5
Strategicv5Strategicv5
Strategicv5
 
REDD+ social safeguards in Indonesia: Opportunities and challenges
REDD+ social safeguards in Indonesia:  Opportunities and challengesREDD+ social safeguards in Indonesia:  Opportunities and challenges
REDD+ social safeguards in Indonesia: Opportunities and challenges
 
Capstone Project_2013-15
Capstone Project_2013-15Capstone Project_2013-15
Capstone Project_2013-15
 
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...
Professional Ethics in Engineering Chapter 5 Contemporary and Emerging issues...
 
Global Comparative Study on REDD+: Inputs for ASEAN region
Global Comparative Study on REDD+: Inputs for ASEAN regionGlobal Comparative Study on REDD+: Inputs for ASEAN region
Global Comparative Study on REDD+: Inputs for ASEAN region
 
National & International Trends in CSR
National & International Trends in CSRNational & International Trends in CSR
National & International Trends in CSR
 
ADB Loan
ADB LoanADB Loan
ADB Loan
 
ADB Loan
ADB LoanADB Loan
ADB Loan
 
Principles for public-private partnerships – towards sustainability? Lessons ...
Principles for public-private partnerships – towards sustainability? Lessons ...Principles for public-private partnerships – towards sustainability? Lessons ...
Principles for public-private partnerships – towards sustainability? Lessons ...
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11
 
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...
Opening Session - Scene-setting Presentation by Korean Ambassador to the OECD...
 
Sustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxSustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptx
 
1 transparency mechanism (english)
1 transparency mechanism (english)1 transparency mechanism (english)
1 transparency mechanism (english)
 
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...
Corporate Social Responsibility (CSR) – Environmental Protection or Creating ...
 

Mehr von Shahadat Hossain Shakil

Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...Shahadat Hossain Shakil
 
Potential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshPotential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshShahadat Hossain Shakil
 
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Shahadat Hossain Shakil
 
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Shahadat Hossain Shakil
 
Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Shahadat Hossain Shakil
 
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Shahadat Hossain Shakil
 
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Shahadat Hossain Shakil
 
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shahadat Hossain Shakil
 
Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Shahadat Hossain Shakil
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3Shahadat Hossain Shakil
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2Shahadat Hossain Shakil
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1Shahadat Hossain Shakil
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Shahadat Hossain Shakil
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Shahadat Hossain Shakil
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Shahadat Hossain Shakil
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Shahadat Hossain Shakil
 

Mehr von Shahadat Hossain Shakil (19)

Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021
 
CV_Shakil_vApr-2020
CV_Shakil_vApr-2020CV_Shakil_vApr-2020
CV_Shakil_vApr-2020
 
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
 
Potential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshPotential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in Bangladesh
 
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
 
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
 
Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...
 
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
 
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...Technical and Financial Proposal-Consultancy Services for the Preparation of ...
Technical and Financial Proposal-Consultancy Services for the Preparation of ...
 
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
 
Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”
 
Key Debates in Environmental Governance
Key Debates in Environmental GovernanceKey Debates in Environmental Governance
Key Debates in Environmental Governance
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 3
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 2
 
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1
EIA Guidelines for Industries_Bangladesh_DoE, MoEF, GoB_June 1997_Part 1
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
 

Kürzlich hochgeladen

办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书zdzoqco
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Call Girls Mumbai
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMijsc
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022herebasit
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 

Kürzlich hochgeladen (20)

办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022World Environment Day PPT slides for Earth DAy arpil 2022
World Environment Day PPT slides for Earth DAy arpil 2022
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 

Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leather Processing Industry Relocation Policy

  • 1. P R E P A R E D B Y S H A H A D A T H O S S A I N S H A K I L ( U S A I D / B A N G L A D E S H ) , S . M . L A B I B ( D E P T . O F U R B A N A N D R E G I O N A L P L A N N I N G , B A N G L A D E S H U N I V E R S I T Y O F E N G I N E E R I N G A N D T E C H N O L O G Y ) , M D . S H A K I L K H A N ( D E P T . O F U R B A N A N D R E G I O N A L P L A N N I N G , K H U L N A U N I V E R S I T Y O F E N G I N E E R I N G A N D T E C H N O L O G Y , K H U L N A ) Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leather Processing Industry Relocation Policy Annual Conference on Recent Research on Urbanization in Bangladesh 2015 The 43rd Anniversary of the Centre for Urban Studies (CUS), Dhaka
  • 2. Introduction • Hazaribagh tannery area has been ranked within world’s top ten worst place for toxic threat •This leather processing industry is surrounded by some of the prestigious residential area of Dhaka city •Liquid effluent and solid waste eventually find its way to Dhaka’s main river Buriganga and destroying the aquatic life of the river •This area has disastrous impact on surface and ground water of the city and health of exposed population •This tannery has been a major polluter for Dhaka city environment and ecology as well as the urban structure
  • 3. Bangladesh Leather Processing Industry Relocation Policy • In response to the criticisms from local community, scientific group and international and local environmental watchdogs, government began to think about the relocation of this industry from city center towards outskirts since the 1991 •Tannery industry supposed to be relocated to Savar (outskirt of Dhaka and more upstream) for ensuring planned development through establishment of Common Effluent Treatment Plant (CETP) within a “Tannery Industry Town”. •Total 205 plot has been developed over 200 acres of land and distributed among 155 tanneries Present Proposed
  • 4. Year Event Pre-liberation 1940 Establishment of first tannery Post-liberation 1972 Government formed Bangladesh Tanneries Corporation (BTC) 1982 Failing to make profit, government transferred the ownership to private body 1986 Government ordered 903 polluting factories (including the Hazaribagh tanneries) to adopt measures to control their pollution within three years 1991 The question of relocation began to be discussed among policy makers 1993 It was decided that tanneries will shift to Savar 2001 High Court of Bangladesh ordered polluting factories (including the Hazaribagh tanneries) to adopt adequate measures to control pollution within one year 2002 Relocation policy announced by that time prime minister of Bangladesh Nationalist Party (BNP) 2003 (Oct, 23rd) - Government and tannery owners signed an agreement - Government (BNP) pledged to provide financial assistance of 40% - “Tannery Industry Town-Savar, Dhaka” Project was initiated to be completed by December, 2005 2005 The project was revised to be completed within May, 2009 2006 - Government allocated 205 plots. - No firm participated in the first tender for CETP (Common Effluent Treatment Plant ) - Second tender for CETP, only one firm responded 2007 - Two firms responded to the third bid call, 2008 - all the tanneries shall shift within February, 2010 2009 - The government in that time (Bangladesh Awami League) said it would not bear the cost of CETP, the owners will have to pay for it - High Court ruled government to ensure relocation by February, 2010, “failing of which [they] shall be shut down” 2010 - The tender of CETP was floated for the fourth time 2012 Chinese joint venture JLEPCL-DCL was awarded the contract of CETP 2013 - European Union (chief buyer of Bangladeshi leather exports) threatened to boycott the country's products - Government targeted to complete the project by June, 2016 - It will now bear 80 percent of the core project cost - The relocation of the tanneries, however, still remains uncertain Ruling (BNP) (BAL) Caretaker Government Relocation Policy (Cont..)
  • 5. Stakeholder Debate in Policy Implementation “Environmental problems are typically complex, uncertain, multi-scale and affect multiple actors and agencies. This demands transparent decision-making that is flexible to changing circumstances, and embraces a diversity of knowledge and values. To achieve this, stakeholder participation is increasingly being sought and embedded into environmental decision making processes, from local to international scales”(Reed, 2008) •Relocation policy yet not been implemented •The main factor played behind this lengthy policy implementation procedure is extreme stakeholder debate and negotiation considering various economic and socio-political issues •Who are the stakeholder s? And their stakes?
  • 6. Stakeholder Debate in Policy Implementation (Cont..) •Area of the Rectangle Represents the Operational Scale or Number of the Actors •Red Color Characterizes Negative Consent towards the Policy Tool and Green Color Symbolize the Opposite •Width of the Arrow (Blue) Denotes Influence upon the Policy Measure (i.e. thick arrow = higher influence) •Arrows in Black Represents the Relationship Between the Actors : Direction Represents the Orientation and Width Symbolizes the Significance
  • 7. Stakeholder Debate in Policy Implementation (Cont..) Issue/Policy: Bangladesh Leather Processing Industry Relocation Stakeholders Aspect of Involvement Goal/Interest European Union Implementation Threatened to boycott for early implementation of the policy to ensure a neat image worldwide of their supply chain Human Rights Watch Implementation Protect the basic right of the exposed community through awareness building United Nations Industrial Development Organization (UNIDO) Implementation Provided an on-site solution and against the relocation because of further risk of pollution via relocation in the upstream (Savar) Bangladesh Small and Cottage Industries Corporation (BSCIC) Formulation & Implementation Relocation initiative under local and national pressure and to ensure environmental compliance Bangladesh Environmental Lawyers Association (BELA) Formulation Immediate relocation to protect the local environment specially the adjacent Buriganga river Asociación Cluster de Industrias de MedioAmbiente de Euskadi (ACLIMA) & Khulna University Formulation Analyzed the present pollution scenario and proposed an extensive and resource consumptive remediation plan for redevelopment in present location; against the relocation in terms of research findings Bangladesh Tanners Association (BTA) Formulation & Implementation Core opposition for relocation; negotiating for years regarding compensation and other aids Bangladesh Finished Leather, Leather Goods & Footwear Exporters’ Association (BFLLFEA) Formulation & Implementation Co-core opposition for relocation; negotiating for years regarding compensation and other aids Workers Effect Tannery as the principal livelihood; physically victim for the delay in policy implementation; will be also effected economically during and after relocation Exposed People Effect Wants early relocation to get rid of the severe health threat Local Political Leaders Implementation Against the relocation; works for the interest of government as well as tannery owners Real Estate Developers Effect Hidden actor of the scenario; wants early relocation for the sake of profit making through re-development
  • 8. Evaluation of relocation process Economic loss and benefit •Played a vital role behind this extreme negotiation between the three key stakeholders - BSCIC, BTA and BFLLFEA •2003 government approved to bear 40 percent of the total cost (TK175.75 crore)whereas tanners had to bear the rest •The new target of relocation was set for June, 2016 resulting project cost spiraled near about 100 percent (TK1078.71 crore) in comparison to the starting point •Now government is willing to bear 80 percent •Tanners from the beginning negotiating about the compensation package as well as running business in the current location considering further risk of pollution in Savar, cost-effectiveness of providing CETP in Hazaribagh, production loss during relocation and other ‘pull factors’ of the current location (i.e. transportation, utilities etc.) Politically biased perspective •First agreement reached about relocation (2003) the ruling government party was Bangladesh Nationalist Party (BNP), who agreed to bear the cost of CETP •2009 when Bangladesh Awami League (BAL) came into the power they refuse to bear the substantial cost of CETP •Tanners are divided among themselves according to political belief
  • 9. Evaluation of relocation process (Cont…) Lobbying •Lobbying strongly by tanners due to their favorable economic, social and political position affected the implementation of the policy further •Due to their financial position they got strong linkages within government and negotiated with top level of the country throughout these years without suffering any penalties •Tanners continuously extended the time of relocation along with government in the face of several ruling from High Court between this time periods •‘lawyer’ “who represented the tannery associations in one petition to the High Court in February 2010 for an extension was ‘a member of the government’. Regulatory Issues •Regulatory chill and glacier pace of the government bureaucracy has been observed for the tanneries which has been extrapolated during the study of Human Rights Watch (2012) and others. •According to a Department of Environment official “there is a de facto policy not to monitor or enforce environmental laws because the Ministry of Industries is preparing a site in Savar for relocation of the tanneries. In the words of one official who requested anonymity, since the plan to shift, the Department of Environment has been inactive”
  • 10. Evaluation of relocation process (Cont…) Disregard of alternatives •EU put high pressure for relocation •ACLIMA (2007) along with Khulna University Bangladesh conducted an extensive research on the pollution of Hazaribagh and recommended to install CETP within it other than relocation •UNIDO proposed an initiative to install CETP in Hazaribagh, but government opposed it with the help of local political leaders •Shifting is simple revenue earning for governments side and profit making for EU, as at new location they (tanners) can expand their existing production scale, which in turn will result more cost-effective supply for EU and more revenue for government •The tanners also but they are concerned about their huge investment in Hazaribagh and production loss during transition period
  • 11. Top-down approach •Failure of top-down approach, in other countries during tannery relocation due to owner’s strong unwillingness should be also taken into consideration while judging this policy •Stakeholder’s unwillingness and debate resulted failure of the policy measure (Case studies) Evaluation of relocation process (Cont…) Country India Egypt Mexico City Tamil Nadu Cairo Leon Number of Tanneries 577 320 675 The River Polluted Palar Nile Gomez Causes of Failure of Relocation Projects Appeals from social communities including tannery owners Unwillingness of the tannery owners to assist the government in ownership and transfer issues No progress because of the unwillingness of the tannery owners Reference Kennedy (1999) Bartone and Benavides (1997) Blackman (2000) Source: Adopted and Reproduced from Bhowmik (2013, p.115)
  • 12. Conclusion • Hazaribagh tannery relocation Policy is an imposed decision on relevant stakeholders (especially on tannery owners). •It is necessary taking consent from the community affected before undertaking any project for the sake of its success •Government had taken the decision to ensure environmental decision which is also crucial but selected the policy options without considering other alternatives and proper research about further risk and sustainability •Recent agreement about the relocation within June, 2016 is questionable by the concerned people of this industry (Human Rights Watch, 2012) due to new debate about the increased allotment cost and failure of similar attempt in other countries.
  • 14. ACLIMA. (2007). Site Remediation and Management Guidelines for Hazaribagh. Asociación Cluster de Industrias de Medio Ambiente de Euskadi. Retrieved from http://www.aclima.net/aclima/Web.nsf/vwPaginasPlanasWEB/9EA57521011F2A8EC1257457002DDFEA?Opendocument Al-Muti, S. A., & Ahmad, N. (2013, November 13). Relocation a Boon for Bangladeshi Leather Sector. Retrieved December 6, 2013, from http://asiafoundation.org/in-asia/2013/11/13/relocation-a-boon-for-bangladeshi-leather-sector/ Asaduzzaman, A. T. M., Nury, S. N., Hoque, S., & Sultana, S. (2004). Water and Soil Contamination from Tannery Waste: Potential Impact on Public Health in Hazaribagh and Surroundings, Dhaka, Bangladesh. In The Ground Beneath Our Feet : A Factor in Urban Planning (Vol. 14, pp. 415–443). New York, USA: United Nations, Economic and Social Commission for Asia and the Pacific. Banglapedia. (2012). Dhaka. In National Encyclopedia of Bangladesh (2nd ed.). Dhaka, Bangladesh: Asiatic Society of Bangladesh. Retrieved from http://www.banglapedia.org/HT/D_0171.htm Bartone, C. R., & Benavides, L. (1997). Local Management of Hazardous Wastes from Small-Scale and Cottage Industries. Waste Management & Research, 15(1), 3–21. http://doi.org/10.1177/0734242X9701500102 Bhowmik, A. K. (2012). Environmental Sustainability vs. Political Decision: A Review of the Bangladesh Leather Processing Industry Relocation Plan (p. 26). Presented at the 2nd World Sustainability Forum, Basel, Switzerland: MDPI. Bhowmik, A. K. (2013). Industries’ Location as Jeopardy for Sustainable Urban Development in Asia: A Review of the Bangladesh Leather Processing Industry Relocation Plan. Environment and Urbanization Asia, 4(1), 93–119. http://doi.org/10.1177/0975425313477749 Bhowmik, A. K., & Islam, M. S. (2009). Relocation of Hazaribagh Tannery: Myth or Reality? (Bachelor Thesis). Department of Urban & Regional Planning, Bangladesh University of Engineering & Technology, Dhaka. Biswas, B., & Hamada, T. (2013). Relation Between Hazaribagh Tannery Industry Development and Buriganga River Pollution in Bangladesh. International Journal of Environment, 2(2), 117–127. Blackman, A. (2000). Making Small Beautiful - Lessons from Mexican Leather Tanneries and Brick Kilns. Small Enterprise Development, 11(2), 4–14. http://doi.org/10.3362/0957-1329.2000.016 Blacksmith Institute, & Green Cross Switzerland. (2013). The World’s Worst Polluted Places - Top Ten Toxic Threats in 2013: Cleanup, Progress, and Ongoing Challenges (p. 35). New York: Blacksmith Institute & Green Cross Switzerland. Retrieved from http://www.worstpolluted.org/docs/TopTenThreats2013.pdf ELAW. (2012). Bangladesh - BELA v. Government of Bangladesh and Others (WP of 2003) (Tannery Case) (Original Petition). Retrieved December 5, 2013, from http://www.elaw.org/node/2561 Goodland, R. (1995). The Concept of Environmental Sustainability. Annual Review of Ecology and Systematics, 26, 1–24. Goodland, R. (2004). Free, Prior and Informed Consent and the World Bank Group. Sustainable Development Law & Policy, 4, 66–75. Hasnain, S. A., Jawahar, S., & Porst, J. (1999). Assistance in Pollution Control in the Tanning Industry in South-East Asia (US/RAS/92/120). United Nations Industrial Development Organization. Retrieved from http://www.unido.org/fileadmin/import/43186_FINAL_EVAL_REPORT_19991007_USRAS92120.pdf Hoque, A., & Clarke, A. (2013). Greening of Industries in Bangladesh: Pollution Prevention Practices. Journal of Cleaner Production, 51, 47–56. http://doi.org/10.1016/j.jclepro.2012.09.008 Hossain, B. (2012). Tannery. In National Encyclopedia of Bangladesh (2nd ed.). Dhaka, Bangladesh: Asiatic Society of Bangladesh. Retrieved from http://www.banglapedia.org/HT/T_0055.htm References
  • 15. Hossain, S. (2008). Rapid Urban Growth and Poverty in Dhaka City. Bangladesh E-Journal of Sociology, 5(1), 1–24. Human Rights Watch. (2012). Toxic Tanneries: The Health Repercussions of Bangladesh’s Hazaribagh Leather. United States of America: Human Rights Watch. Human Rights Watch. (2013, March 4). Italy: Leather Buyers Beware. Retrieved October 10, 2013, from http://www.trust.org/item/?map=italy-leather-buyers-beware IEDS. (2008). Tannery Shifting Stalled and Stuck in Court. Retrieved December 5, 2013, from http://www.iedsbd.org/tannery.html Jibon, S. I. (2013, August 13). Tannery Relocation Project - Cost to be Doubled - Delay in Implementation, Govt. Move to Benefit Tannery Owners Blamed [Online Newspaper]. Retrieved October 10, 2013, from http://newagebd.com/detail.php?date=2013-08-13&nid=60729#.UlagRVOGPSQ Karim, M. R., Manshoven, S., Islam, M. R., Gascon, J. A., Ibarra, M., Diels, L., & Rahman, M. M. (2013). Assessment of an Urban Contaminated Site from Tannery Industries in Dhaka City, Bangladesh. Journal of Hazardous, Toxic, and Radioactive Waste, 17(1), 52–61. http://doi.org/10.1061/(ASCE)HZ.2153-5515.0000139 Kennedy, L. (1999). Cooperating for Survival: Tannery Pollution and Joint Action in the Palar Valley (India). World Development, 27(9), 1673–1691. http://doi.org/10.1016/S0305-750X(99)00080-7 Lanteigne, D. (2010, December 5). Colours of Water: Bangladesh’s Leather Tanneries. Retrieved December 5, 2013, from http://ourworld.unu.edu/en/colours-of- water-bangladesh%E2%80%99s-leather-tanneries Leather International. (2013, February 9). When Will It End? Reviewing the Dhaka Tannery Impasse. Leather International. UK. Retrieved from http://www.leathermag.com/features/featurewhen-will-it-end-reviewing-the-dhakar-tannery-impasse/ MoEF. (1995). National Environment Management Action Plan (NEMAP) - 1995. Dhaka, Bangladesh: Ministry of Environment and Forests, Government of the People’s Republic of Bangladesh. MoEF. (2013). Bangladesh National Environmental Policy 2013 (Draft). Dhaka, Bangladesh: Ministry of Environment, Government of the Peoples Republic of Bangladesh. MoEF, GoB. (2010). Pollution Abatement Strategies for Rivers and Wetlands in and Around Dhaka City (Parliamentary Standing Committee Report on Ministry of Environment & Forests). Dhaka: UNDP. Retrieved from http://ext.bd.undp.org/CCED/bgdp/BGDP%20Materials/Review%20Documents/Pollution%20abatement%20strategies%20for%20river%20and%20wetland.pdf Motlagh, J. (2013, March 9). Hell for Leather: Bangladesh’s Toxic Tanneries Ravage Lives and Environment.Time. Retrieved from http://world.time.com/2013/09/03/hell-for-leather-bangladeshs-toxic-tanneries-ravage-lives-and-environment/ Paul, H. L., Antunes, A. P. M., Covington, A. D., Evans, P., & Phillips, P. S. (2013). Bangladeshi Leather Industry: An Overview of Recent Sustainable Developments. Journal of the Society of Leather Technologists and Chemists, 97(1), 25–32. Rabbani, M. G. (2009). Environmental Risks in Dhaka: Present Initiatives and the Future Improvements. In R. Shaw, H.Srinivas, & A. Sharma (Eds.), Community, Environment and Disaster Risk Management (Vol. 1, pp. 319–338). Emerald Group Publishing Limited. Retrieved from http://www.emeraldinsight.com/10.1108/S2040-7262(2009)0000001020 Reed, M. S. (2008). Stakeholder Participation for Environmental Management: A Literature Review. Biological Conservation, 141(10), 2417–2431. http://doi.org/10.1016/j.biocon.2008.07.014 Saha, S. (2013, August 19). Tannery Relocation by 2016 [Online Newspaper]. Retrieved October 10, 2013, from http://www.thedailystar.net/beta2/news/tannery- relocation-by-2016-barua-says/ Sarker, P. K., & Siddique, A. B. (2013, June 5). Hazardous Hazaribagh. Dhaka Tribune. Dhaka. Retrieved from http://www.dhakatribune.com/environment/2013/jun/05/hazardous-hazaribagh Sheltech. (2009). Preparation of Detailed Area Plan (DAP) for Location-1, 2, 20 of Dhaka Metropolitan Development Plan (DMDP) of RAJUK (Capital Development Authority, Dhaka). Dhaka, Bangladesh: Sheltech Consultants Pvt. Ltd. Sunny, F. A., Karimanzira, T., & Huang, Z. (2012). Environment Security: An Empirical Study of Industrialization and the Impact on Environment in the Dhaka Division, Bangladesh. Environment, Development and Sustainability, 14(6), 885–900. http://doi.org/10.1007/s10668-012-9357-5 References